Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp...

14
Yap Renewable Energy Development Project (YREDP) A Pacific island success story PPA Rarotonga, 05/07/2019 Istvan PONSOT Head Business Development - Pacific – [email protected]

Transcript of Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp...

Page 1: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

Yap Renewable Energy Development Project (YREDP)A Pacific island success story

PPA Rarotonga, 05/07/2019 Istvan PONSOT Head Business Development - Pacific – [email protected]

Page 2: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

1 • YREDP Overview

2 • RE Power System Performance: PV only

3 • PV + Wind complementarity

4 • Maximizing RE Penetration

5 • Grid Stability

6 • Design vs Reality

7 • What Next?

SOMMAIRE

PPA Rarotonga, 05/07/2019

Page 3: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

YREDP Overview1

An Island-wide fully integrated hybrid power system

PPA Rarotonga, 05/07/2019

to address Yap State Power Corporation ambitious objectives:

• 30% RE by 2020• 50% RE by 2030

YREDP Overview

PV + Wind

PV

Maximizing RE

Grid Stability

Design vs Reality

What Next?

Page 4: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

YREDP Overview1

High Speed Diesels: 4550kW

2x 1860 kW1x 830kW

Automated & Real-time control of the high speed generators

PPA Rarotonga, 05/07/2019

YREDP Overview

PV + Wind

PV

Maximizing RE

Grid Stability

Design vs Reality

What Next?

Page 5: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

YREDP Overview1

Photovoltaic Plants: 508,5kWp

Water treatment: 13 kWpPublic Safety: 25 kWpPublic Works: 26 kWpECE: 50 kWpSports Complex: 194.5 kWpPEC: 200 kWp Sports Complex

PPA Rarotonga, 05/07/2019

YREDP Overview

PV + Wind

PV

Maximizing RE

Grid Stability

Design vs Reality

What Next?

Page 6: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

6

YREDP Overview1

Wind Farm: 825kW

VERGNET GEV MP-C : 275kWTiltable design (1 hour up/down)

Light logistics, ground-level maintenance

Unmatched resistance to cyclones

+500 in operation worldwide (150 in the Pacific)

PPA Rarotonga, 05/07/2019

YREDP Overview

PV + Wind

PV

Maximizing RE

Grid Stability

Design vs Reality

What Next?

Page 7: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

1

PPA Rarotonga, 05/07/2019

Integration & Control:

Hybrid Wizard©Automated controller

Algorithm and parameters incorporating a complete modelizing of Yap’s Electrical grid

Final settings and thresholds validated and improved during commissioning

Island-wide communication network:

Optic Fiber between YSPSC Power plant and the Wind farm

Radio connection to all PV sites

3 local Scadas (Diesel, PV, Wind)

1 showcase system: yspsc-sc.com

YREDP Overview

PV + Wind

PV

Maximizing RE

Grid Stability

Design vs Reality

What Next?

YREDP Overview

Page 8: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

RE Power System Performance: PV only2

Low wind or no wind periods

30%

20%

PPA Rarotonga, 05/07/2019

YREDP Overview

PV + Wind

PV

Maximizing RE

Grid Stability

Design vs Reality

What Next?

Page 9: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

3

Sunshine & Trade Winds

PV + Wind complementarity

25%

PV + Low Wind60%

PV + Good Wind

PPA Rarotonga, 05/07/2019

YREDP Overview

PV + Wind

PV

Maximizing RE

Grid Stability

Design vs Reality

What Next?

Page 10: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

4 Maximizing RE penetration

Pushing RE into the Grid to the maximum

80%

55%

11:30am to 2:00pm 9:00am to 5:00pm

PPA Rarotonga, 05/07/2019

YREDP Overview

PV + Wind

PV

Maximizing RE

Grid Stability

Design vs Reality

What Next?

Page 11: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

6 Grid Stability

PPA Rarotonga, 05/07/2019

YREDP Overview

PV + Wind

PV

Maximizing RE

Grid Stability

Design vs Reality

What Next?

Reverse Power on Gensets

2

Software adjustment:

Dynamic regulation limit

windows

IssueNber of

occurencesCorrective

actionProblem Solved?

YES

Robust System: No other issue caused by PV or Wind since commissioning

23/02/19 16/03/2019

Page 12: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

up to 70%

6 Design Vs Reality

Design vs Reality

PPA Rarotonga, 05/07/2019

YREDP Overview

PV + Wind

PV

Maximizing RE

Grid Stability

Design vs Reality

What Next?

Instant RE share

17%Average RE share

Diesel Displacement(US Gallons/year) 113,600

up to 80%

up to 38%

139,374

38% averageRE in Jan-Feb2019

Page 13: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

13

What Next?7

Increasing RE Capacity:Solar

Wind

Introducing Battery StorageMaintaining a high and stable level of RE Penetration

Reduce sollicitation on the high speed diesels for Dynamic Spinning Reserve

Further improving the robustness and efficiency of the system:Replacing radio link by optic fiber

Select future equipment compatible with Hybrid controls requirements for maximum efficiency (communication & time response)

Hybrid Wizard PLC controler is ready for future extensionSeamless scaling up (additional RE capacity, storage, weather prediction…)

Achieving and exceeding Yap’s 2030 RE objective:

PPA Rarotonga, 05/07/2019

YREDP Overview

PV + Wind

PV

Maximizing RE

Grid Stability

Design vs Reality

What Next?

Page 14: Yap Renewable Energy Development Project (YREDP) · 1 YREDP Overview Photovoltaic Plants: 508,5kWp Water treatment: 13 kWp Public Safety: 25 kWp Public Works: 26 kWp ECE: 50 kWp Sports

What Next?7

PPA Rarotonga, 05/07/2019

YREDP Overview

PV + Wind

PV

Maximizing RE

Grid Stability

Design vs Reality

What Next?

Istvan PONSOT Head Business Development - Pacific – [email protected]

Towards 100% Renewable…

Thank you for yourattention

100 % RE plant Wind + Battery – Tchad