The project includes rebuilding about 2 miles of 34.5 kilovolt (kV) transmission line to 69 kV standards. The improvements: • Strengthen the local electric transmission system • Reduce the likelihood of power outages • Speed recovery of service when outages occur • Prepares the local electric system to support future needs in the area The upgrades take place in the Yorktown area. The proposed route travels north from an electrical substation located northeast of the intersection of South Nebo and West River roads along the western side of Yorktown. The line then follows the railroad east. WHAT WHY WHERE YORKTOWN AREA IMPROVEMENTS Indiana Michigan Power (I&M) plans power grid upgrades to increase electric reliability in eastern Indiana. The Yorktown Area Improvements Project involves upgrading about 2 miles of electric transmission line. PROJECT SCHEDULE PROJECT ANNOUNCEMENT & OPEN HOUSE Summer 2019 FINAL LINE ROUTE ANNOUNCEMENT Late Fall 2019 RIGHT-OF-WAY ACTIVITIES Late Fall 2019 - Late 2021 TRANSMISSION LINE CONSTRUCTION Early 2022 - Summer 2022 RESTORATION Fall 2022 FACILITIES PLACED IN SERVICE Summer 2022 FIELD SURVEYS & ENGINEERING Spring 2020 - Late 2020 PRE-CONSTRUCTION ACTIVITIES Fall 2021 - Early 2022 *Timeline subject to change. *Timeline subject to change. 2019 2020 2022 2021 2023

Transcript of Yorktown Factsheet V5 - American Electric Power · 2019. 9. 19. · YORKTOWN AREA IMPROVEMENTS...

Page 1: Yorktown Factsheet V5 - American Electric Power · 2019. 9. 19. · YORKTOWN AREA IMPROVEMENTS PROJECT PROPOSED ROUTE EXISTING TRANSMISSION LINE EXISTING SUBSTATION *Exact structure,

The project includes rebuilding about 2 miles

of 34.5 kilovolt (kV) transmission line to 69

kV standards.

The improvements:

• Strengthen the local electric transmission

system

• Reduce the likelihood of power outages

• Speed recovery of service when outages occur

• Prepares the local electric system to support

future needs in the area

The upgrades take place in

the Yorktown area. The

proposed route travels

north from an electrical

substation located

northeast of the

intersection of South

Nebo and West River roads along the western

side of Yorktown. The line then follows the

railroad east.

WHAT WHY WHERE

YORKTOWNAREA IMPROVEMENTS

Indiana Michigan Power (I&M) plans power

grid upgrades to increase electric reliability

in eastern Indiana. The Yorktown Area

Improvements Project involves upgrading

about 2 miles of electric transmission line.

PROJECT SCHEDULE

PROJECT ANNOUNCEMENT & OPEN HOUSESummer 2019

FINAL LINE ROUTE ANNOUNCEMENTLate Fall 2019

RIGHT-OF-WAY ACTIVITIESLate Fall 2019 - Late 2021

TRANSMISSION LINE CONSTRUCTIONEarly 2022 - Summer 2022

RESTORATIONFall 2022

FACILITIES PLACED IN SERVICESummer 2022

FIELD SURVEYS & ENGINEERINGSpring 2020 - Late 2020

PRE-CONSTRUCTION ACTIVITIESFall 2021 - Early 2022

*Timeline subject to change.*Timeline subject to change.

2019 2020 20222021 2023

Page 2: Yorktown Factsheet V5 - American Electric Power · 2019. 9. 19. · YORKTOWN AREA IMPROVEMENTS PROJECT PROPOSED ROUTE EXISTING TRANSMISSION LINE EXISTING SUBSTATION *Exact structure,

YORKTOWNYORKTOWN

W CO RD 50 SW CO RD 50 S

W JACKSON ST

W JACKSON ST

W PINERIDGE RD

W PINERIDGE RD

300

W30

0 W

W KILGORE AVEW KILGORE AVE

N M

ORRI

SON

RD

N M

ORRI

SON

RD

l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l

ARNOLDSUBSTATION

YORKTOWN AREA IMPROVEMENTS PROJECT

PROPOSED ROUTE

EXISTING SUBSTATIONEXISTING TRANSMISSION LINE

*Exact structure, height and right-of-wayrequirements may vary

I&M will build the line with steel monopole structures

averaging 75-feet in height. Structures will be placed within

a 60-foot right-of-way.

I&M is committed to meeting the energy needs of

customers while protecting the environment and natural

beauty of the region.

TYPICAL STRUCTURES

I&M VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS TO:

09/17/201909/17/2019

Indiana Michigan Powerc/o Scott YarbroughP.O. Box 60Fort Wayne, IN 46801

@ [email protected]

(260) 466-7929

IndianaMichiganPower.com/Yorktown