15th October 2019
XXI Luso-German Energy Symposium
“Energy Efficiency, including Renewable
Energy, in Industry ”
Linha BPI/BEI Eficiência Energética
2
Contents
1. OVERVIEW
2. BENEFICIAIRES AND ELIGIBLE PROJECTS
3. EXPENSES (ELIGIBLE AND NOT ELIGIBLE)
4. ELIGIBLE INVESTMENTS
5. PF4EE ELIGIBILITY WEBCHECK TOOL
6. INVESTMENT EXAMPLES
7. INDICATIVE TERM SHEET
8. MAIN ADVANTAGES
3
1. Overview
EIB1 Programme: with the support of the European Union under LIFE Programme2
Purpose: finance energy eficincy investments ⇒ savings on energy consumption, with special pricing and conditions
1st and only agreement signed in Portugal with EIB
1 of the 10 pilot agreements celebrated in Europe
Exclusive financial intermediary in Portugal
PF4EE (Private Finance for Energy Efficiency)PF4EE (Private Finance for Energy Efficiency)
LINHA BPI/BEI EFICIÊNCIA ENERGÉTICACredit Line of 50 million euros exclusively for energy efficiency projects with a
portfolio guarantee from EIB
1 EIB: European Investment Bank2 LIFE Programme: EU’s funding instrument for the environment and climate action 2014-2020
4
1. Overview
And thus was born Linha BPI/BEI Eficiência Energética…And thus was born Linha BPI/BEI Eficiência Energética…
5
1. Overview
To support investments in:To support investments in:
6
SMEs and Mid-caps (no limit for the number of employees)
Established and operating in Portugal
Not a "firm in difficulty" within the EU definition
Not operating on Excluded Sectors3
With no incidents / defaults within tax authority, social security and banking system
ELIGIBLE BENEFICIARIESELIGIBLE BENEFICIARIES
2. Beneficiaries and Eligible Projects
3 Excluded Sectors: weapons, tobacco, gambling, pure real-estate investments, etc.
7
Investments not exceeding 10 million euros
Located in Portugal
Promoting savings on energy consumption
Which are not new projects: construction of buildings or industrial buildings are excluded
Users of proven technologies
Investments > €500.000 (except PV4 projects ) ⇒ energy audit
Complies with all applicable national and European Union laws and regulations
ELIGIBLE PROJECTSELIGIBLE PROJECTS
4 PV: Photovoltaic
2. Beneficiaries and Eligible Projects
8
ELIGIBLEELIGIBLE NOT ELIGIBLENOT ELIGIBLE
Studies and projects
Construction works
Equipment
Related investments5 up to 50% of the total
eligible investment
Normal maintenance activity
Recoverable costs, such as VAT
Pure financial transactions
Purchase of land or real-estate investment
3. Expenses
5 Not directly related to energy efficiency measures
9
SUMMARYSUMMARY
4. Eligible Investments
Energy efficiency in industryExamples: Compressors; heat recovery; lighting; speed variators; industrial cold
Energy efficiency in existing buildingsExamples: Glazed; insulation; cooling; pumps; automation and control systems
Cogeneration of heat and power
Energy efficiency in outdoor / public lighting (through ESCO)
Photovoltaic Systems for self-consumption
10
Tool specially created to check the eligibility for a PF4EE
finance
It allows the validation of about 20 measures typified in
buildings and industry, obtaining energy savings potential,
cost and CO2 potential reduction
Generates a summary document that can be used to apply for
funding
Free and no registration required
PF4EE Web-check ToolPF4EE Web-check Tool
5. PF4EE Eligibility Webcheck Tool
More information in
https://pf4ee-webcheck.eib.org/bpi
11
6. Investment Examples
Intensive Energy Consumption Management SystemIntensive Energy Consumption Management System
Fonte: Adene
Decreto-Lei n.º 71/2008, de 15 de Abril,
changed by Lei n.º 7/2013, de 22 de
janeiro, e pelo Decreto-Lei n.º 68-A/2015,
de 30 de abril.
Overview and Purpose
Energy Consumption RationalizationAgreements:
Measures supported by “Energy
Consumption Rationalization Agreements”
are typically eligible.
12
Self-consumption in industrial unitSelf-consumption in industrial unit
Fonte: RdA – Climate Solutions
Photovoltaic system to be installed on the
factory roof with 500 kWp. 75% of the
energy produced will be consumed in the
factory (self-consumption)
Investment: € 390.000
Annual energy savings: 695.070 kWh
CO2 reduction: 26,68 ton/year
Payback: 5,7 years
Measures:
Investment and savings:
6. Investment Examples
13
Energy efficiency in industry Energy efficiency in industry
Fonte: RdA – Climate Solutions
Speed variators
Compressed air system review
Burner tuning
Consumption management (measurement and performance)
Self-consumption photovoltaic system (220 kWp)
Investment: € 236.750
Annual energy savings: 550.500 kWh
Annual savings: €61.028
CO2 reduction: 215,4 ton/years
Payback: 4 years
Measuress:
Investment and savings:
6. Investment Examples
14
Energy efficiency in logistic centerEnergy efficiency in logistic center
Fonte: RdA – Climate Solutions
Standby consumption reduction
HVAC system replacement
Installation of translucent roof panels
Lighting replacement
Investment: € 1.300.000
Annual savings: € 160.000
Payback: 8,1 years
Medidas:
Investment and savings:
6. Investment Examples
15
Energy performance contractEnergy performance contract
Heating system renovation
Energy Management System
Piping thermal insulation
Energy efficient management
Led lightning
Investment: € 200.000
Annual savings: € 65.000
Payback: 3 years
EPC duration: 5 years
Measures:
Investment and savings:
Fonte: RdA – Climate Solutions
Final do contratoImplementação
de medidas
Cu
sto
s o
pe
raci
on
ais
EPC
Eco
no
mia
s
Economias garantidas
[retorno do investimento]
Benefício para o cliente
business as usual
6. Investment Examples
16
7. Indicative Term Sheet
Territorial scope Companies and projects located in Portugal
Purpose Investment
Type Medium and long term
Amount Minimum (per project):
€ 40.000
Maximum (per project and company):
5 million euros for SME or improvement of a building
1.125.000 euros in all other cases
Amount Restrictions Provided that the project receives EU subsidies, the total loan amount (subsidies + loan amount) shall
not exceed 90% of the total investment
Term Depending on the payback of the project (between 3 e 20 years)
Pricing Casuistic approval, but always lower than a financing outside the instrument with the same terms
Fees according to BPI’s table
Disbursements During the grace period; against invoices (maximum number of 4)
Reimbursements Tailor made
EIB Guarantee 80%
Fee: 0,1% of loan amount
17
8. Main Advantages
Access to specific adapted financing to the needs of energy efficiency projects
EIB guarantee
No minimis consumption
Benefiting from an Expert Support
Term up to 20 years, according to the asset's life