Yhteistoimintaprosessien hallinta projekti- ja ... · 19.4.2010 plib-iso-iec-din jemima 501 jeita...
Transcript of Yhteistoimintaprosessien hallinta projekti- ja ... · 19.4.2010 plib-iso-iec-din jemima 501 jeita...
XIV PSK & BUILDING SMART ASIANTUNTIJASEMINAARI
9.4.2010
HOTELLI ISOVALKEINEN KUOPIO
Arto Marttinen
DAMO Tec Oy
Yhteistoimintaprosessien hallinta projekti-
ja palveluorganisaatioden verkostoissa
DAMO Tec lyhyesti
Date/Title/Author
2
Yksityishenkilöiden omistama muutamien kuukausien ikäinen
teknologia- ja konsultointiyritys
Toimipaikat Helsinki ja Tampere
Kasvustrategia
Metso tausta – spin-off
Voimakas panostus teknologiakehitykseen
DAMO Tec business ideaBoosting collaboration – optimizing business processes
How to bridge the expectations in collaboration?
3
Business Process
Optimization
Service tool offering
Collaboration
Service Desk
Customer tailored
solutions
Consulting, supporting and optimizing
Web-based tools
Collaboration brokering services
Connecting service providers to the owner/operators
Connecting expert networks and operational processes
Service workflow management toolbox
Special condition monitoring solutions
Prosessiteollisuuden näkökulmaa
Yhteistoiminta on ikivanha peli
Date/Title/Author
4
Tuotanto-omaisuuden elinkaaren aikainen
tiedonhallinta5
Source of the background picture:
ARC Houston 10/2008
Design&
Build
Operate&
Optimize
Maintain&
Improve
MRO (Maintain,
Repair, Overhaul)
partners
EPC partners
Machine and
process suppliers
Equipment
suppliers
Automation
suppliers
Software
suppliers
Logistics services
Supplier
services
O&M
services
Public
authorities
Other partners
Interface layers between
different information systemsphysical, syntactical and semantic
interfaces, different standards
Interface layers between
different operational processesWorkflows, operational practices
Nov 24. 2009/A.Marttinen
Tietojen hallinnan haasteet
Interoperability – yhteentoimivuus
Omat sisäiset liiketoiminnan prosessit
Järjestelmät
Fyysiset, syntaktiset ja semanttiset rajapinnat
Standardit!
Collaboration - yhteistoiminta
Toimintatavat, työn kulku
Yhteistoiminnan prosessit (”ulkoinen liiketoimintaprosessi”)
Standardit?
Kumpikin tarvitaan!!!!!
Date/Title/Author
6
Design – Operate – Maintain (DOM)
Date/Title/Author
7
Source: ARC White Paper, 2007; Use DOM
Interoperability to “Flatten” Your Design,
Operate & Maintain Activities
DOM Requires Interoperability in 3 Dimensions
Suunnittele – Käytä – Ylläpidä (SKY)
DOM Interoperability – tavoiteltavat hyödyt
Date/Title/Author
8
Source: ARC White Paper, 2007
DOM Interoperability – Collaboration
Date/Title/Author
9
Source: ARC White Paper, 2007; Use DOM Interoperability
to “Flatten” Your Design, Operate & Maintain Activities
1. Funtional Interoperability
2. Cross functional business
process Interoperability
3. Business network
interoperability
Thomas Friedman’s three Convergences
Supply Chain Management
solutions, SOA based
system integrators, HEAVY
DUTY SOLUTIONS!
this means
Contracts, agreement based
service works, multilateral
collaboration, etc.
NO SYSTEMS
how about?
Yhteiset standardit?
Järjestelmäintegraatio?
Sovitut liiketoimintaprosessit?
OK. What is the solution?
Date/Title/Author
10
19.4.2010
PLIB-
ISO-
IEC-DIN
JEMIMA
501
JEITA
ECALS
CNIS
511
ISO
13399
ISO
15926-4
NATO/AC135
PIDX
Catmaster
eCL@SS+Bauclass
UNDP/
UNSPSC
GPC
FIATECH
AEX
ETIM
PROLIST
NE100
RNTD
CIDX
Chem eStan
dards
PAPINET
ROSETTA
NET
UN/CEFACT
DINsml
OASIS
BMS
CEN/
ePDC
CEN/
invoiceCEN/
Order
CEN/
cCAT
CEN/
eCAT
BMEcat
REQUI
SITESAP
PFI
AFIM
QUADREM
CAT
pilot
ODETTE
RAPIDCRISTAL
MOSAIC
IDE@
TRADE-
RANGER
ccHUBWOO
ECCMA/
eOTD
GDSNEAN
COM
GS1/
GSMP?
A
PROFI
CLASS
ECC
NAMUR
KOSMEL
PAS1040
TROCS
Product Descriptions
Dictionaries
Classification
Transactions
Catalogues
Marketplaces
CEN activities
Catalogue portals
GTIN/
RFID
GELLISH/StepLIB
© R.BETZ
IEC
61360
ISO
FRANCEGERMANY
ISO
TC172
ELEMICA
ISO
23768
B
C
+GERM->EUR
ISO 22745
ISO 29002
+OntoML
THE “BUBBLE PROBLEM”
2007, Paul van Exel, Director USPIUSPI: Association for the Oil, Gas, Process & Power Industry
Date/Title/Author
12
Enterprise Risk Management System, Enterprise Resource Planning System &
Enterprise KPI/Event Portals
Oil & Gas/PetroChem Industry OpenO&M Interoperability Scenarios
Production Forecasting & Scheduling Systems
Operational Performance Modeling & Optimization Systems
EnterpriseAssetManagementSystems
CBM Advisories (MIMOSA)
Control/SCADA,HMI, & Historians
CBO Advisories (MIMOSA)
Measurements, Events, Inspections, Calibrations, Conditions, Usage, and Sensed O&M Actions
O&M Event Monitoring
I&C Device Monitoring
Portable Monitors (Off-& On-line)
Online Surveillance Monitors
Online Protection Monitors
Online Transient Monitors
Laboratory Information Management Systems (LIMS)
OperationalRisk ManagementSystems(EH&S, PSMS, AHMS, QMS)
Event-Oriented Message Bus
Production Performance (B2MML)
Asset Performance Prediction (B2MML & PRODML)
Full-resolution Condition Data & Events (MIMOSA)
“As-Installed” & “As-Maintained”
Master Data (MIMOSA &
B2MML)
Significant Actual & Early Warning ORM Events (MIMOSA)
ORM KPIs (MIMOSA &
B2MML) Maintenance Work Status, & Work History (MIMOSA)
Production Orders (OAGIS, CIDX, B2MML)
RFQ Cost/Delivery Schedule & PO Delivery Status (OAGIS, CIDX)
RFQ Cost/Delivery Schedule & PO Delivery Status (OAGIS, CIDX)
RFQs & POs (OAGIS, CIDX)RFQs & POs (OAGIS, CIDX)
Supp
liers
Cu
sto
mers
Detailed Prod. Performance (B2MML)
Detailed Prod. Schedules (B2MML)
Pla
nt/
Pro
cess
Engin
eering A
s-D
esi
gned &
As-
Built
Netw
ork
/Segm
ent/
Tag I
nfo
rmation,
Config. M
gm
t. H
isto
rians
Pla
nt/P
roce
ss “As-In
stalle
d” &
“As-M
ain
tain
ed”
Netw
ork
/Segm
ent/A
sset/T
ag R
egistry
&
Config
ura
tion M
anagem
ent H
istoria
ns
OEM
Pro
duct
D
ata
Mgm
t.
Syst
em
s
“As-Designed” & “As-Built” Product/Part Data (ISO 15926 & MIMOSA)
Asset Removals & Installations
(MIMOSA)
EOM
ORM EAM
HIST
DCS HMI
CMSDEV
REG
OPM
MES
EIS
PDMOPM KPIs
(MIMOSA & B2MML)
Forecasted Demand (B2MML
& PRODML)
Planned Asset Unavailability Schedule (MIMOSA & B2MML)
MES KPIs (B2MML)
“As-Designed” & “As-Built” Plant/Process Engineering Data (ISO 15926 & MIMOSA)
Usage Readings (MIMOSA)
CBM/Calib. Schedule
(MIMOSA)
CBM/Calib. Work Completed (MIMOSA)
Maint. KPIs (MIMOSA)
ERM PORT
ERP
Plant/Process Engineering Change Advisories
Product/Part Engineering Change Advisories
Hist. Op. Data & Events (OPC
UA-HDA)
Current Op. Data & Events (OPC UA DA/A&E)
Op. Work Status & Work History
(MIMOSA)
Control Data (Fieldbus)
Source: CEN ORCHID discussions 25. 2. 2010,
drafted by A.Marttinen
ONE TO ONE E-HANDOVER
INTERCOMMUNITY EXCHANGE EMERGING
MATURE COMMUNITY
TimeOPEN COMMUNITIES
CLOSED COMMUNITIES
CASE-BY-CASE
UNMANAGED, NO STANDARDIZATION
Today
2-3 Year 5 Year
SMALL CLOSED COMMUNITIES
Phases of
External business
processes
Phases of Internal
business processes
Internal Company Standards International Standards
INFORMATION INTEROPERABILITY MATURITY
MODEL
Original baseline for this
picture = Feb 2002 TOO OPTIMISTIC
EXPECTATIONS IN 2002
COLLABORATION
THTH ry Collaboration Committee - tavoitteet
Date/Title/Author
15
Established 2/2010
Gather common industry understanding about
collaboration business processes
in capital investment projects
in daily O & M activities
Create and collect common definitions and ”business
rules” for collaboration
Activate national and international discussions
Share industry partners’ best collaboration practices
Give input to European level collaboration discussions
KIITOS
Date/Title/Author
16