Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction in the Arctic Christopher Ott Lead Process Engineer Air Products and Chemicals, Inc. JSC Yamal LNG: Igor Chasnyk, Sander Kaart Yamgaz / TechnipFMC: Christian Bladanet, Benoit Laflotte, Guillaume Le-Ridant, Benoit Delva Baker Hughes, a GE Company: Oriano Zucchi

Transcript of Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV ....

Page 1: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

Yamal LNG:

Meeting the Challenges of Natural Gas

Liquefaction in the Arctic

Christopher Ott

Lead Process Engineer

Air Products and Chemicals, Inc.

JSC Yamal LNG: Igor Chasnyk, Sander Kaart

Yamgaz / TechnipFMC: Christian Bladanet,

Benoit Laflotte, Guillaume Le-Ridant,

Benoit Delva

Baker Hughes, a GE Company: Oriano Zucchi

Page 2: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

Yamal LNG

• Yamal Peninsula, Russia

• South Tambey Field

– 926 BCM (32.7 TCF)

• 16.5 mtpa LNG

– 3 trains x 5.5 mtpa

– 1.2 mtpa gas condensate

• JSC Yamal LNG

– Novatek, Total, CNPC, Silk Road Fund

• Yamgaz

– TechnipFMC, JGC, Chiyoda

Page 3: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

Challenges

• Arctic Conditions

– -50°C Ambient Temperature

– Pile based foundation

– Permafrost preservation

– Modular construction in 10

fabrication yards

Page 4: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

Liquefaction Project

• TechnipFMC Cryomax® – SRE

NGL extraction process

• Air Products AP-C3MR™

liquefaction process

• Baker Hughes, a GE Company

Frame 7 gas turbines, propane

and MR compressors

Page 5: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

NGL Extraction

TechnipFMC Cryomax® – SRE NGL extraction process

• Lean feed gas

• Remove C5+ and aromatics

• Recover C2 and C3 refrigerant

• Boost feed gas to 70 barg for

liquefaction

• Faster commissioning and

start-up

Page 6: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

Liquefaction

Air Products’ AP-C3MR™ liquefaction process

• Air Products

– Over 120 CWHEs for LNG

– Over 90 operating LNG trains

• Largest capacity C3MR to date

– Largest diameter CWHE

– Largest single bundle weight

• BHGE for Air Products liquefaction processes

– 60+ operating LNG trains

– 80+ Frame 7 gas turbines

– 220+ compressors

Page 7: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

Compressor and Driver Arrangement

• Two gas turbine drivers

• Wide ambient temperature

range

• Variable Precooling and MR

power demands

C3 HPMR

LPMR MPMR

Max Power

Cold Ambient

Warm Ambient

C3

LPMR

Max Power

HPMR

MPMR

C3 HPMR

LPMR MPMR

Max Power

Design

C3

LPMR MPMR

Max Power

Design

HPMR

Page 8: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

Compressor and Driver Arrangement

2 x 50% Machinery Configuration

• Fully utilize gas turbine

power

• Improved plant availability

• Higher turndown

C3HelperMotor

LPMR HPMR

C3HelperMotor

LPMR HPMR

String A

String B

Page 9: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

Refrigerant Turbocompressor Technology

• Compressor Characteristics

for 50% Flow

– Shorter bearings span

– Increased shaft stiffness

– 30% smaller nozzle size

C3HelperMotor

LPMR HPMR

C3HelperMotor

LPMR HPMR

String A

String B

Page 10: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

Refrigerant Turbocompressor Technology

Compressor Design

• Referenced Designs for

– Casings

– Impellers

– Bearings

– Dry gas seals

Page 11: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

Refrigerant Turbocompressor Technology

Aerodynamics

• 2 x 50% machinery

– Well Centered Operating Points

• Tip Mach Number

• Flow Coefficient C3

HelperMotor

LPMR HPMR

C3HelperMotor

LPMR HPMR

String A

String B

Page 12: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

2 x 50% Machinery Operation

Propane

• Liquid quench

• Inlet throttling valves

• Cross-connection

C3 Helper

Motor LPMR HPMR

String B

Liquid Quench

Cross Connection

ITV

Page 13: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

2 x 50% Machinery Operation

Mixed Refrigerant

• Cross-connection

• Inlet throttling valves

C3 Helper

Motor LPMR HPMR

String B Cross Connection

ITV

Page 14: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

Commissioning

• Maximize pre-commissioning

in fabrication yards

– High pressure leak tests

• Insulation to maintain warm

defrost gas

– Warm air / nitrogen used

during construction phase

Page 15: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

Plant Start-Up, Initial Operation and Performance Test

• Train 1 – November 2017

• Train 2 – July 2018

• Train 3 – November 2018

• 1 year ahead of schedule

• End of 2018

– 113 LNG cargoes

– 8.5 million tonnes of LNG

Page 16: Yamal LNG: Meeting the Challenges of Natural Gas Liquefaction … · 2019-10-16 · ITV . Commissioning • Maximize pre-commissioning in fabrication yards –High pressure leak tests

The record breaking success of Yamal LNG is the result of

close collaboration between all of the project partners