Maintenance Replacement of Filter YOUGAR M&T INC. ::: YGS Small Hole Drilling EDM Machine ::: A B <Caution> When you release or fasten the coupling, you have to put on the protection gloves. Rl th li (‘A’) C D picture 4-11 Release the coupling(‘A’) As you push the “B” section in the direction of the arrow, push the valve in the direction of “C”. Then the two parts will be separated each other Release the socket on the filter by turning it in the direction of “D” Replace the filter picture 4-12 Assemble the coupling socket by turning it in the direction of clockwise. Put the filter into the water tank Fasten the coupling finally. picture 4-13 <Caution> Turn off the main power before filter replacement. www.yougar.com

Transcript of YGS Small Hole Drilling EDM Machine ::: Maintenancee).pdf · ::: YGS Small Hole Drilling EDM...

Page 1: YGS Small Hole Drilling EDM Machine ::: Maintenancee).pdf · ::: YGS Small Hole Drilling EDM Machine ::: A B  When you release or fasten the coupling, you have to put

MaintenanceReplacement of Filter

YOUGAR M&T INC. ::: YGS Small Hole Drilling EDM Machine :::

A

B

<Caution> When you release or fasten the coupling, you have to put on the protection gloves.

① R l th li (‘A’)

CDpicture 4-11

① Release the coupling(‘A’)

② As you push the “B” section in the direction of the arrow, push the valve in the

direction of “C”. Then the two parts will be separated each other

③ Release the socket on the filter by turning it in the direction of “D”

④ Replace the filter④ ep ace e e

picture 4-12

⑤ Assemble the coupling socket by turning it in the direction of clockwise.

⑥ Put the filter into the water tank

⑦ Fasten the coupling finally.

picture 4-13

<Caution> Turn off the main power before filter replacement.

www.yougar.com

Page 2: YGS Small Hole Drilling EDM Machine ::: Maintenancee).pdf · ::: YGS Small Hole Drilling EDM Machine ::: A B  When you release or fasten the coupling, you have to put

MaintenanceReplacement of Ion resin

YOUGAR M&T INC. ::: YGS Small Hole Drilling EDM Machine :::

① Turn off the system and main power

② Release the ion resin tank by turning it

in the direction of “A:

③ E t th d i i③ Empty the used ion resin.

④ Fill in the new ion resin up to the “MAX”

line(2/3).

⑤ Fasten the ion resin tank by turning it

in the direction of “B:MAXMAX in the direction of B:

※ Replacement cycle

For long time, if the ion value is

maintained or goes over 100, then you

have to replace it.B A

<Caution> O ring

picture 4-14

<Caution>

※ After replacement please clean the area near O ring” before fastening

picture 4-15

※ After replacement, please clean the area near O ring before fastening.

※ Take care of “O ring” not to lose it during replacement.

www.yougar.com

Page 3: YGS Small Hole Drilling EDM Machine ::: Maintenancee).pdf · ::: YGS Small Hole Drilling EDM Machine ::: A B  When you release or fasten the coupling, you have to put

Maintenance(With Out AEC)

Head module(Rubber O ring replacement) -1

YOUGAR M&T INC. ::: YGS Small Hole Drilling EDM Machine :::

그림 4-26

① Take off the cover of head module

picture 4-26

② Remove the spindle motor

( C ti R th t )

3ea

( ※ Caution : Remove the connector)

4ea

remove connector

picture 4-27

3) Remove the Discharge Cable3 4) Remove the high-pressure (carbide) nozzle

※ Caution : high-pressure (carbide) nozzle.

3

picture 4-28

www.yougar.com

Page 4: YGS Small Hole Drilling EDM Machine ::: Maintenancee).pdf · ::: YGS Small Hole Drilling EDM Machine ::: A B  When you release or fasten the coupling, you have to put

Maintenance(With Out AEC)

Head module (Replace “spanner” with “open end wrench”)

YOUGAR M&T INC. ::: YGS Small Hole Drilling EDM Machine :::

⑤ Loosen with an open end wrench the 17mmlower bolts and the 22mm upper bolts.

⑥ Release shaft fixing bolts .

picture 4-29

Spanner (22mm)

Spanner (17mm)

picture 4-30

⑦ After releasing the bolts,

insert high pressure nozzle.

(17mm)

Blow air inside

⑧ Blow the air into upper of shaft spindle.

(Slightly hand the high-pressure nozzle part.)

picture 4-31www.yougar.com

Page 5: YGS Small Hole Drilling EDM Machine ::: Maintenancee).pdf · ::: YGS Small Hole Drilling EDM Machine ::: A B  When you release or fasten the coupling, you have to put

Maintenance(With Out AEC)

Head module(Rubber O ring replacement) -2

YOUGAR M&T INC. ::: YGS Small Hole Drilling EDM Machine :::

① Take off the cover of head module

tremove connector

Picture 4-26

② Remove the spindle motor

※ Caution : Remove the connector)Caution : Remove the connector)

Remove Carbon Brush

picture 4-28

picture 4-27

③ Remove the Discharge Cable

④ Release four (4ea) bolts of DC Motor.

⑤ Remove the DC Motor.

Release bolts (3ea)

www.yougar.com

Page 6: YGS Small Hole Drilling EDM Machine ::: Maintenancee).pdf · ::: YGS Small Hole Drilling EDM Machine ::: A B  When you release or fasten the coupling, you have to put

Maintenance(With Out AEC)

Head module(Rubber O ring replacement) -2

YOUGAR M&T INC. ::: YGS Small Hole Drilling EDM Machine :::

⑥ Release Fixing Bolt (4ea)

Release fixing bolt (4ea)

그림 4-26⑦ Remove the high-pressure

(carbide) nozzle

※ Caution : high-pressure (carbide) nozzle.

⑧ Make a-half of revolution by L – wrench ⑧ y

(4mm) for loosen 3 ea of fixing bolts Release bolts (3ea)

www.yougar.com

Page 7: YGS Small Hole Drilling EDM Machine ::: Maintenancee).pdf · ::: YGS Small Hole Drilling EDM Machine ::: A B  When you release or fasten the coupling, you have to put

Maintenance(With Out AEC)

Head module(Rubber O ring replacement) -3

YOUGAR M&T INC. ::: YGS Small Hole Drilling EDM Machine :::

⑨ Release shaft fixing bolts .

A

picture 4-29

⑩ After releasing the bolts, insert high pressure

nozzle.

picture 4-32

⑪ Blow the air into upper of shaft spindle.

(Slightly hand the high-pressure nozzle part.)

www.yougar.com

Page 8: YGS Small Hole Drilling EDM Machine ::: Maintenancee).pdf · ::: YGS Small Hole Drilling EDM Machine ::: A B  When you release or fasten the coupling, you have to put

Maintenance(With Out AEC)

Head module(Rubber O ring replacement) -4

YOUGAR M&T INC. ::: YGS Small Hole Drilling EDM Machine :::

⑨ Separate the neuron bearing and O ring as shown in picture to the left and replace the O ring.

⑩ <Caution> When exchanging O rings andbearings, lubricate them with grease.

< reference > A. Neuron bearing is not replaceable part.

(It can be used again).

B. Assembly in reverse order. . sse b y e e se o de . ※ Please do not use excessive force.

picture 4-32

Ceramic washer O ring : P3(2T)

O ring : P7(2T)

B i N 6002

O ring P3 : inner diameter 3Ø 2T

O ring P7 : inner diameter 7Ø 2T

Bearing No. 6002

Angular bearingNo. 6002

Bearing No 6804<reference>

Put the P3 O ring inside of P7 O ring.picture 4-33

Bearing No. 6804

www.yougar.com

Page 9: YGS Small Hole Drilling EDM Machine ::: Maintenancee).pdf · ::: YGS Small Hole Drilling EDM Machine ::: A B  When you release or fasten the coupling, you have to put

Maintenance(With Out AEC)

Head module (Spindle Bearing Replacement) -1

YOUGAR M&T INC. ::: YGS Small Hole Drilling EDM Machine :::

그림 4-26

① Take off the cover of head module

picture 4-26

② Remove the spindle motor

( C ti R th t )

3ea

( ※ Caution : Remove the connector)

4ea

remove connector

picture 4-27

③ Remove the Discharge Cable3

④ Remove the high-pressure (carbide) nozzle

※ Caution : high-pressure (carbide) nozzle.

3

picture 4-28

www.yougar.com

Page 10: YGS Small Hole Drilling EDM Machine ::: Maintenancee).pdf · ::: YGS Small Hole Drilling EDM Machine ::: A B  When you release or fasten the coupling, you have to put

Maintenance(With Out AEC)

Head module (Spindle Bearing Replacement) -2

YOUGAR M&T INC. ::: YGS Small Hole Drilling EDM Machine :::

⑤ Loosen with an open end wrench the 17mm lower bolts and the 22mm upper bolts.

⑥ Release shaft fixing bolts . (Picture 4-38 Release 4 bolts) Spanner

picture 4-37

(Picture 4 38 Release 4 bolts) Spanner (22mm)

Remove the gear parts.

Spanner (17mm)

A

picture 4-38

⑦ Remove the gear and timing belt together.

(17mm)

⑧ Release four (4ea) bolts of gear box

Release bolts (4ea)

⑩ Remove the cooper plate (A) with in

the left parts of spindle.

⑪ Remove the carbon brush (B).

B

( )

picture 4-39

www.yougar.com

Page 11: YGS Small Hole Drilling EDM Machine ::: Maintenancee).pdf · ::: YGS Small Hole Drilling EDM Machine ::: A B  When you release or fasten the coupling, you have to put

Maintenance(With Out AEC)

Head module (Spindle Bearing Replacement) -3

YOUGAR M&T INC. ::: YGS Small Hole Drilling EDM Machine :::

⑫ Remove the bearing housing bolts (4ea)

Remove bolts (4ea)

⑬ Separate the bearing housing at the bottom of the spindle.

(picture 4-40)

Remove bearing picture 4-41

picture 4-40

Remove bearing housing

⑭ Replace the bearing in housingWhen changing bearing, be sure to lubricate

picture 4 41

it with grease (Picture 4-41)

⑮ Raise the spindle shaft and separate

bearing 6804

⑮ Raise the spindle shaft and separate

from bearing housing. (Picture 4-42)

Upper bearing 1 required - No. 6002

Lower Angular bearing 2 required - No.

7002

* When replacing angular bearings, be

aware of bearing direction. picture 4-42

www.yougar.com