[XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566...

341
Title Description of program Version Owner Contact Category Licence Name Eligibility Criteria Resource Format File size Release date Next review date Contents Description Data Dictionary Baselines Identified_Opportunities Implemented_Opportunities Notes about data or limitations of use

Transcript of [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566...

Page 1: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Publication DetailsTitleDescription of program

VersionOwnerContact

CategoryLicence

DatasetName

Eligibility Criteria

ResourceFormatFile sizeRelease dateNext review dateContents

Notes about data or limitations of use

Description

Data DictionaryBaselinesIdentified_OpportunitiesImplemented_Opportunities

Page 2: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Notes about data or limitations of use

Page 3: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Publication DetailsNSW Energy Savings Action Plan Program

1.0Data and Evaluation Team, Metro Branch, Regional Operations GroupErin Harwood, Senior Information Analyst - Data and Evaluation(02) 9995 6386

BusinessThis dataset carries the following licence:

DatasetEnergy Savings Action Plan dataData for 265 Energy Savings Action Plans that were approved by the Minister for the Environment.

OEH databasexls989 kbdd/mm/2016

Description of fields in OEH databaseElectricity and natural gas baselines identified in approved plansAll electricity and natural gas opportunities identified in approved plans with estimated savingsImplemented electricity and natural gas opportunities reported to OEH with actual savings

Energy Savings Action Plans identified a range of cost-effective and potentially cost-effective energy efficiency opportunities that could deliver significant energy and cost savings. Organisations were required to submit annual reports on the implementation of energy efficiency opportunities for the three years following the approval of their Plans. The program ran from 28 October 2005 to 31 December 2012.

[email protected]

Creative Commons Attribution 3.0 Australia

You are free to reproduce, incorporate, adapt and distribute this work, even commercially. Under the terms of the license you are required to attribute OEH material in the manner specified but not in any way that suggests that OEH endorses you or your use of the work.OEH dataset used as suppliedProvided you have not modified or transformed OEH material in any way the material contained in this dataset may be reused provided one of the following attributions is given: Source: OEH, NSW Government or Source: Office of Environment and Heritage, NSW Government.Derivative materialIf you have modified or transformed OEH material, or derived new material from those of OEH in any way, one of the following attributions must be used: Based on OEH, NSW Government data or Based on Office of Environment and Heritage data, NSW Government.

The Energy Savings Action Plan (ESAP) program was established in the Energy Savings Order 2005 under the Energy and Utilities Administration Act 1987. It required all NSW businesses and government agencies with premises that used more than 10 gigawatt hours a year of electricity and all NSW local councils with populations of more than 50,000 people to develop an ESAP. The Act states an ESAP expired four years after the date it was approved. In December 2012 the NSW Premier announced the ESAP program had ceased.

1. This dataset has been de-identified to comply with the Privacy and Personal Information Protection Act 1998 (NSW) (PPIP Act) and Government Information (Public Access) Act 2009 (GIPA Act), and to minimise the risk of identifying a particular commercial entity. Only the highest order ANZSIC Division has been published.

2. 267 ESAPs were approved by the Minister for the Environment. The names of the organisations required to prepare plans were published in the NSW Government Gazette. Two ESAPs were exempt following approval. This data has been excluded.

3. Published ESAP baseline and savings data is restricted to electricity and natural gas only. Opportunities saving other fuel types or other fuel types in combination with electricity and/or natural gas have been excluded.

Page 4: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

8. Some measure descriptions have been edited to remove nomenclature that could be used to identify a particular entity.

4. Data includes opportunties identified as cost-effective or potentially-cost effective in approved plans only. Cost-effective energy savings measures were those that exceeded the organisation’s hurdle rate of return (cost of capital). Generally measures with a payback period of less than 2 to 4 years were cost-effective. New opportunities identified in annual reports have not been included as the data could not be verified.

5. Opportunity start and completion dates are as reported to OEH. Where there are no start and completion dates, for the purpose of conducting analysis on the ESAP program OEH generally attributes: a) the opportunity start date to the year it was identified in the plan based on the plan approval dateb) the completion date to the year prior to the date the annual report was submitted.The time taken for the plan to be approved could mean that some opportunities were identified well before the date of plan approval and in fact some organisations actually implemented opportunities before their plan was approved.

7. All costs are as reported to OEH and are reflective of that point in time. Costs have not been adjusted in any way. Estimated cost to implement ($) is attributable to the year the opportunity was identified in the Plan. Actual cost to implement ($) is attributable to the year the project was implemented. Care should be exercised in determining the relevance of this information as time passes.

9. It is likely that implementation is underestimated in this dataset. Organisations were required to submit three annual reports post-approval detailing progress against energy savings actions identified in the plan but annual reporting was not mandatorily enforced. Only one third of organisations met annual reporting requirements.

10. Unless the opportunity was implemented and actual savings were reported to OEH, savings are assumed to be the value identified in the approved plan. An opportunity that does not have a status implies the organisation did not submit an annual report or did not update progress on implementing that opportunity.

11. Opportunities can be linked to the plan baseline using the organisation unique identifier (OrgID). Implemented opportunities can be linked to identified opportunities using the opportunity unique identifier (OppID).

Page 5: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007
Page 6: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Field

OrgID

Suburb

Postcode

ANZSIC Division

Electricity (MWh)

Natural Gas (GJ)

Baseline Start Date

Baseline End Date

Approval

OppID

Measure Description

Measure Type

Equipment Type

Estimated cost ($)

Estimated electricity savings (MWh/yr)

Estimated natural gas savings (GJ/yr)

Status

Actual cost ($)

Actual electricity savings (MWh/yr)

Actual natural gas savings (GJ/yr)

Start Date

Completion Date

Page 7: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Definition

Unique ID for site (i.e. a business with 3 sites will have 3 different OrgIDs)

Suburb name of business (site address)

Postcode of business (site address)

ANZSIC Division

Baseline electricity consumption from approved plan (annual)

Baseline natural gas consumption from approved plan (annual)

Baseline start date from approved plan

Baseline end date from approved plan

Year plan was approved

Unique ID for each measure/opportunity identified in the approved plan

Description of the measure/opportunity identified in the approved plan

Identified measures were categorised as cost-effective or potentially cost-effective (based on the organisation's own investment criteria) in the approved plan

Technology/equipment classification applied by OEH to identified measure/opportunity

Cost to implement measure/opportunity identified in the approved plan

Electricity savings (annual) identified in the approved plan

Natural gas savings (annual) identified in the approved plan

Status of measure/opportunity reported to OEH in annual report: implemented, ongoing, under-investigation, to be implemented, not to be implemented, blank (no status reported).

Cost to implement measure/opportunity reported to OEH in annual report

Electricity savings (annual) reported to OEH in annual report

Natural gas savings (annual) reported to OEH in annual report

Implementation start date of measure/opportunity reported to OEH in annual report

Implementation completion date of measure/opportunity reported to OEH in annual report

Page 8: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

OrgID Suburb Postcode ANZSIC Division

280 Penrith 2750 C - Manufacturing

281 Mulwala 2647 M - Professional, Scientific and Technical Services

282 Garden Island 2011 M - Professional, Scientific and Technical Services

283 Botany 2019 C - Manufacturing

284 Yennora 2161 C - Manufacturing

285 Revesby 2212 N - Administrative and Support Services

286 Matraville 2036 N - Administrative and Support Services

288 Huntingwood 2148 C - Manufacturing

289 The Domain 2000 R - Arts and Recreation Services

290 Macquarie Park 2113 C - Manufacturing

291 Hexham 2322 C - Manufacturing

292 Lidcombe 2141 C - Manufacturing

293 Wetherill Park 2164 C - Manufacturing

294 Berkeley Vale 2261 C - Manufacturing

295 Berkeley 2506 C - Manufacturing

296 Bankstown 2200 H - Accommodation and Food Services

297 Hanwood 2680 A - Agriculture, Forestry and Fishing

298 Beresfield 2322 A - Agriculture, Forestry and Fishing

299 Toongabbie 2146 C - Manufacturing

300 Muswellbrook 2333 B - Mining

301 Smithfield 2164 C - Manufacturing

302 Berrima 2577 C - Manufacturing

303 Picton 2571 C - Manufacturing

304 Marulan South 2579 C - Manufacturing

305 Port Kembla 2505 C - Manufacturing

306 Port Kembla 2505 C - Manufacturing

307 Cringila 2502 C - Manufacturing

308 Wentworthville 2145 C - Manufacturing

309 Camellia 2142 B - Mining

311 Emu Plains 2750 B - Mining

312 Eastgardens 2036 C - Manufacturing

313 Broadway 2007 L - Rental, Hiring and Real Estate Services

314 Belmore 2192 H - Accommodation and Food Services

315 Kurnell 2231 C - Manufacturing

316 Singleton 2330 B - Mining

317 Kooragang 2304 F - Wholesale Trade

318 Tamworth 2340 C - Manufacturing

319 Bomen 2650 C - Manufacturing

320 Narrabri 2390 F - Wholesale Trade

321 Tumut 2720 C - Manufacturing

322 Oberon 2787 C - Manufacturing

323 Kandos 2848 C - Manufacturing

324 Clarence 2790 B - Mining

325 Mandalong 2264 B - Mining

327 Wangi Wangi 2267 B - Mining

328 Lidsdale 2790 B - Mining

329 Wagga Wagga 2678 P - Education and Training

Page 9: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

330 Lemington 2330 B - Mining

331 Cobar 2835 B - Mining

332 Northmead 2152 C - Manufacturing

333 Burwood 2134 J - Information Media and Telecommunications

334 Kurnell 2231 C - Manufacturing

335 Roselands 2196 L - Rental, Hiring and Real Estate Services

336 Penrith 2750 C - Manufacturing

337 Wetherill Park 2164 C - Manufacturing

338 Ingleburn 2565 C - Manufacturing

339 Darling Harbour 2000 H - Accommodation and Food Services

340 Kelso 2795 C - Manufacturing

341 Raglan 2795 C - Manufacturing

342 Orange 2800 C - Manufacturing

343 Cobar 2835 B - Mining

344 Greenacre 2190 C - Manufacturing

345 Dubbo 2830 C - Manufacturing

346 Enfield 2136 C - Manufacturing

347 Ermington 2115 C - Manufacturing

348 Kurri Kurri 2327 C - Manufacturing

349 Mascot 2015 C - Manufacturing

350 Glennies Creek 2330 B - Mining

351 Ultimo 2007 M - Professional, Scientific and Technical Services

352 Stratford 2422 B - Mining

353 Sydney 2000 L - Rental, Hiring and Real Estate Services

354 Sydney 2000 L - Rental, Hiring and Real Estate Services

355 Kurnell 2231 C - Manufacturing

356 Bankstown Airport 2200 C - Manufacturing

357 Helensburgh 2508 B - Mining

358 Concord West 2138 G - Retail Trade

359 Oberon 2787 C - Manufacturing

360 Windsor 2756 C - Manufacturing

361 Tomago 2322 D - Electricity, Gas, Water and Waste Services

362 New Lambton 2305 Q - Health Care and Social Assistance

363 Loxford 2326 C - Manufacturing

364 Tumbarumba 2653 C - Manufacturing

365 Artarmon 2064 J - Information Media and Telecommunications

366 West Pennant Hills 2125 J - Information Media and Telecommunications

367 Baulkham Hills 2153 J - Information Media and Telecommunications

368 Appin 2560 B - Mining

369 Douglas Park 2569 B - Mining

370 Appin 2560 B - Mining

371 Kooragang Island 2304 B - Mining

372 Lisarow 2250 A - Agriculture, Forestry and Fishing

373 Hoxton Park 2171 A - Agriculture, Forestry and Fishing

374 Seven Hills 2147 C - Manufacturing

377 Rosehill 2142 C - Manufacturing

378 Oberon 2787 C - Manufacturing

379 Botany 2019 C - Manufacturing

Page 10: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

380 Albury 2640 C - Manufacturing

381 Ingleburn 2565 C - Manufacturing

382 Mayfield 2304 C - Manufacturing

383 Vales point 2259 B - Mining

384 The Rocks 2000 H - Accommodation and Food Services

385 Lidcombe 2141 C - Manufacturing

386 North Ryde 2113 P - Education and Training

387 Manildra 2865 C - Manufacturing

388 Camellia 2142 C - Manufacturing

389 Granville 2142 C - Manufacturing

390 Port Kembla 2505 C - Manufacturing

391 North Sydney 2060 K - Financial and Insurance Services

394 Ultimo 2000 R - Arts and Recreation Services

395 Chullora 2190 J - Information Media and Telecommunications

396 Blayney 2799 C - Manufacturing

397 Orange 2800 B - Mining

398 Sydney 2000 L - Rental, Hiring and Real Estate Services

400 Albury 2640 C - Manufacturing

401 Parkes 2870 B - Mining

402 Casino 2470 C - Manufacturing

403 St Leonards 2065 Q - Health Care and Social Assistance

404 Darlinghurst 2010 O - Public Administration and Safety

405 Bathurst 2795 C - Manufacturing

406 Mayfield 2304 C - Manufacturing

407 Rooty Hill 2766 C - Manufacturing

408 Mayfield 2304 C - Manufacturing

410 Scone 2337 C - Manufacturing

411 Chullora 2190 C - Manufacturing

413 Matraville 2036 I - Transport, Postal and Warehousing

414 Bomaderry 2541 C - Manufacturing

415 Banksmeadow 2019 I - Transport, Postal and Warehousing

416 Cobar 2835 B - Mining

417 Lane Cove 2066 C - Manufacturing

418 Tamworth 2340 C - Manufacturing

419 Penrith 2750 H - Accommodation and Food Services

420 Broken Hill 2880 B - Mining

422 Ingleburn 2565 C - Manufacturing

423 Moorebank 2170 J - Information Media and Telecommunications

424 Wollongong 2500 I - Transport, Postal and Warehousing

425 Carrington 2294 I - Transport, Postal and Warehousing

426 Moorebank 2170 C - Manufacturing

427 Mascot 2020 I - Transport, Postal and Warehousing

428 Matraville 2036 C - Manufacturing

429 Sydney 2000 K - Financial and Insurance Services

430 Deniliquin 2710 C - Manufacturing

431 Leeton 2705 C - Manufacturing

432 Wagga Wagga 2650 C - Manufacturing

433 Yanco 2703 C - Manufacturing

Page 11: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

434 Lisarow 2250 C - Manufacturing

435 Greenwich 2065 C - Manufacturing

436 Rosehill 2142 C - Manufacturing

437 Sydney 2000 H - Accommodation and Food Services

438 Bomaderry 2541 C - Manufacturing

439 Bathurst 2795 F - Wholesale Trade

440 Kelso 2795 F - Wholesale Trade

441 Rosebery 2018 J - Information Media and Telecommunications

442 Banksmeadow 2019 C - Manufacturing

443 Huntingwood 2148 M - Professional, Scientific and Technical Services

444 Randwick 2031 Q - Health Care and Social Assistance

445 Kogarah 2217 Q - Health Care and Social Assistance

446 yennora 2161 C - Manufacturing

447 The Rocks 2000 H - Accommodation and Food Services

448 Kogarah 2217 K - Financial and Insurance Services

452 Wahroonga 2076 Q - Health Care and Social Assistance

453 Sydney International Airport 2020 I - Transport, Postal and Warehousing

454 Flemington 2140 L - Rental, Hiring and Real Estate Services

455 Sydney 2000 R - Arts and Recreation Services

456 Bankstown 2200 Q - Health Care and Social Assistance

457 Campbelltown 2560 Q - Health Care and Social Assistance

458 Concord West 2138 Q - Health Care and Social Assistance

459 Liverpool 2170 Q - Health Care and Social Assistance

460 Camperdown 2050 Q - Health Care and Social Assistance

461 Cronulla 2230 D - Electricity, Gas, Water and Waste Services

462 Malabar 2036 D - Electricity, Gas, Water and Waste Services

463 Manly 2095 D - Electricity, Gas, Water and Waste Services

464 Prospect 2148 D - Electricity, Gas, Water and Waste Services

465 St Marys 2760 D - Electricity, Gas, Water and Waste Services

466 West Ryde 2114 D - Electricity, Gas, Water and Waste Services

467 Kingswood 2747 Q - Health Care and Social Assistance

468 Westmead 2145 Q - Health Care and Social Assistance

469 Tahmoor 2573 B - Mining

470 Rooty Hill 2766 C - Manufacturing

471 Willoughby 2068 J - Information Media and Telecommunications

472 Haymarket 2000 J - Information Media and Telecommunications

473 North Sydney 2060 J - Information Media and Telecommunications

474 Parramatta 2150 J - Information Media and Telecommunications

475 Sydney 2000 J - Information Media and Telecommunications

477 Horsley Park 2175 C - Manufacturing

478 Horsley Park 2175 C - Manufacturing

479 Waratah 2298 C - Manufacturing

480 Westmead 2145 Q - Health Care and Social Assistance

481 Alexandria 2015 J - Information Media and Telecommunications

482 Lidcombe 2141 C - Manufacturing

484 Sydney 2000 K - Financial and Insurance Services

485 University of Sydney 2006 P - Education and Training

486 Tomago 2322 C - Manufacturing

Page 12: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

488 Tweed Heads 2485 H - Accommodation and Food Services

489 Minto 2566 C - Manufacturing

490 Appin 2560 D - Electricity, Gas, Water and Waste Services

491 Armidale 2350 P - Education and Training

492 Randwick 2031 P - Education and Training

493 Callaghan 2308 P - Education and Training

494 Gwynneville 2500 P - Education and Training

495 Smithfield 2164 C - Manufacturing

496 Smithfield 2164 C - Manufacturing

497 Tumut 2720 C - Manufacturing

498 Smithfield 2164 C - Manufacturing

499 Kings Park 2148 C - Manufacturing

500 Prestons 2170 C - Manufacturing

501 Wetherill Park 2164 C - Manufacturing

502 Warkworth 2330 B - Mining

503 Mount Thorley 2330 B - Mining

504 Artarmon 2064 C - Manufacturing

505 Miranda 2228 L - Rental, Hiring and Real Estate Services

506 Parramatta 2150 L - Rental, Hiring and Real Estate Services

508 North Ryde 2113 K - Financial and Insurance Services

509 Tumut 2720 C - Manufacturing

510 Cullen Bullen 2790 B - Mining

511 Singleton 2330 B - Mining

512 Teralba 2284 B - Mining

513 Killingworth 2278 B - Mining

514 Ravensworth 2330 B - Mining

515 Ulan 2850 B - Mining

516 Inverell 2360 C - Manufacturing

561 Auburn 2144 O - Public Administration and Safety

562 Bankstown 2200 O - Public Administration and Safety

563 Blacktown 2148 O - Public Administration and Safety

564 Katoomba 2780 O - Public Administration and Safety

565 Camden 2570 O - Public Administration and Safety

566 Campbelltown 2560 O - Public Administration and Safety

567 Campsie 2194 O - Public Administration and Safety

568 Drummoyne 2047 O - Public Administration and Safety

569 Coffs Harbour 2450 O - Public Administration and Safety

570 Sydney 2000 O - Public Administration and Safety

571 Wakeley 2176 O - Public Administration and Safety

572 Gosford 2250 O - Public Administration and Safety

573 Windsor 2756 O - Public Administration and Safety

574 Merrylands 2160 O - Public Administration and Safety

575 Hurstville 2220 O - Public Administration and Safety

576 Kogarah 2217 O - Public Administration and Safety

577 Gordon 2072 O - Public Administration and Safety

578 Speers Point 2284 O - Public Administration and Safety

579 Leichhardt 2040 O - Public Administration and Safety

580 Liverpool 2170 O - Public Administration and Safety

Page 13: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

581 Maitland 2320 O - Public Administration and Safety

582 Petersham 2049 O - Public Administration and Safety

583 Newcastle 2300 O - Public Administration and Safety

584 North Sydney 2060 O - Public Administration and Safety

585 Parramatta 2124 O - Public Administration and Safety

586 Penrith 2750 O - Public Administration and Safety

587 Warriewood 2102 O - Public Administration and Safety

588 Port Macquarie 2444 O - Public Administration and Safety

589 Raymond Terrace 2324 O - Public Administration and Safety

590 Randwick 2031 O - Public Administration and Safety

591 Rockdale 2216 O - Public Administration and Safety

592 Ryde 2112 O - Public Administration and Safety

593 Shellharbour 2529 O - Public Administration and Safety

594 Nowra 2541 O - Public Administration and Safety

595 Sutherland 2232 O - Public Administration and Safety

596 Tamworth 2340 O - Public Administration and Safety

597 Castle Hill 2154 O - Public Administration and Safety

598 Hornsby 2077 O - Public Administration and Safety

599 Murwillumbah 2484 O - Public Administration and Safety

600 Wagga Wagga 2650 O - Public Administration and Safety

601 Dee Why 2099 O - Public Administration and Safety

602 Bondi Junction 2022 O - Public Administration and Safety

603 Chatswood 2067 O - Public Administration and Safety

604 Wollongong 2500 O - Public Administration and Safety

605 Double Bay 2028 O - Public Administration and Safety

606 Wyong 2259 O - Public Administration and Safety

Page 14: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Electricity (MWhNatural Gas (GJ)Baseline Start D Baseline End DaApproval

110,169 2,247,454 1/01/06 31/12/06 2007

16,733 190,566 1/05/05 30/04/06 2007

61,705 11,492 1/05/05 30/04/06 2007

73,631 1/07/05 30/06/06 2008

95,105 1,006,189 1/01/07 31/12/07 2009

12,330 38,361 1/07/04 30/06/05 2007

118,468 1,818,347 1/07/04 30/06/05 2006

25,846 176,446 1/08/06 31/07/07 2009

8,705 43,036 1/03/05 1/03/06 2008

33,019 1/01/05 31/12/05 2007

9,888 60,827 1/07/05 30/06/06 2007

13,022 45,863 1/07/05 30/06/06 2007

17,054 115,412 1/07/05 30/06/06 2008

13,910 106,943 1/07/05 30/06/06 2007

11,040 1/06/06 1/07/07 2009

10,844 1/04/05 31/03/06 2007

23,537 146,818 1/01/05 1/01/06 2007

44,461 57,289 1/01/05 1/01/06 2008

11,843 70,363 1/01/06 31/12/06 2008

58,124 1/01/04 31/12/04 2009

11,110 67,015 1/07/05 30/06/06 2007

135,085 30/06/04 1/07/05 2007

57,097 31/12/04 31/12/05 2007

16,483 628,764 31/12/04 31/12/05 2007

2,229,975 2,521,100 1/01/04 31/12/04 2007

329,952 1,466,379 1/07/03 30/06/05 2007

222,973 31,075 1/01/05 31/12/05 2006

10,440 101,231 1/07/05 30/06/06 2007

11,362 429,591 1/07/05 30/06/06 2007

12,843 1/01/05 31/12/05 2007

30,589 92,865 1/01/05 1/01/06 2007

15,830 1/07/05 1/06/06 2007

11,348 1/03/06 1/03/07 2008

114,598 2,551,895 1/01/05 31/12/05 2009

28,092 1/07/05 1/07/06 2007

10,831 220,828 1/06/05 31/05/06 2007

11,731 4/05/05 5/04/06 2007

23,038 148,517 1/05/05 30/04/06 2007

16,679 1/06/05 1/06/06 2007

25,406 1/01/05 1/01/06 2006

118,816 603,027 1/01/05 1/01/06 2006

497,024 1/07/05 30/06/06 2009

35,893 1/07/05 30/06/06 2007

46,523 1/01/05 31/12/05 2007

27,948 1/01/05 31/12/05 2007

46,854 1/01/05 1/01/06 2006

12,084 48,337 1/05/05 30/04/06 2007

Page 15: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

139,639 1/01/05 1/01/06 2007

80,719 1/01/06 31/12/06 2008

12,294 37,039 1/01/05 31/12/05 2007

28,104 1/09/06 31/08/07 2008

19,003 75,398 1/01/05 31/12/05 2007

7,156 1/07/05 1/07/06 2008

15,290 185,556 1/02/05 31/01/06 2007

31,603 451,422 1/04/04 31/03/05 2007

47,274 140,276 1/04/04 31/03/05 2007

19,736 1/09/04 31/08/05 2007

12,984 161,755 1/07/05 30/06/06 2007

34,670 207,739 1/01/05 1/01/06 2006

20,212 47,000 1/01/05 1/01/06 2007

78,328 1/07/05 30/06/06 2007

23,966 29,818 1/01/05 1/01/06 2007

25,799 241,573 1/01/06 31/12/06 2007

20,892 35,431 1/08/05 31/07/06 2007

11,720 42,110 5/09/05 3/09/06 2008

10,637 2,957 1/07/05 1/07/06 2007

12,245 175,604 1/07/05 30/06/06 2007

14,948 1/08/05 1/08/06 2007

24,335 1/07/06 30/06/07 2009

21,954 1/07/05 30/06/06 2009

12,416 8,830 1/08/05 31/07/06 2008

17,096 1/12/05 30/11/06 2008

16,738 307,000 1/01/05 1/01/06 2006

19,182 41,637 1/07/04 30/06/05 2009

33,861 1/07/05 30/06/06 2007

9,512 1/07/05 30/06/06 2008

21,143 61,387 1/01/05 31/12/05 2007

10,495 1,500 1/07/05 30/06/06 2007

20,117 1/11/05 1/11/06 2008

25,757 43,212 1/07/06 30/06/07 2008

2,610,913 540,945 1/01/04 31/12/04 2006

24,306 1/07/05 30/06/06 2007

25,919 1/01/05 31/12/05 2009

20,961 1,011 1/01/05 31/12/05 2009

21,958 1/01/06 31/12/06 2009

55,463 1/01/05 1/01/06 2007

31,432 1/01/05 1/01/06 2007

116,554 1/01/05 1/01/06 2007

93,451 10,552,243 1/10/04 30/09/05 2006

18,880 144,126 1/06/05 31/05/06 2008

11,893 26,752 1/05/05 30/04/06 2008

42,371 33,612 1/07/04 30/06/05 2007

27,275 8,790 1/07/05 30/06/06 2007

22,121 95,242 1/01/05 31/12/05 2006

37,972 333,802 1/07/05 30/06/06 2007

Page 16: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

26,638 2,752 1/01/05 1/01/06 2006

27,338 20,754 1/02/05 1/02/06 2007

13,020 205,834 1/07/05 30/06/06 2007

12,074 1/07/05 30/06/06 2007

12,133 35,028 1/01/07 31/12/07 2008

30,812 242,286 1/01/05 1/01/06 2007

29,391 67,028 1/11/04 31/10/05 2009

50,997 1/04/05 31/03/06 2007

7,941 26,702 1/07/05 1/07/06 2007

15,616 25,333 1/01/07 31/12/07 2009

34,181 330,534 1/01/05 31/12/05 2007

11,090 1/10/04 31/10/05 2008

10,170 3 1/09/05 31/08/06 2007

22,655 34,544 1/07/05 30/06/06 2007

22,062 151,525 1/01/05 1/01/06 2007

608,000 1/03/04 28/02/06 2007

8,562 1/09/05 31/08/06 2007

702,714 1,365,677 1/08/06 31/01/07 2008

204,228 1/01/05 31/12/05 2007

17,872 1/01/05 31/12/05 2007

20,996 33 1/01/05 1/01/06 2009

9,860 1/03/06 28/02/07 2007

12,587 14,559 1/01/06 31/12/06 2007

27,199 138,184 1/01/04 1/01/05 2009

308,848 612,783 1/01/04 1/01/05 2007

151,269 1,590,879 1/01/04 1/01/05 2007

12,724 1/01/06 31/12/06 2008

31,346 105,792 1/08/05 31/07/06 2007

10,715 1/01/05 31/12/06 2008

24,131 5/05/06 10/05/07 2007

9,448 1/08/05 31/07/06 2008

55,296 1/01/05 1/01/06 2006

15,977 156,776 30/06/05 30/06/06 2007

95,563 1/07/05 30/06/06 2007

12,950 18,960 1/01/05 31/12/05 2008

120,332 1/07/07 30/06/08 2008

27,695 1,177,939 1/04/05 1/04/06 2007

21,172 74,581 1/08/04 1/08/05 2007

17,607 1/01/05 31/12/05 2007

91,199 1/01/05 31/12/05 2007

32,582 1/01/06 31/12/06 2009

17,354 1/01/05 31/12/05 2007

196,529 2,267,199 1/07/04 1/07/05 2007

15,725 1/07/05 30/06/06 2008

12,372 1/05/05 30/04/06 2008

14,017 17,642 1/05/05 30/04/06 2008

13,531 37,731 1/10/05 1/10/06 2007

15,151 212,914 1/07/05 30/06/07 2007

Page 17: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

17,105 44,924 1/03/05 28/02/06 2007

14,200 88,200 1/01/05 1/04/06 2007

295,000 16,040,000 1/01/05 30/04/06 2006

12,521 15,272 1/03/06 1/03/07 2007

123,047 157,891 1/04/05 31/03/06 2007

32,701 1/09/05 31/08/06 2007

12,248 21,000 1/01/06 30/12/06 2008

13,234 1/07/05 30/06/06 2007

14,654 283,275 1/01/05 31/12/05 2007

26,771 16,377 1/03/06 1/03/07 2009

39,990 78,050 1/01/06 31/12/06 2007

37,738 1/01/06 31/12/06 2007

15,374 40,914 1/07/05 1/07/06 2007

10,079 19,954 1/01/06 31/12/06 2008

14,638 5,652 1/10/05 30/09/06 2007

15,026 52,289 30/09/07 30/09/08 2009

86,489 66,592 1/07/04 30/06/05 2006

44,528 1/07/04 30/06/05 2006

19,030 1/07/05 30/06/06 2008

10,293 21,819 1/07/06 30/06/07 2008

12,101 24,715 1/07/06 30/06/07 2009

17,924 101,324 1/07/06 30/06/07 2008

33,048 57,561 1/07/06 30/06/07 2009

43,329 56,424 1/07/06 30/06/07 2008

10,704 3,088 1/05/05 1/05/06 2007

15,949 1/07/05 1/07/06 2007

40,654 1/02/05 1/02/06 2007

44,923 1/03/05 1/03/06 2007

11,720 1/03/05 1/03/06 2007

30,893 3,901 1/04/05 1/04/06 2007

15,816 22,777 1/07/04 30/06/06 2008

50,468 122,237 1/07/04 30/06/06 2008

205,706 1/01/05 1/01/06 2007

20,492 69,143 30/06/06 30/06/07 2007

10,524 481 1/04/05 31/03/06 2007

14,132 1/01/05 31/12/05 2007

10,069 1/01/05 31/12/05 2007

11,282 1/01/05 31/12/05 2007

15,661 1/01/05 31/12/05 2007

10,896 381,674 1/07/02 30/06/03 2007

15,292 598,284 1/07/02 30/06/03 2007

234,766 1,193,642 1/02/05 31/01/06 2006

23,269 45,206 1/07/03 30/06/04 2009

36,962 147,464 1/01/05 1/12/05 2006

22,168 69,932 1/01/05 31/12/05 2006

12,347 1,187 1/01/05 31/12/05 2007

69,003 17,495 1/01/06 1/01/07 2009

7,402,771 1,548,051 1/01/05 31/12/05 2006

Page 18: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

10,347 9,078 1/12/05 1/12/06 2007

13,655 25,834 1/04/05 31/03/06 2009

13,429 1/01/05 31/12/05 2007

14,616 85,223 31/12/04 31/12/05 2007

64,240 53,562 1/01/04 1/01/05 2007

26,387 20,835 1/01/05 31/12/05 2007

25,911 23,492 1/01/05 31/12/05 2007

17,969 1/01/05 1/01/06 2007

12,220 44,658 1/03/05 1/03/06 2006

59,212 382,913 1/05/05 1/05/06 2007

117,646 1/01/05 31/12/05 2006

58,932 39,612 1/04/05 1/04/06 2007

11,408 31,775 1/05/05 30/04/06 2007

15,797 8,925 1/04/05 1/04/06 2007

20,996 1/07/04 30/06/05 2007

165,219 1/01/05 1/01/06 2007

22,962 29,055 1/07/05 30/06/06 2007

14,814 1/07/05 30/06/06 2007

24,200 1/07/05 30/06/06 2007

11,463 1/11/05 31/10/06 2008

19,297 31,608 1/01/06 31/12/06 2008

27,408 1/01/05 1/01/06 2007

142,544 1/01/05 1/01/06 2007

47,335 1/01/05 1/01/06 2007

294 1/01/05 1/01/06 2007

28,644 1/01/05 1/01/06 2007

88,821 1/01/05 1/01/06 2007

18,325 1/07/07 30/06/08 2009

5,323 13,988 1/07/05 1/07/06 2007

5,228 5,545 1/07/04 30/06/05 2007

8,553 33,383 31/12/04 31/12/05 2007

5,483 3,622 1/07/04 1/07/05 2008

2,853 3,059 1/01/06 31/12/06 2009

18,203 21,376 1/01/06 31/12/06 2008

2,744 11,491 1/09/02 1/10/03 2008

1,544 5,021 1/07/04 30/06/05 2008

9,871 1/04/05 1/04/06 2007

13,230 6,610 1/01/05 31/12/05 2007

15,930 3,386 1/01/05 31/12/05 2007

20,032 1/07/07 30/06/08 2008

8,037 12,564 1/07/06 30/06/07 2008

2,442 13,980 1/06/05 1/06/06 2007

2,729 30/11/03 30/11/04 2007

3,670 2,378 30/06/05 30/06/06 2008

7,293 1/07/02 30/06/03 2009

3,364 8,352 1/07/04 30/06/05 2008

5,135 62 1/07/05 30/06/06 2007

5,370 14,214 1/01/05 1/01/06 2007

Page 19: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

4,334 1/01/05 31/12/05 2007

2,520 1/07/05 30/06/06 2007

7,255 2,083 1/07/04 30/06/05 2008

4,594 1/01/05 31/12/05 2007

6,879 1,679 1/07/06 1/07/07 2009

20,858 1/05/05 1/05/06 2007

1,933 1,889 1/07/04 1/07/05 2007

17,986 1/01/06 1/01/07 2007

5,261 4,253 1/02/05 1/02/06 2007

3,451 3,028 1/07/04 30/06/05 2008

1,451 1/07/05 30/06/06 2008

5,742 10,778 1/04/05 1/04/06 2007

1,745 4,413 1/01/05 31/12/05 2007

19,407 887 1/02/06 31/01/07 2008

17,515 1/09/05 31/08/06 2007

11,628 1/07/04 1/07/05 2007

5,972 2,278 1/07/06 30/06/07 2009

2,992 12,372 1/07/05 1/07/06 2007

5,866 1/07/05 30/06/06 2007

8,782 13,058 1/01/06 1/01/07 2009

4,231 1/07/04 30/06/05 2008

4,528 1/01/04 31/12/04 2008

3,076 11,436 1/07/05 30/06/06 2009

8,348 9,059 1/07/06 30/06/07 2009

1,392 490 1/07/03 30/06/04 2008

20,433 1/07/04 30/06/05 2008

Page 20: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

OrgID OppID Measure Description Measure Type

601 2682 Temperature reset controls and timing rescheduling Cost-Effective

601 2683 Temperature reset controls and timing rescheduling Cost-Effective

597 5694 Install solar water heating system as an auxiliary pool heating system Potentially Cost-Effective

305 931 ‘Lights off initative’ Cost-Effective

492 4106 Staff are encouraged to report energy and water waste online Cost-Effective

492 4107 Staff are encouraged to report energy and water waste online Cost-Effective

492 4092 Staff are encouraged to report energy and water waste online Cost-Effective

492 4093 Staff are encouraged to report energy and water waste online Cost-Effective

492 4104 Aims to monitor and reduce energy consumption via research projects,Cost-Effective

492 4083 Aims to monitor and reduce energy consumption via research projects,Cost-Effective

492 4090 Aims to monitor and reduce energy consumption via research projects,Cost-Effective

492 4091 Aims to monitor and reduce energy consumption via research projects,Cost-Effective

330 440 Dragline Digital Drive & Tritronics Installation and Optimisation of OperPotentially Cost-Effective

514 4612 20 Minute rule on the dragline. Cost-Effective

352 2340 200kVAr Power Factor Correction Duralie - demand reduction 83kVA Cost-Effective

342 1154 24 hour, 7 day timers on natural gas comfort heaters Cost-Effective

570 839 24 hours fluorescent lighting: convert to T5 lamps Cost-Effective

390 4861 Drawbench main drives Potentially Cost-Effective

303 3590 Improve efficiency of compressed air distribution Cost-Effective

303 3583 Cement mill diaphragm allowing media escape - repair and replace Cost-Effective

302 3560 Improve the reuse & recycling of reject material Cost-Effective

303 3591 Link all compressors to DCS to improve on/off and load/unload control.Cost-Effective

303 3585 VSD on slag dryer colling fan(s) Potentially Cost-Effective

303 3576 Install VSDs on clinker cooling fans Potentially Cost-Effective

302 3561 On-line fineness analyser for Cement Mills Potentially Cost-Effective

302 3559 Upgrade cement milling capacity by installing a new cement mill #7 Cost-Effective

583 2954 8Watt 24V Double Wedge-1Watt LED Crystal flex Potentially Cost-Effective

501 4249 A compressor scheduling system on the high pressure compressors has Cost-Effective

298 2145 Action to ensure doors to freezers and refrigerated areas closed: instrucCost-Effective

445 4208 Activate Energy Star feature on PCs Potentially Cost-Effective

580 5306 Activate Energy Star on computers Cost-Effective

575 1502 Add 7-day time switch to control domestic hot water circulation pump Cost-Effective

575 1515 Add 7-day timers to boiling water units Cost-Effective

349 1322 Add light switches to intermittently used offices and rooms Potentially Cost-Effective

466 3149 Add stiffening bracings on units Cost-Effective

438 3117 Adjust feedwater pump on boiler Cost-Effective

564 1755 Adjust HVAC control, introduce economy cycle and replace A/C unit withCost-Effective

594 5058 Adjust Start/Finish times of air conditioner Cost-Effective

571 3244 Adjust steam generator timer to operate only when required. Cost-Effective

434 2181 Adjust Suction Pressure on Ammonia Refrigeration Cost-Effective

561 2739 Adjust the time clock on the water feature pump to turn off during high Cost-Effective

582 4709 Adjust the timer controls for the change room lighting. Cost-Effective

571 3315 Adjust time switch on movement detector that controls the toilet blocks' Cost-Effective

414 4824 Advanced Air Compressor Control System Potentially Cost-Effective

465 1599 Aerobic sludge digestion controls Potentially Cost-Effective

318 4462 After Burner gas reduction Potentially Cost-Effective

480 5357 After Hours Shut-Down Cost-Effective

Page 21: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

336 5942 Afterburner Potentially Cost-Effective

290 3409 AHU temperature Set-point setback Cost-Effective

336 5941 Air compressor Potentially Cost-Effective

379 1189 Air compressor and chiller energy management control system. Potentially Cost-Effective

379 1177 Air compressor cooling tower recirculation pump VSD Cost-Effective

482 418 Air Compressor Inlet Air Supply (Heat Exhaust) Potentially Cost-Effective

334 3803 Air compressor leak reduction Cost-Effective

291 4293 Air compressor operation Cost-Effective

312 787 Air compressor optimal control Cost-Effective

495 1290 Air compressor replacement Cost-Effective

411 2528 Air compressor room lighting timer switch Cost-Effective

332 4507 Air Compressors Cost-Effective

486 218 Air Compressors: Investigate potential savings through: 1) elimination Potentially Cost-Effective

583 3000 Air Con System Review Cost-Effective

583 3027 Air Con System Review Cost-Effective

583 3009 Air Con System Review(site 10% of AC consumption) Cost-Effective

378 16 Air Conditioning – Install timer control to office air conditioning units. Cost-Effective

489 4147 Air Conditioning & Ventilation – office Potentially Cost-Effective

460 1892 air conditioning control to outer buildings Cost-Effective

595 5436 Air conditioning economy cycle Potentially Cost-Effective

377 4847 Air knife systems Potentially Cost-Effective

336 5943 Air preheater on shaft furnace Potentially Cost-Effective

280 4237 Air rinse on elevators Cost-Effective

480 5355 Air-Conditioning System Improvements Cost-Effective

455 1920 Air-conditioning to the Box office Foyer area Potentially Cost-Effective

455 1915 Air-conditioning to the Venue areas Cost-Effective

595 5435 Air-cooled heat exchanger to CoGen Potentially Cost-Effective

506 4279 Car Park Shutdown - Centre security to isolate access to Car Park at 8:Cost-Effective

428 4406 Installation of Master Batch extruder in a unit Cost-Effective

305 940 Enable power saving feature on all PC's Cost-Effective

305 1021 Install sensors for lights in infrequently used areas Potentially Cost-Effective

305 941 Install timers on Air Con units Cost-Effective

486 216 Improve current efficiency of ALPYSYS Pot Regulation System Cost-Effective

486 214 Improve current efficiency of ALPYSYS Pot Regulation System Cost-Effective

486 217 Improve current efficiency of ALPYSYS Pot Regulation System Cost-Effective

604 2265 Alter the air conditioning controls to suit the current occupancy Cost-Effective

594 5077 Alter the control system to increase the aeration delay time Cost-Effective

485 5817 Alter the controls on Mechanical SW/BD Cost-Effective

485 5815 Alter the controls on the level 2 common/staff room air conditioners Cost-Effective

485 5816 Alter the controls on the laboratory console air conditioners Cost-Effective

571 3276 Alterations and additions to light control system Cost-Effective

583 3037 Alterations to site staff sheds Potentially Cost-Effective

502 4526 Alternative conveyor route Potentially Cost-Effective

426 5350 Aluminium Wire drawing lubrication system Potentially Cost-Effective

577 2491 Amenities block lighting upgrade Cost-Effective

604 2319 Amenities Blocks solar hot water with additional 600 litres storage (optiPotentially Cost-Effective

429 6558 Amenities Light Sensors Cost-Effective

440 6532 Ammonia Back pressure valves for Spirals Potentially Cost-Effective

Page 22: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

318 4436 Ammonia pipe lagging Cost-Effective

411 2542 Ammonia pump VSD Potentially Cost-Effective

371 367 Ammonia storage refrigeration plant efficiency Potentially Cost-Effective

318 4438 Application fo lumitrols Cost-Effective

329 1676 Application of air cooled condenser Cost-Effective

468 6476 Application of C-Bus system for controlling lighting - Upgrade of lightin Potentially Cost-Effective

318 4453 Application of occupancy sensors (50 units) Potentially Cost-Effective

339 2657 Application of Skycool to roof surface Potentially Cost-Effective

373 5513 Application of VSD on high pressure fan Potentially Cost-Effective

401 702 Application of VSD’s - Improve the efficiency of larger drives by appli Potentially Cost-Effective

321 294 Application of VSDs to Dryers Potentially Cost-Effective

419 2119 Apply "SkyCool" Heat Reflective Paint to Roof Potentially Cost-Effective

455 1917 Appoint an energy Manager Cost-Effective

379 1190 Apron feeder recirculation fan VSD Potentially Cost-Effective

443 5830 Department Economy Cycle Cost-Effective

509 6502 Artifical Demand - Cylinders Cost-Effective

509 6518 Artifical demand - Rise to Pressure Potentially Cost-Effective

336 442 Artificial Lighting Measures Cost-Effective

397 4014 Assess all air-conditioning systems for efficiency and install latest gen Potentially Cost-Effective

397 4017 Assess all site electric motor operation for operating efficiency – inclu Cost-Effective

397 4015 Assess possibility of using external air for cooling of substations durin Potentially Cost-Effective

464 1637 Assess the Feasibility of Implementing a Hydro-Turbine Potentially Cost-Effective

466 3155 Assess the feasibility to purchase, implement and operate a water pumPotentially Cost-Effective

464 1633 Assess the Feasibilityto Purchase, Implement and Use a Water Pump Potentially Cost-Effective

498 2831 Assorted variable speed drives Cost-Effective

386 4069 Atrium Lighting Upgrade Potentially Cost-Effective

324 1657 audit and repair of the compressed air network Cost-Effective

515 4657 Audit of the Compressed Air System Cost-Effective

396 626 Auto - shutdown for milling operations based on duty requirement Cost-Effective

465 1602 Auto bleeders on RAS pumps Potentially Cost-Effective

396 645 Auto shutdown for minor road dump elevator Cost-Effective

396 634 Auto stop controls for 'Product control' transfer drag conveyors Cost-Effective

297 535 Automate Intake System to enable shutdown of entire system when notCost-Effective

298 2165 Automate Intake System on PLC Potentially Cost-Effective

297 6043 Automate Intake System; interlink silo and silo blower controls to ena Cost-Effective

298 2149 Automate refrigeration plant Potentially Cost-Effective

499 4275 Automate shut down of perform conveyors when the IMM s are off Cost-Effective

396 653 Automate start / stop conveyors Potentially Cost-Effective

440 6525 Automated compressor staging, compressor capacity control and ReplCost-Effective

396 638 Automated oxygen trim for Steambloc boiler Cost-Effective

349 1320 Automatic control of Barometric and Cooling Water pumps. Connect Potentially Cost-Effective

417 4388 Automatic Timed Shutdown of Delivery Dust Collector Potentially Cost-Effective

581 3944 Automatic water test linked to pump to reduce hours of operations (as Cost-Effective

581 3948 Automatic water test linked to pump to reduce hours of operations (as Cost-Effective

571 3321 Automatically switch off the shower block's hot water system when it is Potentially Cost-Effective

571 3322 Automatically switch off the shower block's lighting when not required. Potentially Cost-Effective

493 6168 Automation of natural ventilation louvres Potentially Cost-Effective

512 4582 Automation of surface conveyor Cost-Effective

Page 23: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

396 637 auto-sequence shut-down based on drier status Cost-Effective

285 1568 Auto-shut on hydraulic pump Cost-Effective

497 1335 Dryer hood humidity control. Install %RH or dew point measurements inCost-Effective

497 1339 Use oversize wood chips as boiler fuel. The resizer can then be turned Cost-Effective

497 1341 Reduce compressed air pressure. Cost-Effective

497 1342 Increase lime mud %solids to kiln. Cost-Effective

497 1348 Mill condensate pump - motor too large. Cost-Effective

486 212 Installation of U Main balancing dampers Cost-Effective

486 229 O2 / CO inline analysis. Better control of excess air Potentially Cost-Effective

282 3163 Balance heating and cooling and reset set points Cost-Effective

604 2241 Bank one of the hot water boilers at all times Cost-Effective

570 843 Bar radiator time delay switches. Cost-Effective

354 2891 Basement carpark lighting control — motion sensors Cost-Effective

280 4255 Batch house vacuum system Cost-Effective

486 219 Bathhouse hot water system: Investigate alternative options to existing Potentially Cost-Effective

293 2765 Battery charging bay lighting Potentially Cost-Effective

292 4349 Battery charging bay lighting Cost-Effective

491 739 Benchmark electricity use from metering data and apply recommendatiCost-Effective

491 740 Benchmark SNG use from metering data and apply recommendations frCost-Effective

433 3855 Bio Mas Plant Potentially Cost-Effective

318 4435 Biofilter Cost-Effective

319 2423 Biogas Collection from Anaerobic ponds Potentially Cost-Effective

486 215 Riser Bolted Joints (reduced voltage drop) Cost-Effective

575 1527 Blank off outside air louvres behind the seating gallery in the pool hall. Cost-Effective

356 2552 Lay-up AHU,modify unit to replace electric hot water service with hot Potentially Cost-Effective

458 1878 evaporative fluid cooler refurbishment Cost-Effective

458 1879 Bld refurbishment Cost-Effective

299 2633 Blowdown heat recovery Cost-Effective

485 5731 BMS scheduling of centre a/cs Cost-Effective

458 1882 BMS time clock control building 3 air handling and fan coil units Cost-Effective

337 1046 Boardline Oven Energy options Potentially Cost-Effective

408 1231 Boiler - Use waste heat in boiler blowdown to preheat feed water. CurrenCost-Effective

426 5345 Boiler air/fuel ratio adjustment Cost-Effective

319 2428 Boiler Blowdoen Heat Exchanger Potentially Cost-Effective

299 2634 Boiler economiser Cost-Effective

291 4300 Boiler economiser Potentially Cost-Effective

292 4360 Boiler economiser Potentially Cost-Effective

349 1318 Boiler efficiency Project Cost-Effective

411 2539 Boiler Feedwater pump VSD Potentially Cost-Effective

291 4297 Boiler feedwater tank insulation Potentially Cost-Effective

291 4310 Boiler house lighting Potentially Cost-Effective

379 1179 Boiler house lighting. Cost-Effective

382 3683 Boiler optimisation Potentially Cost-Effective

308 3782 Boiler optimisation Cost-Effective

291 4301 Boiler Oxygen Trim Control Potentially Cost-Effective

438 4840 Boiler pass out steam turbines Potentially Cost-Effective

379 1170 Boiler precision combustion control Cost-Effective

411 2536 Boiler precision combustion control Potentially Cost-Effective

Page 24: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

372 5484 Boilers feed pump speed control Potentially Cost-Effective

328 249 Bore Pumps 3xVVVF & Power Factor Correction Potentially Cost-Effective

305 960 BOS off-gas (LDG) recovery Potentially Cost-Effective

318 4456 Build MCC & air condition Potentially Cost-Effective

329 1688 Building Cost-Effective

329 1700 Building Cost-Effective

329 1701 Building Cost-Effective

329 1702 Building Cost-Effective

329 1703 Building Cost-Effective

379 1174 Dryer recirculation fan VSD Cost-Effective

379 1192 Process Hydraulic Pump VSD Potentially Cost-Effective

329 1681 Building Cost-Effective

329 1682 plant room Cost-Effective

329 1683 plant room Cost-Effective

329 1678 Building Cost-Effective

329 1679 Building Cost-Effective

329 1680 Tlectronic bar heaters Cost-Effective

379 1181 Oven recirculation fan VSD Cost-Effective

329 1685 Building Cost-Effective

329 1684 Building Cost-Effective

379 1186 Building dryer circulation fan VSD Potentially Cost-Effective

379 1191 Building Dryer recirculation fan VSD Potentially Cost-Effective

379 1182 Building Oven recirculation fan VSD Cost-Effective

379 1173 Building daylight compensation Cost-Effective

329 1686 Building laboratory section Cost-Effective

329 1687 Building pharmacy section Cost-Effective

329 1690 Building Cost-Effective

329 1689 Building Cost-Effective

329 1707 Building Cost-Effective

329 1691 Building Cost-Effective

329 1692 Building Cost-Effective

329 1706 Building Cost-Effective

292 4338 Building Air Con Cost-Effective

292 4339 Building lighting Cost-Effective

329 1711 Building Cost-Effective

329 1705 Building Cost-Effective

329 1697 Building Cost-Effective

329 1698 Building Cost-Effective

329 1695 Building Cost-Effective

329 1694 Building Cost-Effective

329 1693 Building Cost-Effective

329 1696 Building Cost-Effective

282 3168 Building Management System Potentially Cost-Effective

455 1926 Building Management System replacement Potentially Cost-Effective

344 530 Building Management System, Metering & HVAC plant initiatives Potentially Cost-Effective

454 108 Building T refrigeration control Cost-Effective

329 1710 Buildings Cost-Effective

492 4094 Bulk change over of all 50W halogen light globes to 35/20W IRC lampsCost-Effective

Page 25: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

329 1670 Bus shed lights off Cost-Effective

497 1352 Recover condensate from all sources Potentially Cost-Effective

506 4344 C02 control of minimum outside air. Currently AHU s (24 off) have betwePotentially Cost-Effective

497 1353 C02. Use cold fresh air to rooms to reduce A/C load. Potentially Cost-Effective

497 1354 Use VSD's in energy plant where warranted. Potentially Cost-Effective

497 1355 Improve insulation to rooms to reduce A/C load and danger of drives trPotentially Cost-Effective

497 1356 Install high efficiency motors. Potentially Cost-Effective

497 1357 Install VSD drives in paper machine where warranted. Potentially Cost-Effective

497 1360 Agitator power variation with VSD. Potentially Cost-Effective

604 2273 Cabin Incandescent lamp replacement Cost-Effective

366 5678 Cafeteria and Corridors Lamp Replacement - Replace 490 100W incandesCost-Effective

414 4811 Canteen Lighting Automation Cost-Effective

325 764 Capture Compressor Waste Heat 10 space-heat house (using Heat PuPotentially Cost-Effective

387 1273 Capture heat from air compressors to pre-heat boiler feedwater. Cost-Effective

505 4379 Car Park and House Flourescent Lighting - T5 kit lamp conversion of houPotentially Cost-Effective

505 4382 Car Park and Loading Dock Ventilation Control - VSD Control of supplyPotentially Cost-Effective

506 4352 Car Park and Pelmet Flourescent Lighting - T5 kit lamp conversion of lPotentially Cost-Effective

570 847 Car park lighting: dimming control system Cost-Effective

570 848 Car park lighting: separate store area circuits Cost-Effective

506 4330 Car Park Ventilation Control -VSD Control of Car Park Ventilation fans Potentially Cost-Effective

602 2777 Carbon dioxide sensors and variable speed drives to control supply anPotentially Cost-Effective

433 3862 Carcass decontamination unit Potentially Cost-Effective

433 3857 Carcass wash water to paunch chute Potentially Cost-Effective

580 5181 Carpark - Delamp fluorescent lighting with triphosphor tubes and modifyCost-Effective

339 2655 Carpark Lighting replace 150 Watt ligh with lower wattage flurorescent Cost-Effective

329 1666 Building Cost-Effective

573 3464 Carry out a lighting refit to a T5 LL MT adaptor System Potentially Cost-Effective

573 3462 Carry out a lighting refit to all T5 LL MT Adaptor System Potentially Cost-Effective

363 325 Casting Plant optimisation, installing multiple thermocouples to reduce Cost-Effective

455 1921 C-BUS incorporating lighting control and implementation of lighting sc Potentially Cost-Effective

342 1156 C-bus programmable lighting control Potentially Cost-Effective

396 633 Cease use of P4 cyclone fan Cost-Effective

312 788 Ceiling Space Ventilation above cigarette manufacturing area Cost-Effective

468 6477 Central Cogeneration Project Potentially Cost-Effective

569 3677 Office lighting upgrade Potentially Cost-Effective

590 2904 CFL's in ground floor lobbies, service area Cost-Effective

592 1413 Change fittings with 54W T5 globes to 28W T5 globes Potentially Cost-Effective

284 4028 Change from continuous operation to 3 out of 4 shifts Cost-Effective

320 4415 Change from Pneumatic to Mechanical Meal Conveying Potentially Cost-Effective

571 3343 Change incandescent lights to compact fluorescent Cost-Effective

372 5477 Change Mercury Vapour to Metal Halide lamps Cost-Effective

594 5075 Change operation of Blowers so that both Blowers operate on full VSD Cost-Effective

417 4385 Change Service Agreement for Service of Burners Cost-Effective

363 326 Change to launder refractory Potentially Cost-Effective

373 5511 Change to mercury halide lamps Cost-Effective

581 3949 Changing luminaires to more efficient types Cost-Effective

581 3950 Changing luminaires to more efficient types Cost-Effective

581 3951 Changing luminaires to more efficient types Cost-Effective

Page 26: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

571 3235 Changing the pool water temperature to 27oC. Cost-Effective

485 5892 Check all control systems and schedules of HVAC systems Cost-Effective

587 5028 Check time clock program and analyse time use Cost-Effective

329 1712 Factory Cost-Effective

400 1734 Chemical addition to reduce specific energy consumption in primary stagPotentially Cost-Effective

329 1704 Building Cost-Effective

444 4045 HW boilers - link North and South boilers Potentially Cost-Effective

297 541 Chilled water manufacturing plant on Citec to enable pump cycling, st Cost-Effective

482 421 Chilled Water Pump Replacement (Further investigation required bas Potentially Cost-Effective

344 529 Chilled Water System Initiatives Cost-Effective

445 4211 Chiller 1&2 VSDs on cooling tower fans Potentially Cost-Effective

366 5683 Chillers replacement - 6 chillers will be replaced by 4 Centrifugal Chi Cost-Effective

370 1461 Address Vacuum Pump V-belt slippage Cost-Effective

370 1460 Repair cell compressor line leak Cost-Effective

370 1465 Shut down Shale Belt Potentially Cost-Effective

370 1464 Shut down raw coal belts and trash screen Potentially Cost-Effective

370 1466 VVVF drive on conveyors Potentially Cost-Effective

370 1458 VVVF drive on reclaim conveyor Cost-Effective

370 1463 VVVF drive on stack out conveyors Potentially Cost-Effective

370 1459 Washdown water use and sump pump water level management Cost-Effective

444 4031 CHW temperature reset - central campus chillers Cost-Effective

444 4030 CHW temperature reset chillers Cost-Effective

366 5684 Circulating pumps for HVAC replaced with VSDs Cost-Effective

396 641 Citect control for roof fans Cost-Effective

396 632 Citect control of Air Handling units (roof & rear factory inlets / roof exhaCost-Effective

396 639 Citect Control of dust collectors Cost-Effective

512 4583 Citect Warning on train loading belts running empty Cost-Effective

458 1881 clean all evaporative fluid cooler jets Cost-Effective

282 3164 Clean light shields and de-lamp Cost-Effective

500 509 Clean up wash line water Cost-Effective

408 1230 Baking furnaces in cleaning house tend to all be left on, but can make Cost-Effective

570 845 Cleansing Bay lighting: change to 250W metal halide Cost-Effective

298 2167 Close off holes in walls where extractor fans have been removed Cost-Effective

583 2960 Close pool in June, July and August Cost-Effective

284 4029 Close production areas Cost-Effective

574 5137 CO control of car park ventilation Potentially Cost-Effective

570 831 CO Sensors and On/Off controls for car park ventilation fan Cost-Effective

505 4384 CO2 control of minimum outside air - Currently AHU's (32 off) have betwPotentially Cost-Effective

354 2892 CO2 monitoring & Minimum outside air control Cost-Effective

469 479 Coal washery energy efficiency improvements Potentially Cost-Effective

355 312 Co-Gen; Steam turbine generator Potentially Cost-Effective

359 465 Cogeneration Potentially Cost-Effective

439 3301 Cogeneration Potentially Cost-Effective

345 3831 Cogeneration Potentially Cost-Effective

290 3414 Co-generation facility Potentially Cost-Effective

335 1761 Co-generation including Absorption Chiller Potentially Cost-Effective

340 3892 Co-generation system Cost-Effective

603 2604 Co-generation to provide electricity and water heating requirements Cost-Effective

Page 27: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

318 4455 Cold air recovery from boning room Potentially Cost-Effective

379 1180 Combination Line Oven recirculation fan VSD Cost-Effective

371 364 Combination of 2 and 4 Potentially Cost-Effective

371 349 Combination of two options Cost-Effective

322 5952 combine oil circuit Potentially Cost-Effective

318 4441 Combustion air preheating for the boiler Potentially Cost-Effective

319 2421 Combustion control for 10MW Boiler Potentially Cost-Effective

318 4434 Combustion control to control oxygen to fuel ratio to the boiler Cost-Effective

596 4973 Commercial refrigerator control Cost-Effective

568 3512 Communications network tool coupled with data collected from an existCost-Effective

568 3514 Communications network tool coupled with data collected from an existCost-Effective

568 3518 Communications network tool coupled with data collected from an existCost-Effective

570 857 Community Room - HVAC time control Cost-Effective

587 5027 Compare bills. We appear to be significantly overcharged Cost-Effective

604 2255 Complete commissioning of the ammonia stripping system and fine tuneCost-Effective

453 1082 Complete program to replace old BMCS with new Metasys BMCS Cost-Effective

573 3434 Completed - Soft starters installed on key equipment Potentially Cost-Effective

573 3450 Completed - Upgrade to more efficient units (some pump stations) Potentially Cost-Effective

573 3424 Completed automatic doors installed to minimise heat loss Potentially Cost-Effective

301 1142 Compressed air - demand control Cost-Effective

446 4570 Compressed air - leaks - identify and fix Cost-Effective

446 4567 Compressed air - resize the main compressor / install small unit for lowCost-Effective

335 1766 Compressed Air System Cost-Effective

344 533 Compressed Air and Vacuum System lnitiaitves Potentially Cost-Effective

498 2829 Compressed air controls Cost-Effective

299 2637 Compressed air inlet air temperature reduction Cost-Effective

323 5395 Compressed air inlet temperature reduction Cost-Effective

438 3119 Compressed air leak control and system enhancements Cost-Effective

422 717 Compressed air leak initiative Cost-Effective

328 242 Compressed air leak reduction Cost-Effective

469 472 Compressed air leak reduction Cost-Effective

434 2179 Compressed Air leak reduction Cost-Effective

477 524 Compressed Air leak repair initiative Cost-Effective

338 3523 Compressed Air leak repair initiative Cost-Effective

478 753 Compressed air leak repair initiative. Cost-Effective

511 6599 Compressed air leak review Cost-Effective

439 3294 Compressed air leak survey/zoning Cost-Effective

337 1042 Compressed Air Leakage Cost-Effective

323 5400 Compressed air leakage programme Potentially Cost-Effective

282 3200 Compressed air leakage reduction Potentially Cost-Effective

411 2535 Compressed air leakage reduction program Potentially Cost-Effective

426 5347 Compressed air leakage reduction program Potentially Cost-Effective

414 4828 Compressed Air Leakage Reduction Programme Potentially Cost-Effective

377 4845 Compressed Air Leakage Reduction Programme Potentially Cost-Effective

318 4423 Compressed Air leakages awarness programme Cost-Effective

443 5833 Compressed Air Leakge Reduction Program Cost-Effective

355 309 Compressed Air Leaks Cost-Effective

342 1159 Compressed Air Leaks Potentially Cost-Effective

Page 28: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

293 2762 Compressed Air Leaks Cost-Effective

418 3418 Compressed Air Leaks Cost-Effective

291 4294 Compressed air leaks Cost-Effective

407 3721 Compressed air main fume plant - utilise existing interconnector to re Potentially Cost-Effective

288 5722 Compressed air optimisation Cost-Effective

322 305 Compressed air optimisation - New Schedule incorporating improved conCost-Effective

337 1044 Compressed air pressure reduction Potentially Cost-Effective

337 1041 Compressed Air Production Cost-Effective

346 3815 Compressed air refurb, WAN Potentially Cost-Effective

346 3814 Compressed air refurb, WM Potentially Cost-Effective

318 4465 Compressed Air removal for water removal on packages isolation valv Potentially Cost-Effective

383 2456 Compressed Air review Cost-Effective

357 2488 Compressed air review and ongoing 10% leakage reduction Potentially Cost-Effective

325 766 Compressed Air Review and Ongong 10% Leakage Reduction Potentially Cost-Effective

469 473 Compressed air staging controls Cost-Effective

340 3891 Compressed air system - comprehensive review Cost-Effective

504 579 Compressed Air System Comprehensive upgrade - compressor replacemenCost-Effective

299 2635 Compressed air system pressure reduction Cost-Effective

318 4422 Compressed Air System Pressure Reduction Cost-Effective

442 1574 Compressed air system reduction from 7.4 bar to 7.0 bar. Cost-Effective

511 4562 Compressed Air system review Potentially Cost-Effective

321 290 Compressed air use reduction (e.g. solenoid, blowers) Cost-Effective

424 4245 Compressed air. Replace and relocate site air compressors. Replace eCost-Effective

357 2481 Compresses Air reciever installation Cost-Effective

411 2543 Compressor Air intake Potentially Cost-Effective

359 461 Compressor Control Upgrade Cost-Effective

282 3199 Compressor for after hours load Potentially Cost-Effective

510 4492 Compressor Leak Review Cost-Effective

514 4614 Compressor Leak Review Cost-Effective

378 21 Compressor Management Cost-Effective

299 2638 Compressor replacement for VSD compressor Cost-Effective

322 5955 Compressor replacement (VSD in place of fixed) Potentially Cost-Effective

512 4591 Compressor review Potentially Cost-Effective

499 4277 Compressor scheduling package- control both high and low pressure Cost-Effective

515 4650 Compressor system review Potentially Cost-Effective

492 4108 Computer Laboratories: Air conditioning and lighting controlled using aCost-Effective

384 1968 Computer Monitor Upgrade Potentially Cost-Effective

365 5457 Computer raised floor Modules energy efficient lighting upgrade. UpgradCost-Effective

599 3205 Computer Shutdowns - turning off hard drives and monitors when not inCost-Effective

504 595 Computerised Energy Management and Control System - to progressively coPotentially Cost-Effective

508 2652 Computers - Replace CRT computer monitors with TFT monitors. Potentially Cost-Effective

318 4458 Condensat wast heat recovery from blood separation Potentially Cost-Effective

299 2632 Condensate Return Cost-Effective

439 3323 Condensate return Potentially Cost-Effective

426 5349 Condensate return pipe insulation Potentially Cost-Effective

434 2192 Condenser Fan VFD Control Potentially Cost-Effective

410 1777 condenser replacement Potentially Cost-Effective

389 4138 Conduct Air Leak Survey Cost-Effective

Page 29: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

360 3493 Conduct an air leak survey and instigate a regular repair program Potentially Cost-Effective

298 2152 Conduct leak detection for air& vacuum systems Cost-Effective

479 199 Conduct Motor Efficiency and Motor System Audit Potentially Cost-Effective

583 3032 Conduct of review of the truckwash operations and energy tariffs Potentially Cost-Effective

445 4194 Conduct regular air leak checks on compressed air lines Cost-Effective

435 452 Conduct series of test runs to define boiler operating windows to deliveCost-Effective

379 1195 Conference Room Occupancy Sensors Potentially Cost-Effective

396 630 Connect factory lighting to Citect control system Cost-Effective

396 628 Connect packaging area 'Climate-master' system to Citect to facilitat Cost-Effective

454 101 Consider installation of replacement capacitors in PFC equipment Potentially Cost-Effective

338 3532 consider VSDs on water pumps Potentially Cost-Effective

448 3763 Consolidate printes, photocopiers and faxes by using single Multi FunctiCost-Effective

585 4189 Upgrade Potentially Cost-Effective

458 1883 Energy meeting to designed system to replace the need for reticulated Cost-Effective

294 1640 Continuation of above work on motors Cost-Effective

491 741 Continue connection of non-networked HVAC systems (progressive) Cost-Effective

580 5304 Continue delamping of fluorescent lights to triphosphor Cost-Effective

404 2749 Continue de-lamping strategy Cost-Effective

580 5402 Continue retrofitting of twin lamps with single Cost-Effective

580 5411 Continue to reduce twin lamps to single lighting Cost-Effective

465 1601 Control & maintenance of golf course pumps Potentially Cost-Effective

493 6229 Control carpark exhaust fan based on CO level / air quality with vsd Potentially Cost-Effective

305 1009 Control excess lighting Potentially Cost-Effective

305 1015 Control excess lighting Potentially Cost-Effective

485 5799 Control HHW pump and boiler to heating demands Cost-Effective

569 3675 Control of package AC units Potentially Cost-Effective

314 6484 Control switch for top deck of carpark lights Cost-Effective

396 623 Control System for Air compressors Cost-Effective

305 1016 Control tank level Potentially Cost-Effective

571 3275 Control the condenser water temperature to a minimum acceptable temCost-Effective

604 2307 Control the lights in intermittently occupied areas with movement sensoPotentially Cost-Effective

604 2328 Control the outside air dampers on the Hall air conditioner based on Potentially Cost-Effective

604 2287 Control the outside air dampers on the air conditioner based on C02 leCost-Effective

604 2297 Control the outside air dampers on the air conditioners based on CO2 Potentially Cost-Effective

604 2250 Control the outside air dampers on the air handling units based on C02Cost-Effective

595 5433 Conversion of 125W MV to 70WMH and 36W with T8 triphosphor lamp fPotentially Cost-Effective

390 4857 Conversion of electric induction furnace to gas Potentially Cost-Effective

380 258 Conversion of Electric Hot Water systems to instantaneous gas units Cost-Effective

592 1416 Convert two 18W PL-C lamps to one 13W PL-C lamp. Potentially Cost-Effective

592 1429 Convert 128 remaining fittings with 50W halogens to 35W halogens Cost-Effective

592 1412 Convert 18 fittings with two 26W Pl-C lamps to single 13W PL-C lampsCost-Effective

592 1410 Convert 90 fittings with 50W downlights to 35W LV downlight. Cost-Effective

600 2571 Convert AC4 to spill air ventilation from theatre Potentially Cost-Effective

571 3278 Convert chilled water pumps to variable speed Potentially Cost-Effective

296 2680 Convert existing electric and gas hot water units to solar units Cost-Effective

416 413 Convert from electric to solar hot water. Cost-Effective

592 1381 Convert mercury vapour lamps to metal halide lamps Cost-Effective

592 1398 Convert MV lamps to CFL Potentially Cost-Effective

Page 30: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

586 5969 Convert pool heating for both the indoor and outdoor pools to a heat Potentially Cost-Effective

604 2295 Convert the air handling systems with bypass damper control to variablPotentially Cost-Effective

604 2312 Convert the Amenities Block hot water systems to solar(Gas) Potentially Cost-Effective

604 2331 Convert the outside air economy cycle air conditioner to fully modulatinPotentially Cost-Effective

604 2288 Convert the outside air economy cycle air conditioner to fully modulatinCost-Effective

604 2304 Convert the outside air economy cycle to fully modulating and upgrade thPotentially Cost-Effective

571 3344 Convert the restaurant hot water to natural gas Cost-Effective

381 669 Converting areas air conditioning olants temperature control set points Cost-Effective

511 4560 Conveyor Automation. Potentially Cost-Effective

383 2453 Conveyor Optimisation Cost-Effective

510 4496 Conveyor Sequencing Potentially Cost-Effective

510 4490 Conveyor Upgrade Cost-Effective

443 5826 Cooling Tower Capacity Cost-Effective

382 3665 Cooling tower fans & CW pump VFD control Potentially Cost-Effective

480 5356 Cooling Tower Operation Cost-Effective

307 29 Cooling tower re-life Cost-Effective

446 4573 Cooling Towers control - improved control of cooling towers. Turn off whPotentially Cost-Effective

366 5682 Cooling Towers replacement - replace Shinwa Cooling Towers with new Cost-Effective

322 5957 Core and Flake Drier Optimisation of gas use and possible fitting of VSPotentially Cost-Effective

312 786 Corporate air conditioning economy cycle repair Cost-Effective

312 793 Corporate air conditioning return air system. Change 100% outside air Potentially Cost-Effective

570 856 Court lighting controls Cost-Effective

306 777 CPL3 oven LEL increase Potentially Cost-Effective

367 5497 CRAC Unit load balance Cost-Effective

298 2143 Create PM for weekly leak detection programs on vacuum system and Cost-Effective

515 4643 Crusher Automated Shutdown Cost-Effective

401 697 Crusher optimisation - Improve primary crusher and conveyor energy pPotentially Cost-Effective

514 4613 Crusher start and shutdown Cost-Effective

292 4353 DAF lighting Cost-Effective

396 625 Dampers for Scrubbers to prevent short circuiting Cost-Effective

433 3847 Day time pressure cleaning Cost-Effective

314 6478 Daylight compensating control of main foyer lights Cost-Effective

426 5354 Daylight compensation control Potentially Cost-Effective

282 3162 Daylight compensation for lights Potentially Cost-Effective

282 3184 Daylight compensation for lights Cost-Effective

282 3193 Daylight compensation for lights Potentially Cost-Effective

282 3196 Daylight compensation for lights Potentially Cost-Effective

411 2534 Daylight compensation for wastewater treatment plant lighting Potentially Cost-Effective

592 1414 Daylight control of exterior lighting Potentially Cost-Effective

592 1407 Daylight harvesting for perimeter and metal halide lamps Potentially Cost-Effective

305 936 DC System Return Water Pond Agitator Cost-Effective

448 3766 Decomission existing computer centre supplementary HVAC and assosiCost-Effective

561 2708 Decommision the hot water boiler serving the change room showers ans iPotentially Cost-Effective

396 658 Decommission hot water generator Potentially Cost-Effective

381 670 Decommission air conditiong air handling and utilise second air handliCost-Effective

444 4034 Decommission Parkes building steam boilers Cost-Effective

433 3856 Dedicated steriliser supply line Potentially Cost-Effective

320 4417 Dehulling Upgrade Cost-Effective

Page 31: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

440 6535 Dehumidification of Cool Store Potentially Cost-Effective

593 4902 De-lamp & retrofit existing 36W fluoro lights with T5 Save It Easy® kitsPotentially Cost-Effective

582 4711 Delamp all twin fluorescent fittings. Cost-Effective

584 5631 Delamp CFL fittings in function room Cost-Effective

582 4717 Delamp fluorescent light fittings in the office, rear administration area Potentially Cost-Effective

597 5707 De-lamp lighting in over-lit areas (office section) Cost-Effective

589 2572 Delamp Quad Fluorescent Lights Potentially Cost-Effective

589 2381 Delamp Quad Fluorescent Lights In Offices Cost-Effective

448 3760 Delamp selected fittings, eg corridors, breakout areas and café Cost-Effective

481 111 De-lamping Cost-Effective

333 1907 Delamping in the ground floor storage area Potentially Cost-Effective

379 1167 De-lamping. Cost-Effective

589 2360 Delay Activation of HVAC equipment Cost-Effective

569 3623 Demand based ventilation system Cost-Effective

477 520 Demand Control Review (load duration curve characteristics for electricCost-Effective

426 5353 Demand management and compressed air energy management syste Potentially Cost-Effective

575 1474 Derate hot water heater and lower the top thermostat setting to 60 degCost-Effective

575 1486 Derate hot water heater and lower the top thermostat setting to 60 degCost-Effective

575 1480 Derate hot water heater in the Centre and lower the top thermostat set Cost-Effective

575 1483 Derate hot water heater in the Centre and lower the top thermostat set Cost-Effective

575 1512 Derate hot water heater in the Centre and lower the top thermostat set Cost-Effective

353 3365 Design and execute an Energy Education Program that includes ways to Potentially Cost-Effective

290 3412 Dessicant de-humidification Potentially Cost-Effective

496 2817 Develop a procedural system for the standby compressor to be switcheCost-Effective

588 5044 Develop energy efficient street lighting strategies Potentially Cost-Effective

600 2577 Development of public lighting strategy Potentially Cost-Effective

442 1573 Devise and implement a program to routinely monitor compressed air syCost-Effective

442 1572 Devise and implement a program to routinely monitor steam trap operatiCost-Effective

513 4600 Dewatering pumping system Cost-Effective

418 3415 Dextrin reactors cooling vessels Cost-Effective

565 4151 DHW Cost-Effective

565 4154 DHW Cost-Effective

565 4158 DHW Cost-Effective

565 5261 DHW Potentially Cost-Effective

348 3253 Dichroic lamp replacement with CFLs Cost-Effective

378 17 Die Change Shutdown Procedure Cost-Effective

312 794 DIET plant chiller replacement Potentially Cost-Effective

424 4251 Direct coal loadout. Potentially Cost-Effective

485 5894 Disable fresh air fan and zone duct heaters when the outside air tempeCost-Effective

602 2775 Disable HVAC from operating during public holidays Cost-Effective

602 2780 Disable HVAC from operating during public holidays Cost-Effective

485 5767 Disable local setpoint adjustments on temperature sensors Cost-Effective

371 355 Disable NH3 storage CT temperature control Cost-Effective

566 1998 Disable plant from operating during public holidays Cost-Effective

566 2016 Disable plant from operating during public holidays Cost-Effective

593 4890 Disable plant from operating during public holidays Cost-Effective

595 5431 Disable plant from operating during public holidays Cost-Effective

595 5443 Disable plant from operating during public holidays Cost-Effective

Page 32: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

595 5446 Disable plant from operating during public holidays Cost-Effective

396 621 Disconnect Fan Cost-Effective

356 2553 Disconnect un-used lighting from all areas where possible. (Start will d Potentially Cost-Effective

379 1168 Discontinue steam injection to Hotwell tank Cost-Effective

440 6527 Discontinue use of Compressed Air Guns Cost-Effective

377 4848 Distribution lighting control Potentially Cost-Effective

453 1070 Document and implement replacement program (including target dates) Cost-Effective

453 1116 Document and implement replacement program (including target dates)Cost-Effective

453 1115 Document and implement replacement program (including target dates) Cost-Effective

453 1075 Document and implement replacement program (including target dates) Cost-Effective

453 6039 Document and implement replacement program (including target dates) Potentially Cost-Effective

506 4285 Domestic Hot Water - Review and adjust temperature control setpoints Cost-Effective

570 838 Domestic hot water: Electric heat pump to replace electric storage typeCost-Effective

570 852 Domestic Hot Water-solar heat pump system with remote evaporators Cost-Effective

503 886 Dragline Optimisation/Tritonics Cost-Effective

469 469 Drfit conveyor operation control Cost-Effective

284 4049 Drossing off, melter practices, sequencing of product - standardisation Cost-Effective

407 3718 Develop efficient ladle preheating schedule as currently preheaters eithPotentially Cost-Effective

469 471 Belts operation control Cost-Effective

411 2541 Economiser Potentially Cost-Effective

379 1171 Economiser and heat recovery for boilers Cost-Effective

439 3291 Economiser and variable speed drive on one RM compressor, serving Cost-Effective

335 1765 Economy Cycle Cost-Effective

488 4113 Economy cycle + CO2 monitoring for seven units Cost-Effective

488 4121 Economy cycle fitted to the room Potentially Cost-Effective

282 3186 Economy cycle for AHU Potentially Cost-Effective

282 3189 Economy cycle for AHU Potentially Cost-Effective

282 3195 Economy cycle for AHU Potentially Cost-Effective

379 1187 Economy cycle for office AHU's Potentially Cost-Effective

488 4120 Economy cycle to FCU-1 Potentially Cost-Effective

597 5705 Educate staff on various measures and enable energy saving features Cost-Effective

340 3903 Efficiencies from heat recovery Potentially Cost-Effective

341 282 Efficiency potential from replacement of Extruder 0 DC motor with AC Potentially Cost-Effective

291 4309 Effluent farm aeration Potentially Cost-Effective

292 4345 Effluent plant hot water Cost-Effective

314 6481 Electric heater air temperature sensor control Cost-Effective

319 2419 Electrical condensate drain on air receivers Potentially Cost-Effective

411 2533 Electricity supply/compressor control room lighting Potentially Cost-Effective

485 5727 Electro-mechanical timers for air conditioners Cost-Effective

318 4448 Electronic Condensate Drains for Air receivers Potentially Cost-Effective

282 3157 Electronic expansion valve Potentially Cost-Effective

282 3188 Electronic expansion valve Potentially Cost-Effective

465 1604 Eliminate aeration in channels to clarifiers Potentially Cost-Effective

360 3492 Eliminate cooling tower for LRV pump and Centac air compressor (onlyPotentially Cost-Effective

509 6522 Eliminate Idle/Run on time requirement (Atlas Copco) Potentially Cost-Effective

509 6521 Eliminate Rise to Pressure Control Potentially Cost-Effective

282 3202 EMCS Cost-Effective

574 5132 Enable Energy Star settings Cost-Effective

Page 33: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

561 2693 Enable Energystar facility on all computers Cost-Effective

404 2752 Enable powersave mode on printers and computers Cost-Effective

568 3516 Energy and Water Efficient Showerheads Cost-Effective

568 3520 Energy and Water Efficient Showerheads Potentially Cost-Effective

377 4855 Energy awareness & management programme Potentially Cost-Effective

405 2345 Energy Awareness & Monitoring Cost-Effective

481 116 Energy awareness & monitoring program Cost-Effective

414 4812 Energy Awareness & Monitoring Programme Cost-Effective

379 1184 Energy awareness and management program Cost-Effective

410 1770 Energy awareness and management program Cost-Effective

411 2529 Energy awareness and management program Cost-Effective

426 5348 Energy awareness and management program Potentially Cost-Effective

312 789 Energy Awareness and Monitoring Program Cost-Effective

443 5834 Energy Awareness Monitoring Programme Cost-Effective

282 3204 Energy Awareness Program Cost-Effective

583 3041 Energy Awareness Program for Park Patrons Cost-Effective

414 4813 Energy Best Practice Training Programme Cost-Effective

443 5835 Energy Best Practice Training Programme Cost-Effective

282 3172 Energy efficient chiller with VSD Potentially Cost-Effective

282 3165 Energy Efficient lighting design Potentially Cost-Effective

568 3513 Energy Efficient Lighting in Clubhouse Cost-Effective

568 3515 Energy Efficient Lighting in Clubhouse Cost-Effective

568 3519 Energy Efficient Lighting in Clubhouse Potentially Cost-Effective

363 330 Energy Efficient Pump Selection Potentially Cost-Effective

404 2756 Energy information and reporting system Cost-Effective

561 2705 Energy management and staff awareness Cost-Effective

410 1778 energy management control system Potentially Cost-Effective

411 2544 energy management control system Potentially Cost-Effective

480 5363 Energy Management Program Cost-Effective

372 5480 Energy management system Potentially Cost-Effective

319 2413 Energy Recovery from Flash Steam Cost-Effective

384 1965 Energy Save Units to Control Car Park Lights Potentially Cost-Effective

384 1967 Energy Save Units to Control Office Area Lights Potentially Cost-Effective

384 1964 Energy Save Units to Laundry Area Lights Potentially Cost-Effective

308 3773 Energy saving devices for lighting fixtures Cost-Effective

484 3536 Energy Star Activation Cost-Effective

292 4351 Engineering stores lighting Cost-Effective

359 459 Enhanced Process Control Cost-Effective

322 303 Enhanced Process Control in the Heat Plant Cost-Effective

573 3452 Ensure all pump stations are upgraded, as required to more efficient unPotentially Cost-Effective

575 1531 Ensure pool covers are used at night. Cost-Effective

453 1068 Ensure regular boiler tuning is included in boiler maintenance program.Cost-Effective

575 1524 Ensure the large panel lift doors leading to the outdoor area are shut in Cost-Effective

366 5696 Environmental controller for Computer Raised Floor Area (RFA). RFA manPotentially Cost-Effective

585 4186 Upgrade Potentially Cost-Effective

505 4377 Escalators - Raise awareness to ensure escalators and travellators are Cost-Effective

506 4322 Escalators - Raise awarness to ensure escalators and travellators are nCost-Effective

353 3368 Establish a system to ensure that the Tower floors house lighting is swiPotentially Cost-Effective

Page 34: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

307 32 Evaporative cooler Cost-Effective

356 2551 Evaporative Humidification, replace steam generator with evaporative uPotentially Cost-Effective

433 3859 Evisceration belt wash-pulsed wash Potentially Cost-Effective

587 5026 Examine opportunities to reduce pump operation in winter. Cost-Effective

367 5500 Exist lighting upgrade to LEDs. Replace 10W fluorescent lighting with Potentially Cost-Effective

604 2298 Extend boiling water time clock control to kitchen boiling water units Potentially Cost-Effective

445 4197 External lighting - photocell control Cost-Effective

343 3954 External lighting on mill to be controlled by photoelectric (PE) cells Cost-Effective

467 6469 External Shading Cost-Effective

366 5679 Refurbishment with new lighting. Replace 203 36W T8 fluorescent lamCost-Effective

319 2422 Fab room Cooling C02/Air Heat exchanger Potentially Cost-Effective

470 4533 Factory - refurb 400W to 320W highbay Cost-Effective

426 5352 Factory 5 CCV high pressure water pumps Potentially Cost-Effective

323 5390 Factory Air Compressor Potentially Cost-Effective

337 1045 Factory Lighting Control System Potentially Cost-Effective

422 724 factory lighting control to selected factory area Potentially Cost-Effective

470 4531 Factory refurb 250W to 200W highbay Cost-Effective

470 4532 Factory refurb/replace flourescent lamps to 1x36W+kw2+E ballast Cost-Effective

504 589 Fettling Area Dust Extraction System fit VSD, shut off valves, control s Potentially Cost-Effective

479 124 Finalise Implementation of Auto Load Shedding Project Cost-Effective

561 2692 Fine Tune the operating times of the air conditioning plant Cost-Effective

593 4900 Fine tuning of HVAC system Cost-Effective

363 327 Fine Tuning of the holding furnace to reduce excess air levels over firi Cost-Effective

379 1178 Finishing process burner fan VSD s Cost-Effective

398 1061 Fire stair lighting Cost-Effective

371 372 Fire water sustaining pumps Potentially Cost-Effective

305 977 Fit a waste gas boiler on the Lime Kiln exhaust. Potentially Cost-Effective

571 3312 Fit low ballasts to florescent lights fittings Potentially Cost-Effective

280 4325 Fit sensors to start air knives on demand Potentially Cost-Effective

570 6498 Fit timer to large ZIP water heater in main kitchen area Cost-Effective

570 6488 Fit timer to ZIP water heater in staff kitchenette Cost-Effective

570 6494 Fit timer to ZIP water heater in staff kitchenette Cost-Effective

586 5984 Fit timers to ZIP hot water boilers Potentially Cost-Effective

305 937 Fit VVVF drives on CT fan for Scarfer system Cost-Effective

305 969 Fit VVVF drives on CT fan for Vacuum Degasser Potentially Cost-Effective

305 938 Fit VVVF drives on CT fan forVDG system Cost-Effective

305 968 Fit VVVF drives on CT fans for Mould & Machine Potentially Cost-Effective

305 967 Fit VVVF drives on CT fans for Slab cooling Potentially Cost-Effective

571 3234 Fix 25m pool’s leaks Cost-Effective

571 3329 Fix compressed air leaks Cost-Effective

290 3404 Fixed dimming for corridor fluorescent lighting Cost-Effective

289 1935 Fixed dimming in skylights above old Courts Potentially Cost-Effective

484 3541 Fixed dimming to T8 light fittings Potentially Cost-Effective

590 2909 Fixed dimming: Single T8s, car park Cost-Effective

411 2532 Flash Steam and Blowdown Heat Recovery System Potentially Cost-Effective

318 4432 Flash steam recovery for Boiler feed water heating Cost-Effective

318 4427 Flash steam recovery from faulty traps Cost-Effective

465 1603 Flow-pace Stage 3 MLR pumps Potentially Cost-Effective

Page 35: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

318 4454 Fluorescent change to Tri phosphor tubes Potentially Cost-Effective

504 599 Fluorescent Light Controllers - various areas Potentially Cost-Effective

486 220 Fluorescent Lighting in Office Areas: Investigate the feasibility of ch Potentially Cost-Effective

372 5476 Fluorescent tubes change to triphosphor Cost-Effective

315 5426 Focused maintenance campaigns on steam traps and leaks Cost-Effective

593 4918 Formalise a maintenance schedule Cost-Effective

593 4921 Formalise a maintenance schedule Cost-Effective

408 1236 FPP - Chiller - shut down when plating not operating. Cost-Effective

408 1235 FPP - Shut down FPP scrubber fans and pump (2x37kW + 11kW) when nCost-Effective

323 5423 Front office air conditioning Potentially Cost-Effective

323 5419 Front office de-lamping Potentially Cost-Effective

486 222 FTC Fans: Investigate cost benefits of installing VSD's on FTC Fans Potentially Cost-Effective

347 1738 fuel gas analysis and adjustments on ovens Potentially Cost-Effective

382 3711 Full investigation of lagging of vessels, tanks, pipework and insulate a Potentially Cost-Effective

439 3296 Full refrigeration plant automation, including VSDs on one HT and on Potentially Cost-Effective

570 800 Full tenant condenser water system plus DX air- conditioning system t Cost-Effective

504 590 Furnace Area Dust Extraction System fit VSD /or repair service operatiPotentially Cost-Effective

446 4572 Furnace area ventilation - requires further investigation Potentially Cost-Effective

422 720 Furnace burner upgrade to low NOX pre mix systems Cost-Effective

422 719 Furnace survey Cost-Effective

446 4569 Furnaces - rescheduling in line with production levels, resulting reduc Cost-Effective

600 2565 Further investigation of after hours loads Cost-Effective

461 1585 Further optimisation of UV lamps Cost-Effective

280 4263 Future LP air operation (review after reduction opportunities complete) Potentially Cost-Effective

408 1232 FWG - Two existing compressors, one continuously loaded, the other Cost-Effective

570 842 Improve garage lighting & associated control Cost-Effective

439 3299 Gas driven chillers Potentially Cost-Effective

440 6533 Gas heating of plant floor Potentially Cost-Effective

488 4122 GEF-2 fan to have a VSD fitted and controlled thru the BMS Potentially Cost-Effective

509 6503 General Air Leaks Cost-Effective

282 3166 General Lighting Potentially Cost-Effective

282 3169 General Lighting Potentially Cost-Effective

282 3171 General Lighting Potentially Cost-Effective

282 3174 General Lighting Potentially Cost-Effective

282 3178 General Lighting Potentially Cost-Effective

282 3180 General Lighting Potentially Cost-Effective

282 3187 General Lighting Potentially Cost-Effective

282 3192 General Lighting Potentially Cost-Effective

282 3194 General Lighting Potentially Cost-Effective

282 3198 General Lighting Potentially Cost-Effective

282 3177 General lighting (service ducts) Potentially Cost-Effective

587 4988 General lighting retrofit (reflectors, single tube, reduce outout by 50%) Cost-Effective

587 4995 General lighting retrofit (reflectors, single tube, reduce output by 50%) Cost-Effective

379 1185 General office and canteen lighting Potentially Cost-Effective

570 6489 Get the A/C controls recommissioned form a Carrier technician + instalCost-Effective

411 2526 Glycol pump VSD Cost-Effective

344 531 Goldway Energy Saving unit(ESIJ) Initiative Potentially Cost-Effective

585 4187 Upgrade Potentially Cost-Effective

Page 36: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

486 221 GTCs: Investigate feasibility of removing counterflow fans (64 fans *1 Potentially Cost-Effective

569 3638 Guest education program- based on Energy Smart Homes information anCost-Effective

384 1966 Guest Room Air-Conditioning Control Potentially Cost-Effective

384 1961 Guest Room Halogen Dichroic Lighting Replacement Potentially Cost-Effective

384 1959 Guest Room Incandescent Lamp Replacement Stage 2 Cost-Effective

384 1958 Guest Room Mini Bar Fridge Cost-Effective

585 4188 Upgrade Potentially Cost-Effective

570 855 Lighting - voltage reduction Cost-Effective

563 5526 Control modification on space temperature set points Cost-Effective

563 5551 Replace existing thermostatic expansion valve with electronic expansioCost-Effective

563 5539 Time delay switches for 17 electric radiant heaters Cost-Effective

563 5516 Variable speed drive to 2 of the 3 Air Handling Units for pool heating Cost-Effective

563 5541 VSDs for 3 chilled water pumps (1.2 and 3) controlled by CHW differenCost-Effective

563 5552 Modify control strategy: reheat set point to 20+-0.5 degC, space tem Cost-Effective

563 5517 Motion sensors to 4 ventilation fans in sporting hall with a fan cutting i Cost-Effective

563 5527 Variable speed drives for 6 condenser water pumps Cost-Effective

563 5542 VSDs for AHU1 fan with a sliding scale signal on O/A temperature: fu Cost-Effective

563 5543 Modify control strategy: reheat set poit to 20+-0.5 degC, space tempe Cost-Effective

408 1241 HC WD - Cold well overflowing to hot well, pumping is more than necesPotentially Cost-Effective

292 4358 Head pressure control ammonia refrigeration Potentially Cost-Effective

291 4303 Head pressure control ammonia refrigreation system Potentially Cost-Effective

386 4065 Heat Exchange Outside Air Cost-Effective

386 4067 Heat Exchange Outside Air Potentially Cost-Effective

386 4068 Heat Exchange Outside Air Potentially Cost-Effective

371 353 Heat loss reduction - ammonia area Cost-Effective

371 351 Heat loss reduction - Nitrates Area Cost-Effective

598 4938 Heat pump DHW Cost-Effective

598 4939 Heat pump DHW Cost-Effective

362 1747 Heat pump for domestic hot water Cost-Effective

568 3485 Heat Pumps for pool heating (high efficiency boiler) Potentially Cost-Effective

601 2681 Heat reclaim and temperature reset controls and timing rescheduling Cost-Effective

318 4459 Heat reclaim condenser Potentially Cost-Effective

387 1275 Heat reclaim on boiler blowdown. Potentially Cost-Effective

481 119 Heat recovery Potentially Cost-Effective

319 2412 Heat recovery from 180kW air compressor Cost-Effective

318 4460 Heat recovery from 75Kw compressor to the boiler combustion air prehPotentially Cost-Effective

439 3302 Heat recovery from blanched product Potentially Cost-Effective

379 1188 Heat recovery from Blowdown Cost-Effective

379 1172 Heat recovery from flash steam and process steam vent Cost-Effective

411 2537 heat recovery from hot gas Potentially Cost-Effective

499 4278 Heat relaim on pellet driers- in injection moulding Machines 1 to 11. Potentially Cost-Effective

501 4250 Heat relaim on pellet driers on four IMM - as per set-up of new IMM Potentially Cost-Effective

359 458 Heater Control Cost-Effective

342 1153 Heaters in 7 cabinet foaming tools running unnecessarily Cost-Effective

329 1668 heating general store Cost-Effective

322 302 HGG Gas Burner Improvement Cost-Effective

504 592 HID Light dimmers - to allow reduced lighting levels at selected times oPotentially Cost-Effective

509 6516 High efficiency 110 kW motor Potentially Cost-Effective

Page 37: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

509 6517 High efficiency 15 kW motor Potentially Cost-Effective

509 6515 High efficiency 150 kW motor Potentially Cost-Effective

335 1764 High Efficiency Chiller Cost-Effective

569 3646 High efficiency electric motor Potentially Cost-Effective

371 366 High efficiency fans ammonia cooling tower Potentially Cost-Effective

515 4648 High Efficiency Moter review Potentially Cost-Effective

512 4588 High Efficiency Motor review Potentially Cost-Effective

514 4618 High Efficiency Motor review Potentially Cost-Effective

511 6603 High efficiency motor review Potentially Cost-Effective

511 4558 High Efficiency Motor Review: large motors Potentially Cost-Effective

511 4555 High efficiency motor review: Large motors:total Potentially Cost-Effective

511 4556 High efficiency motor review: small motors Potentially Cost-Effective

299 2631 High efficiency motors (HEM) in air conditioning units Cost-Effective

334 3806 High efficiency motors as motors reach end of life: 49 motors from 1.5 Potentially Cost-Effective

339 2656 High Efficient compressors to chillers Potentially Cost-Effective

486 228 Holding Furnace door sealing upgrade. Will result in less losses, therefPotentially Cost-Effective

486 227 Homo Furnaces - Use of exhaust gasses to pre-heat the charge Potentially Cost-Effective

583 3002 Hot Water Boiling Units Cost-Effective

583 3025 Hot Water Boiling Units Cost-Effective

583 3014 Hot Water Boiling Units Time Control(9) Cost-Effective

511 4557 Hot Water Boost with Solar Heating Potentially Cost-Effective

578 6545 Hot water pipe insulation Cost-Effective

443 5824 Hot Water Pump VSD Cost-Effective

319 2434 Hot water reduction - Viscera Table Potentially Cost-Effective

569 3640 Hot water system insulation- based on insulation leading to a 10% red Cost-Effective

401 704 Hot Water Systems - Replace Electric Hot Water Systems for offices andPotentially Cost-Effective

328 241 Housekeeping practices on overland conveyor supply Cost-Effective

577 2448 HVAC Cost-Effective

577 2451 HVAC Cost-Effective

577 2461 HVAC Cost-Effective

565 4150 HVAC Cost-Effective

565 4153 HVAC Cost-Effective

565 4157 HVAC Cost-Effective

565 5260 HVAC Potentially Cost-Effective

494 4221 HVAC - chiller and condensor water systems Cost-Effective

494 4219 HVAC - control improvements Cost-Effective

494 4224 HVAC - control of personal equipment and general awareness Cost-Effective

494 4223 HVAC - economy cycle, CO2, outside air and night purge Cost-Effective

494 4222 HVAC - Holiday scheduling and time of day Cost-Effective

508 2647 HVAC - Install Variable Speed Drives on pumps and fans in the HVAC Cost-Effective

494 4225 HVAC - new or refurbished plant Cost-Effective

446 4564 HVAC - Office reschedule controls to switch off the system when not reCost-Effective

494 4226 HVAC - other Cost-Effective

389 4144 HVAC - Retro commissioning (RCx) - Conduct Phase II study using MePotentially Cost-Effective

389 4143 HVAC - Retro commissioning (RCx) - Expense 'Actionable' items depePotentially Cost-Effective

508 2648 HVAC - Upgrade aged motors (8x15kW pumps, 2x55kW fans, 2x37kW fans &Cost-Effective

570 853 HVAC 365 day time-switch Cost-Effective

598 4936 HVAC control, economy cycle and VSD application Cost-Effective

Page 38: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

570 826 HVAC controls tuning: time of use Cost-Effective

601 2678 HVAC upgrade including VSD on the HVAC pump and Heat reclaim. Cost-Effective

362 1743 HVAC/BMS controls strategies: modifications to the operational time scCost-Effective

570 824 HVAC: Adjust temperature set- points to widen dead-band Cost-Effective

570 823 HVAC: Function Rooms - Occupancy Sensor control + Reassignment oCost-Effective

570 844 HVAC: install push-button timers and contactors for 8 units Cost-Effective

570 828 HVAC: Optimum start and stop Cost-Effective

510 4493 Hydraulic Circuits Cost-Effective

445 4200 Hydrotherapy pool cover Cost-Effective

604 2275 Identify and Rectify the significant gas consumption increase associat Cost-Effective

580 5249 Identify and reduce idle equipment operation baseload Cost-Effective

423 2556 Identify and repair air leaks Cost-Effective

348 3255 Implement 75KW VSD Air Compressor for site compressed air distributCost-Effective

285 1570 Implement a base-load reduction program (e.g. label change and ext Potentially Cost-Effective

433 3853 Implement a leak reduction program and compressor control Cost-Effective

297 543 Implement a maintenance and leak detection program in MEX for the Cost-Effective

297 544 Implement a maintenance and leak detection program in MEX for the Cost-Effective

423 2557 Implement a range of lighting measures Cost-Effective

571 3274 Implement a strategy to minimize the conflict between heating and cooCost-Effective

394 3635 Implement adiobatic rehumidification and rewrite the matrix for humidityCost-Effective

448 3772 Implement ambient temperature boiler cutoff in BMS Cost-Effective

589 2365 Implement an Economy Cycle Potentially Cost-Effective

482 417 Implement an Energy Awareness Program Cost-Effective

571 3277 Implement chilled water flow temperature reset Cost-Effective

433 3858 Implement Citect control and monitoring system in the Rendering PlantPotentially Cost-Effective

404 2759 Implement comprehensive sub-metering system Potentially Cost-Effective

448 3765 Implement comprehensive sub-metering system Cost-Effective

587 5022 Implement education program - including appropriate signage Cost-Effective

602 6038 Implement energy efficient street lighting as part of participation in SSROCost-Effective

587 5008 Implement HVAC Controls - 365 days (50%) Cost-Effective

298 2162 Implement leak detection program for compressed air system Cost-Effective

448 3756 Implement manual ON lighting system Cost-Effective

482 415 Implement Motor System Efficiency Cost-Effective

432 2221 Implement new evacuation system for removing dirt and other waste froPotentially Cost-Effective

353 3366 Implement night purge control strategy on air handlers where tenants Potentially Cost-Effective

448 3777 Implement night purge in BMS Cost-Effective

448 3779 Implement optimised start strategy for BMS Cost-Effective

604 2237 Implement optimum start/stop control in conjunction with a morning warCost-Effective

485 5818 Implement out of hours night setback on Supply Air Fan 1 heating Cost-Effective

363 332 Implement project to improve the life of pot linings Potentially Cost-Effective

348 3251 Implement remote pressure sensor for ne 75KW VSD Air Compressor Cost-Effective

333 1899 Implement Staff Awareness campaign to switch off Lights Cost-Effective

587 5019 Implement staff education program - including appropriate signage Cost-Effective

587 5011 Implement staff education program - including appropriate signage. Cost-Effective

445 4195 Implement steam trap survey and repair faulty steam traps Cost-Effective

468 6475 Implement upgrade of BMCS Cost-Effective

584 5578 Implementation of lighting policy with the cleaning contact Cost-Effective

492 4102 Implementation of the Thermal Comfort Policy: Establishes new therm Cost-Effective

Page 39: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

571 3273 Improve after hours operation of chamber air conditioning Cost-Effective

571 3283 Improve after hours operation of the Administration building air conditi Potentially Cost-Effective

371 371 Improve AN storage dehumidification Potentially Cost-Effective

486 223 Improve Anode Stem Machine reliability Potentially Cost-Effective

486 224 Improve anodic voltage drop Potentially Cost-Effective

284 4052 Improve burner efficiency by tuning Cost-Effective

284 4053 Improve burner efficiency by tuning Cost-Effective

479 175 Improve compressed air end use efficiency - cease using compressed aiCost-Effective

350 3600 Improve Compressed Air Performance Cost-Effective

316 4501 Improve Compressed Air Performance Cost-Effective

503 490 Improve Control of Lighting Plants Cost-Effective

500 510 Improve insulation on tanks and pipe work for pelletiser water system Cost-Effective

509 6513 Improve lighting efficiency - replace dichroic lamps with UCFLs; pilot d Potentially Cost-Effective

280 4236 Improve O2 balance on SP2 and SP4 Cost-Effective

500 507 Improve plant power factor correction Cost-Effective

319 2417 Improve power factor from 0.92 to 0.98 Cost-Effective

349 1319 Improve Procedures to Identify and Repair Air Leaks Cost-Effective

298 2150 Improve steam demand management by programmed gradual opening ofCost-Effective

509 6520 Improved Compressor Efficiency & Control Methods Potentially Cost-Effective

570 6485 Improved HVAC efficiency through improved maintenance -production oCost-Effective

317 4481 Improved power factor correction - install additional capacitors Potentially Cost-Effective

424 4248 Improved power factor correction. Improve Site Power Factor. Supply,Cost-Effective

280 4268 Improved ventilation compressed air building Potentially Cost-Effective

598 4886 Improvement to air conditioning control system Cost-Effective

434 2208 Improvements in Hot Water Use (Enforce cleaning procedures, improved Potentially Cost-Effective

313 3729 Improvements to economy cycle Cost-Effective

580 5184 Include energy efficient outcomes within the Heating Ventilation and Cost-Effective

330 432 Include Review of Higher Efficiency Motors in Purchasing Procedures Cost-Effective

503 889 Include Review of Higher Efficiency Motors in Purchasing Procedures. Cost-Effective

580 5389 Include within existing air conditioning maintenance contract a trial t Cost-Effective

580 5346 Include within the air conditioning maintenance contract a trial to opt Cost-Effective

580 5305 Include within the existing air condition maintenance contract a trial Cost-Effective

455 1919 Incorporation of energy efficient motors Potentially Cost-Effective

455 1922 incorporation of variable speed drives to pumps Potentially Cost-Effective

436 382 Increase Boiler deaerator pressure Cost-Effective

312 785 Increase capacity of boilerhouse cooling towers Cost-Effective

333 1896 Increase setting on PAC Units Cost-Effective

296 2686 Increase existing CFL's from 13% to 80%, Year 1 18% to 30% Year 3 Cost-Effective

461 1587 Increase operation of cogen unit on nat gas Potentially Cost-Effective

417 4386 Increase Power Factor Correction Potentially Cost-Effective

486 213 Increase shift manning - place Process Technicians on shift to react moreCost-Effective

438 3116 Increase steam pressure to 3&4 Starch Dryers Cost-Effective

404 2753 Increase temperature set points on supplementary air-conditioning unitCost-Effective

436 394 Increase turndown ratio of HVU Potentially Cost-Effective

318 4444 Increasing Boiler drum TDS levels Potentially Cost-Effective

318 4425 Increasing the power factor from an average of 0.96 to 0.98. Cost-Effective

504 596 Induction Furnaces fit VSDs to cooling tower fans and pumps - 2 proje Potentially Cost-Effective

395 1286 Infrared reflective coating on Publishing Hall Roof. Potentially Cost-Effective

Page 40: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

395 1285 Infrared reflective coating on Press Hall Roof. Cost-Effective

457 5243 Initiate a program to upgrade existing luminaires with triphosphor lampsPotentially Cost-Effective

459 5191 Initiate a program to upgrade existing luminaires with triphosphor lamps,Potentially Cost-Effective

594 5098 Replace remaining Time switch controls on system I Public Lighting sysPotentially Cost-Effective

594 5099 Develop and implement comprehensive Scheduled Maintenance programPotentially Cost-Effective

594 5101 Complete inventories of Public Lighting Systems 2,3 & 4 and undertake Potentially Cost-Effective

594 5097 Convert system 4 Public Lighting Systems to one of the other systems Potentially Cost-Effective

594 5089 Progressively replace exixting 50W & 80W MV S/L fittings and lamps wiCost-Effective

594 5092 Complete the change out of 250W & 400W MV & 310 HPS S/L fittings Cost-Effective

594 5095 Develop and implement procedures to confirm that individual street lighPotentially Cost-Effective

594 5091 Replace 81 X 80W MV Sphere Fittings with more efficient fittings an Cost-Effective

594 5090 Replace 17 X 80W MV Sphere lights in with more efficient fittings an Cost-Effective

325 765 Install (delay) timer switches on lights, with safety overrides Potentially Cost-Effective

349 1321 Install “best practice” air compressors and distribution system Potentially Cost-Effective

575 1504 Install 1 voltage reduction unit for Basement car park Lighting Cost-Effective

587 4994 Install 12 x movement sensors Cost-Effective

592 1409 Install 140kWe cogeneration plant Potentially Cost-Effective

587 4987 Install 15 x movement sensors (30%) Cost-Effective

587 4971 Install 16 x movement sensors (30%) Cost-Effective

591 1850 install 1x36W EL KW2 troffers to boost lighting levels in offices Potentially Cost-Effective

575 1516 Install 2 Voltage reduction units for Basement car park Lighting Cost-Effective

587 5025 Install 2 x movement sensors to control lighting in amenities block an Cost-Effective

587 4978 Install 2 x timers for water heaters & water coolers (30%) Cost-Effective

592 1376 Install 24hr timer on zip boilers. Potentially Cost-Effective

592 1371 Install 24hr timer on zip boiles. Cost-Effective

586 5983 Install 275L heat pump hot water system to be used in place of larger unPotentially Cost-Effective

587 5020 Install 3 x hot water timers Cost-Effective

587 5010 Install 30 x movement sensors (30%) Cost-Effective

591 1805 install 350 voltage reduction units for 1x36W troffer fittings-relamp tubePotentially Cost-Effective

587 4986 Install 365 day hot water timer to control 3 x HWHs (30%) Cost-Effective

587 4993 Install 365 day hot water timers to control 2 x HWSs (30%) Cost-Effective

580 5282 Install 365 day timer and optimise start-stop times for HVAC units Cost-Effective

580 5301 Install 365 day timer to switch off HVAC during holidays and optimise sCost-Effective

580 5381 Install 365 day timer to switch off HVAC during holidays and optimise sPotentially Cost-Effective

580 5386 Install 365-day timer to switch off HVAC during holidays and optimise sCost-Effective

587 4957 Install 4 timers (30%) Cost-Effective

587 5000 Install 4 x timers for hot water heaters & water coolers (30%) Cost-Effective

591 1829 install 4-5 star rated appliances Potentially Cost-Effective

592 1374 Install 5 star appliances Potentially Cost-Effective

587 4977 Install 5 x dimmer controls (30%) Cost-Effective

587 5009 Install 5 x hot water timers (40%) Cost-Effective

592 1378 Install 5kW photovoltaic panels Potentially Cost-Effective

592 1399 Install 5kW photovoltaic panels Potentially Cost-Effective

592 1417 Install 5kW photovoltaic panels Potentially Cost-Effective

592 1389 Install 5kW photovoltaic panels on the roof Potentially Cost-Effective

592 1421 Install 5kW photvoltaic panels on roof Potentially Cost-Effective

587 4996 Install 6 dimmer controls - incl. energy efficient lamps, minor repairs a Cost-Effective

587 4989 Install 6 dimmer controls - including energy efficient lamps, minor repa Cost-Effective

Page 41: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

587 5018 Install 6 x movement sensors (30%) Cost-Effective

587 4963 Install 6 x movement sensors in amenities and storerooms, etc (30%) Cost-Effective

580 5313 Install 7-day timers on the hydro-boil units Potentially Cost-Effective

580 5396 Install 7-day timers on the hydro-boil units Potentially Cost-Effective

587 5001 Install 9 x movement sensors (30%) Cost-Effective

571 3339 Install a 1 hour run down timer to stop excessive operations of the radiPotentially Cost-Effective

590 2906 Install a 365 day, optimal start time clock in admin building plant room Cost-Effective

437 2628 Install a 600kW co-generation plant to supply electricity on site (FurtherPotentially Cost-Effective

456 6584 Install a 800kW cogeneration plant to supply electricity on site. The w Potentially Cost-Effective

571 3238 Install a BMS to upgrade air conditioning controls so the plant operate Cost-Effective

582 4689 Install a CBUS system to equip & materials storage area Potentially Cost-Effective

437 2627 Install a CO monitoring system and VSD on ventilation fans in the car Cost-Effective

604 2235 Install a dedicated air cooled system for the printing area air conditioni Cost-Effective

305 971 Install a lime kiln preheater. Potentially Cost-Effective

582 4692 Install a lux sensor in lunchroom Potentially Cost-Effective

561 2723 Install a movement detector in the staff room to control the lighting. Potentially Cost-Effective

561 2712 Install a movement detector to control the light fittings Cost-Effective

561 2717 Install a movement detector to control the lighting in the Crib Room. Potentially Cost-Effective

561 2711 Install a movement detector to control the mechanics pit lights. Cost-Effective

561 2718 Install a movement detector to control the opertaion of light fittings in thPotentially Cost-Effective

561 2734 Install a movement detector to control the waiting room lights. Potentially Cost-Effective

561 2722 Install a movement detector to trun off the waiting room's lighting when Potentially Cost-Effective

561 2736 Install a movement detector to turn off lighting in the Study/Meeting R Potentially Cost-Effective

561 2721 Install a movement detector to turn off lights in the staffroom/meeetin Potentially Cost-Effective

561 2709 Install a new solar heating system for the 25 metre pool. Potentially Cost-Effective

561 2731 Install a one hour electro-mechanical timer to turn off the meeting roomPotentially Cost-Effective

571 3241 Install a PE Cell to switch of pool change room corridor lighting when nCost-Effective

571 3240 Install a PE Cell to switch off the external plant security light when not Cost-Effective

604 2238 Install a photosensor control of lights in the staff dining area Cost-Effective

561 2726 Install a push button timer to control the boiling water unit. Cost-Effective

561 2716 Install a run down timer in each of the six storage bays to control the ligPotentially Cost-Effective

571 3236 Install a run down timer to control light in the sports hall. Cost-Effective

571 3237 Install a run down timer to control light in the squash court. Cost-Effective

561 2724 Install a run-down timer to turn off light fittings in the Store Room. Potentially Cost-Effective

594 5074 Install a Single Variable Speed Drive with a change over switch mec Potentially Cost-Effective

604 2278 Install a thermal blanket on the refrigerator glass door in the potting sh Cost-Effective

586 5974 Install a UV Treatment System on the indoor pool Potentially Cost-Effective

355 311 Install a VSD drive on C-14 Potentially Cost-Effective

405 2349 Install a VSD on Blower 26 Potentially Cost-Effective

471 707 Install a yearly timer to automatically switch AC units Cost-Effective

582 4762 Install A/C controls with thermostats. At present the 2 x 15.1 kW units Cost-Effective

597 5698 Install active roof air extraction system for theatre pavilion to minimis Cost-Effective

582 4833 Install additional switches to enable lights to be switched off during th Cost-Effective

448 3768 Install advanced chiller controls (eg electronic expansion valves, VSDsCost-Effective

568 3499 Install advanced HVAC control Potentially Cost-Effective

568 3507 Install advanced HVAC control Potentially Cost-Effective

298 2151 Install alarms on both freezer doors to sound when doors are left open Cost-Effective

486 233 Install ALF3 Hoppers on side of pot Potentially Cost-Effective

Page 42: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

593 4916 Install an advance control system for A/C Potentially Cost-Effective

297 562 Install a pressure contoller on the second biofilter fan so that it runs Potentially Cost-Effective

582 4715 Install an occupancy sensor in the kitchen to control the 15 x 36W singCost-Effective

582 4727 Install an occupancy sensor to control the lighting in the staff lunchroo Potentially Cost-Effective

416 408 Install and repair non-return valves in the mine dewatering system. Cost-Effective

301 1143 Install antechamber or fast closing doors on the freezer Cost-Effective

442 1577 Install application occupancy sensors, photocells and lumitrols throu Cost-Effective

571 3331 Install auto transformer to control fluroescent lighting within the generalCost-Effective

477 522 Install automated high bay lighting contro system Cost-Effective

478 751 Install automated high bay lighting control system Cost-Effective

416 411 Install automatic timers, motion sensorsor photo-electric cells on the suCost-Effective

561 2720 Install auto-transformer to control fluorescent light fittings Potentially Cost-Effective

561 2735 Install auto-transformer to control the fluorescent light circuits Potentially Cost-Effective

561 2729 Install auto-transformers to control the car park fluorescent lights. Cost-Effective

590 2907 Install BMS Cost-Effective

590 2911 Install BMS Cost-Effective

493 6314 Install BMS control & occupancy based control of AC systems Potentially Cost-Effective

493 6289 Install BMS control to AC systems inculding economy cycle Potentially Cost-Effective

493 6232 Install BMS controls to replace time clock & local controls Potentially Cost-Effective

312 790 Install Boiler Economiser into existing steam boilers in the boilerhouse.Potentially Cost-Effective

570 858 Install boiling hot-water time switch. Cost-Effective

582 4694 Install CBUS system in the Archives room Potentially Cost-Effective

493 6116 Install CHW & HW supply from one building to another building and re Potentially Cost-Effective

444 4037 Install CO control to car park fans Potentially Cost-Effective

589 2361 Install CO Sensor To Control Car Park Exhaust Fan Potentially Cost-Effective

298 2163 Install control system to turn off grinders when not required (currently boCost-Effective

298 2160 Install control system to turn off grinders when not required Cost-Effective

580 5251 Install controller to automate pool heating system (larger saving with poPotentially Cost-Effective

587 4979 Install controls for major HVAC i.e. micro process the thermostats & usePotentially Cost-Effective

587 4981 Install controls for major HVAC i.e. micro process the thermostats & usePotentially Cost-Effective

587 4982 Install controls for major HVAC i.e. micro process the thermostats & usePotentially Cost-Effective

588 5039 Install controls on Lift Motor Room fans Potentially Cost-Effective

569 3671 Install controls to external lighting & selected circuits Cost-Effective

420 3131 Install Correctly Sized Compressors Potentially Cost-Effective

405 2347 Install Daylight Compensation Control in warehouse Cost-Effective

337 883 Install daylight control on external lights Cost-Effective

592 1383 Install daylight sensor and separate circuits near exterier of carpark. Cost-Effective

604 2329 Install daylight sensor control of the perimeter downlights Potentially Cost-Effective

360 3475 Install daylight sensors and controls in the warehouse section with skylCost-Effective

586 5973 Install daylight switching on the Metal Halide floodlights located under sPotentially Cost-Effective

317 4471 Install dearator on boiler Cost-Effective

470 4527 Install demand management controller for ac units Cost-Effective

466 3154 Install differential pressure and real-time monitoring of pump efficiency Potentially Cost-Effective

464 1632 Install Differential Pressure Cells and Real Time Monitoring of PumpingPotentially Cost-Effective

415 2128 Install dimming controls to take advantage of natural light availability Cost-Effective

575 1488 Install dimming photoelectric cell switches where appropriate Cost-Effective

573 3454 Install domestic heat pump hot water system for amenities area Potentially Cost-Effective

573 3458 Install domestic heat pump hot water system for building Potentially Cost-Effective

Page 43: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

573 3460 Install domestic heat pump hot water system for change rooms Potentially Cost-Effective

573 3442 Install domestic heat pump how water system for amenities area Potentially Cost-Effective

453 6040 install domestic hot water solar pre-heater Potentially Cost-Effective

453 1091 Install domestic hot water solar pre-heater. Potentially Cost-Effective

580 5188 Install economy air cycle on to four Air Handling Units (AHUs) Cost-Effective

493 6164 Install economy cycle & BMS controls on remaining AC unit Potentially Cost-Effective

493 6103 Install economy cycle and pushbutton control of small package AC Potentially Cost-Effective

493 6115 Install economy cycle on AC Potentially Cost-Effective

493 6193 Install economy cycle on AC system Potentially Cost-Effective

493 6295 Install economy cycle on AC systems Potentially Cost-Effective

488 4127 Install economy cycle on AHU Potentially Cost-Effective

493 6067 Install economy cycle on all small ducted AC systems Potentially Cost-Effective

493 6160 Install economy cycle on network room AC Potentially Cost-Effective

571 3246 Install Economy Cycle on the building air conditioning Potentially Cost-Effective

488 4126 Install Economy cycle to AHU Potentially Cost-Effective

445 4199 Install economy cycle to ward block lift motor room process coolers Cost-Effective

474 4371 Install Economy Cycles in building Potentially Cost-Effective

594 5057 Install ECO-Save on remainder of lighting circuits Cost-Effective

580 5405 Install electronic ballasts on all lamps Potentially Cost-Effective

580 5415 Install electronic ballasts on all lamps Potentially Cost-Effective

442 1575 Install electronic condensate drains on the instrument air compressor anCost-Effective

591 1800 install electronic expansion valves on chiller Potentially Cost-Effective

391 3087 Install electronic expansion valves to the coolroom compressors Cost-Effective

391 3088 Install electronic expansion valves to the reciprocating water-cooled chillCost-Effective

582 4672 Install electronic TX valves to the air conditioning compressors. Cost-Effective

573 3463 Install energy efficient hi-bay replacements (~ fittings) Potentially Cost-Effective

573 3459 Install energy efficient hi-bay replacements(~100 fittings) Potentially Cost-Effective

337 1050 Install energy efficient motors on a replacement basis. Potentially Cost-Effective

353 3354 Install energy management software to analyse and manage building coCost-Effective

585 4163 Install Energy Save Units Cost-Effective

585 4174 Install energy save units for lighting in change rooms Potentially Cost-Effective

585 4181 Install energy save units for lighting in change rooms Potentially Cost-Effective

585 4176 Install energy save units Potentially Cost-Effective

585 4184 Install Energy Save Units to control fluorescent lighting Cost-Effective

589 2575 Install energy save units to control lighting Potentially Cost-Effective

589 2586 Install energy save units to control lighting in building Potentially Cost-Effective

589 2587 Install energy save units to control lighting in building Potentially Cost-Effective

589 2581 Install energy save units to control lighting in building Potentially Cost-Effective

589 2584 Install energy save units to control lighting in building Potentially Cost-Effective

589 2585 Install energy save units to control lighting in building Potentially Cost-Effective

589 2582 Install energy save units to control lighting in building Potentially Cost-Effective

589 2583 Install energy save units to control lighting in building Potentially Cost-Effective

589 2364 Install Energy Save Units To Control Lighting in Car Park Potentially Cost-Effective

589 2352 Install Energy Save Units To Control Lighting In Change Rooms Potentially Cost-Effective

589 2367 Install Energy Save Units To Control Lighting In Change Rooms Potentially Cost-Effective

589 2375 Install Energy Save Units To Control Lighting In Change Rooms Potentially Cost-Effective

589 2384 Install Energy Save Units To Control Lighting In Change Rooms Potentially Cost-Effective

589 2354 Install Energy Save Units To Control Lighting In Foyer Potentially Cost-Effective

Page 44: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

589 2382 Install Energy Save Units To Control Lighting In Hallways Potentially Cost-Effective

589 2599 Install energy saving units to control lighting in change rooms Potentially Cost-Effective

575 1487 Install Energy star rated fridges and appliances when current applianc Cost-Effective

584 5613 Install ESM 4000 Abbotly chiller controls Cost-Effective

482 416 Install Factory Lighting Control Cost-Effective

437 2626 Install fixed dimmer in the car park for the fluorescent lighting circuits Cost-Effective

475 4402 Install fixed dimming sytems to common area lighting. Potentially Cost-Effective

475 4401 Install fixed dimming to car park lighting. Potentially Cost-Effective

473 4342 Install Fixed Dimming to Fire Stairs. Cost-Effective

333 1911 Install Flywheel System to Replace UPS Potentially Cost-Effective

493 6199 Install gas boost to hydronic condenser water loop to reduce usage of ePotentially Cost-Effective

493 6237 Install gas boost to hydronic condenser water loop to reduce usage of ePotentially Cost-Effective

493 6132 Install gas boost to hydronic condenser water loop to reduce use of elecPotentially Cost-Effective

585 4177 Install gas domestic hot water heater Potentially Cost-Effective

453 1093 Install grid connected solar power array as part of future airport expansPotentially Cost-Effective

493 6094 Install heat recovery equipment on chillers to provide concurrent heatinPotentially Cost-Effective

493 6281 Install heat recovery equipment to utilise waste heat from chillers for r Potentially Cost-Effective

561 2707 Install high efficency motors on the pool filter pumps. Potentially Cost-Effective

592 1435 Install high efficiency air cooled chiller Potentially Cost-Effective

592 1384 Install high efficiency flourescent lamps single 36W in lieu of twin 36W Potentially Cost-Effective

592 1382 Install high efficiency flourescent lamps single 56W in lieu of twim 56WCost-Effective

470 4524 Install high efficiency motors on blowers and pumps Cost-Effective

320 4409 Install Hull Diverter Valve Cost-Effective

588 5035 Install insulation Potentially Cost-Effective

587 4969 Install inverter type reverse cycle air conditioners Potentially Cost-Effective

437 2625 Install key card/tag in guest rooms (To be included next refurbishment)Cost-Effective

569 3667 Install key operated switches for plant room Cost-Effective

333 1900 Install key tag switches to plant room lighting Cost-Effective

445 4192 Install key tag switches to plant room lighting Cost-Effective

317 4477 Install larger boiler economiser Cost-Effective

575 1479 Install LCD computer screens for customer use when current screens aCost-Effective

575 1495 Install LCD computer screens for customer use when current screens aCost-Effective

568 3489 Install LED based exit lighting Potentially Cost-Effective

582 4705 Install light switch in handicap bathroom. Potentially Cost-Effective

570 812 Install light switches Cost-Effective

493 6163 Install lighting control on atrium lights for daytime Potentially Cost-Effective

579 3991 Install lighting control PIR sensor in meeting room Cost-Effective

579 3993 Install lighting control PIR sensor in toilets Cost-Effective

509 6506 Install lighting controls Cost-Effective

472 4328 Install Lighting Controls to nominated areas Cost-Effective

474 4368 Install Lighting Controls to nominated areas Cost-Effective

473 4350 Install Lighting Controls to nominated areas. Cost-Effective

584 5632 Install lighting controls to the function room bathrooms Cost-Effective

475 4399 Install lighting controls to the Office, carpark and equipment room. Cost-Effective

584 5624 Install lighting controls Cost-Effective

573 3429 Install lighting occupancy sensors in the aerobics room (note: additionaPotentially Cost-Effective

587 5007 Install lighting retrofit for remianing half of the building - built since last Cost-Effective

597 5718 Install lighting sensors on 12 double fluorescent fixtures. Currently lef Cost-Effective

Page 45: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

363 331 Install Lighting System upgrades to pot line and replace metal halide li Cost-Effective

604 2282 Install local switching of the high bay lights Cost-Effective

562 2070 Install low flow shower heads Cost-Effective

285 1569 Install low pressure (3.5 bar) air compressor for the VSD unit Potentially Cost-Effective

582 4703 Install lux sensor to control external lighting. Cost-Effective

584 5641 Install lux sensors to control carpark lighting Cost-Effective

585 4183 Install Lux Sensors to control change room lighting Cost-Effective

589 2351 Install Lux Sensors To Control Compact Fluorescent Lights In The FoyPotentially Cost-Effective

562 2059 Install lux sensors to control external lights. Cost-Effective

589 2356 Install Lux Sensors To Control Lighting In Kiosk Potentially Cost-Effective

333 1906 Install Manual Switches where possible Potentially Cost-Effective

485 5866 Install MDs in four labs Cost-Effective

594 5086 Install Metered Power Heads on Storage Van sites Cost-Effective

417 4337 Install Mill Starch Thickener Cost-Effective

448 3785 Install modulating boilers with heat recovery Potentially Cost-Effective

321 299 Install modulation for second boiler. Cost-Effective

404 2744 Install motion activated control for all open plan areas Cost-Effective

404 2746 Install motion activated control for selected car park lighting Cost-Effective

404 2745 Install motion activated control in enclosed rooms Cost-Effective

448 3783 Install motion activated lighting control in all offices, meeting rooms, u Potentially Cost-Effective

453 1090 Install motion activated lighting control. Potentially Cost-Effective

493 6064 Install motion sensor control of lighting in all teaching rooms Potentially Cost-Effective

584 5564 Install motion sensor Cost-Effective

569 3669 Install motion sensors at car park & toilets Cost-Effective

360 3473 Install motion sensors in toilets and change rooms Cost-Effective

593 4879 Install motion sensors to change rooms Potentially Cost-Effective

485 5843 Install movement control of the lights in selected intermittently occupie Cost-Effective

485 5885 Install movement control of the lights in selected intermittently occupie Cost-Effective

485 5897 Install movement control of the lights in selected intermittently occupie Cost-Effective

485 5898 Install movement control of the lights in selected intermittently occupie Cost-Effective

485 5911 Install movement control of the lights in selected intermittently occupie Cost-Effective

485 5925 Install movement control of the lights in selected intermittently occupie Cost-Effective

561 2741 Install movement detector in the distribution area. Potentially Cost-Effective

485 5804 Install Movement Detectors in selected rooms Cost-Effective

561 2715 Install movement detectors to control male staff bathroom light fittings. Potentially Cost-Effective

571 3346 Install movement detectors to switch off restaurant dining, function roo Cost-Effective

562 2067 Install movement sensor control for lights in general purpose hall Cost-Effective

485 6610 Install movement sensor control in 11 rooms Cost-Effective

561 2700 Install movement sensor control of lights in intermittently occupied areaPotentially Cost-Effective

561 2743 Install movement sensor control of the change room lighting. Potentially Cost-Effective

604 2267 Install movement sensor control of the lights in the Archives Room Cost-Effective

604 2281 Install movement sensor controlled lights in intermittently occupied are Cost-Effective

587 5029 Install movement sensors in amenities (50%) Cost-Effective

587 5031 Install movement sensors in amenities (50%) Cost-Effective

594 5055 Install movement sensors on lighting circuits. Cost-Effective

568 3486 Install movement sensors to AC units in meeting rooms Cost-Effective

604 2296 Install movement sensors to control lights in intermittently occupied ar Potentially Cost-Effective

493 6079 Install natural ventilation control devices to improve indoor air quality Potentially Cost-Effective

Page 46: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

493 6304 Install natural ventilation controls and devices Potentially Cost-Effective

493 6155 Install natural ventilation to improve thermal comfort Potentially Cost-Effective

441 2226 Install New Economy Cycle for FCU 6/7 to provide 100% capacity, currePotentially Cost-Effective

333 1898 Install new IT equipment with broader temp and RH specs Cost-Effective

329 6032 install new meters Cost-Effective

353 3367 Install new NO2 and CO car park gas monitoring systems and control Potentially Cost-Effective

432 2220 Install new process for extracting a burr by-product from the main procePotentially Cost-Effective

460 1894 install new sensible heat exchanges to reclaim energy from operating tPotentially Cost-Effective

337 1051 Install notched vee belts on a replacement basis Potentially Cost-Effective

471 711 Install O.5MW co generation plant Potentially Cost-Effective

582 4708 Install occ sensors in external the male & female bathroom. Cost-Effective

582 4691 Install occ sensors in the bathrooms and locker rooms Potentially Cost-Effective

582 4696 Install occ sensors in the office & lunchroom Potentially Cost-Effective

582 4693 Install occ sensors in offices Potentially Cost-Effective

582 4688 Install occ sensors to meeting, bathrooms & training. Potentially Cost-Effective

582 4687 Install occ sensors to offices Potentially Cost-Effective

493 6278 Install occupancy & timer control of lighting Potentially Cost-Effective

493 6250 Install occupancy control for teaching room lighting and offices Potentially Cost-Effective

568 3504 Install occupancy control in selected areas Cost-Effective

493 6181 Install occupancy control of lab lighting Potentially Cost-Effective

493 6298 Install occupancy control of lighting & upgrade lighting Potentially Cost-Effective

582 4676 Install occupancy sensor in the carpark to control the lighting. Potentially Cost-Effective

597 5716 Install occupancy sensor on lighting in the access corridor on the bottoCost-Effective

582 4729 Install occupancy sensor to control the lighting in the bathroom. Potentially Cost-Effective

582 4674 Install occupancy sensor to male and female bathrooms. Potentially Cost-Effective

597 5708 Install occupancy sensors for lighting in low use areas (meeting area Potentially Cost-Effective

358 3094 Install occupancy sensors in low utilisation areas such as disaster recoPotentially Cost-Effective

582 4712 Install occupancy sensors in the male and female locker rooms. Potentially Cost-Effective

415 2127 Install occupancy sensors in the office and amenity buildings to reduce Cost-Effective

584 5628 Install occupancy sensors to administration office to control lighting Cost-Effective

582 4673 Install occupancy sensors to all individual offices. Most offices had be Potentially Cost-Effective

604 2252 Install occupancy sensors to control fan coil units serving meeting roomCost-Effective

589 2383 Install Occupancy Sensors To Control Lighting In Bathrooms Potentially Cost-Effective

589 2355 Install Occupancy Sensors To Control Lighting In Office Potentially Cost-Effective

358 3091 Install occupancy sensors to control the air-conditioning in meeting r Cost-Effective

584 5669 Install occupancy sensors to courtside bathrooms, first aid room, store Cost-Effective

570 809 Install occupancy sensors to main office and staff room lights Cost-Effective

570 810 Install occupancy sensors to office, common room and store lights of buCost-Effective

570 811 Install occupancy sensors to the office, common room and corridor lighCost-Effective

582 4704 Install occupancy sensors to the male and female locker rooms. Potentially Cost-Effective

582 4728 Install occupancy sensors to the reading room, computer room, youth Potentially Cost-Effective

586 5980 Install occupancy/motion sensors on lighting in low traffic areas Potentially Cost-Effective

355 310 Install oil cooler on compressor drive (C-06) Cost-Effective

571 3286 Install optimum start control of HVAC systems Cost-Effective

485 5742 Install outside air compensation on levels 2,3 and 4 fan coils' chilled w Cost-Effective

415 2125 Install partition in the office to enable night shift operation within limit Cost-Effective

570 817 Install PE cell control to car park fluorescent and halogen flood lamps Cost-Effective

493 6202 Install PE cell daylight sensor on external stair lights Cost-Effective

Page 47: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

448 3759 Install PE cell lighting control in selected areas, eg Café Cost-Effective

561 2713 Install PE cell to control the lights under the roof eave near the male baCost-Effective

570 818 Install PE light switch and occupancy sensor with On/Off timer to fluo Cost-Effective

509 6505 Install Photocell control and over-ride switch - Exterior lighting Cost-Effective

509 6504 Install Photocell control and over-ride switch - High mast Cost-Effective

304 4808 Install photo-detectors on remaining lights Potentially Cost-Effective

604 2283 Install photoelectric / movement control of Gang shed awning lights Cost-Effective

561 2689 Install Photoelectric control of the Atrium uplights. Cost-Effective

561 2699 Install Photoelectric control of the shelf lighting West end first floor. Potentially Cost-Effective

561 2702 Install photoelectric control of the pool entry lights Cost-Effective

604 2322 Install photosensor control Potentially Cost-Effective

596 4959 Install photovoltaic arrays Potentially Cost-Effective

571 3314 Install photovoltaic cells Potentially Cost-Effective

592 1436 Install photovoltaic panels. Potentially Cost-Effective

591 1810 install PIR for 2x163W fittings, L/S in 1st floor female bathroom Potentially Cost-Effective

591 1811 install PIR for 2x163W fittings, L/S in 1st floor male bathroom Potentially Cost-Effective

591 1847 install PIR for 3x136W + 1x218W fittings, L/S in female toilets Cost-Effective

591 1848 install PIR for 3x136W + 1x218W fittings, L/S in male toilets Cost-Effective

591 1814 install PIR for 3x136W fittings, L/S in 2nd floor female bathroom Potentially Cost-Effective

591 1815 install PIR for 3x36W fittings, L/S in 2nd floor male bathroom Potentially Cost-Effective

568 3509 Install PIR movement sensor Cost-Effective

591 1807 install PIR with 2x136W fittings, L/S in ground floor female bathroom Potentially Cost-Effective

591 1808 install PIR with 2x136W fittings, L/S in ground floor male bathroom Potentially Cost-Effective

586 5965 Install pool blankets over indoor and outdoor pools Cost-Effective

593 4876 Install Pool cover & timer on boilers Cost-Effective

593 4894 Install power Factor Correction Cost-Effective

573 3427 Install power factor correction equipment at this site Cost-Effective

573 3438 Install power factor correction equipment at this site Potentially Cost-Effective

594 5073 Install Power Factor Equipment to raise PF from an average.78 to.98 Cost-Effective

320 4416 Install Presifting in Meal Grinding Potentially Cost-Effective

604 2302 install push button time control of local space heaters Potentially Cost-Effective

604 2305 Install push button timer control in conjunction with occupancy sensing oPotentially Cost-Effective

485 6613 Install push button timer control in two rooms Cost-Effective

485 5785 Install push button timer control of lights in selected intermittently occ Cost-Effective

571 3261 Install push button timer control of the aerobics room air conditioning anCost-Effective

485 5766 Install push button timer control of the mail room Cost-Effective

604 2324 Install push button timer control of lighting Potentially Cost-Effective

485 5906 Install push button timer control on selected air conditioners Cost-Effective

485 5932 Install push button timer control on the air conditioner serving laborato Cost-Effective

562 2071 Install push button timer of the tennis room boiling water unit Cost-Effective

570 814 Install push-button timer switch to bar radiators. Cost-Effective

284 4047 Install realtime metering to report energy usage, energy per tonne, eneCost-Effective

305 973 Install recuperative burners on ladle dryer Potentially Cost-Effective

561 2688 Install reduced voltage control on office building fluorescent lighting Cost-Effective

561 2698 Install reduced voltage control on carpark HID lights Potentially Cost-Effective

453 1077 Install reflectors in conjunction with de-lamping of twin flourescent fittinCost-Effective

571 3348 Install room air-conditioning units in restaurant managers office Potentially Cost-Effective

561 2737 Install run down timer to control electric heaters in the distribution area.Cost-Effective

Page 48: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

604 2311 Install run on timer contol of boiling water units in the kitchen and roomPotentially Cost-Effective

604 2306 Install run on timer control of boiling water units Potentially Cost-Effective

604 2327 install run on timer control of boiling water units Potentially Cost-Effective

604 2332 Install run on timer control of boiling water units in the kitchen and the Potentially Cost-Effective

604 2284 Install run on timer control of local electric heaters Cost-Effective

604 2269 Install run on timer control of the kitchen domestic hot water systems Cost-Effective

604 2325 Install run on timers on reverse cycle air conditioners Potentially Cost-Effective

317 4474 Install sensing electronic drain valves for air receivers Cost-Effective

587 5021 Install sensor lighting in room & add 5 movement sensors (25%) Cost-Effective

298 2142 Install sensors to shut off vacuum system when not in use for a certain Cost-Effective

604 2249 Install separate controls for hall & 2 and set back the temperature in t Cost-Effective

604 2268 Install separate run down timers to control the hall air conditioners Cost-Effective

290 3413 Install Siemens LMV system on lead boiler Potentially Cost-Effective

445 4205 Install Skycool product to roof Potentially Cost-Effective

500 514 Install smaller chiller unit to run at a more even load Potentially Cost-Effective

592 1373 Install SMS based shutdown of floodlights Potentially Cost-Effective

470 4522 Install solar panel for domestic hot water preheating. Cost-Effective

591 1802 install solar panels for domestic hot water Potentially Cost-Effective

568 3501 Install solar panels for domestic hot water generation Potentially Cost-Effective

591 1855 install solar panels for domestic hot water heating Potentially Cost-Effective

568 3510 Install solar panels for hot water generation Potentially Cost-Effective

592 1377 Install solar panels to preheat dhw Potentially Cost-Effective

592 1388 Install solar panels to preheat dhw Potentially Cost-Effective

592 1397 Install solar panels to preheat dhw Potentially Cost-Effective

592 1422 Install solar panels to preheat dhw Potentially Cost-Effective

592 1415 Install solar panels to preheat domestic hot water (dhw) Potentially Cost-Effective

592 1434 Install solar panels to preheat domestic hot water and plumbing to requPotentially Cost-Effective

592 1408 Install solar panels to preheat ten domestic hot water units Potentially Cost-Effective

592 1405 Install Solar Pool heating Cost-Effective

604 2300 install solar pool heating Potentially Cost-Effective

604 2309 install solar pool heating Potentially Cost-Effective

493 6279 Install solar preheat to DHWS Potentially Cost-Effective

448 3764 Install solar pre-heaters on existing DHW systems Cost-Effective

404 2758 Install solar system for domestic hot water Potentially Cost-Effective

573 3426 Install solar water heating system on available roof space Potentially Cost-Effective

341 277 Install solenoids on nozzle on packing line and air knife on Pockets lineCost-Effective

492 4110 Install split-system AC unit to air-condition server room. Potentially Cost-Effective

562 2068 Install spring return taps in the showers to reduce showering time Cost-Effective

583 2930 install submetering to promote energy awareness Cost-Effective

583 2949 install submetering to promote energy awareness Cost-Effective

484 3539 Install T5 conversation to tenancy lighting Potentially Cost-Effective

600 2570 Install T5 retrofit to plant rooms Potentially Cost-Effective

596 4980 Install T5 streetlights Potentially Cost-Effective

591 1798 install temp reset on A/C units Potentially Cost-Effective

591 1817 install temp reset on A/C units Cost-Effective

591 1849 install temp reset on A/C units Potentially Cost-Effective

591 1825 install temp resets on A/C units Cost-Effective

592 1433 Install temperature reset, time scheduling and demand savings on ac unPotentially Cost-Effective

Page 49: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

561 2703 Install time clock and photoelectrric control of the change room lights. Cost-Effective

561 2701 Install time clock control of the domestic hot water circulating pumps. Potentially Cost-Effective

448 3762 Install time clocks on general power equipment to prevent operation a Cost-Effective

488 4118 Install time clocks on instantaneous hot water heaters Potentially Cost-Effective

602 2779 Install time motion sensors Cost-Effective

604 2245 Install time of day control of the potable water circulating pump Cost-Effective

493 6294 Install time schedule control of compressed air system Potentially Cost-Effective

594 5056 Install time switches on Boiling Water Units Cost-Effective

493 6065 Install timed pushbutton control of all small remote AC systems Potentially Cost-Effective

493 6066 Install timed pushbutton controls on all office lighting Potentially Cost-Effective

493 6260 Install timer control on electric heaters Potentially Cost-Effective

493 6161 Install timer controls on wall mounted RAC's Potentially Cost-Effective

448 3758 Install timer delay switches in all store rooms Cost-Effective

404 2747 Install timer delay switches in selected store/computer rooms Cost-Effective

298 2170 Install timer for auto shut off of office & canteen airco over part of wee Cost-Effective

602 2774 Install timer motion sensors Potentially Cost-Effective

602 2782 Install timer motion sensors Cost-Effective

575 1482 Install timer switch for air conditioning system in tandem with manual sCost-Effective

589 2357 Install Timer Switch To Control Spa Operation Potentially Cost-Effective

589 2379 Install Timer Switch To Control Spa Operation Potentially Cost-Effective

593 4924 Install timer to air compressor Cost-Effective

570 6497 Install timer to the large refrigerator plug such that the fridge only op Cost-Effective

591 1797 install timers for zip boilers Potentially Cost-Effective

305 930 Install timers on air conditioning equipment for several office complexeCost-Effective

588 5032 Install timers on boiling water units Cost-Effective

404 2751 Install timers on BWU's Cost-Effective

423 2555 Install timers on Office A/C systems Cost-Effective

586 5981 Install timers on small hot water services/zip boilers Potentially Cost-Effective

586 5991 Install timers on the Air Compressors Potentially Cost-Effective

597 5706 Install timers on vending machines and wall mounted AC units to preveCost-Effective

585 4168 Install timers to foyer, administration and bathroom areas Potentially Cost-Effective

593 4892 Install timers to ZIP water boiler units Cost-Effective

593 4925 Install timers to ZIP water boiler units Cost-Effective

587 5012 Install translucent roofing for work areas Potentially Cost-Effective

562 2089 Install two inverter air conditioners, which draw a variable amount of cuCost-Effective

569 3627 Install TX Valve Potentially Cost-Effective

580 5182 Install ultrasonic motion detection devices for the lighting in three roomCost-Effective

416 410 Install upgraded compressor controller modules to manage loads. Cost-Effective

493 6198 Install usage control on compressed air & cool room systems Potentially Cost-Effective

571 3257 Install variable speed control of indoor pool filter pumps Cost-Effective

571 3258 Install variable speed control of outdoor pool filter pumps Cost-Effective

604 2263 Install variable speed control of the heat pump circulating system Cost-Effective

604 2260 Install variable speed control of the pool filter pump Cost-Effective

317 4476 Install variable speed drive on boiler combustion fan Cost-Effective

591 1801 install variable speed drive on chilled water pump Potentially Cost-Effective

579 3970 Install Variable Speed Drive on heat pump to reduce flow to 50% duringCost-Effective

594 5082 Install Variable Speed Drive on Outdoor Circulation Pump Cost-Effective

594 5085 Install Variable Speed Drive on Outdoor Circulation Pump Cost-Effective

Page 50: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

584 5565 Install variable speed drive to recirculating pump Cost-Effective

460 1890 install variable speed drives for chilled water and condenser water pu Cost-Effective

471 708 Install variable speed drives for studio condenser water pumps Potentially Cost-Effective

571 3239 Install Variable Speed Drives on 25 meter pool pumps. Cost-Effective

591 1799 install variable speed drives on Air handling unit 1 Potentially Cost-Effective

516 5734 Install variable speed drives on boilers ID Fans, FD Fans and boiler f Potentially Cost-Effective

594 5071 Install Variable Speed Drives on each of the six 37KW Aerators Potentially Cost-Effective

573 3453 Install Variable Speed Drives on irrigation pumps and aim to reduce opPotentially Cost-Effective

573 3443 Install Variable Speed Drives on other key variable-demand equipmentPotentially Cost-Effective

437 2624 Install variable speed drives on pumps, fans and upgrade aged pump mCost-Effective

444 4041 Install variable speed drives to CDW pumps and isolate generator heat Potentially Cost-Effective

496 2816 Install VFDs on 4 blowers Cost-Effective

448 3757 Install voltage control and re-lamp general office lighting Cost-Effective

453 1079 Install voltage control units in selected areas. Cost-Effective

592 1380 Install Voltage controller Cost-Effective

592 1411 Install Voltage Controller for lighting Cost-Effective

592 1394 Install voltage controllers Potentially Cost-Effective

568 3490 Install voltage controllers Potentially Cost-Effective

592 1430 Install voltage controllers on each level. Cost-Effective

333 1905 Install Voltage Reduction Cost-Effective

485 5772 Install voltage reduction control of the level 3 open plan office area roo Cost-Effective

575 1529 Install voltage reduction unit for car park lighting Cost-Effective

570 832 Install voltage reduction unit to fluorescent lamps in main hall and two lCost-Effective

570 6495 Install voltage reduction unit to the fluorescent lamps in ground floor t Cost-Effective

360 3481 Install voltage reduction units - FL light in offices and factory Potentially Cost-Effective

591 1795 install voltage reduction units for 1x36W troffer fittings for 2 nd floor 3/ Cost-Effective

591 1824 install voltage reduction units for 21 of 1x36W diffused batterns + rela Potentially Cost-Effective

591 1796 install voltage reduction units for 2x18W batten fittings in the fire stairs Cost-Effective

591 1837 install voltage reduction units for 2x26W downlight fittings in main offic Potentially Cost-Effective

591 1860 install voltage reduction units for 3 1x18W IP765 fittings in stairs and Potentially Cost-Effective

591 1793 install voltage reduction units for 3x18w troffer fittings on the 2nd floor Cost-Effective

591 1861 install voltage reduction units for 45x1x36W batten fittings Cost-Effective

591 1787 install voltage reduction units for 94 of 1x36W troffer + 12 of 2x18W dowCost-Effective

591 1791 install voltage reduction units in 4 1x36W troffer fittings in first floor offi Cost-Effective

562 2061 Install voltage reduction units on fluorescent light circuits Potentially Cost-Effective

580 5250 Install voltage reduction units on fluorescent lighting Cost-Effective

570 6487 Install voltage reduction units to fluorescent lamps Cost-Effective

475 4398 Install voltage reduction units to the lighting circuits in equipment roomsCost-Effective

473 4354 Install voltage reduction units to the lighting circuits in the chiller plant Potentially Cost-Effective

472 4282 Install voltage reduction units to the lighting circuits on plantroom. Cost-Effective

474 4367 Install voltage reduction units to the lighting circuits on plantroom. Cost-Effective

475 4381 Install voltage reduction units to the lighting circuits on roof and plantr Cost-Effective

591 1812 install VRU for 3x18W troffer fittings in 2nd floor manager offices Potentially Cost-Effective

582 4695 Install VRU in the Archives room Potentially Cost-Effective

341 278 Install VSD control for 3 x biofilter fans to replace damper control Cost-Effective

341 279 Install VSD control and exhaust fans to replace damper control Cost-Effective

493 6230 Install vsd control to all fume exhaust systems Potentially Cost-Effective

470 4530 Install VSD fitted compressors on all three circuits Cost-Effective

Page 51: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

500 513 Install VSD instrument air compressor Potentially Cost-Effective

298 2157 Install VSD on 11 kW waste water pump Potentially Cost-Effective

298 2153 Install VSD on 30kW Wolfking Mixer/Grinder Potentially Cost-Effective

298 2155 Install VSD on 75 kW Block Grinder Potentially Cost-Effective

298 2156 Install VSD on 90 kW Bowl Cutter Potentially Cost-Effective

493 6306 Install VSD on CHW / CW & HW pumps Potentially Cost-Effective

493 6146 Install vsd on CHW / CW / HW pumps & CT Fan Potentially Cost-Effective

493 6282 Install VSD on cooling tower fan Potentially Cost-Effective

320 4411 Install VSD on Cooling Tower Fan Drive Cost-Effective

493 6200 Install vsd on CW pumps & control valves on each AC unit Potentially Cost-Effective

493 6238 Install VSD on CWP & CT fan including control valves at each AC unit Potentially Cost-Effective

297 536 Install VSD on Pellet Press 03 (315 kW) Potentially Cost-Effective

493 6097 Install vsd on screw chiller primary CHW pump Potentially Cost-Effective

349 1317 Install VSD on Cooling Tower Fan Cost-Effective

493 6068 Install VSD to all fans & pumps with variable load Potentially Cost-Effective

360 3474 Install VSD to control chilled water supply pump - lid line chilled water Cost-Effective

585 4161 Install VSD to control cooling tower fan Cost-Effective

580 5252 Install VSD to control Recirculating pumps - dependent on pool and pl Potentially Cost-Effective

493 6133 Install vsd to CW pumps and control valves on each AC unit Potentially Cost-Effective

491 743 Install VSD to HVAC plant (progressive) Cost-Effective

593 4919 Install VSD to main circulation pumps Cost-Effective

593 4922 Install VSD to main circulation pumps Cost-Effective

474 4372 Install VSDs and Zone Controls to AHUs in Building 2 Potentially Cost-Effective

298 2164 Install VSDs on 5 pelleters to reduce operating load,enable better cont Potentially Cost-Effective

298 2166 Install VSDs on A1/A2 grinders Potentially Cost-Effective

493 6123 Install vsd's on CHW & CW pumps Potentially Cost-Effective

493 6231 Install vsd's on CHW / CW system pumps Potentially Cost-Effective

594 5065 Install VSD's on Circulation Pumps Cost-Effective

448 3769 Install VSD's on cooling tower fans Cost-Effective

573 3428 Install VSD's on main circulation pumps (eg 80% of usual flow rate overPotentially Cost-Effective

444 4044 Install VSDs on selected HW pumps Potentially Cost-Effective

592 1387 Install VSDs on Supply and Return Fans (Hall AHU) Potentially Cost-Effective

473 4336 Install VSDs to AHUs Cost-Effective

444 4039 Install VSDs to Central campus CHW pumps Potentially Cost-Effective

444 4043 Install VSDs to central campus cooling towers Potentially Cost-Effective

444 4042 Install VSDs to cooling towers Potentially Cost-Effective

444 4040 Install VSDs to CHW pumps Potentially Cost-Effective

333 1909 Install VSD's to Chilled Water Pumps Potentially Cost-Effective

595 5440 Install VSDs to circulation pumps Cost-Effective

566 2010 Install VSD's to circulation pumps Potentially Cost-Effective

566 2014 Install VSD's to circulation pumps Potentially Cost-Effective

445 4209 Install VSDs to CSB heating hot water pumps Potentially Cost-Effective

333 1910 Install VSD's to Main Chillers Potentially Cost-Effective

445 4207 Install VSDs to main CHW pumps Potentially Cost-Effective

593 4884 Install VSDs to main circulation pumps Cost-Effective

493 6096 Install VSD's to supply fans to reduce operation out of high load times Potentially Cost-Effective

445 4206 Install VSDs to tower block heating hot water pumps Potentially Cost-Effective

462 1618 Install VVVF drives on sewage pumps Potentially Cost-Effective

Page 52: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

383 2454 Install weekly timer on bathouse heating to turn off on weekends Cost-Effective

592 1379 Install wet bulb sensor to minimize cooling tower fan run. Potentially Cost-Effective

587 5002 Install window tinting (10%) Cost-Effective

589 2362 Install Window Tinting To Windows On The Northern Side Potentially Cost-Effective

354 2894 Installation high efficiency motors Cost-Effective

593 4910 Installation of “occupancy button” to ACU-2 Cost-Effective

578 6552 Installation of 10 Solarhart 151L hot water units - one on each of the sePotentially Cost-Effective

493 6316 Installation of 120kWe cogeneration plant for pool heating Potentially Cost-Effective

493 6093 Installation of 500kWe cogeneration plant & 1000kWr absorption chiller Potentially Cost-Effective

352 2339 Installation of 900kVAr of PFCE Cost-Effective

391 3090 Installation of a 2.4MW cogeneration plant, including 2 x 1.2MW Natur Potentially Cost-Effective

599 3207 Installation of a Building Management System Cost-Effective

599 3211 Installation of a Building Management System Cost-Effective

574 5138 Installation of a Building Management System (BMS) Potentially Cost-Effective

599 3222 Installation of a Buliding Management System & Variable Speed DrivesCost-Effective

574 5149 Installation of a Business Management System (BMS) Potentially Cost-Effective

574 5151 Installation of a Business Management System (BMS) Potentially Cost-Effective

594 5081 Installation of a Compressor control system to shut down the second Potentially Cost-Effective

350 3602 Installation of a Heat Pump hot Water Service at the bath house Potentially Cost-Effective

564 1759 installation of a solar pool heating system to replace the exisitng heat Cost-Effective

574 5159 Installation of a hood Potentially Cost-Effective

599 3213 Installation of a Humidity Control Unit for humidity control. Potentially Cost-Effective

593 4901 Installation of additional light switches Cost-Effective

593 4903 Installation of advance HVAC control system Potentially Cost-Effective

600 2567 Installation of air change units to pre cool and pre heat outside air Potentially Cost-Effective

596 4955 Installation of BMCS Cost-Effective

599 3223 Installation of Building Management System & Variable Speed Drives Cost-Effective

493 6240 Installation of CHW AC units for offices Potentially Cost-Effective

493 6178 Installation of CHW central cooling plant to replace multizone DX syst Potentially Cost-Effective

566 2049 Installation of co-generation Potentially Cost-Effective

493 6312 Installation of daylight control of external lighting Potentially Cost-Effective

352 2342 Installation of demand management on remote pumping whilst train unloPotentially Cost-Effective

574 5164 Installation of economy cycle Potentially Cost-Effective

574 5169 Installation of economy cycle Potentially Cost-Effective

574 5174 Installation of economy cycle Cost-Effective

574 5135 Installation of economy cycle and CO2 control Potentially Cost-Effective

574 5144 Installation of economy cycle and CO2 control Potentially Cost-Effective

493 6130 Installation of economy cycle on AC system Potentially Cost-Effective

574 5158 Installation of economy cycle to meeting rooms Potentially Cost-Effective

600 2564 Installation of economy cycle to the NAGG Cost-Effective

597 5690 Installation of electronic expansion valves on DX units. Refer to att Potentially Cost-Effective

569 3632 Installation of energy efficient shower heads in all villas and amenities Cost-Effective

566 2041 Installation of Energy Reduction Controllers Cost-Effective

595 5434 Installation of Energy Reduction Controllers Cost-Effective

595 5439 Installation of Energy Reduction Controllers Cost-Effective

595 5442 Installation of Energy Reduction Controllers Cost-Effective

595 5445 Installation of Energy Reduction Controllers Cost-Effective

595 5449 Installation of Energy Reduction Controllers Cost-Effective

Page 53: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

595 5450 Installation of Energy Reduction Controllers Potentially Cost-Effective

595 5451 Installation of Energy Reduction Controllers Cost-Effective

595 5452 Installation of Energy Reduction Controllers Cost-Effective

595 5453 Installation of Energy Reduction Controllers Potentially Cost-Effective

566 2001 Installation of Energy Reduction Unit (ERC) to lighting circuits Cost-Effective

596 4940 Installation of Energy Save Units Potentially Cost-Effective

596 4958 Installation of Energy Save Units Potentially Cost-Effective

596 4964 Installation of Energy Save Units Potentially Cost-Effective

596 4945 Installation of Energy Save Units to Control Lights in the Car Park Potentially Cost-Effective

596 4946 Installation of Energy Save Units to Control Lights in the Offices Potentially Cost-Effective

566 2031 Installation of ERC Cost-Effective

566 2046 Installation of ERC Cost-Effective

566 2048 Installation of ERC Cost-Effective

596 4965 Installation of external door Potentially Cost-Effective

589 2563 Installation of Flow Restrictors to Taps Potentially Cost-Effective

350 3604 Installation of Heat Pump Hot Water Services on bath house Potentially Cost-Effective

350 3601 Installation of Heat Pump Hot Water Services on bath house Potentially Cost-Effective

574 5154 Installation of heat pump hot water system Potentially Cost-Effective

574 5171 Installation of heat pump hot water systems Potentially Cost-Effective

574 5120 Installation of heat pump pool heating Potentially Cost-Effective

574 5130 Installation of heat pump pool heating Potentially Cost-Effective

574 5111 Installation of heat pump water heaters Potentially Cost-Effective

574 5118 Installation of heat pump water heating Potentially Cost-Effective

574 5129 Installation of heat pump water heating Potentially Cost-Effective

574 5112 Installation of heat pumps for pool heating Potentially Cost-Effective

346 3810 Installation of Light Eco in Mill Cost-Effective

596 4974 Installation of light sensors to control external lighting Potentially Cost-Effective

584 5654 Installation of lux sensors to control carpark lighting Cost-Effective

575 1520 Installation of Motion Detector in meeting room 2, to review performancePotentially Cost-Effective

493 6119 Installation of motion sensor & push button control of lighting Potentially Cost-Effective

593 4928 Installation of motion sensors Cost-Effective

493 6105 Installation of motion sensors and pushbuttons on lighting and AC Potentially Cost-Effective

493 6100 Installation of motion sensors and timed pushbuttons on lighting and A Potentially Cost-Effective

593 4906 Installation of motion sensors to amenities block Cost-Effective

593 4911 Installation of motion sensors to change rooms & toilets Cost-Effective

566 2004 Installation of Motion Sensors to offices, meeting rooms Cost-Effective

493 6197 Installation of natural & forced ventilation systems to improve building Potentially Cost-Effective

493 6137 Installation of natural ventilation / economy cycle into AC system Potentially Cost-Effective

429 6556 Installation of new air conditioner controls Cost-Effective

574 5126 Installation of non return dampers on pool room vents Cost-Effective

493 6259 Installation of occupancy / timer controls to lighting Potentially Cost-Effective

493 6241 Installation of occupancy control of lighting Potentially Cost-Effective

493 6209 Installation of occupancy control of office lighting Potentially Cost-Effective

493 6218 Installation of occupancy control to auditorium lighting & AC Potentially Cost-Effective

493 6191 Installation of occupancy or pushbutton time controlled lighting to officePotentially Cost-Effective

596 4941 Installation of Occupancy Sensors Potentially Cost-Effective

584 5649 Installation of occupancy sensors to bathrooms Cost-Effective

584 5579 Installation of occupancy sensors to file storage area Cost-Effective

Page 54: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

493 6220 Installation of occupany control of lights to foyer & meeting rooms Potentially Cost-Effective

447 1869 installation of ozone wash treatment for the 3 valet 25kg washers Potentially Cost-Effective

596 4951 Installation of Photovoltaic Arrays Potentially Cost-Effective

596 4956 Installation of Photovoltaic Arrays Potentially Cost-Effective

596 4975 Installation of Photovoltaic Arrays Potentially Cost-Effective

600 2569 Installation of pool blankets Potentially Cost-Effective

595 5441 Installation of pool solar heating system Potentially Cost-Effective

315 5725 installation of Power Factor capacitance(5 MVAr) with new site substatCost-Effective

566 2000 Installation of power factor correction units Cost-Effective

493 6088 Installation of pushbutton and motion sensor lighting controls Potentially Cost-Effective

493 6147 Installation of pushbutton timer for AC & economy cycle Potentially Cost-Effective

493 6219 Installation of roof insulation and sealing to prevent loss of heating fro Potentially Cost-Effective

566 2015 Installation of solar hot water to replace current storage tank setup Cost-Effective

566 2035 Installation of Sensors Potentially Cost-Effective

584 5661 Installation of sensors to carpark bathroom to control lighting Cost-Effective

578 6543 Installation of shower duration timers Cost-Effective

593 4913 Installation of skytube Potentially Cost-Effective

571 3341 Installation of solar hot water Potentially Cost-Effective

589 2368 Installation of solar hot water heater Potentially Cost-Effective

589 2578 Installation of solar hot water heaters Potentially Cost-Effective

593 4930 Installation of solar hot water system Cost-Effective

579 3994 Installation of Solar Hot Water System to replace current Electric SystemCost-Effective

579 3989 Installation of Solar Hot Water System to supplement current Gas BoileCost-Effective

566 2007 Installation of solar system (glazed panels) Potentially Cost-Effective

583 2918 installation of sub-metering to raise energy usage awareness Cost-Effective

574 5153 Installation of T5 lighting Potentially Cost-Effective

388 3467 Installation of temperature control of cooling tower fans Cost-Effective

566 2047 Installation of time clock to HVAC Cost-Effective

493 6208 Installation of timed pushbutton control of small package AC Potentially Cost-Effective

320 4410 Installation of timed switches on Seed Shed lighting Cost-Effective

583 3030 Installation of timers for BWU and water cooling units Cost-Effective

571 3350 Installation of timers for hot water systems in parks - trial in 4 parks to Cost-Effective

566 2003 Installation of timers to switch off hot water boiler units (ZIP) overnight Potentially Cost-Effective

319 2415 Installation of variable speed control for ammonia compressor Cost-Effective

319 2416 Installation of variable speed control for BAC cooling tower fans Cost-Effective

319 2431 Installation of variable speed control for watse water lagoon aeration unPotentially Cost-Effective

599 3225 Installation of Variable Speed Drive Potentially Cost-Effective

599 3224 Installation of Variable Speed Drives and PLCs Potentially Cost-Effective

314 6480 Installation of variable speed drives for chilled and hot water pumps ef Cost-Effective

308 3776 Installation of variable speed motors on jet dyeing Cost-Effective

606 3066 Installation of variable speed pump to provide the reclaimed water sys Potentially Cost-Effective

604 2240 Installation of Verosol Blinds on the Eastern, Northern and Western e Cost-Effective

320 4413 Installation of VSD on Boiler Feedwater Pump Drive Cost-Effective

596 4949 Installation of VSDs Chilled Water Pumps Potentially Cost-Effective

596 4947 Installation of VSDs Condensor Water Pumps Potentially Cost-Effective

596 4967 Installation of VSDs Condensor Water Pumps Potentially Cost-Effective

493 6111 Installation of VSD's on CHW & HW pumps Potentially Cost-Effective

493 6095 Installation of VSD's on cooling tower fans Potentially Cost-Effective

Page 55: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

596 4952 Installation of VSDs to Control Pumps Potentially Cost-Effective

596 4960 Installation of VSDs to Control Pumps Potentially Cost-Effective

596 4968 Installation of VSDs to Cooling Towers Potentially Cost-Effective

589 2562 Installation of Water efficient device to taps Cost-Effective

589 2385 Installation of water efficient shower heads and taps Potentially Cost-Effective

589 2568 Installation of water efficient shower heads and taps Cost-Effective

589 2580 Installation of water efficient shower heads and taps Potentially Cost-Effective

589 2588 Installation of water efficient shower heads and taps Cost-Effective

589 2589 Installation of water efficient shower heads and taps Cost-Effective

589 2590 Installation of water efficient shower heads and taps Potentially Cost-Effective

589 2591 Installation of water efficient shower heads and taps Cost-Effective

589 2592 Installation of water efficient shower heads and taps Potentially Cost-Effective

589 2593 Installation of water efficient shower heads and taps Potentially Cost-Effective

589 2600 Installation of water efficient shower heads and taps Potentially Cost-Effective

583 3043 Installation timed showers (projected costs without water savings) Potentially Cost-Effective

337 1047 Installed notched type vee belts on drives when belts are due for repla Potentially Cost-Effective

374 1165 Installing Eco-motor controllers for 22 motors Potentially Cost-Effective

298 2147 Insulate 10,000L Feedwater Preheat Tank Potentially Cost-Effective

573 3457 Insulate ceiling (minimum R3.5) and under floor (where accessible) Potentially Cost-Effective

597 5712 Insulate building (inc. bulk insulation to accessible roof space and sealiPotentially Cost-Effective

440 6529 Insulate CIP pipes Potentially Cost-Effective

293 2768 Insulate extruder barrels Potentially Cost-Effective

495 1293 Insulate extrusion chilled water tank Cost-Effective

292 4363 Insulate glycol plate heat exchangers Potentially Cost-Effective

440 6528 Insulate hot water system pipes Potentially Cost-Effective

291 4296 Insulate hot water tank Potentially Cost-Effective

439 3295 Insulate hot water tanks Cost-Effective

301 1150 Insulate pasteurisers Potentially Cost-Effective

440 6523 Insulate refrigeration pipes to cold stores Cost-Effective

439 3300 Insulate steam piping Potentially Cost-Effective

417 4395 Insulate Steep Tanks Potentially Cost-Effective

382 3652 Insulate the deaerator tank and all associated pipes and fittings Cost-Effective

485 5934 Insulate the flow and return pipework from the potable and non potable Cost-Effective

571 3247 Insulate the pool hall return air ductwork Potentially Cost-Effective

516 5737 Insulate uninsulated refrigerant pipe Potentially Cost-Effective

318 4463 Insulating the dryer cylinder Potentially Cost-Effective

346 3816 Insulation improvements - boiler house Cost-Effective

346 3822 Insulation improvements - steam pipes Potentially Cost-Effective

295 5327 Insulation of external hot water pipes where possible Cost-Effective

319 2432 Insulation of tallow storage tanks Potentially Cost-Effective

387 1272 Insulation of unlagged valves and fittings in the steam system. Cost-Effective

318 4442 Insulting Tallow tank heat loss Potentially Cost-Effective

594 5062 Integrate Zane solar system into BMS Cost-Effective

596 4942 Integration of Pumps with SCADA system Potentially Cost-Effective

379 1183 Interconnect MP and HP Steam Headers Cost-Effective

434 2216 Interconnection of the refrigeration plant rooms to create a plant-wide Potentially Cost-Effective

485 6609 Interface tempered air systems to the BMS to provide time of day schedCost-Effective

349 1315 Interlock Line 6 air conditioning unit to light switch Cost-Effective

Page 56: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

396 655 Interlock P4 coater / cooler rotary valves Potentially Cost-Effective

396 656 Interlock P4 gearbox oil motor Potentially Cost-Effective

396 640 Interlock P4 rotary valves & spreaders Cost-Effective

396 636 Interlock rotary valve associated with re-seed system Cost-Effective

396 629 Interlock system that transfers from small ingredients to mill tower Cost-Effective

485 5740 Interlock the boiler with the associated air handling plant Cost-Effective

587 5023 Interrogate where the floodlights are being billed. Supposed to be off Cost-Effective

363 6029 Introduce Efficient Pot room exhaust motors on replacement Potentially Cost-Effective

594 5080 Introduce Energy Awareness & Monitoring Prograramme to motivate staff Potentially Cost-Effective

337 1048 Introduce energy efficient electric motors. Potentially Cost-Effective

594 5079 Introduce Motor System Efficiency Programme to raise maintenance staPotentially Cost-Effective

422 721 Introduce water injection to enhance regenerator performance Cost-Effective

354 2900 introducing chilled ceiling & beams system Potentially Cost-Effective

354 2901 introducing photo voltaic cells Potentially Cost-Effective

294 1649 Investigate adjustments to mixture/combustible variability in gas burnerPotentially Cost-Effective

575 1467 Investigate alternative court lighting for greater efficiency and reduction oCost-Effective

575 1490 Investigate alternative floodlighting for greater efficiency and reduction Cost-Effective

575 1469 Investigate alternative sporting field lighting for greater efficiency and redCost-Effective

573 3447 Investigate and address strange operation of power factor correction Potentially Cost-Effective

296 2670 Investigate and implement improvement of A/C efficiency Cost-Effective

597 5711 Investigate and price opportunity for 'heat reflective' coating on roof of Potentially Cost-Effective

597 5710 Investigate and price opportunity for natural lighting in works sheds (viaPotentially Cost-Effective

580 5283 Investigate and reduce baseload Cost-Effective

580 5303 Investigate and reduce baseload - all year Cost-Effective

580 5325 Investigate and reduce baseload (2kW) Cost-Effective

580 5302 Investigate and reduce winter baseload Cost-Effective

570 6490 Investigate and resolve high 'base power' issues. Cost-Effective

575 1510 Investigate causes of high pre-occupancy energy consumption in the Cost-Effective

381 671 Investigate compressed air pressure reduction of up to 50 kPa. Cost-Effective

587 5030 Investigate consolidation of meters as we are being charged rental cosCost-Effective

580 5290 Investigate cost and security feasibility of creating perimeter lighting at Potentially Cost-Effective

580 5289 Investigate current circuit setup and potential to install motion detectorsPotentially Cost-Effective

580 5310 Investigate current circuit setup and potential to install motion detectorsPotentially Cost-Effective

423 2561 Investigate feasibility of replacing ring main pumps with VSD on chilled Potentially Cost-Effective

579 3990 Investigate hour of hours usage - airconditioning controls Cost-Effective

453 1069 Investigate leaving CHW temperature rise (once controls upgrade compCost-Effective

294 1648 Investigate load/unload to improve refrigeration plant efficiency Potentially Cost-Effective

453 1076 Investigate loss of chilled water from secondary chilled water circuit ( Cost-Effective

333 1902 Investigate negative air pressure in basement area Cost-Effective

573 3451 Investigate opportunities for further saving (including Variable Speed DPotentially Cost-Effective

580 5294 Investigate opportunities to reduce heat impacts on the HVAC system thPotentially Cost-Effective

583 2945 Investigate options to sell electricity to the grid from solar panels Potentially Cost-Effective

575 1470 Investigate partial de-lamping of sporting field lights following installatioCost-Effective

588 5043 Investigate possibility of reducing pool temperature and avoiding sum Potentially Cost-Effective

351 5375 Investigate potential for Cogeneration (replace current power systems)Potentially Cost-Effective

381 672 Investigate Replacement of Large motors with high energy efficient moPotentially Cost-Effective

562 2096 Investigate replacing exterior lamps with energy efficient lamps when Potentially Cost-Effective

346 3821 Investigate sources of boiler feedwater pre-heat Potentially Cost-Effective

Page 57: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

575 1494 Investigate the causes of baseload (mainly lights and office equipmen Cost-Effective

575 1511 Investigate the causes of high baseload (mainly lights and office equi Cost-Effective

575 1501 Investigate the causes of high mechanical load overnight and on weekendCost-Effective

488 4123 Investigate the correct sizing of pumps or alternatively fit VSD' to pu Potentially Cost-Effective

580 5198 Investigate the cost and feasibility of installing an occupancy sensor in Potentially Cost-Effective

580 5311 Investigate the current circuit setup and the potential to install a photo cPotentially Cost-Effective

580 5324 Investigate the current circuit setup and the potential to install motion Cost-Effective

580 5231 Investigate the feasibility of consolidating refrigeration in the off-seasonCost-Effective

423 2558 Investigate the feasibility of installing a low pressure air loop for bind Potentially Cost-Effective

423 2560 Investigate the feasibility of installing VSD air compressor to replace t Potentially Cost-Effective

580 5239 Investigate the feasibility of shutting down the 50 metre pool in winte Cost-Effective

327 449 investigate the installation of additional underground tunnels and roadsPotentially Cost-Effective

575 6035 Investigate the viability of installing translucent panelling on sporting st Potentially Cost-Effective

575 1497 Investigate the viability of retrofitting existing double low bay aisle li Potentially Cost-Effective

575 1475 Investigate viability of motion detector switches for club house and worPotentially Cost-Effective

381 673 Investigate Voltage control of existing flourescents. Preliminary estimatPotentially Cost-Effective

491 744 Investigate/monitor operation of Heating/Cooling plant Cost-Effective

572 3129 Investigations are underway to reduce the compressor runtime each day.Potentially Cost-Effective

594 5083 Isolate one of the two indoor Circulation Pumps outside normal hours Cost-Effective

367 5496 IT refresh - It technology refresh for IBM Lotus Notes Applications provCost-Effective

367 5495 IT refresh for client providing energy saving at data centre Cost-Effective

390 4869 Building air conditioning dampers Potentially Cost-Effective

359 462 Kiln Control System Upgrade Potentially Cost-Effective

509 6507 Kilns - correctly apply edge baffles Cost-Effective

382 3693 Conduct a full review of motor efficiency and motor systems to determiPotentially Cost-Effective

382 3689 Engage suitably qualified contractors to conduct a building services sy Potentially Cost-Effective

563 5544 Light save transformers Cost-Effective

563 5525 MLS using occupancy/daylight sensors Cost-Effective

563 5518 Replace CF fittings with triphosphor lamps, install 5 light save transfor Cost-Effective

563 5533 Voltage controller Cost-Effective

333 1913 L3 Server Room - Install Specialist Humidity Control System Potentially Cost-Effective

329 1709 Laboratory Cost-Effective

329 1708 Laboratory Cost-Effective

323 5424 Laboratory Air Conditioning Potentially Cost-Effective

305 947 Laboratory Services -Enable power saving feature on all non-critical PCCost-Effective

318 4431 Lagging hot water steam & condensate pipes, costings & paybacks basCost-Effective

495 1297 Lamp upgrade Extrusion Cost-Effective

604 2318 Laundry Dryer replacement with air preheating or exhaust air flow con Potentially Cost-Effective

568 3498 LED based exit lighting at Civic Hall Potentially Cost-Effective

583 3004 LED Exit Fittings Potentially Cost-Effective

583 3028 LED Exit Fittings Potentially Cost-Effective

366 5700 LEDs for Emergency Exit Lighting - all exit lighting is conventional 10WPotentially Cost-Effective

577 2440 Level 2 lighting control Potentially Cost-Effective

485 5840 Level 4 Research lab Cost-Effective

328 248 Level control of compressed air pumps (subject to 10% trial to confirm viPotentially Cost-Effective

492 4095 Chillers staging software upgrade for optimised energy efficient operatiCost-Effective

329 1672 Economic cycle on packaged units Cost-Effective

329 1671 Economy cycle Cost-Effective

Page 58: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

570 863 HVAC: 365 day time switch Cost-Effective

329 1673 Increase chilled water temperature Cost-Effective

577 2471 light conservation system (Light ECO) Cost-Effective

577 2483 light conservation system (Light ECO) Cost-Effective

577 2487 light conservation system (Light ECO) Cost-Effective

577 2464 Light conservation sytem (Light Eco) Cost-Effective

367 5498 Light de-lamping in Service Corridors Cost-Effective

313 3731 Light eco 4.8 energy controller - carpark Cost-Effective

313 3733 Light eco 4.8 energy controller - cove lighting Cost-Effective

340 3893 Light fittings upgrade Cost-Effective

453 1064 Light Level Survey (Optimise light levels and operating times) Cost-Effective

567 1972 Lighting Cost-Effective

567 1980 Lighting Cost-Effective

567 1984 Lighting Cost-Effective

567 1987 Lighting Cost-Effective

567 1989 Lighting Cost-Effective

567 1993 Lighting Cost-Effective

567 1995 Lighting Cost-Effective

567 1997 Lighting Cost-Effective

418 3440 Lighting Potentially Cost-Effective

489 4146 Lighting Potentially Cost-Effective

565 5254 Lighting Potentially Cost-Effective

565 5258 Lighting Potentially Cost-Effective

565 5263 Lighting Potentially Cost-Effective

565 5265 Lighting Cost-Effective

565 5291 Lighting Potentially Cost-Effective

480 5358 Lighting Cost-Effective

413 6569 Lighting - upgrade the luminaries on central roof, turn off northern end Cost-Effective

508 2646 Lighting - Install motion sensors in 38 rooms to switch off 85% of ligh Cost-Effective

378 20 Lighting – Install zone control of the high bay lighting and install timer Cost-Effective

489 4145 Lighting – office areas only Potentially Cost-Effective

413 6567 Lighting - Cranes turn off during the day Cost-Effective

508 2653 Lighting - Replace 250W exterior lights with 150W metal halide lights prPotentially Cost-Effective

441 2224 Lighting - Replace 50w lamps with 35w IRC equivalents for 30 dichroic'Cost-Effective

508 2645 Lighting - Replace 70W exterior bollard lights with 26W compact fluorescCost-Effective

508 2649 Lighting - Replace single 40W fluorescent lamps in offices and computePotentially Cost-Effective

508 2651 Lighting - Replace twin 40W fluorescent lights in plant rooms with a sinPotentially Cost-Effective

508 2650 Lighting - Replace twin 65W fluorescent lamps used in corridors, officePotentially Cost-Effective

599 3206 Lighting - Replacement of the 2 X 38 watt Fluorescents with triphosphorCost-Effective

508 2644 Lighting - Switch off external 70W and 150W downlights as the building Cost-Effective

413 6565 Lighting Admin Building - Static Dimmers Cost-Effective

362 1745 lighting and control Cost-Effective

577 2449 Lighting and Hot water Cost-Effective

577 2459 Lighting control Cost-Effective

569 3626 Lighting Control Cost-Effective

583 2952 Lighting control alterations Cost-Effective

583 3003 Lighting control alterations Cost-Effective

583 3011 Lighting Control Alterations (Timed switches on five stores) Cost-Effective

Page 59: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

454 100 Lighting control modifications to three sheds Cost-Effective

359 463 Lighting Control System Potentially Cost-Effective

322 5953 lighting control system(timers,dimmers and sensors) Potentially Cost-Effective

321 296 Lighting control systems (e.g. timers, sensors and dimmers) Potentially Cost-Effective

570 819 Lighting control: Install switches in the car park store room, main stor Cost-Effective

605 2842 Lighting controls Cost-Effective

605 2843 Lighting controls Cost-Effective

605 2844 Lighting controls Cost-Effective

605 2845 Lighting controls Cost-Effective

605 2846 Lighting controls Cost-Effective

605 2874 Lighting controls Potentially Cost-Effective

605 2875 Lighting controls Potentially Cost-Effective

441 2233 Lighting Controls Equipment Rooms - Install controls to provide 50% conPotentially Cost-Effective

506 4283 Lighting Controls Loading Dock - Provide 24 hour security lighting and anCost-Effective

506 4284 Lighting Controls Mall & Car Park Areas - Review current zone control, Cost-Effective

505 4374 Lighting Controls Mall & Car Park Areas - Review current zone control, Cost-Effective

505 4390 Lighting Controls Malll & Car Park Areas - Review current zone, cleaninPotentially Cost-Effective

441 2232 Lighting Controls Office Areas- Install a reset after hours controls incl Potentially Cost-Effective

413 6564 Lighting Engineering Office - upgrade to new triphosphor lamps/luminariCost-Effective

446 4565 Lighting factory - lower luminaires and reduce wattage Cost-Effective

329 1667 lighting general store Cost-Effective

371 360 Lighting improvement - ammonia plant Cost-Effective

371 361 Lighting improvement - demin plant Cost-Effective

371 375 Lighting improvement - Industrial ammonia plant Potentially Cost-Effective

371 362 Lighting improvement Cost-Effective

371 376 Lighting improvement - Non manufacturing Potentially Cost-Effective

494 4229 Lighting initiatives Cost-Effective

506 4361 Lighting Lamp Replacement Dichroic 50w to 35w - Replace mall dichroicPotentially Cost-Effective

505 4393 Lighting Lamp Replacement Dichroic 50W to 35W - Replace mall dichroiPotentially Cost-Effective

352 2341 Lighting Management Potentially Cost-Effective

446 4566 Lighting Office Technology upgrade Cost-Effective

348 3252 Lighting option 1 - Turn off program Cost-Effective

441 2230 Lighting Option 1- Replace 1170, 2x36w luminairies in equipment rooms,Potentially Cost-Effective

441 2231 Lighting Option 2 - T5 kit lamp conversion of linear lighting (2340 lamp Potentially Cost-Effective

395 1283 Lighting refit / autotransformers Cost-Effective

506 4357 Lighting Replacement MV to MH Car Park and Loading Docks - Replace 5Potentially Cost-Effective

505 4391 Lighting Replacement MV to MH Car Park and Loading Docks - Replace 6Potentially Cost-Effective

568 3521 Lighting retrofit Potentially Cost-Effective

599 3210 Lighting Retrofit - replacement of the double fluorescent lamps with tr Cost-Effective

599 3220 Lighting Retrofit - replacement of the double fluorescent lamps with tr Cost-Effective

335 1767 Lighting System Cost-Effective

344 532 Lighting System Initiative - Refer Section 9.1 of DFS Report dated 7/ Potentially Cost-Effective

600 2566 Lighting technology review Potentially Cost-Effective

592 1372 Lighting upgrade Potentially Cost-Effective

577 2446 Lighting upgrade Cost-Effective

577 2475 Lighting upgrade Cost-Effective

578 6540 Lighting upgrade - meeting room Cost-Effective

578 6539 Lighting upgrade - Workroom Cost-Effective

Page 60: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

570 833 Lighting upgrade from T8 to T5 lamps using retrofit kits - two seminar Cost-Effective

592 1420 Lighting upgrade of twin tubes Potentially Cost-Effective

570 803 Lighting upgrade to five levels - install voltage reduction units with T8 Cost-Effective

460 1895 lighting upgrade using new luminaires or retrofit existing units with Potentially Cost-Effective

329 1660 lighting upgrade Potentially Cost-Effective

577 2439 Lighting upgrade, Zip boilers, Water heaters, water coolers Cost-Effective

592 1386 Lighting Upgrade. Potentially Cost-Effective

385 1303 Lighting, compressed air, refrigeration and power factor correction. Cost-Effective

605 2876 Lighting, HVAC and Hot water controls - Annex Potentially Cost-Effective

570 822 Lighting: Exterior PE cell control Cost-Effective

570 827 Lighting: Incandescent to CFLs upgrade Cost-Effective

570 825 Lighting: Levels 1&2 circuits separation + control Cost-Effective

570 820 Lighting: Occupancy sensor control in tea room Cost-Effective

485 5865 Link a/c MDs to Lighting in four rooms Cost-Effective

485 5867 Link a/c MDs to Lighting in seminar room Cost-Effective

371 357 Link compressed air systems Cost-Effective

485 5864 Link lecture theatre a/c MDs to lighting Cost-Effective

286 72 Link Trim Slusher Agitator to Winder Potentially Cost-Effective

298 2161 lnterlink control of pelleter and cooling fans to enable cooling fans to Cost-Effective

377 4837 Loading dock lighting control Cost-Effective

506 4331 Loading Dock Ventilation Control -VSD Control of Loading Dock VentilatPotentially Cost-Effective

301 1151 Localised gas water heating for pasteurisers. Potentially Cost-Effective

315 5427 Long-term replacement of electrical motors (several hundred) with EX-veCost-Effective

315 5428 Long-term upgrade of plant lighting with better quality, higher efficien Cost-Effective

308 3774 Loop control on the 6 bay stenter Cost-Effective

400 1735 Low Energy Refiner Plates.Improved design of refiner plates enable highPotentially Cost-Effective

286 57 Lower compressed air pressure Cost-Effective

295 5326 Lower hot water temperature on individual units to 60 degrees Cost-Effective

595 5448 Lower temperature setpoint in winter Cost-Effective

587 5017 Lower thermostat temperature of hot water heaters & install timers (30 Cost-Effective

571 3282 Luminaire Replacement Potentially Cost-Effective

286 85 Lumitrol South End First Floor Potentially Cost-Effective

286 71 Lumitrol Stockyard Lighting Potentially Cost-Effective

280 4262 Machine 11 cooling fans Potentially Cost-Effective

286 79 Machine Dip Seal Pump Impeller Potentially Cost-Effective

342 1155 Machines and conveyors running unnecessarily Cost-Effective

446 4568 Machines running when not required Cost-Effective

408 1160 Main compressors - Replace as operational risk Cost-Effective

570 862 Main Hall Foyer: CFLs in chandelier Cost-Effective

570 860 Main Hall: dimmable CFLs in chandeliers Cost-Effective

445 4213 Main lighting - retrofit with single 37W quadphosphor fittings Potentially Cost-Effective

445 4212 Main lighting option 2 - retrofit with "save it easy" T5 kit (24/7) Potentially Cost-Effective

408 1213 Main Mill - Shut down NTM/stelmor fans when not used Cost-Effective

414 4832 Main Office Air Conditioning Heat Load Reduction Potentially Cost-Effective

433 3861 Main product belt wash-pulsed Potentially Cost-Effective

323 5421 Main Store lighting Cost-Effective

328 239 Main ventilation fan optimisation Cost-Effective

567 1991 Maintain Fire Booster Pump Cost-Effective

Page 61: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

455 1918 Maintenance improvement Cost-Effective

593 4899 Maintenance schedule Cost-Effective

323 5420 Lighting Cost-Effective

448 3788 Major BMCS Upgrade Potentially Cost-Effective

448 3789 Major Lighting Upgrade Potentially Cost-Effective

313 3730 Make up air for kitchen exhaust Cost-Effective

380 254 Manual Slide Gate for MB BWE duct to minimise waste air vacuum Cost-Effective

570 849 Masonry Store external lighting: Install PE cell control Cost-Effective

570 841 Masonry Store lighting: occupancy sensor control Cost-Effective

570 840 Masonry Store lighting: central control Cost-Effective

570 837 Masonry Store Lighting: turn off some lighting Cost-Effective

413 6566 Mast Lighting - staged switching Cost-Effective

404 2754 Match HVAC operating times to staff requirements and consolidate afteCost-Effective

448 3778 Match HVAC operating times to staff requirements and consolidate AHCost-Effective

284 4050 Maximise hot charging Cost-Effective

306 774 MCL3 Electric Launder Cost-Effective

329 1665 Mechanical shed Cost-Effective

379 1194 Medium Pressure Lead Boiler Feedwater Pump VSD Potentially Cost-Effective

306 775 MG Set replacement Cost-Effective

463 1624 Micro-Hydro Power generation - Feasibility study Potentially Cost-Effective

440 6534 Microwave thawing instead of air tempering room fans Potentially Cost-Effective

290 3378 Migrate production of respules and PE processes from Altis to Nova to Cost-Effective

293 2769 Milk intake lighting Potentially Cost-Effective

291 4295 Milk intake lighting Cost-Effective

292 4343 Milk intake lighting Cost-Effective

408 1218 Mill cooling - install VSDs on 2x225 kW Mill low pressure pumps to mPotentially Cost-Effective

408 1199 Mill cooling - replce 2x337kW De-scaler pumps Cost-Effective

408 1212 Mill drives - shut down NTM and other rolling stands when idle Cost-Effective

324 1659 mine ventilation Potentially Cost-Effective

370 1457 Mine: Optimisation of underground conveyors operating procedures. Cost-Effective

434 2180 Minimise compressed air delivery pressure Cost-Effective

385 1306 Minimise DAW cooling and thermal storage Potentially Cost-Effective

561 2694 Minimise the outside air intake of the air conditioner Potentially Cost-Effective

570 836 Minor Lighting: Turnoff practices Cost-Effective

395 1284 Miscellaneous lighting projects Cost-Effective

461 1584 Modification of secondary aeration controls Cost-Effective

596 4954 Modify air conditioning schedule Cost-Effective

570 850 Modify escalators to incorporate VSDs and time control, slowing stairs Cost-Effective

575 1532 Modify pool hall air conditioing control system to enable night setback Cost-Effective

486 6030 Modify pot startup procedures using coke/graphite to eliminate need foPotentially Cost-Effective

465 1598 Modify secondary aeration blower controls Cost-Effective

354 2898 Modify tenancty lighting controls Potentially Cost-Effective

583 3036 Modify the administration area to segregate airconditioning zones Potentially Cost-Effective

604 2276 Monitor the reduced gas and electricity consumption resulting from th Cost-Effective

363 324 Monitoring air compressor operations, to ensure miniumum number of aCost-Effective

503 888 Monitoring and Management Cost-Effective

330 431 Monitoring and Management SCADA - Electricity Cost-Effective

390 4868 More efficient water drain for compressed air receivers Potentially Cost-Effective

Page 62: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

571 3256 Mothball pool changerooms in winter Cost-Effective

581 3941 Motion detector installation for lighting where appropriate Cost-Effective

313 3732 Motion sensor controller - carpark Cost-Effective

338 3527 Motive Drives - where cost effective intent to use efficient motors Potentially Cost-Effective

338 3528 Motive drives - where cost effective, intend to use notched type vee bePotentially Cost-Effective

477 526 Motive drives intent to use efficient motors Potentially Cost-Effective

478 754 Motive Drives intent to use efficient motors Cost-Effective

336 443 Motor Control Measures Cost-Effective

429 6562 Motor Control System for Lifts Potentially Cost-Effective

408 1204 Motor Cooling - shut down Motor CT cooling fans (11kW) when temps Potentially Cost-Effective

356 2550 Motor Efficiency Program, setup a program to ensure correct purchasePotentially Cost-Effective

378 23 Motor Load Optimisation Cost-Effective

378 19 Motor Replacement Program – Cost-Effective

408 1219 Motor rooms - interlock operation of motor room fans to Drive Motor opPotentially Cost-Effective

481 115 Motor system efficiecy program Cost-Effective

410 1769 motor system efficiency program Cost-Effective

411 2525 motor system efficiency program Cost-Effective

426 5343 motor system efficiency program Cost-Effective

323 5425 motor system efficiency program Cost-Effective

379 1166 Motor system efficiency program. Cost-Effective

414 4818 Motor System Efficiency Programme Potentially Cost-Effective

377 4854 Motor System Efficiency Programme Potentially Cost-Effective

443 5832 Motor System Efficiency Programme Cost-Effective

282 3203 Motor Systems Efficiency Cost-Effective

322 304 Motor Upgrades - Example presented for selecting 10 x 150 kw high efCost-Effective

359 460 Motor Upgrades - Example presented for selecting a 150 kw high efficiCost-Effective

297 540 Movement activate sensors for processing plant lighting Cost-Effective

485 5754 Movement detector in rooms Cost-Effective

485 5858 Movement sensor control to four labs Cost-Effective

485 5859 Movement sensor in room for split a/c Cost-Effective

485 5860 Movement sensor in two rooms split a/cs Cost-Effective

403 2334 Multi-Level Car Park Lighting Upgrade Potentially Cost-Effective

417 4389 Natrual Gas Powered Refrigeration with Cogeneration of Dryer Heat Potentially Cost-Effective

418 3441 Natural Gas Cogeneration Potentially Cost-Effective

289 6587 New 500KW steam Generator Potentially Cost-Effective

579 3973 New AC system for indoor air heating and cooling with heat exchange (Potentially Cost-Effective

489 4148 New Air compressor and pressure reduction Potentially Cost-Effective

463 1627 New air compressors. Note that this project is linked to a management Potentially Cost-Effective

598 4878 New controls for heat pump and solar pool heating systems Cost-Effective

385 1305 New energy monitoring system Cost-Effective

356 2546 New lighting method for vertical tasks Potentially Cost-Effective

322 5947 New press plattern. This produces smoother boards hence less sandingCost-Effective

341 281 New small motor HEM selection & small motor operating practices / conPotentially Cost-Effective

477 525 New smaller air compressor for non production periods (replace compressCost-Effective

341 280 New technology & controls for office and plant lighting Potentially Cost-Effective

286 74 Heat Recovery to Hot Water Potentially Cost-Effective

479 157 Ball Plant 3kHz Inverter Upgrade Cost-Effective

293 2760 Boiler Insulation Cost-Effective

Page 63: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

286 69 Condensate Line Insulation Potentially Cost-Effective

286 77 HP Wash Up Pumps Press. Control Potentially Cost-Effective

286 60 Steam and condensate leaks Cost-Effective

286 63 Steam Line Insulation Cost-Effective

286 64 Ceiling heating Cost-Effective

286 80 Condensate Line Insulation Potentially Cost-Effective

286 78 HP Wash Up Pumps Pres. Control Potentially Cost-Effective

286 59 Machine Lead Group Pres. Control Cost-Effective

286 62 Main Slusher Agitator on Demand Cost-Effective

286 61 Steam and Condensate Leaks Cost-Effective

286 66 Steam Line Insulation Cost-Effective

372 5469 Nonworking days energy management Cost-Effective

469 470 North West two belts operation control Cost-Effective

406 5178 Mill-shut down bag house fan when galvaising not operating Cost-Effective

406 5215 Mill-Use VSD (not manual slide plate ) on 15 KW ILG fume fan to controPotentially Cost-Effective

406 5203 Mill-Use VSD on 7.5KW ILG acid scrubber fan and pump to reduce ventiPotentially Cost-Effective

406 5200 Mill- use waste heat from drying oven to dry paint. Potentially Cost-Effective

406 5213 Compressed air #4 Mill-Shut down compressor on pressure, when unloadPotentially Cost-Effective

406 5177 Galvanising fume baghouse: Limit operation of baghouse to productionCost-Effective

406 5201 Galvanising- Use VSDs on HDG combustion air blowers (2x22 KW) withPotentially Cost-Effective

406 5199 Galvanising-Install regenerative burners or recuperators on HDG zinc batPotentially Cost-Effective

406 5212 Galvanising-Replace outlet dampers with VSD to control HDG bag house Potentially Cost-Effective

406 5214 Lighting Mill-Reduce lighting levels in discussed production areas . Potentially Cost-Effective

406 5175 Site Compressors- Review site air needs as part of compressor replacemCost-Effective

406 5202 Site-Install regenerative or recuperative burners on other baths and dryePotentially Cost-Effective

406 5180 Site-limit use of lighting outside production periods Cost-Effective

406 5219 Site-Resite 4 main compressors to reduce large pressure loss. Potentially Cost-Effective

406 5176 Site-shut down 30KW cooling tower pumps out of hours Cost-Effective

406 5204 Site-Shut down hydraulic pumps during down times. Potentially Cost-Effective

406 5179 Site-Turn off compressors during downtimes Cost-Effective

406 5205 Site-VSD on 15-20 KW transformer room fan to control temperature to sPotentially Cost-Effective

408 1245 VSD on hot well pumps. Currently DCL, one starts every 3 minutes. ProPotentially Cost-Effective

408 1244 Air tower 19(12 kW) compressor runs unloaded much of the time when sPotentially Cost-Effective

408 1243 5.6 kW Zalcote combustion air blower restricted by control ,valve to Potentially Cost-Effective

408 1259 Fluidised bed furnace hood temperature 840C, no heat recovery, air intPotentially Cost-Effective

408 1260 No air connection facility to rest of mill. Compressors in facility to ope Potentially Cost-Effective

408 1242 Valve inside building to restrict flow, water recycled if :emperature too Potentially Cost-Effective

408 1254 Zinc bath no heat recovery. Opportunity for air preheating with recuperPotentially Cost-Effective

408 1261 Heat recovery on fluid bed furnace. Potentially Cost-Effective

408 1262 Heat recovery on zinc furnace. Potentially Cost-Effective

408 1248 Heat recovery or reduced flue temperature on annealing line. Flue abouPotentially Cost-Effective

408 1263 Rationalise galvanising lines operation. Two lines each run about 50% Potentially Cost-Effective

408 1250 CT fans and pumps running longer and/or harder than required by coolingPotentially Cost-Effective

408 1264 Ensure motor cooling fans are shut down when machines are idle - egPotentially Cost-Effective

408 1265 Improve gas submetering and monitor use per production. Three alreadPotentially Cost-Effective

408 1251 Nitrogen compressor appears to load and unload with nitrogen demandPotentially Cost-Effective

408 1266 No condensate return - live steam or heat exchangers with condensate tPotentially Cost-Effective

408 1267 Poor air connection N-S; small pipes, no ring main. Compressors in item Potentially Cost-Effective

Page 64: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

408 1252 Shut down ventilation fan(s) when not needed. Lots of small ans 5.5 k Potentially Cost-Effective

408 1271 Use waste heat rather than steam for process applications Potentially Cost-Effective

408 1246 Wire drawing - CT continue running during down time - eg zinc plant Potentially Cost-Effective

292 4362 O2 trim control Potentially Cost-Effective

293 2766 O2 trim control and VSD's on fans Potentially Cost-Effective

493 6077 Occupancy Control of lighting & heating systems Potentially Cost-Effective

493 6222 Occupancy control of lighting in offices and lecture teaching rooms Potentially Cost-Effective

333 1904 Occupancy Controls Cost-Effective

445 4198 Occupancy controls on lighting Cost-Effective

282 3197 Occupancy sensor for conference room lighting Potentially Cost-Effective

372 5475 Occupancy Sensors Cost-Effective

570 861 Off control of manually switched HVAC plant Cost-Effective

379 1193 Office AHU suppy fan VSD Potentially Cost-Effective

494 4230 Office and other equipment initiatives Cost-Effective

384 1962 Office Area Halogen Dichroic Lighting Replacement Potentially Cost-Effective

379 1169 Office boiler and chiller supervisory control Cost-Effective

377 4849 Office building air conditioning economy cycle Potentially Cost-Effective

366 5680 Office Lighting dimming system upgrade Option 1. There are approximatelyCost-Effective

377 4843 Office lighting timer control reprogramming Cost-Effective

377 4850 Office lighting voltage control Potentially Cost-Effective

470 4528 Office Refurb/replace troffers Cost-Effective

470 4529 Offices refurb 50W to 35W downlights Cost-Effective

570 854 Offices/Reception areas lighting - voltage reduction Cost-Effective

323 5417 Old stock house Cost-Effective

321 289 Ongoing motor replacement (HEM). Example of 5 x 150 kW units. MarCost-Effective

322 300 Ongoing optimisation of Refiners including enhanced operational contrCost-Effective

325 761 Operate one duty ventilation fan at mine Cost-Effective

604 2277 Operate the Mercury Fountain periodically thought the day on a time duCost-Effective

604 2259 Operate the solar heating system automatically as the first stage of heatCost-Effective

604 2264 Operate two Hall air conditioners from the average temperature in the Cost-Effective

371 356 Operate two main pumps - NH3 storage CT Cost-Effective

368 1445 Operating and Maintenance Procedures: Optimise ON/OFF Control of Cost-Effective

368 1449 Operating and Maintenance Procedures: Optimise ON/OFF Control of MPotentially Cost-Effective

368 1450 Operating and Maintenance Procedures: Optimise ON?OFF Control of UPotentially Cost-Effective

368 1448 Operating and Maintenance Procedures: review Ventilation Run Hours aPotentially Cost-Effective

311 618 Change plant regime to operate Crushing Plant at full capacity Cost-Effective

311 619 Increase capacity of two sand pumps to enable 24% increase in CrushingPotentially Cost-Effective

311 616 Reduce lost time by 12% to improve Plant throughput and avoid energy lCost-Effective

311 615 Fit ultrasonic or radar sensor to control the overflow crusher to avoid Cost-Effective

311 614 Shut down pump 4 and screen 3 when transfer is complete and controCost-Effective

311 612 Reconfigure process water pumps to reduce operating times made possCost-Effective

311 611 Install level control to header tank supplied by 150mm water pump (ie Cost-Effective

280 4266 Operation of Dessicant dryer. Investigate further Potentially Cost-Effective

280 4260 Operation of existing fans with VSDs (needs specialist resource) Potentially Cost-Effective

280 4238 Operation of HP air compressors Cost-Effective

280 4239 Operation of LP air compressors Cost-Effective

311 617 Reduce lost time (eg from meal breaks, stockpile full, lack of stone, Cost-Effective

311 613 Change current interlocks to allow mannual control to stop unecessaryCost-Effective

Page 65: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

495 1295 Operators to isolate chilled water to extrusion line when not in use Cost-Effective

347 1739 opportunistic installation of high efficiency motors Potentially Cost-Effective

346 3811 opportunistic installation of high efficiency motors Potentially Cost-Effective

347 1740 opportunistic installation of T5 lighting Potentially Cost-Effective

346 3824 Opportunistic installation of T5 lighting (Lab & Offices) Potentially Cost-Effective

346 3812 Opportunistic installation of T5 lighting (plant) Potentially Cost-Effective

578 6546 Opportunistic metering of unmetered sites Potentially Cost-Effective

578 6551 Opportunistic metering of unmetered sites Potentially Cost-Effective

578 6553 Opportunistic replacement of fluorescent lamps with T5 fittings Cost-Effective

481 114 Optima area lighting control Cost-Effective

377 4846 Optimal air compressor control Potentially Cost-Effective

443 5825 Optimal Chiller Control Cost-Effective

405 2348 Optimal Control of LP Blowers Cost-Effective

463 1620 Optimisation of sewage pump operations Cost-Effective

462 1614 Optimisation of sewage pump selection Cost-Effective

453 1071 Optimise air conditioning operating times in Bus Bays Cost-Effective

591 1854 optimise air conditioning controls and rebalancing system Cost-Effective

396 643 Optimise auto shutdown on major truck dump Cost-Effective

485 5878 Optimise BMS control functions Cost-Effective

423 2559 Optimise chilled water supply temperature Potentially Cost-Effective

570 805 Optimise CHW and condenser water chiller control Cost-Effective

312 784 Optimise control of three chillers located in the boilerhouse. Cost-Effective

485 5857 Optimise Lecture theatre duct heater ops Cost-Effective

485 5856 Optimise Lecture threatre economy cycle Cost-Effective

453 1072 Optimise lighting operating times in Bus Bays Cost-Effective

371 368 Optimise cooling water pumps Potentially Cost-Effective

371 369 Optimise cooling water pumps Potentially Cost-Effective

462 1615 Optimise Operation of VSD speed setpoints on Odour Scrubber Fans Cost-Effective

300 2290 Optimise plant allocation based on feed rate. Schedule plant to minimisePotentially Cost-Effective

424 4244 Optimise rail delivery conveyors and stackers. Automate and OptimiseCost-Effective

569 3644 Optimise reclaim water pump operation Cost-Effective

424 4243 Optimise road delivery conveyors and stackers. Automate and OptimisCost-Effective

337 881 Optimise scheduling of compressors Cost-Effective

485 5893 Optimise the operation of the rundown timers Cost-Effective

285 1564 Optimise the speed of the bodymaker filter mesh fan - re-size pulley Cost-Effective

285 1565 Optimise the speed of the old incinirator vent fan - re-size pully Cost-Effective

422 726 Optimise warehouse heating controls, destratification fans and potential Potentially Cost-Effective

340 3899 Optimising controls and maintenance of lighting systems Potentially Cost-Effective

485 5923 Optimum start/stop and scheduling of A/c Cost-Effective

443 5829 Orders Department Economy Cycle Cost-Effective

328 245 Other Pump Control Opportunities - eg VSD / Variable Displacement pPotentially Cost-Effective

485 5741 Outside air compensation on the heating for two lecture theathres and Cost-Effective

354 2893 Outside air dampers Cost-Effective

328 240 Overland conveyor delivery optimisation Cost-Effective

284 4036 Oxygen enrichment to reduce gas consumption Cost-Effective

563 5547 Install new thermostat with accuracy to +-0.5 degC Cost-Effective

563 5549 Install new thermostat with accuracy to +-0.5 degC Cost-Effective

563 5536 VSDs for 2 filtration pumps Cost-Effective

Page 66: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

563 5550 Install several pool covers on the smallest pool, and regular use of pooCost-Effective

563 5548 Install several pool covers on the smallest pool, and regular use of the Cost-Effective

563 5519 Turn off 1 HW circulation pump when 1 boiler runs, and run 1 filtratio Cost-Effective

408 1240 11kW P2 acid scrubber fan on continuously, flow could be reduced durPotentially Cost-Effective

408 1239 11kW P2 zinc combustion air blower on continuously vanes restricted Potentially Cost-Effective

408 1225 Ensure zinc bath is covered with vermiculite (not covered during inspecCost-Effective

408 1229 Some fans left on that don't need to be while plant is down, eg entry a Cost-Effective

408 1233 37 -45kW plant air blower providing trench and lead bath cooling on c Cost-Effective

563 5538 Pool covers for indoor and outdoor pools Cost-Effective

396 627 Drier auto shut-down when idle time exceeded Cost-Effective

396 622 Auto shut-down when idle running timer exceeded Cost-Effective

443 5828 Packaging Area Economy Cycle Cost-Effective

443 5827 Packaging Area VSD Cost-Effective

292 4333 Packing air conditioning set point Cost-Effective

293 2770 Packing line conveyor control Potentially Cost-Effective

292 4359 Packing line conveyor control Potentially Cost-Effective

498 2828 Paper machines optimisation study Cost-Effective

481 113 Paper store control lighting Cost-Effective

463 1625 PAR Project: Treating screenings below ground Potentially Cost-Effective

511 4553 Paste Thickener Cost-Effective

485 5876 PBT control on the staff room 727 lights Cost-Effective

485 5919 PBT for two rooms Cost-Effective

485 5921 PBT for Tutorial Room Cost-Effective

404 2757 PE cell control of perimeter lighting Potentially Cost-Effective

506 4280 PE Lighting Controls - PE control of selected interior mall and perimeterCost-Effective

505 4376 PE Lighting Controls - PE control of selected interior mall and perimeterCost-Effective

297 546 Peak load shedding on refrigeration compressors with third party sellinPotentially Cost-Effective

563 5540 PF- Inspect and test existing power factor correction equipment, upgraCost-Effective

563 5521 PF- Install 250kVAr power factor correction equipment Cost-Effective

282 3201 Phase Balance Cost-Effective

439 3293 Phase out use of compressed air in aligning tins to filling machine Cost-Effective

327 450 Phase out utilisation of air operated diaphragm pumps for mine dewaterPotentially Cost-Effective

453 1080 Photelectric cell control of lights near skylights and windows. Cost-Effective

455 1924 Photo sensor installation in Western office, Ground Floor; using proposePotentially Cost-Effective

485 5844 Photo-sensor lighting control to select perimeter aeras Cost-Effective

293 2773 Pipe insulation air conditioned areas Potentially Cost-Effective

293 2771 Pipework insulation Potentially Cost-Effective

291 4286 Pipework insulation Cost-Effective

292 4347 Pipework insulation Cost-Effective

597 5717 Place day-light sensor or timer controls on the up-lighting in the front a Cost-Effective

573 3461 Place non-perishable drinks fridges and vending machines on timer swPotentially Cost-Effective

573 3423 Place the central up-lights on a light-sensor override (so thay are alwaysPotentially Cost-Effective

573 3444 Planned - Upgrade of building's HVAC systems (8-12 reverse cycle unitsPotentially Cost-Effective

363 333 Planning to increase capacity of pot lines Potentially Cost-Effective

515 4646 Plant Control System upgrade Potentially Cost-Effective

379 1196 Plenum #1 and #2 fan VSD Potentially Cost-Effective

565 5259 Pool & Mech Potentially Cost-Effective

444 4033 Pool cover Cost-Effective

Page 67: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

561 2704 Pool heating boiler replacement Cost-Effective

566 2011 Pool solar heating system Potentially Cost-Effective

566 2013 Pool solar heating system Potentially Cost-Effective

565 4159 Pool VSD Cost-Effective

495 1300 Portable blowers for extrusion plant Potentially Cost-Effective

318 4451 Power Demand Improvement Cost-Effective

324 1658 power factor correction Cost-Effective

431 2123 Power Factor Correction Cost-Effective

331 2139 Power Factor correction Potentially Cost-Effective

602 2776 Power factor correction Cost-Effective

602 2778 Power factor correction Cost-Effective

505 4378 Power Factor Correction - Install PFC equipment (160KVAR) at main swPotentially Cost-Effective

329 1662 power factor correction Cost-Effective

342 1158 Power factor correction equipment Potentially Cost-Effective

469 476 Power Factor Correction for new main ventilation system Cost-Effective

328 247 Power factor correction on overland conveyor supply Potentially Cost-Effective

328 243 Power Factor Correction Shaft 3 Potentially Cost-Effective

328 244 Power Factor Correction Sub0 Potentially Cost-Effective

356 2554 Power Factor Correction,installation fo Approx 1,850 KVAR of capacitors.Potentially Cost-Effective

416 407 Power factor correction. Cost-Effective

433 3854 Power Factor upgrade from 0.91 to 0.96 Potentially Cost-Effective

400 1736 Power generation from steam by installing backpressure turbine betw Potentially Cost-Effective

294 1646 Pre heat East boiler water feed water with waste heat from the processCost-Effective

294 1647 Pre heat West boiler feed water with waste heat from the boiler blowd Cost-Effective

386 4066 Precinct Central Chiller Cost-Effective

312 791 Precision combustion control on each steam boiler in the boilerhouse. Potentially Cost-Effective

441 2225 Pre-condition (space temperatures) for Disaster Recovery Room (mainlCost-Effective

401 703 Pre-crushing mill feed - By reducing the mill feed top-size from 90mm toPotentially Cost-Effective

319 2420 Pre-heat combustion air for 10MW Boiler Potentially Cost-Effective

338 3526 Pressure settings for 6 Bar system is currently 7 Bar. Review to asce Potentially Cost-Effective

514 4611 Pre-strip Productivity Team Cost-Effective

574 5131 Prevent unnecessary operation of air conditioning Cost-Effective

401 701 Examine the potential benefit of moving the first stage cyclone underfloPotentially Cost-Effective

443 5831 Printing Area Economy Cycle Cost-Effective

293 2764 Process hot water system Potentially Cost-Effective

511 4552 Product Centrifuge Cost-Effective

382 3653 Product transfer VSD control - dehydrated tar circulating pump Cost-Effective

382 3712 Product transfer VSD control - pitch reboiler pump Potentially Cost-Effective

382 3656 Product transfer VSD control - soft pitch feed pump Cost-Effective

382 3655 Product transfer VSD control - Tar Feed Pump Cost-Effective

382 3654 Product transfer VSD control - Tar Reboiler Pump Cost-Effective

401 698 Proflote technology - The Proflote system uses innovative technology toCost-Effective

453 1065 Program automatic boiler cut-off when ambient temperature high in B Cost-Effective

453 1112 Program automatic boiler cut-off when ambient temperature high in B Cost-Effective

597 5720 Program the BMS to turn off lighting at the front of the building. CurrentCost-Effective

389 4139 Promote energy conservation & awareness Cost-Effective

455 1914 proposed chiller strategy Cost-Effective

575 1530 Provide 7-day time switch to switch of domestic hot water circulation p Cost-Effective

Page 68: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

575 1528 Provide 7-day time switch to switch off air conditioning unit overnight. Cost-Effective

457 5244 Provide a new small air cooled chiller to replace obsolete Carrier chille Potentially Cost-Effective

457 5235 Provide automatice control to switch lights off in main staff dining ro Cost-Effective

575 1514 Provide carbon monoxide (CO) monitoring system to control car park meCost-Effective

575 1505 Provide carbon monoxide (CO) monitoring system to control car park mePotentially Cost-Effective

404 2750 Provide light switch signage Cost-Effective

459 5195 Provide lighting control in small offices, administrative areas and cons Potentially Cost-Effective

457 5245 Provide lighting control in small offices, administrative areas and cons Potentially Cost-Effective

604 2236 Provide more specific instructions to staff on office equipment manage Cost-Effective

604 2248 Provide more specific instructions to staff on office equipment manage Cost-Effective

604 2279 Provide more specific instructions to staff on office equipment manage Cost-Effective

604 2286 Provide more specific instructions to staff on office equipment manage Cost-Effective

459 5185 Provide new automatic sequencing controller for management of main cCost-Effective

396 657 Provide operator capability to turn off conveying between fillers and c Potentially Cost-Effective

592 1404 Provide pool covers on olympic pool. Cost-Effective

575 6033 Provide solar preheating for pool water Potentially Cost-Effective

592 1396 Provide temp. reset, demand savings and deadband modicfications on Potentially Cost-Effective

575 1498 Provide variable speed drive for air conditioner condenser water pump Potentially Cost-Effective

575 1518 Provide variable speed drive for condenser water pump Potentially Cost-Effective

471 706 Provide variable speed drives for 2 main building chilled water pumps Cost-Effective

471 705 Provide variable speed drives for 2 studio chilled water pumps Cost-Effective

457 5234 Provide variable speed drives for chilled water and condenser water p Cost-Effective

459 5196 Provide variable speed drives for cooling tower fans Potentially Cost-Effective

381 675 Provide water to water heat exchangers to allow condenser water coolingPotentially Cost-Effective

280 4256 Pulse bubblers SP4 Cost-Effective

572 3123 Pump 2 is scheduled to be replaced. This will bring a 5% saving in enerPotentially Cost-Effective

572 3122 Pump 3 is scheduled to be replaced. This will bring a 5% saving in enePotentially Cost-Effective

360 3479 Purchase a smaller air compressor and install a more efficient rimmer Potentially Cost-Effective

352 2338 Purchase and install smaller compressor as determined by review Cost-Effective

360 3478 Purchase multi-purpose reactor PET drier for the existing extruder Potentially Cost-Effective

319 2414 Purchase of hand held steam trap monitor to allow weekly checks of s Cost-Effective

598 4888 Push button time delay switches to control AC unit Cost-Effective

485 5880 Push button timer control of twp training room air conditioners Cost-Effective

485 5800 Push button timers for acoustic lab a/c Cost-Effective

358 3093 Put all computers in disaster recovery centre on a central switch for Cost-Effective

305 962 Put common variable speed drives on BOS First DC pumps Potentially Cost-Effective

305 961 Put variable speed drives on BOS First Stage Dust Collection pumps Potentially Cost-Effective

565 5293 PV Potentially Cost-Effective

579 4003 Quad 36W fluorescent fitting refurbished to twin 37W quad lamp with refCost-Effective

305 945 Enable power saving feature on all PC's Cost-Effective

305 946 Turn off single room A/C units Cost-Effective

293 2767 Rapid shut doors cold room Potentially Cost-Effective

292 4356 Rapid shut doors cold room Potentially Cost-Effective

295 5323 Rationalising air compressor control Cost-Effective

511 4551 Raw Coal Feed Upgrade Cost-Effective

512 4586 Raw coal shutdown on no coal Cost-Effective

407 3724 Raw materials - use VSD (not inlet vane control) to slow materials handPotentially Cost-Effective

281 3144 RDX cooling water Cost-Effective

Page 69: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

281 3143 RDX vacuum Cost-Effective

281 3145 RDX water supply pumps Cost-Effective

485 6612 Rearrange light switching in the Levels 2 and 3 foyers so that only acceCost-Effective

578 6544 Rearrangement of lighting circuits Cost-Effective

408 1203 Rec Yard - Turn off 50 high bays lights outside production periods. Cost-Effective

453 1118 Recalibrate space temperature sensors Cost-Effective

290 3405 Re-calibrate the automatic TDS senors Cost-Effective

570 804 Recommission AHU pressure control strategy Cost-Effective

453 1078 Recommission system and evaluate upgrade options. Cost-Effective

561 2696 Re-commission and fine tune the HPM Wizard automatic light control sPotentially Cost-Effective

570 808 Recommission boiler controls and heating valves Cost-Effective

367 5499 Re-commission CRAC unit environmental controls Cost-Effective

570 799 Recommission domestic hot water (DHW) controls Cost-Effective

453 1114 Re-commission existing T2 voltage control sytems Cost-Effective

304 4787 Re-commission fuzzy logic Cost-Effective

570 806 Recommission outside economy air-cycles Cost-Effective

448 3755 Re-commissioning existing lighting controls (time settings, holidays setCost-Effective

570 830 Recommissioning of chiller control strategy Cost-Effective

492 4109 Recommissioning Cost-Effective

492 4097 Recommissioning Cost-Effective

492 4098 Recommissioning Cost-Effective

307 31 Recondensing of vented oxygen Potentially Cost-Effective

402 3840 Reconfigure bloodmeal process flow to allow replacement of 55kW motPotentially Cost-Effective

291 4298 Recover additional steam condensate-evap.building Potentially Cost-Effective

291 4289 Recover evaporator condensate to boiler feedwater Cost-Effective

417 4396 Recover Flash Steam from Germ Dryer Potentially Cost-Effective

417 4397 Recover Flash Steam from Gluten Dryer Potentially Cost-Effective

318 4449 Recover heat from the flue gases and utilise for heating the feed water tPotentially Cost-Effective

594 5067 Recover heat loss from 25m pool exhaust system Cost-Effective

594 5068 Recover heat loss from female change room exhaust system Cost-Effective

594 5070 Recover heat loss from pool exhaust system Cost-Effective

594 5061 Recover heat loss from male change room exhaust system Cost-Effective

317 4472 Recover preparation area flash steam during sunflower processing Cost-Effective

462 1617 Recovery of benefit for cogen exports Cost-Effective

571 3272 Rectify AHU 2 damper operation Cost-Effective

485 5739 Rectify operation of the heating hot water pump Cost-Effective

504 583 Recuperative burners for HT Furnace - Foundry Cost-Effective

504 582 Recuperative burners for HT Furnace - Foundry Cost-Effective

504 581 Recuperative burners for HT Furnace - Foundry Cost-Effective

433 3849 Recycle evaporation water from stick water process Cost-Effective

304 4793 Recycle kiln dust into finished product Potentially Cost-Effective

304 4799 Recycle spillage from pre-heater Potentially Cost-Effective

563 5586 Redefine operating hours - Control and AC modification Cost-Effective

569 3613 Reduce air conditioner hours- change winter start-up from 4am to 7am Cost-Effective

574 5141 Reduce air conditioning operating times Cost-Effective

337 882 Reduce air leakage throughout site. Cost-Effective

337 885 Reduce air supply pressure. Potentially Cost-Effective

429 6561 Reduce and replace existing HWS Potentially Cost-Effective

Page 70: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

309 2661 Reduce board grammage Cost-Effective

284 4056 Reduce charge time Potentially Cost-Effective

461 1591 Reduce compressed air leaks Potentially Cost-Effective

317 4475 Reduce compressed air pressure Cost-Effective

485 5771 Reduce domestic hot water from 70C to 60C Cost-Effective

397 3995 Reduce electricity consumption of external lights Cost-Effective

397 4012 Reduce electricity consumption of sump pumps by restoring automatic Potentially Cost-Effective

571 3328 Reduce hot water temperature in the sites main crib room and bathroo Cost-Effective

280 4259 Reduce HP air pressure (review after reduction opportunities completePotentially Cost-Effective

330 435 Reduce Idle Load on Conveyors and Plant Cost-Effective

503 488 Reduce Idle Load on Conveyors and Plant Cost-Effective

360 3471 Reduce idle time of chillers on plastic line Cost-Effective

341 276 Reduce idle time of mills, associated blowers and vent units via impro Cost-Effective

327 446 Reduce leaks in underground compressed air piping Cost-Effective

457 5238 Reduce lighting intensity in Medical Records to 320 lux level to reduc Cost-Effective

486 235 Reduce metal left in stopped pots requiring remelt Potentially Cost-Effective

396 631 Reduce mixing of Dye colour tanks Cost-Effective

371 354 Reduce operation of ammonia CT fans Cost-Effective

465 1605 Reduce operation of anoxic zone mixers Potentially Cost-Effective

461 1586 Reduce operation of RE pumps Cost-Effective

594 5059 Reduce operation time of Gas Boiler Cost-Effective

348 3254 Reduce outlet temperature of Electric Hot Water Heaters Cost-Effective

506 4334 Reduce Outside Air - Investigate the reduction of O/A requirement throuPotentially Cost-Effective

284 4048 Reduce pit cycle time, soak time Cost-Effective

500 508 Reduce plant air leaks Cost-Effective

562 2066 Reduce pool temperature by 2 degrees celsius to 30 degrees celsius Cost-Effective

573 3425 Reduce pool temperature set points by 1c (26-27C) Potentially Cost-Effective

593 4871 Reduce pool temperature to 26C Cost-Effective

604 2243 Reduce pool temperatures by 1°C throughout the year Cost-Effective

594 5066 Reduce pool water temperature Cost-Effective

595 5438 Reduce pool water temperature Cost-Effective

291 4306 Reduce refrigeration load- Air con. Evap. Building Potentially Cost-Effective

291 4304 Reduce refrigeration load- Rapid shut doors cold room Potentially Cost-Effective

291 4290 Reduce refrigeration load-Chilled water leaks Cost-Effective

291 4291 Reduce refrigeration load-loss of chilled water for cheese Cost-Effective

337 884 Reduce rework of fibreboard by 300 tonne target per month. Cost-Effective

567 1990 Reduce Run Hours Cost-Effective

284 4057 Reduce scrapped coils Potentially Cost-Effective

561 2714 Reduce temperature of the hot water system Cost-Effective

571 3303 Reduce the building's hot water temperature Cost-Effective

604 2253 Reduce the chiller condenser water set point in accordance with the m Cost-Effective

571 3349 Reduce the dam pump operations by installing movement detector Potentially Cost-Effective

571 3316 Reduce the grandstand & function centre's entrance foyer lighting operaCost-Effective

562 2069 Reduce the hot water temperature to 60 degrees celsius Cost-Effective

571 3248 Reduce the infriltration through the ceiling vents Potentially Cost-Effective

571 3345 Reduce the operation of the farm hall hot water by installing a run on t Cost-Effective

571 3342 Reduce the operation of the lighting in the nursery building by installingCost-Effective

604 2247 Reduce the plant room domestic hot water temperature to 60°C Cost-Effective

Page 71: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

604 2258 Reduce the plant room domestic hot water temperature to 60°C Cost-Effective

604 2251 Reduce the push button timer control of fan coil units serving areas o Cost-Effective

571 3336 Reduce the temperature of the building trade's hot water system and instaCost-Effective

571 3334 Reduce the temperature of the city works kitchen hot water system Cost-Effective

561 2733 Reduce the temperature of the hot water system Cost-Effective

561 2732 Reduce the temperature of the hot water system in the Women's Rest Cost-Effective

561 2738 Reduce the temperature of the residential laundry's hot water system. Cost-Effective

571 3319 Reduce the trotting club's lighting operations to when it is required Cost-Effective

493 6243 Reduce time delay on lighting control Potentially Cost-Effective

284 4051 Reduce time doors are open (work practices) Cost-Effective

513 4599 Reduce time taken to shut down crusher at end of shift Cost-Effective

309 2660 Reduce time to do a size change (1Hr to 0.5Hr) Cost-Effective

360 3470 Reduce unnecessary idle time on the grinding motors Cost-Effective

500 512 Reduce warehouse lighting Potentially Cost-Effective

380 266 Reduced Chilled Water load by increasing operational setpoint of FDU Cost-Effective

380 263 Reduced Chilled Water load by increasing operational setpoint of Que Cost-Effective

359 466 Reduced compressed air for cleaning Potentially Cost-Effective

486 234 Reduced generation of scrap metal quads requiring remelt through impPotentially Cost-Effective

424 4254 Reduced lighting Potentially Cost-Effective

485 5806 Reduced voltage control on fluorescent lighting Cost-Effective

485 5883 Reduced voltage control on fluorescent lighting Cost-Effective

380 264 Reduction in compressor discharge pressure Cost-Effective

380 265 Reduction in Extruder Discharge pressure Cost-Effective

597 5692 Refine pool temp operation with aim to reduce set points by average 1 Cost-Effective

378 18 Refiner – Improve the pre-steaming of the chip which inturn will reduc Cost-Effective

305 942 Refractory Services - Computers off at the end of the day Cost-Effective

305 943 Refractory Services - Lights off at the end of the day (only appropriate lCost-Effective

305 944 Refractory Services - Turn off single room A/C units Cost-Effective

318 4457 Refrigeration system optimisation Potentially Cost-Effective

582 4741 Refurbish 1 x 36W twin fitting in the staff lunchroom and 2 x 36W twin fittiCost-Effective

591 1794 refurbish 11 50W low voltage downlights to 35W IRC + EL tranny for 2ndCost-Effective

591 1853 refurbish 15 50W low voltage downlights to 35W IRC+EL transformer in 1Cost-Effective

591 1826 refurbish 25 2x36W plaster troffers 1x36W KW2 +Y19 in main office Cost-Effective

584 5621 Refurbish 250 MH fittings with 150W MH fittings Cost-Effective

582 4746 Refurbish 30 x 36W twin fittings. Cost-Effective

582 4791 Refurbish 40 x 36W twin fittings to single fittings in the offices and pla Potentially Cost-Effective

584 5620 Refurbish 400W MV fittings with 250W MH fittings Cost-Effective

591 1803 refurbish 41 20W low voltage downlights with 35W globes IRC +EL trannPotentially Cost-Effective

582 4760 Refurbish 6 x 36W twin fittings to single fittings. Cost-Effective

591 1843 refurbish 7 50W low voltage downlights to 35W IRC +EL transformer Cost-Effective

582 4756 Refurbish 9 x 36W twin fittings to single fittings (Main Building). Cost-Effective

582 4765 Refurbish 9 x 36W twin fittings to single fittings in the offices and play Cost-Effective

569 3670 Refurbish all 50w LV fittings Cost-Effective

584 5639 Refurbish carpark office light fittings from twin to single fittings Cost-Effective

472 4272 Refurbish fluorescent light fittings in the corridors and lift lobbies. Cost-Effective

474 4365 Refurbish fluorescent light fittings in the corridors and lift lobbies. Cost-Effective

475 4375 Refurbish fluorescent light fittings in the corridors and MDF. Cost-Effective

473 4346 Refurbish fluorescent light fittings in the corridors, offices and foyer. Cost-Effective

Page 72: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

569 3625 Refurbish light fittings Cost-Effective

591 1786 refurbish light fittings in main foyer-replace 42 50W globes with 35W g Cost-Effective

294 1641 Refurbish Low Bays light fittings as per report Cost-Effective

584 5643 Refurbish metal halide fittings Cost-Effective

582 4675 Refurbish quad fluorescent light fittings to single fittings. Potentially Cost-Effective

582 4809 Refurbish twin fittings to single fittings in the administration offices. Potentially Cost-Effective

582 4732 Refurbish twin fluorescent light fittings from twin fittings to single fittingsPotentially Cost-Effective

582 4734 Refurbish twin fluorescent light fittings from twin fittings to single fittingsPotentially Cost-Effective

582 4736 Refurbish twin fluorescent light fittings from twin fittings to single fittingsPotentially Cost-Effective

582 4690 Refurbish twin light fittings to single fittings – in one building. Potentially Cost-Effective

584 5660 Refurbishment fluorescent light fittings in carpark Cost-Effective

604 2234 Refurbishment of water cooled packaged air conditioners with a new chCost-Effective

305 964 Regulate slab water cooler flow based on water temperature Potentially Cost-Effective

408 1200 Reheat Furnace - Continuous excess oxygen monitoring to minimisw eCost-Effective

407 3722 Reheat furnace - direct rolling of billets from caster Potentially Cost-Effective

407 3714 Reheat furnace - Hot charging of billets Cost-Effective

408 1202 Reheat Furnace - improve furnace sealing - doors (staying open), and pCost-Effective

408 1222 Reheat Furnace - improve furnace sealing around loading arms Potentially Cost-Effective

407 3720 Reheat furnace - improve operation of tempering air fan. Fan runs contiPotentially Cost-Effective

408 1214 Reheat Furnace - increase recuperators operating temperature Cost-Effective

408 1217 Reheat furnace - install continuous excess oxygen monitoring Cost-Effective

408 1198 Reheat Furnace - install regenerative burners Cost-Effective

407 3717 Reheat furnace - install regenerative burners Cost-Effective

408 1211 reheat furnace - install regenerative burners. Cost-Effective

408 1201 Reheat Furnace - Maximise heat transfer in recuperator by determiningCost-Effective

408 1207 Reheat furnace - Provide better flame supervision to enable turndown Potentially Cost-Effective

407 3719 Reheat furnace - reduce discharge door open time - observed to be opePotentially Cost-Effective

408 1215 Reheat furnace - reduce furnace push-out door pen times Cost-Effective

407 3723 Reheat furnace - use direct measurement of stock temp to control furn Potentially Cost-Effective

407 3715 Reheat furnace - VSD on Combustion Air Fan Cost-Effective

407 3713 Reheat furnace - Warm Charging of billets Cost-Effective

445 4190 Re-instate CHW valves on theatre AHU's - electricity savings Cost-Effective

445 4191 Re-instate CHW valves on Theatre AHU's - gas savings Cost-Effective

485 5896 Re-instate disconnected movement sensor control on examination room Cost-Effective

485 5736 Re-instate the economy cycle control for selected systems Cost-Effective

570 851 Reinstate time switch control of ventilation fans Cost-Effective

591 1827 relamp 18 50W LV spotlights with 35W IRC lamps in main office Cost-Effective

593 4895 Re-lamp existing twin fluorescent 36W fittings with 28W T5 Save It EasPotentially Cost-Effective

593 4905 Relamp incandescent lamps with compact fluorescent lamps Cost-Effective

580 5183 Relamp with one less lamp and install ultrasonic motion detection devi Cost-Effective

481 117 Relative humidity control Potentially Cost-Effective

485 5758 Relocate motion sensors to get better perfomance Cost-Effective

324 1656 relocate water pump from main dam to settling ponds Cost-Effective

515 4645 Relocation of crusher and conveyor 1099 Cost-Effective

578 6549 Removal and replacement of existing light fittings as per ECS specificaPotentially Cost-Effective

492 4101 Removal of DHW from hand basins in all but disabled toilets. Cost-Effective

295 5320 Remove air leaks in compressed air system Cost-Effective

570 6493 Remove leaking 50 litre hot water heater and connect piping to existin Cost-Effective

Page 73: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

445 4204 Remove primary brine loop from chiller 1&2 Potentially Cost-Effective

580 5414 Remove the empty commercial fridge or turn off when not being used Cost-Effective

509 6501 Remove/Isolate SMC Desiccant Dryer Cost-Effective

433 3860 Rendering belt conveyor wash-pulsed Potentially Cost-Effective

504 606 Renewable Energy - solar pv array - 200 kW Potentially Cost-Effective

459 5197 Renewal of Carrier R11 Chiller no.5 Potentially Cost-Effective

420 3132 Renovate Lighting on Surface Buildings Cost-Effective

280 4258 Repair air leaks Cost-Effective

433 3851 Repair co-generator Cost-Effective

604 2280 Repair compressed air leaks and isolate compressors out of hours Cost-Effective

420 3136 Repair cooling tower controls to shut down unneeded towers Cost-Effective

453 1129 Repair corroded HHW 3-way control valve Cost-Effective

445 4210 Repair large steam leak Potentially Cost-Effective

305 1014 Repair leakage Potentially Cost-Effective

453 1134 Repair Leaking HHW 2-way control valves Cost-Effective

327 447 Repair leaks in compressed air piping on surface Cost-Effective

485 5908 Repair odour problem and install push button timers with movement seCost-Effective

368 1444 Repair of major air leaks and optimisation of air distribution system Cost-Effective

338 3522 Repair outdoor lighting contorl Cost-Effective

580 5280 Repair outside air damper - activate ECO cycle Cost-Effective

291 4288 Repair passing steam traps Cost-Effective

604 2246 Repair potable hot water circulating pump Cost-Effective

445 4196 Repair small steam leak Cost-Effective

291 4287 Repair steam and condensate leaks Cost-Effective

305 1010 Repair steam leaks Potentially Cost-Effective

305 1012 Repair steam traps Potentially Cost-Effective

445 4203 Repipe condensate for hydrotherapy pool to condensate return tank Potentially Cost-Effective

439 3292 Re-piping retort cooling systems to minimise mixing Cost-Effective

575 1526 Replace low efficiency shower heads with high efficiency low flow heaCost-Effective

591 1819 replace 10 2x36W battens with 1x36W EL+KW2 diffused battens in groCost-Effective

591 1838 replace 10 2x36W reflector battens with 1x36W EL+KW2 reflector batt Potentially Cost-Effective

591 1831 replace 10 2x58W reflector battens with 2x36W EL+KW2 reflector battePotentially Cost-Effective

586 5986 Replace 1000W Up Lights with 250W Metal Halides Potentially Cost-Effective

570 6496 Replace 100W halogen wall lamps with 23W CFLs in the foyers Cost-Effective

591 1836 replace 11 2x36W reflector battens with 1x36W EL+KW2 reflector batt Potentially Cost-Effective

591 1841 replace 11 HL 400W MV with 250W PSMH with light switch Potentially Cost-Effective

491 742 Replace 125 watt street lights with 70 watt HPS (progressive) Cost-Effective

591 1828 replace 13 2x36W battens with 1x36W EL KW2 diffused battens in mainCost-Effective

591 1830 replace 13 2x36W battens with 1x36W EL+KW2 diffused battens in stoPotentially Cost-Effective

591 1822 replace 14 2x36W battens with 1x36W EL+KW2 EP fittings Cost-Effective

591 1823 replace 14 2x36W battens with 1x36W EL+KW2 EP fittings in section ofPotentially Cost-Effective

592 1406 Replace 150W Metal Halide lamps with 40W CFL Cost-Effective

591 1858 replace 16 2x36W battens with 1x58W EL+KW2 WG fittings in 1st floorPotentially Cost-Effective

591 1839 replace 18 2x36W reflector battens with 1x36W EL+KW2 reflector batt Potentially Cost-Effective

591 1813 replace 1x36W LL with 2x36W EL+KW2 in 2nd floor toilets Potentially Cost-Effective

591 1835 replace 2 2x36W battens with 1x36W EL+KW2 diffused battens Potentially Cost-Effective

591 1790 replace 2 2x36W LL with 1x36W EL+KW2 in first floor sick room Cost-Effective

298 2159 Replace 2 speed motor on meals intake drag with VSD to allow greater fCost-Effective

Page 74: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

591 1852 replace 20 2x36W T-Bar troffer with 1x36 EL KW2 troffers in communitPotentially Cost-Effective

419 2120 Replace 20W Halogen Dichroic Lamps with 7W LED Lamps Potentially Cost-Effective

591 1840 replace 24 2x36W reflector battens with 1x36W EL+KW2 reflector batt Potentially Cost-Effective

584 5656 Replace 250W metal halide light fittings with 37W twin quadphosphor ligCost-Effective

591 1818 replace 2x36W battens with 1x36W EL+KW2 diffused battens in variouCost-Effective

591 1856 replace 2x36W fittings with 1x36 EL KW2 EP fittings in various offices Potentially Cost-Effective

591 1804 replace 2x36W LL with 1x36W EL+KW2 in ground floor foyer behind coPotentially Cost-Effective

591 1845 replace 2x36W T-Bar troffer with 1x36 EL KW2 troffers in lift foyer Cost-Effective

591 1851 replace 2x36W T-Bar troffer with 1x36 EL KW2 troffers in offices Potentially Cost-Effective

591 1844 replace 2x36W T-Bar troffer with 1x36 EL KW2 troffers in toilets Cost-Effective

591 1832 replace 3 2x36W reflector battens with 1x36W EL+KW2 reflector battenPotentially Cost-Effective

586 5985 Replace 300W Quartz Halogen Uplights with 75W Metal Halide lmaps Potentially Cost-Effective

485 5757 Replace 36W lamps with T5s Cost-Effective

358 3095 Replace 36W twin fluorescent lamps in offices with a single 36W triphosPotentially Cost-Effective

456 6586 Replace 36W twin fluorescent lamps in offices with single T5 lamps Potentially Cost-Effective

456 6583 Replace 36W twin fluorescent lamps in offices, waiting rooms, corridors,Cost-Effective

415 2134 Replace 36W twin fluorescent lamps in the office and amenity buildingsPotentially Cost-Effective

360 3487 Replace 36W twins with single 37W quads-phosphor lamps Potentially Cost-Effective

333 1912 Replace 36W with 31W phillips Potentially Cost-Effective

591 1820 replace 4 2x36W battens with 1x36W EL+KW2 diffused battens Cost-Effective

591 1833 replace 4 2x36W battens with 1x36W EL+KW2 diffused battens in staffPotentially Cost-Effective

591 1789 replace 4 2x36W LL with 1x36W EL+KW2 in first floor corridor near liftsCost-Effective

485 5884 Replace 40 watt fluorescent tubes with 36 watt tubes Cost-Effective

485 5910 Replace 40 watt raoid start tubes (single fittings) with 32 watt rapid starCost-Effective

485 5784 Replace 40 watt rapid start tubes with 32 watt rapid start tubes Cost-Effective

415 2126 Replace 400W mercury vapour with 250W metal halide achieving approprCost-Effective

594 5069 Replace 400W Mercury Vapour lamps with more efficient 250W HPI P Cost-Effective

593 4926 Replace 400W mercury vapour with 250W metal halide lamps Potentially Cost-Effective

374 1163 Replace 400W to the new 300W Pulse start lamps Cost-Effective

485 5760 Replace 40W lamps with 36W Cost-Effective

580 5288 Replace 40W rapid start with 36W electronic ballast in staff carpark Potentially Cost-Effective

417 4387 Replace 44 HG Vapour Lights with MH Lights Potentially Cost-Effective

591 1821 replace 5 2x36W battens with 1x36W EL+KW2 diffused battens Cost-Effective

591 1792 replace 5 2x36W LL with 1x36W EL+KW2 in first floor back of house toiCost-Effective

561 2695 Replace 50 watt halogen down light lamps with 35 IRC lamps. Potentially Cost-Effective

604 2310 Replace 50 watt halogen down light lamps with 35 watts IRC lamp Potentially Cost-Effective

604 2303 Replace 50 watt halogen downlights with 35 watt lamps Potentially Cost-Effective

571 3306 Replace 50w Dichroic Lamps with 35w IRC Lamps Potentially Cost-Effective

394 3636 Replace 50W Dichroic lamps with 35W units Cost-Effective

580 5342 Replace 50W dichroic with 35W equivalent Cost-Effective

289 1932 Replace 50w dichroic with 35w IRC type lamps (100 off) Potentially Cost-Effective

358 3092 Replace 50W dichroics in office space, entrance, corridors with 35W IRCCost-Effective

333 1903 Replace 50W Dichroics with 35W IRC Dichroics Cost-Effective

570 6491 Replace 50W Low voltage down lights with 35W IRC lamps Cost-Effective

570 6499 Replace 50W Low voltage down lights with 35W IRC lamps Cost-Effective

582 4726 Replace 50W low voltage lamps in the foyer area. Cost-Effective

437 2629 Replace 50W LV downlights, 300 W PAR 56 lamps, 60W strip incandescenPotentially Cost-Effective

582 4806 Replace 50W LV lamps in the corridor. Cost-Effective

Page 75: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

484 3538 Replace 50W LV with 35W IRC and electronic ballast Potentially Cost-Effective

593 4896 Replace 50W LVDL with 13W RCF Potentially Cost-Effective

358 3096 Replace 58W twin fluorescent lamps in offices with a single 36W triphosPotentially Cost-Effective

295 5328 Replace 5x individual hot water systems with heat pumps (as required)Potentially Cost-Effective

591 1842 replace 6 2x36W reflector battens with 1x36W EL+KW2 reflector battensPotentially Cost-Effective

591 1834 replace 6 2x36W T-bar troffers with 1x36W KW2 troffers Potentially Cost-Effective

591 1788 replace 7 2x36W LL with 1x36W EL+KW2 in back of house toilets and Cost-Effective

591 1857 replace 72 2x36W battens with 1x58W EL+KW2 WG fittings in 1st floorCost-Effective

591 1846 replace 79 2x36W T-Bar troffer with 1x36 EL KW2 troffers in offices Cost-Effective

582 4755 Replace 8 x 60W incandescent lamps in the infant’s playroom (Rear BuiCost-Effective

298 2168 Replace aged & inefficient air conditioning system with an appropriate Potentially Cost-Effective

586 5971 Replace air conditioning for the main pool hall will a heat recovery packPotentially Cost-Effective

493 6167 Replace air cooled AC equipment with central CHW plant Potentially Cost-Effective

493 6308 Replace air cooled AC systems with higher efficiency water cooled c Potentially Cost-Effective

493 6275 Replace air cooled chiller with pipework from central CHW system to ouPotentially Cost-Effective

493 6288 Replace air cooled package AC equipment with CHW from high efficiencPotentially Cost-Effective

301 1141 Replace Air powered pumps with electric Cost-Effective

573 3433 Replace all (~1,400) 80W mercury vapour lamps with twin T5 alternati Potentially Cost-Effective

587 4966 Replace all hot water units in accommodation with heat pump technol Potentially Cost-Effective

569 3678 Replace all twin 36w fittings Potentially Cost-Effective

582 4747 Replace all window and door seals. Also seal each room where ductworCost-Effective

566 2002 Replace and De-Lamp Cost-Effective

566 2028 Replace and De-Lamp Cost-Effective

604 2270 Replace area mercury vapour lamps with metal halide Cost-Effective

486 211 Replace Bake Oven 1 Ringmain - reduce air leakage and gas flow Cost-Effective

383 2455 Replace bath house heating coils with heat pumps Cost-Effective

584 5640 Replace bathroom lamps from incandescent to compact fluorescent Cost-Effective

312 797 Replace boilerhouse chiller number 3 with larger high efficiency chiller. CCost-Effective

301 1144 Replace cap dryers with electrically heated blowers Cost-Effective

574 5147 Replace car park fluorescent lighting with T5 Potentially Cost-Effective

408 1210 Replace Champion air compressor (Energy Savings and Operational SecuriCost-Effective

604 2244 Replace change room shower taps with spring return type Cost-Effective

445 4215 Replace chiller 2 Potentially Cost-Effective

282 3156 Replace chiller with energy efficient chiller Potentially Cost-Effective

474 4370 Replace chillers Cost-Effective

391 3089 Replace compressor lubricant Cost-Effective

590 2902 Replace computer CRT monitors with LCD monitors Cost-Effective

325 763 Replace bath house 5000L boiler with Heat pumps and 2x340L hot watPotentially Cost-Effective

325 762 Replace bath house space heating with heat pumps Cost-Effective

415 2135 Replace CRT computer screens with TFT screens. Potentially Cost-Effective

358 3097 Replace CRT computer screens with TFT screens Potentially Cost-Effective

456 6585 Replace CRT computer screens with TFT screens Potentially Cost-Effective

437 2611 Replace CRT computer screens with TFT screens (Ongoing) Cost-Effective

562 2074 Replace CRT computer screens with TFT screens. Potentially Cost-Effective

562 2091 Replace CRT computer screens with TFT screens. Potentially Cost-Effective

562 2093 Replace CRT computer screens with TFT screens. Potentially Cost-Effective

562 2099 Replace CRT computer screens with TFT screens. Potentially Cost-Effective

590 2912 Replace CRT Monitors Cost-Effective

Page 76: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

585 4179 Replace CRT monitors with LCD monitors Potentially Cost-Effective

585 4182 Replace CRT monitors with LCD monitors Potentially Cost-Effective

585 4185 Replace CRT monitors with LCD monitors Potentially Cost-Effective

562 2077 Replace CRT screens with TFT screens Potentially Cost-Effective

594 5063 Replace current gas boilers with Rotex/Rinnai gas package for main poCost-Effective

597 5693 Replace degraded training pool cover with higher quality/high R-value aPotentially Cost-Effective

317 4478 Replace desolventiser toaster with new. Potentially Cost-Effective

396 649 Replace dessicant air driers with refrigerated drier Potentially Cost-Effective

485 5755 Replace Dichroics with CF and install MDs Cost-Effective

485 5756 Replace Dichroics with IRC types Cost-Effective

466 3152 Replace dividing valve at site Potentially Cost-Effective

562 2060 Replace domestic hot water heaters with natural gas heaters Potentially Cost-Effective

493 6109 Replace DX AC equipment with CHW/HW fan coil units Potentially Cost-Effective

492 4100 Replace electric DHW with gas DHW units Cost-Effective

493 6153 Replace electric duct heaters with gas heating and reciprocating comprPotentially Cost-Effective

493 6061 Replace electric duct heaters with natural gas fired boilers and hot watePotentially Cost-Effective

493 6297 Replace electric duct heating with gas duct furnace Potentially Cost-Effective

493 6263 Replace electric duct heating with gas duct furnace or boiler/coil/pump Potentially Cost-Effective

562 2062 Replace electric heat pump with gas boiler for outdoor pool Potentially Cost-Effective

589 2353 Replace Electric Heat Pumps and Gas Boilers with New High-EfficiencPotentially Cost-Effective

493 6157 Replace electric heaters for lecture theatre with gas heating or reversePotentially Cost-Effective

493 6185 Replace electric heating to Lecture Theatre with gas or reverse cycle Potentially Cost-Effective

585 4180 Replace electric hot water heaters with gas hot water heaters Cost-Effective

493 6110 Replace electric hot water system with gas or solar Potentially Cost-Effective

493 6159 Replace electric HWS with gas Potentially Cost-Effective

493 6124 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6128 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6136 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6144 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6165 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6169 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6179 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6186 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6195 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6228 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6235 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6249 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6287 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6301 Replace electric HWS with gas or solar Potentially Cost-Effective

493 6173 Replace electric HWS with solar or gas Potentially Cost-Effective

493 6256 Replace electric HWS with solar or gas Potentially Cost-Effective

493 6078 Replace electric space heaters with gas fired water heaters Potentially Cost-Effective

445 4201 Replace evaporator CHW control valves on chillers 3&4 Cost-Effective

593 4893 Replace existing 125W MV foyer lighting with 28W Compact Fluoresc Cost-Effective

290 3407 Replace existing 400W metal halide lamps with UPS 320W Cost-Effective

586 5979 Replace existing 50W halogen down lights with energy saving lamps andPotentially Cost-Effective

493 6139 Replace existing air cooled AC with fan coil units fed from central CH Potentially Cost-Effective

586 5978 Replace existing centralised air conditioning unit with more energy effi Potentially Cost-Effective

Page 77: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

575 1468 Replace existing club house fluorescent luminares with more efficient Potentially Cost-Effective

586 5990 Replace existing conventional storage hot water systems with heat pumpPotentially Cost-Effective

493 6192 Replace existing DX water cooled heat pumps including electric duct hPotentially Cost-Effective

597 5689 Replace existing electric hot water service with heat pump or gas alte Cost-Effective

571 3245 Replace existing electric storage hot water system with heat pumps Potentially Cost-Effective

586 5993 Replace existing Fluorescent lights with 2X14W T5 Streetlights or otherPotentially Cost-Effective

357 2474 Replace existing heatcoil ducting with heat pumps Cost-Effective

586 5994 Replace existing incandescent lights with 2X14W T5 Streetlights or othPotentially Cost-Effective

586 5976 Replace existing indoor T8 fluorescent light fittings with T5 fittings Potentially Cost-Effective

581 3940 Replace existing internal lights to more energy efficient types Cost-Effective

581 3942 Replace existing internal lights to more energy efficient types Cost-Effective

581 3943 Replace existing internal lights to more energy efficient types Cost-Effective

581 3947 Replace existing internal lights to more energy efficient types Cost-Effective

445 4214 Replace existing linear accelerator process coolers Potentially Cost-Effective

351 5376 Replace existing luminaires with T5 lamps Potentially Cost-Effective

319 2433 Replace existing ring type blood drier with contact disc drier Potentially Cost-Effective

586 5992 Replace existing Small MV Lights with 2X14W and 2X24W T5 StreetlightPotentially Cost-Effective

586 5970 Replace existing spa heating system with a dedicated heat pump syst Potentially Cost-Effective

581 3946 Replace existing Stage lights and fittings to more energy efficient typesCost-Effective

586 5989 Replace existing T8 and incandescent fittings with t% fittings Potentially Cost-Effective

586 5972 Replace existing T8 indoor fluorescent light fittings with T5 fittings Potentially Cost-Effective

575 1492 Replace existing translucent roofing and installation of new translucent Potentially Cost-Effective

471 710 Replace existing twin and quad tube fittings in office areas Potentially Cost-Effective

280 4267 Replace existing vacuum pumps Potentially Cost-Effective

493 6280 Replace existing VAV control with space based VAV including occupancPotentially Cost-Effective

586 5995 Replace exisying Large MV lights with HP Sodium Streetlights or other Potentially Cost-Effective

575 1478 Replace exterior lights timer switch with photoelectric cell switch Cost-Effective

562 2097 Replace fluorescent lamps with half as many triphosphor lamps and highCost-Effective

562 2090 Replace fluorescent lamps with half as many triphosphor lamps and high Cost-Effective

475 4380 Replace fluorescent light fittings in the plant rooms and entry foyer. Cost-Effective

473 4348 Replace fluorescent light fittings in the plant rooms and MDF. Cost-Effective

472 4281 Replace fluorescent light fittings in the plant rooms. Cost-Effective

474 4366 Replace fluorescent light fittings in the plant rooms. Cost-Effective

574 5145 Replace fluorescent lighting with T5 Potentially Cost-Effective

349 1324 Replace fluorescent lights in production areas with HID fittings Potentially Cost-Effective

589 2358 Replace Halogen Dichroic Lamps in Office Potentially Cost-Effective

589 2380 Replace Halogen Dichroic Lamps in Office Potentially Cost-Effective

589 2597 Replace Halogen Dichroic Lamps in Office Potentially Cost-Effective

589 2598 Replace halogen dichroic lamps in water view cabins Potentially Cost-Effective

589 2363 Replace Halogen Dichroic Lights Potentially Cost-Effective

588 5040 Replace Halogen DLs in Cust Service area Potentially Cost-Effective

586 5982 Replace Halogen downlights with more energy efficient lamps Potentially Cost-Effective

351 5377 Replace halogen lamps with metal halide Potentially Cost-Effective

294 1642 Replace High Bay light fittings as per report Cost-Effective

343 3957 Replace high-bay lights with special fluroescents Potentially Cost-Effective

597 5709 Replace high-intensity discharge lamps in storage areas with fluorescenPotentially Cost-Effective

493 6226 Replace hydraulic lift with rope counterweight lift Potentially Cost-Effective

493 6234 Replace hydraulic lift with rope counterweight lift Potentially Cost-Effective

Page 78: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

493 6242 Replace hydraulic lift with rope counterweight lift Potentially Cost-Effective

493 6131 Replace hydraulic lift with rope/counterweight lift Potentially Cost-Effective

493 6141 Replace hydraulic lift with rope/counterweight lift Potentially Cost-Effective

493 6194 Replace hydraulic lift with rope/counterweight lift Potentially Cost-Effective

493 6318 Replace hydraulic lift with rope/counterweight lift Potentially Cost-Effective

354 2896 Replace ice storage plant Potentially Cost-Effective

561 2706 Replace incandescant and mercury vapour lamps and replace with metaPotentially Cost-Effective

585 4164 Replace incandescent downlights with CFL downlights Cost-Effective

561 2740 Replace incandescent globes with compact fluorescent lamps. Potentially Cost-Effective

582 4742 Replace incandescent lamp in sleeping room with CFL. Cost-Effective

589 2371 Replace Incandescent Lamps In Bathrooms Cost-Effective

582 4671 Replace incandescent lamps in bathrooms with compact fluorescent laCost-Effective

589 2374 Replace Incandescent Lamps In Cedar Cabin Cost-Effective

582 4710 Replace incandescent lamps in First Aid room with CFLs. Cost-Effective

585 4165 Replace incandescent lamps in foyer with CFL lamps Cost-Effective

589 2370 Replace Incandescent Lamps In Cabins Cost-Effective

589 2594 Replace incandescent lamps in cabins Potentially Cost-Effective

589 2596 Replace incandescent lamps in cabins Potentially Cost-Effective

589 2373 Replace incandescent lamps in cabins Potentially Cost-Effective

589 2372 Replace Incandescent Lamps In Office Cost-Effective

589 2369 Replace incandescent lamps in cabins Cost-Effective

589 2376 Replace incandescent lamps in cabins Potentially Cost-Effective

589 2366 Replace Incandescent Lamps In Staff Bathrooms Cost-Effective

589 2595 Replace incandescent lamps in cabins Potentially Cost-Effective

597 5688 Replace incandescent lamps throughout building with dimmable CFL's (Cost-Effective

585 4175 Replace incandescent lamps with 13W CFL Cost-Effective

582 4798 Replace incandescent lamps with CFLs in staff bathrooms, back of housCost-Effective

582 4804 Replace incandescent lamps with CFLs. Cost-Effective

493 6257 Replace individual electric heating with central gas heating system Potentially Cost-Effective

573 3431 Replace kiosk halogen lighting with 20W IRC halogens Potentially Cost-Effective

600 2574 Replace ladies HWS Potentially Cost-Effective

305 1011 Replace lagging Potentially Cost-Effective

585 4167 Replace laundry electric hot water unit with gas hot water unit Cost-Effective

568 3511 Replace lighting in administration section of the facility & replace merc Potentially Cost-Effective

493 6307 Replace lighting with high efficiency including occupancy based controlPotentially Cost-Effective

493 6154 Replace lighting with high efficiency light fittings and occupancy controlPotentially Cost-Effective

493 6152 Replace lighting with high efficiency lighting & improved dimming syst Potentially Cost-Effective

493 6102 replace lighting with triphosphor Potentially Cost-Effective

493 6113 replace lighting with triphosphor Potentially Cost-Effective

493 6135 replace lighting with triphosphor Potentially Cost-Effective

493 6158 replace lighting with triphosphor Potentially Cost-Effective

493 6170 replace lighting with triphosphor Potentially Cost-Effective

493 6174 replace lighting with triphosphor Potentially Cost-Effective

493 6180 replace lighting with triphosphor Potentially Cost-Effective

493 6196 replace lighting with triphosphor Potentially Cost-Effective

493 6227 replace lighting with triphosphor Potentially Cost-Effective

493 6248 replace lighting with triphosphor Potentially Cost-Effective

493 6188 Replace lighting with triphosphor & install occupancy control Potentially Cost-Effective

Page 79: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

493 6286 Replace lighting with triphosphor & occupancy based control Potentially Cost-Effective

493 6166 Replace lighting with triphosphor & occupancy control Potentially Cost-Effective

493 6118 Replace lighting with Triphosphor fittings Potentially Cost-Effective

493 6236 Replace lighting with triphosphor including occupancy control Potentially Cost-Effective

493 6293 Replace lighting with triphosphor including occupancy control Potentially Cost-Effective

493 6302 Replace lighting with Triphosphor including occupancy/timer control Potentially Cost-Effective

493 6083 Replace lighting with triphosphour Potentially Cost-Effective

493 6127 Replace lighting with Triphospohor Potentially Cost-Effective

360 3480 Replace liquid ring vacuum pump with dry vacuum pump Potentially Cost-Effective

568 3503 Replace low voltage down lights Cost-Effective

568 3500 Replace low voltage down lights and install electronic transformers Potentially Cost-Effective

586 5987 Replace low voltage Halogen Spotlights with 35W IRC lamps and electrPotentially Cost-Effective

586 5977 Replace low voltage Halogens with more efficient lamps and upgrade witPotentially Cost-Effective

582 4670 Replace low voltage lamps in meeting rooms no 1 & 2 on level 3 and kCost-Effective

584 5580 Replace low voltage light fittings Cost-Effective

584 5634 Replace low voltage light fittings in the Mollie Dive function room wit Cost-Effective

600 2576 Replace Mercury Vapor high bays Potentially Cost-Effective

582 4800 Replace mercury vapour lamps with compact fluorescent lamps in Hall.Potentially Cost-Effective

570 834 Replace metal halide lamps in car park to T5 fluorescent lamps Cost-Effective

457 5236 Replace metal halide lamps in main entry foyer with lower wattafe la Cost-Effective

444 4035 Replace mild steel dampers in AHUs Potentially Cost-Effective

493 6284 Replace multiple air cooled process chillers with circulated cooling s Potentially Cost-Effective

582 4810 Replace MV lamps with compact fluorescent lamps. Potentially Cost-Effective

371 365 Replace NAP1 Expander Potentially Cost-Effective

371 363 Replace nitrates boilers Potentially Cost-Effective

597 5695 Replace old 36W batten luminaires with energy efficient 36W fittings at vaPotentially Cost-Effective

438 4842 Replace old air compressors Potentially Cost-Effective

444 4032 Replace old motors in AHUs with high efficiency Cost-Effective

416 409 Replace older motors with high efficiency motors. Cost-Effective

471 709 Replace one existing studio chiller with new variable speed centrifugal Potentially Cost-Effective

295 5335 Replace outstanding electrical motors with energy efficient ones Potentially Cost-Effective

283 4314 Replace Oxygen compressor head for life extension and cooling effici Cost-Effective

585 4173 Replace PAR38 incandescent lamps with PAR38 CFL lamps Cost-Effective

597 5697 Replace PAR38 spotlights in foyer of theatre paviliion with CFL alternatCost-Effective

604 2274 Replace pole top 250 watt mercury vapour lamps with 150 watt metal Cost-Effective

575 6034 Replace pool hall exhaust air heat recovery coils with dry media air to Potentially Cost-Effective

562 2065 Replace pool halogen lights with metal halide lamps due to high failureCost-Effective

485 5793 Replace reading lamps with compact fluorescents Cost-Effective

493 6299 Replace reciprocating compressor AC system with CHW from Central pPotentially Cost-Effective

493 6223 Replace reciprocating compressors on 2x 400kWr Carrier chillers with Potentially Cost-Effective

493 6264 Replace Reciprocating DX AC system with CHW coil fed from high efficiPotentially Cost-Effective

493 6283 Replace remaining lift controls with vsd based control Potentially Cost-Effective

502 4516 Replace ROM conveyor and bypass ROM pumps Cost-Effective

445 4216 Replace seized dampers in ward block and re-instate economy cycle Potentially Cost-Effective

343 3956 Replace selected mill motors with super high efficient motors Potentially Cost-Effective

343 3958 Replace selected surface motors with super high efficient motors Potentially Cost-Effective

343 3952 Replace selected underground motors with super high efficient motors Potentially Cost-Effective

466 3148 Replace SER drives with VVVF controllers on units 14, 3, 4, 5, 6 and 7Cost-Effective

Page 80: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

493 6069 Replace small air & water cooled package AC systems with central chilPotentially Cost-Effective

486 209 Replace Sniff unit on VDC 1 with an ACD Unit which uses no electricalCost-Effective

297 534 Replace soft starter on with VSD on (315 kW) mill Cost-Effective

298 2141 Replace standard (halophosphur) T8 flourescents with Triphosphor fluCost-Effective

442 1576 Replace standard fluorescent tubes with Tn- phosphor tubes for general Cost-Effective

493 6063 Replace standard light fittings with Triphosphor Potentially Cost-Effective

298 2169 Replace standard(halophosphur)T8 flourescents with triphosphor fluor Potentially Cost-Effective

459 5192 Replace suction vacuum pumps in Building Potentially Cost-Effective

586 5968 Replace T8 fluorescent light fittings with T5 fittings Potentially Cost-Effective

571 3249 Replace the 50m pool pump's motors with high efficiency motors Potentially Cost-Effective

582 4761 Replace the 50W low voltage lamp in the kitchen with 20W lamps. Cost-Effective

582 4766 Replace the 60W incandescent lamp at entry to a compact fluorescent Cost-Effective

582 4718 Replace the 60W incandescent lamp in the cleaners store with an 11WPotentially Cost-Effective

604 2308 Replace the change room domestic hot water systems with instantane Potentially Cost-Effective

571 3250 Replace the existing large air conditioning with chilled water air condit Potentially Cost-Effective

604 2321 Replace the main fountain pump electric motor with a high efficiency mPotentially Cost-Effective

604 2272 Replace the office 50 watt halogen down lights with 35 watt IRC lampsCost-Effective

604 2323 Replace the glasshouse gas heating with solar Potentially Cost-Effective

604 2326 Replace the truck wash medium bay lights with weatherproof fluorescenPotentially Cost-Effective

349 1313 Replace the upstairs A/C Unit in Building No. 2 Cost-Effective

578 6554 Replace time switches with PE sensor control Cost-Effective

575 1489 Replace timer switch on night time security lighting with photoelectric cCost-Effective

509 6511 Replace Timer Valves (Drains) Potentially Cost-Effective

585 4166 Replace top loading washing machines with front loading washing macCost-Effective

584 5622 Replace triple 36W fittings with twin 37W quadphosphor fittings Cost-Effective

568 3506 Replace twin 26W downlights Potentially Cost-Effective

584 5623 Replace twin 58W fittings with single 58W triphosphor fittings Cost-Effective

589 2579 Replace twin florescent lights Potentially Cost-Effective

584 5633 Replace twin fluorescent fittings with single fittings including new reflecCost-Effective

569 3645 Replace twin watt fitting Potentially Cost-Effective

381 667 Replace two reciprocating chillers with a single high efficiency chiller. Potentially Cost-Effective

322 5956 replace V-belt motors with Notched belts (250KW example) Potentially Cost-Effective

493 6233 Replace water cooled DX heat pumps with CHW central system & gas Potentially Cost-Effective

493 6156 Replace window mounted RAC's with central AC plant Potentially Cost-Effective

579 3974 Replacement Heat Pumps of higher efficiency as old ones wear out (dePotentially Cost-Effective

504 580 Replacement induction furnace for No.3 Heat Recovery Cost-Effective

447 1866 Replacement of 1060 room standing lamp incandescant 100 watt lamps Cost-Effective

394 3637 Replacement of 45 Vapac Electrical steam injection humidifiers with m Potentially Cost-Effective

493 6062 Replacement of AC control system with BMS DDC on all buildings withPotentially Cost-Effective

493 6149 Replacement of AC with higher efficiency system Potentially Cost-Effective

434 2214 Replacement of air Atlas Copco with new compressor Potentially Cost-Effective

574 5134 Replacement of air conditioning equipment Potentially Cost-Effective

574 5148 Replacement of air conditioning equipment Potentially Cost-Effective

493 6106 Replacement of air cooled chiller with connection to central chiller tha Potentially Cost-Effective

493 6210 Replacement of air cooled DX AC equipment with central high efficien Potentially Cost-Effective

604 2313 Replacement of Cabin Hot water units with solar (electricity) Potentially Cost-Effective

604 2316 Replacement of Cabin hot water units with solar(electricity) Potentially Cost-Effective

604 2317 Replacement of Cabin hot water units with solar(gas) Potentially Cost-Effective

Page 81: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

319 2430 Replacement of compressed air conveying of raw materials Potentially Cost-Effective

318 4466 Replacement of compressed air to conveyor for material handling Potentially Cost-Effective

447 1867 Replacement of Cooling tower drive motors 18.5kw to 7.5 kw with soft stCost-Effective

596 4944 Replacement of Cooling Towers Potentially Cost-Effective

596 4950 Replacement of CRT Monitors Potentially Cost-Effective

484 3533 Replacement of CRT monitors with TFT Cost-Effective

493 6086 Replacement of DX cooling plant with CHW from central plant Potentially Cost-Effective

493 6126 Replacement of DX water cooled package AC units with CHW/HW fan coil uPotentially Cost-Effective

493 6108 Replacement of electric duct heater with heating water coil Potentially Cost-Effective

493 6122 Replacement of electric heating with gas Potentially Cost-Effective

493 6075 Replacement of electric HWS with gas or Solar Potentially Cost-Effective

493 6087 Replacement of electric HWS with gas or Solar Potentially Cost-Effective

493 6099 Replacement of electric HWS with gas or Solar Potentially Cost-Effective

493 6121 Replacement of electric HWS with gas or Solar Cost-Effective

493 6206 Replacement of electric HWS with gas or Solar Potentially Cost-Effective

493 6214 Replacement of electric HWS with gas or Solar Potentially Cost-Effective

493 6217 Replacement of electric HWS with gas or Solar Potentially Cost-Effective

387 1274 Replacement of electric motors with high efficiency units. Potentially Cost-Effective

574 5163 Replacement of existing air conditioning Potentially Cost-Effective

578 6542 Replacement of existing black polythene tubing solar collector with totaPotentially Cost-Effective

581 3945 Replacement of existing fluorescent lighting with energy efficient lighti Cost-Effective

488 4116 Replacement of existing incandescent and halogen lighting with CompaPotentially Cost-Effective

488 4124 Replacement of existing incandescent and halogen lighting with CompaPotentially Cost-Effective

380 262 Replacement of Extruder V-belts with more efficient timing belts Cost-Effective

596 4961 Replacement of fixed theatre lights Potentially Cost-Effective

574 5136 Replacement of fluorescent lighting with T5 Potentially Cost-Effective

574 5162 Replacement of fluorescent lighting with T5 equipment Potentially Cost-Effective

574 5167 Replacement of fluorescent lighting with T5 equipment Potentially Cost-Effective

574 5170 Replacement of fluorescent lighting with T5 equipment Potentially Cost-Effective

434 2217 Replacement of glycol HE with plate HE Potentially Cost-Effective

574 5140 Replacement of halogen lighting with IRC or Megaman equipment Potentially Cost-Effective

574 5156 Replacement of halogen with IRC or Megaman equipment Potentially Cost-Effective

380 261 Replacement of high bay Mercury Vapour lamps with more efficient, lo Cost-Effective

381 674 Replacement of high-bay lights with special fluorescents. Preliminary ePotentially Cost-Effective

493 6205 Replacement of hydraulic lift with rope/counterweight lift Potentially Cost-Effective

493 6313 Replacement of hydraulic lift with rope/counterweight lift Potentially Cost-Effective

493 6089 Replacement of hydraulic lifts with rope lifts Potentially Cost-Effective

569 3633 Replacement of incandescent globes with CFL. This should only occur wiCost-Effective

596 4972 Replacement of incandescent lamps Cost-Effective

584 5648 Replacement of incandescent lamps with compact fluorescent lamps in Cost-Effective

574 5166 Replacement of incandescent lighting Potentially Cost-Effective

493 6076 Replacement of light fittings with Triphosphor Potentially Cost-Effective

493 6150 Replacement of lighting with high efficiency and occupancy control Potentially Cost-Effective

493 6143 Replacement of lighting with triphosphor Potentially Cost-Effective

493 6207 Replacement of lighting with triphosphor Potentially Cost-Effective

493 6213 Replacement of lighting with triphosphor Potentially Cost-Effective

493 6148 Replacement of lighting with triphosphor and perimeter dimming Potentially Cost-Effective

493 6107 Replacement of lighting with Triphosphor fittings Potentially Cost-Effective

Page 82: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

442 1578 Replacement of main office air conditioning unit and installation of PLC Potentially Cost-Effective

574 5172 Replacement of Mercury Vapour High Bays Potentially Cost-Effective

574 5168 Replacement of Mercury Vapour lighting Potentially Cost-Effective

574 5173 Replacement of Mercury Vapour lighting Potentially Cost-Effective

574 5155 Replacement of PAR fittings Potentially Cost-Effective

574 5165 Replacement of PAR lighting Potentially Cost-Effective

596 4943 Replacement of pumps Potentially Cost-Effective

596 4948 Replacement of Reciprocating Chillers Potentially Cost-Effective

493 6145 Replacement of reciprocating compressor chiller with Turbocor high efficPotentially Cost-Effective

493 6084 Replacement of reciprocating compressors on Carrier 30LA1100 chillerPotentially Cost-Effective

493 6085 Replacement of roof sheeting with light colour and installation of R3 InsPotentially Cost-Effective

606 3068 Replacement of sludge pumps with variable speed type. Potentially Cost-Effective

606 3065 Replacement of smaller Effluent Discharge pump to handle Average DPotentially Cost-Effective

574 5128 Replacement of space heating equipment Potentially Cost-Effective

569 3630 Replacement of T-bar with high efficiency type Potentially Cost-Effective

354 2899 Replacing existing 'Luke' chillers Potentially Cost-Effective

363 329 Replacing other motors Potentially Cost-Effective

435 453 Replacing steam tracing with electrical tracing Potentially Cost-Effective

455 1925 replacing T12 halo-phosphor lamps with T5 tri-phosphor lamps Potentially Cost-Effective

354 2897 Replacing tenancy light fittings Potentially Cost-Effective

604 2271 Reposition the Block PE cell Cost-Effective

282 3183 Reprogram C-Bus for lights and AHU Cost-Effective

485 5805 Reprogram Cbus system Cost-Effective

570 807 Reschedule all after-hour fans and misc. A/C loads to limit use to 7am Cost-Effective

593 4891 Reschedule HVAC start time Cost-Effective

365 5458 Re-set automatic lighting timer for all 12 modules. Cost-Effective

282 3191 Reset condenser pressure Cost-Effective

595 5432 Reset HVAC start time Cost-Effective

595 5444 Reset HVAC start time Cost-Effective

595 5447 Reset HVAC start time Cost-Effective

593 4898 Reset HVAC timer to disable plant on Public Holidays Cost-Effective

593 4909 Reset HVAC timer to disable plant on Public Holidays Cost-Effective

571 3285 Reset space temperature base on outside temperature Cost-Effective

445 4202 Reset steam pressure Cost-Effective

459 5186 Reset time schedule for air handling units in Building and others to m Cost-Effective

457 5240 Reset time schedules for air handling units and fan coil units through Cost-Effective

459 5189 Reset time schedules for chillers and air handling units in health Serv Cost-Effective

384 1963 Restaurant Halogen Dichroic Lighting Replacement Potentially Cost-Effective

514 4615 Restore 5000 tonne bin capacity Potentially Cost-Effective

353 3364 Retail Light Efficiency Upgrade Potentially Cost-Effective

583 2956 Retrofit 18 Watt Fluro Exit light-2Watt Exit light Potentially Cost-Effective

583 2923 Retrofit 18Watt Fluro Exit light-2Watt Exit light Potentially Cost-Effective

583 3022 Retrofit 18Watt Fluro Exit light-2Watt Exit light Potentially Cost-Effective

447 1865 Retro-fit 2 of the existing AC chilllers with a soft start speed drive Cost-Effective

583 2921 Retrofit 250Watt Mercury Vapour with 80Watt CFL Lamp Potentially Cost-Effective

583 3010 Retrofit 400Watt MH Hi/Lo bay with 80Watt CFL Lamp Cost-Effective

583 3012 Retrofit 400Watt MH Hi/Lo bay with 80Watt CFL Lamp Cost-Effective

583 3016 Retrofit 400Watt MH Hi/Lo bay with 80Watt CFL Lamp Cost-Effective

Page 83: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

583 3040 Retrofit 400Watt MH Hi/Lo bay with 80Watt CFL Lamp Cost-Effective

583 3031 Retrofit 400Watt Spot with 80Watt CFL Lamp Cost-Effective

360 3483 Retrofit 440W mercury vapour with 250W pulse start metal halide lampPotentially Cost-Effective

583 3029 Retrofit 500Watt Spot with 80Watt CFL Lamp Cost-Effective

575 1537 Retrofit de-superheater to pool hall air conditioning units to produce d Potentially Cost-Effective

575 1517 Retrofit exisitng office lighting in room to more efficient lamps and con Cost-Effective

593 4912 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Potentially Cost-Effective

593 4915 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Potentially Cost-Effective

593 4927 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Potentially Cost-Effective

593 4929 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Cost-Effective

575 1473 Retrofit existing double fluorescent luminares with more efficient lamp Cost-Effective

575 1477 Retrofit existing double fluorescent luminares with more efficient lamp Cost-Effective

575 1484 Retrofit existing double luminaries with more efficient lamps and contr Potentially Cost-Effective

575 1491 Retrofit existing low bay luminaires with more efficient lamps and contrPotentially Cost-Effective

576 2083 Retrofit Lighting -retrofit plasterboard troffer,replace battens, replace mCost-Effective

576 2079 Retrofit Lighting -install voltage reduction unit, upgrade lamp fittings Cost-Effective

576 2029 Retrofit Lighting Cost-Effective

576 2084 Retrofit Lighting Cost-Effective

576 2080 Retrofit Lighting Cost-Effective

576 2086 Retrofit Lighting Cost-Effective

576 2034 Retrofit Lighting Cost-Effective

576 2087 Retrofit Lighting Cost-Effective

576 2036 Retrofit Lighting Cost-Effective

576 2085 Retrofit Lighting Cost-Effective

576 2078 Retrofit of Lighting -Install electronic ballasts and convert twin 36 wa Cost-Effective

583 3024 Retrofit Single 20Watt Fluro - Single Quad 28Watt,elect ballast and higPotentially Cost-Effective

583 3023 Retrofit Single 40Watt Fluro - Single Quad 28Watt,elect ballast and higPotentially Cost-Effective

583 2955 Retrofit Single 40Watt Fluro Exit light-2 Watt Exit light Potentially Cost-Effective

583 2924 Retrofit Single 40Watt Fluro-Single Quad 28Watt,elect ballast and highbPotentially Cost-Effective

447 1868 Retro-fit the 1 remaining York AC chillers with a soft start speed drive Potentially Cost-Effective

583 3020 Retrofit Twin 20Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

604 2299 Retrofit twin 36 watt fluorescent light fittings with single 28 watt T5 light Potentially Cost-Effective

583 2919 Retrofit Twin 40 watts Fluro with Single Quad 28 Watt, elect ballast andPotentially Cost-Effective

583 2932 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elec ballast and hiPotentially Cost-Effective

583 2933 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elec ballast and hiPotentially Cost-Effective

583 2938 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elec ballast and hiPotentially Cost-Effective

583 2939 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elec ballast and hiPotentially Cost-Effective

583 2941 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elec ballast and hiPotentially Cost-Effective

583 2942 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elec ballast and hiPotentially Cost-Effective

583 3013 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiCost-Effective

583 3017 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

583 3018 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

583 3019 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

583 3021 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

583 3033 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

583 3034 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

583 3035 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

583 3042 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

Page 84: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

587 4962 Re-tube with single tri-phosphors (50%) Cost-Effective

382 3668 Return as much condensate at as high of temperature as possible to thePotentially Cost-Effective

500 511 Reuse exhausted heat from Novatec dryer Cost-Effective

566 2040 Review & revised BMCS control strategies Cost-Effective

575 1503 Review air conditioning plant operating schedules to match occupancy Cost-Effective

575 1513 Review air conditioning plant operating schedules to match occupancy Cost-Effective

575 1496 Review air conditioning plant operating schedules to match occupancy Cost-Effective

433 3848 Review air requirements for product lines in rendering plant Cost-Effective

349 1325 Review all cooling systems and install VSDs to save energy Potentially Cost-Effective

566 1999 Review and revise BMS control strategies Cost-Effective

425 3546 Review automatic control of lighting Cost-Effective

425 3552 Review automatic control of lighting Cost-Effective

448 3775 Review BMS economy cycle setpoints and operation Cost-Effective

453 1111 Review boiler tuning strategy and schedule Cost-Effective

448 3771 Review chiller sequencing to match chiller capacity to load Cost-Effective

448 3780 Review cleaning hours Cost-Effective

587 5024 Review cleaning times policy for toilet block. Lights on all night, not on Cost-Effective

587 5036 Review cleaning times policy for toilet block. Lights on all night, not on Cost-Effective

363 323 Review compressed air leakage and establish repair program Cost-Effective

425 3545 Review control and temperature settings for air conditioning units in o Cost-Effective

425 3550 Review control and temperature settings for air conditioning units in o Cost-Effective

580 5187 Review control strategy of the Building Management System (BMS) Cost-Effective

389 4141 Review current metering and evaluate energy consumption data requi Potentially Cost-Effective

573 3422 Review electricity contract pricing (once co-gen equipment operation isCost-Effective

479 149 Review feasibility of Heat Recovery from Hot Billet (Hot Box) Potentially Cost-Effective

479 146 Review feasibility of Cogeneration/Waste Heat Boiler using Billet Cast Potentially Cost-Effective

479 144 Review feasibility of Cogeneration/Waste Heat Boiler using EAF Off GaPotentially Cost-Effective

479 145 Review feasibility of Cogeneration/Waste Heat Boiler using EAF Off GaPotentially Cost-Effective

479 187 Review feasibility of Degasser Boiler Controls upgrade Potentially Cost-Effective

479 138 Review feasibility of EAF Scrap Pre Heating Potentially Cost-Effective

479 173 Review feasibility of Mill (EWM) Electrical Upgrade (do away with DC Potentially Cost-Effective

479 198 Review feasibility of implementing a High Efficiency Motor (HEM) purchPotentially Cost-Effective

479 128 Review feasibility of Ingot Waste Heat Recovery using Organic RankinPotentially Cost-Effective

479 156 Review feasibility of installation of VSD on Furnace Inlet Fan (remove Potentially Cost-Effective

479 189 Review feasibility of installation of Waste Heat Boiler using EAF off g Potentially Cost-Effective

479 190 Review feasibility of installation of Waste Heat Recovery from Boiler F Potentially Cost-Effective

479 185 Review feasibility of installing a compressed air dryer or cooler to elim Potentially Cost-Effective

479 177 Review feasibility of installing CAPS Intelligent compressor controller ( Cost-Effective

479 186 Review feasibility of reducing air compressor intake air temperature b Potentially Cost-Effective

479 183 Review feasibility of reducing compressed air system pressure by 50 Potentially Cost-Effective

479 188 Review feasibility of replacing boilers with vacuum pumps for steel degPotentially Cost-Effective

479 176 Review feasibility of retrofitting of different VSD on an existing air com Cost-Effective

479 129 Review feasibility of Steelmaking Slag Waste Heat Recovery Potentially Cost-Effective

479 147 Review feasibility of VSD on Dust Extraction System (Remove Damper Potentially Cost-Effective

604 2254 Review heat pump staging Cost-Effective

588 5041 Review hot water options Potentially Cost-Effective

479 122 Review installation of Arc Furnace Electrode Control Upgrade Cost-Effective

479 121 Review installation of VSD on Dust Extraction System (Remove DampeCost-Effective

Page 85: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

479 123 Review installation of VSD on Dust Extraction System (Remove DampeCost-Effective

296 2685 Review kitchen equipment for energy efficiency improvements Cost-Effective

349 1314 Review lighting controls in the Warehouse Cost-Effective

583 3001 Review Lighting Operation Cost-Effective

583 3026 Review Lighting Operation Cost-Effective

583 3015 Review Lighting Operation Cost-Effective

349 1323 Review number and type of security lights Potentially Cost-Effective

583 2915 Review of cleaning times (savings based on 6 am start) Cost-Effective

390 4859 Review of compressed air system Potentially Cost-Effective

511 6604 Review of compressed air system and usage Cost-Effective

583 2950 Review of lighting and air-conditioning requirements Cost-Effective

600 2573 Review of lighting opportunities Cost-Effective

328 238 Review procedures for U/G conveyor operation Cost-Effective

364 3938 Review site compressed air system, address system deficiencies thro Cost-Effective

571 3311 Review the air conditioning control strategies Potentially Cost-Effective

604 2266 Review the condenser pump controls to ensure that each pump only operatCost-Effective

604 2262 Review the heat pump control strategy to utilize all eight stages Cost-Effective

434 2215 Review VFD Control for No. 1 Refrigeration System Compressors Potentially Cost-Effective

338 3531 Review viability of Pneumatic Return replacement with counter weight Potentially Cost-Effective

484 3535 Revised Air Conditioning schedules Cost-Effective

484 3534 Revised lighting schedules Cost-Effective

569 3628 Revised time scheduling Potentially Cost-Effective

454 99 Revision to the chiller control system in shed Cost-Effective

582 4686 Rewire lighting circuits in the ground floor equipment and materials stoCost-Effective

584 5642 Rewire lighting circuits to allow every second light to be switched Cost-Effective

570 816 Rewire lighting in building and install occupancy sensors to the lamps Cost-Effective

584 5655 Rewiring of lighting circuits to allow every second light to be switched Cost-Effective

584 5662 Rewiring of lighting circuits to allow every second light to be switched Cost-Effective

486 225 Investigate Primary Crusher run time with no load. Maybe able to run itPotentially Cost-Effective

410 1771 roof space lighting Cost-Effective

323 5416 Ropeway drive room lighting Potentially Cost-Effective

566 2009 Rotex/Rinnai Solar hot water unit Cost-Effective

566 2005 Rotex/Rinnai Solar hot water unit installation to replace current storageCost-Effective

315 5429 Suite (~80) of minor improvement projects, some with energy improvemCost-Effective

280 4324 Run 2 compressor cooling water pumps (after air use reduced) Potentially Cost-Effective

290 3411 Run boilers on a lead-lag system Potentially Cost-Effective

604 2315 Run Down timer control of air conditioners Potentially Cost-Effective

604 2314 Run Down timer control of Cabin heaters Potentially Cost-Effective

604 2320 Run down timer control of Cabin heaters Potentially Cost-Effective

286 91 Run Saveall Recd. Stock Pump on demand Potentially Cost-Effective

305 981 Run Out Table pumps soft starter and condition monitoring control Potentially Cost-Effective

504 591 Sand reclaim/ Shakeout Area Dust Extraction System fit VSD, control Potentially Cost-Effective

465 1607 SCADA monitoring of power consumption Potentially Cost-Effective

297 548 Scalder Hot Water Heat Exchanger Potentially Cost-Effective

408 1216 Scale pit - install VSDs on scale pit pumps Cost-Effective

604 2242 Schedule cleaning operations to reduce energy consumption Cost-Effective

504 598 Schedule melting times at times of low cost electricity Potentially Cost-Effective

495 1296 Scrap Reduction Program Cost-Effective

Page 86: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

434 2178 Screw Refrigeration Compressor VFD Control Cost-Effective

404 2755 Seal all computer rooms doors and vents Cost-Effective

305 966 Seal Type 1 tundish covers. Potentially Cost-Effective

453 1083 Seasonal adjustment of HVAC Set points in selected areas. Cost-Effective

379 1175 Secondary chilled water pump VSD Cost-Effective

304 4807 Secondary Crusher replacement Cost-Effective

312 796 Secondary Manufacturing Department air cooled chiller rationalisation.Potentially Cost-Effective

492 4099 Selection, training and support of “Energy Champions” for each buildingCost-Effective

485 5926 Selectively de-lamp museum Cost-Effective

485 6611 Selectively relamp triple 40 W rapid start light fittings in a room Cost-Effective

396 642 Sequenced shut-down capability for P4 exit conveying & shakers Cost-Effective

396 654 Sequenced shutdown elevator thru to P8 coater Potentially Cost-Effective

396 624 Sequenced shutdown for Extruder 3 (feed bin to PEC) based on extrudeCost-Effective

396 648 Sequenced Shutdown of Process 1/2 (feed bin to POC) to minimise idlPotentially Cost-Effective

396 652 Sequenced shutdown of Process 1/2 output systems Potentially Cost-Effective

414 4826 Service Center Lighting Modifications Potentially Cost-Effective

367 5501 Service Corridor Lighting Modifications. Rewire corridor lighting to creaPotentially Cost-Effective

311 620 Replace wheel wash spray pump motor with correctly sized (only 45% loaPotentially Cost-Effective

311 608 Fit movement sensor to admin building lunch room lights Cost-Effective

311 610 Implement programmed compressed air system leak detection regime, iCost-Effective

354 2895 Serving domestic hot water by reverse cycle heaters only Cost-Effective

573 3439 Set air conditioning in control room to minimum 24C-21C Potentially Cost-Effective

448 3767 Set new computer centre supplementary air conditioning units setpoi Cost-Effective

604 2285 Set the BMCS time of day schedules to core occupancy times Cost-Effective

604 2239 Setback space temperatures in the Function Room when it is unoccupiCost-Effective

297 539 Setup and implement a maintenance and leak detection program for theCost-Effective

336 5944 shaft furnace Potentially Cost-Effective

454 107 Shed cool room evaporator control Cost-Effective

424 4246 Ship loaders base load. Reduce Ship Loader base load. Provide electrCost-Effective

513 4601 Shut down crusher over crib Potentially Cost-Effective

455 1916 Side Foyer feature floodlights time switch installations Cost-Effective

579 3966 Single 50W dichroic fitting replaced with single 11W compact fluoro lampCost-Effective

579 3980 Single 50W dichroic fitting replaced with single 11W compact fluoro lampCost-Effective

408 1238 Site - electrical sub-metering to monitor energy consumption in differe Potentially Cost-Effective

408 1237 Site - Rationalise cooling systems eg CTs 13 and 14 and others Potentially Cost-Effective

408 1227 Site - reduce lighting levels in areas htat are unused for long periods ofCost-Effective

408 1226 Site - Reduce lighting levels in disused production areas Cost-Effective

407 3725 Site - Reduce lighting levels in rarely attended parts of mill Potentially Cost-Effective

408 1228 Site - Turn off high bay lights outside production periods where productiCost-Effective

514 4616 Site water management : transfer pumps Potentially Cost-Effective

440 6530 Sky lighting in Packaging Warehouse Potentially Cost-Effective

495 1298 Skylights in warehouses Potentially Cost-Effective

601 2684 Solar absorbers at the WAC to produce hot water Cost-Effective

480 5360 Solar Hot Water Cost-Effective

599 3218 Solar Hot Water & Pool Blankets Potentially Cost-Effective

299 2640 Solar hot water heating Potentially Cost-Effective

593 4907 Solar Hot Water System Cost-Effective

567 1977 Solar Pool Heating Cost-Effective

Page 87: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

567 1982 Solar Pool Heating Cost-Effective

567 1979 Solar PV Cost-Effective

567 1983 Solar PV Cost-Effective

567 1988 Solar PV Cost-Effective

567 1992 Solar PV Cost-Effective

567 1996 Solar PV Cost-Effective

604 2301 Solar storage heating of potable hot water Potentially Cost-Effective

280 4269 SP3 Air Fuel ration control. Can only be done with control upgrade Potentially Cost-Effective

594 5064 Spa heating using Rotex system Cost-Effective

371 358 Speed control - AN1 CDC pusher fan Cost-Effective

371 373 Speed control AN2 02J01 blower Potentially Cost-Effective

371 374 Speed control AN2 02J02 blower Potentially Cost-Effective

371 359 Speed control AN2 02J06 fan Cost-Effective

330 439 Spirals Upgrade Potentially Cost-Effective

408 1234 SPRC - VSDs on CT pumps and fans for 3 CT on grassed area West of Cost-Effective

329 1661 Cultural Change Cost-Effective

329 1699 Staff club Cost-Effective

569 3615 Staff education and training- this should assist in reducing energy c Cost-Effective

411 2531 Standby Boiler Operation Potentially Cost-Effective

418 3437 Starch Fired Cogeneration Potentially Cost-Effective

286 97 Start/Stop HP Felt Spray Pumps Potentially Cost-Effective

286 96 Start/Stop Belbond Pumps Potentially Cost-Effective

293 2763 Steam and condensate leaks Cost-Effective

292 4341 Steam and condensate leaks Cost-Effective

485 5841 Steam boilers Cost-Effective

362 1746 steam boilers and steam system rationalisation Cost-Effective

359 464 Steam circuit integration Potentially Cost-Effective

371 352 Steam leak / trap improvement - nitrates Cost-Effective

318 4426 Steam Leaks-steam traps monitoring Cost-Effective

346 3820 Steam metering and review boiler operation Potentially Cost-Effective

372 5472 Steam monitoring Cost-Effective

299 2639 Steam Pipe Insulation Cost-Effective

411 2527 Steam pipe lagging Cost-Effective

385 1304 Steam Plant Upgrade (2 new boilers) Cost-Effective

319 2435 Sterilised waste heat recovery Potentially Cost-Effective

318 4445 Sterilised waste heat recovery Potentially Cost-Effective

433 3852 Stick water vacuum pump recycling Cost-Effective

498 2832 Stock preparation agitators Cost-Effective

498 2827 Stock pump efficiency audit Cost-Effective

280 4261 Stop-start pallet train. Requires IT resource currently on priority work Potentially Cost-Effective

414 4821 Store Area Lighting Automation Potentially Cost-Effective

482 420 Stores Lighting Replacement (Replaced only as required) Potentially Cost-Effective

308 3781 Streamlining production efficiency Cost-Effective

329 1677 Administration Cost-Effective

486 232 Study of low resistance cathode bars - Fundamental R&D Potentially Cost-Effective

486 231 Study of low resistance pots - Fundamental R&D Potentially Cost-Effective

346 3817 Subject to Op5, ductwork on D60 air compressor Cost-Effective

413 6574 Sub-metering - install automated system to capture sub meter data = rePotentially Cost-Effective

Page 88: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

422 725 Supplementary bath heating through use of gas fired ceramic tube Potentially Cost-Effective

438 3118 Supply transformers - load sharing Cost-Effective

469 474 Surface coal haulage energy efficiency Cost-Effective

357 2495 Surface Lighting Optimisation Potentially Cost-Effective

570 815 Survey of site and installation of new air compressor Cost-Effective

384 1960 Swimming Pool Halogen Dichroic Lighting Replacement Potentially Cost-Effective

571 3332 Switch off store mezzanine lighting when not required Cost-Effective

298 2144 Switch off conveyors when not in use (e.g. in module wash area) Cost-Effective

285 1566 Switch off cooling fan - supply and exhaust Cost-Effective

571 3327 Switch off hot water system Cost-Effective

571 3313 Switch off lighting in kitchen and the toy store when not required Potentially Cost-Effective

333 1901 Switch off lighting in Server Rooms when not in use Cost-Effective

571 3340 Switch off pit lighting when not required Potentially Cost-Effective

575 1525 Switch off pool circulation pumps and UV sterilising equipment when thCost-Effective

586 5966 Switch off pool heat pumps during summer to avoid high monthly dem Cost-Effective

571 3304 Switch off radiant heater when not required Cost-Effective

360 3472 Switch off redundant vacuum pump for plastics area Cost-Effective

571 3305 Switch off room air conditioners when not required Potentially Cost-Effective

285 1567 Switch off heater when not required Cost-Effective

580 5404 Switch off street floodlights - adquate street lighting at night is availableCost-Effective

571 3318 Switch off the awnings lighting when there is adequate natural sun lightCost-Effective

571 3320 Switch off the condensor water pump and cooling tower when not requiPotentially Cost-Effective

571 3335 Switch off the crib room's lighting when not required Cost-Effective

571 3287 Switch off the hall's electric radiant heaters when not required Cost-Effective

571 3310 Switch off the hall's entrance lighting when there is adequate natural ligPotentially Cost-Effective

571 3307 Switch off the hall's lighting when not required Potentially Cost-Effective

571 3338 Switch off the lighting in the city works office's bathroom when it is not Cost-Effective

571 3337 Switch off the lighting in the city works office's crib room when it is not Cost-Effective

571 3309 Switch off the meeting rooms' lighting when not required Potentially Cost-Effective

571 3330 Switch off the meeting room's lighting when not required Cost-Effective

571 3333 Switch off the parks and garden storage areas lighting when not requir Cost-Effective

571 3317 Switch off the the grandstand & function centre's function room refrigerCost-Effective

571 3347 Switch off toilet lights and exaust fans when not required by installing Cost-Effective

396 647 Switch off boiler when Process 1/2 not in use Cost-Effective

453 1073 Switch off travelators and escalators during curfew and low usage peri Cost-Effective

580 5237 Switch off urn in staff room during winter and use a timer on the urn d Cost-Effective

509 6508 Switch off waste system for 2 hours overnight Cost-Effective

485 5912 Switching to provide access lighting through lab Cost-Effective

349 1316 Switch-Off Program for Out-of-Hours Equipment Cost-Effective

372 5482 System optimisation Potentially Cost-Effective

598 4937 T5 lighting upgrade Cost-Effective

590 2914 T5 Lighting: Car Park Cost-Effective

590 2903 T5 lighting: replace single T8's, car park Cost-Effective

590 2913 T5 Lighting: Replace twin T8s Cost-Effective

288 5719 T8 to T5 Fluorescent Lighting Replacement Cost-Effective

573 3446 Targeted 4kW reduction in building standby (after-hours audit, install ti Potentially Cost-Effective

280 4323 Temperature Comp. SP2 Comb. Air (investigation needed) Potentially Cost-Effective

601 2679 Temperature reset controls and timing rescheduling Cost-Effective

Page 89: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

294 1650 Temperature/time analysis in air conditioning supply Potentially Cost-Effective

495 1291 Thermal insulation blankets for extruders Cost-Effective

390 4863 Thermostat control of radac cooling fans site wide Potentially Cost-Effective

280 4264 Thermostatic control furnace cooling towers. Check in winter Potentially Cost-Effective

463 1623 Ti 2 to T8 Lighting upgrade - Ongoing replacement Cost-Effective

599 3216 Time clock on drink fridge Cost-Effective

314 6479 Time clock/daylight sensor control of perimeter lights in carpark Cost-Effective

314 6482 Time clock/daylight sensor control of two levels of carpark Cost-Effective

599 3219 Time Clocks on Urns - installation of time clocks on the urn and zippiesCost-Effective

599 3214 Time Clocks on Urns - installation of time clocks on the zippy Cost-Effective

485 5729 Time of day scheduling of the computer access room air conditioner Cost-Effective

493 6172 Timed push buttons on split system AC units Potentially Cost-Effective

396 644 Timer control of office area water heaters Cost-Effective

297 542 Timer controls on Processing Plant air conditioning. Installation, progr Cost-Effective

592 1428 Timers for small electrical equipment using over 100W on standby Cost-Effective

590 2910 Timers on kitchenette equipment Cost-Effective

398 1062 Toilet lighting controls via PIR, lamp replacement, foyer lighting controlCost-Effective

305 951 Top Recovery Turbine at 6BF Potentially Cost-Effective

353 3363 Tower House Lighting Efficiency Upgrade Potentially Cost-Effective

353 3357 Tower Return Air System Cost-Effective

309 2659 TPM Maintenance Program TRACC Cost-Effective

294 1645 TPM3 team on ways to reduce energy usage on site by 4% through a Cost-Effective

347 1741 tracing & inspection of compressed air Potentially Cost-Effective

492 4105 Training and monitoring of practices by cleaning staff (turning lights off)Cost-Effective

492 4103 Training and support of security staff in energy conservation and wasteCost-Effective

453 1067 Trial Balltech device to improve chiller efficiency Cost-Effective

369 1443 Trial level control of centrifugal air pumps - 1 area Potentially Cost-Effective

368 1451 Trial level control of centrifugal air pumps - 1 area Potentially Cost-Effective

453 1089 Trial new T5 Flourescent lighting retrofit kits ffor standard 36W flouresPotentially Cost-Effective

319 2427 Tripe cooking waste heat recovery Potentially Cost-Effective

318 4447 Tripe cooking waste heat recovery Potentially Cost-Effective

579 3998 Triple 18W fluroescent fitting refurbished to twin 18W quad lamp with refCost-Effective

579 3996 Triple 36W fluorescent fitting refurbished to twin 37W quad lamp with refCost-Effective

336 5945 Tube wash steam boiler Potentially Cost-Effective

589 2377 Turn Fridge In Studio Rooms On Only When Require Cost-Effective

389 4140 Turn off air conditioning in docks 1,2,3 & 5 at night and upgrade ventilaCost-Effective

305 939 Turn off all computers, printers and copiers overnight if not needed. Cost-Effective

461 1590 Turn off centrifuge exhaust fan when not in use Potentially Cost-Effective

291 4292 Turn off cooling tower make up water pump Cost-Effective

390 4858 Turn off three hydraulic pumps if not used Potentially Cost-Effective

416 406 Turn off crusher when not in use for periods longer than 0.5hr. Cost-Effective

305 935 Turn off HVAC in Office buildings at night Cost-Effective

580 5232 Turn off kitchen lights and fans in off-season Cost-Effective

561 2719 Turn off lighting that operates continuosly within the Hall's storeroom ( Cost-Effective

286 58 Turn off lights Ceiling Space Cost-Effective

580 5233 Turn off main office air conditioner at night Cost-Effective

569 3614 Turn off major appliances at night and weekends (photocopiers etc.). BCost-Effective

593 4923 Turn off office equipment when not in use Cost-Effective

Page 90: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

371 350 Turn off one boiler Cost-Effective

280 4240 Turn off soda ash dust collector Cost-Effective

561 2730 Turn off the continuosly operating roof pole light when there is adequatePotentially Cost-Effective

561 2742 Turn off the field change room hot water system. Cost-Effective

502 4515 Turn off U/G fans and pump Cost-Effective

284 4046 Turn synchronous motor to incoming bus to improve power factor Cost-Effective

580 5412 Turn the Zip boiler unit off and allow patrons to turn on as needed Cost-Effective

284 4054 Turning burners Potentially Cost-Effective

579 4005 Twin 18W fluorescent fitting replaced by new single 18W quad lamp with Cost-Effective

579 3986 Twin 36W and 58W fluorescent fitting replaced by new single 37W quad aCost-Effective

579 3983 Twin 36W fluorescent fitting refurbished to single 37W quad lamp with reCost-Effective

579 4004 Twin 36W fluorescent fitting replace by new single 37W quad lamp with reCost-Effective

579 3972 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective

579 4010 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective

579 4007 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective

579 3971 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with rCost-Effective

579 3982 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective

579 3988 Twin 36W fluroescent fitting replace by new single 37W quad lamp with rCost-Effective

579 4006 Twin 36W fluroescent fitting replaced by new single 37W quad lamp with Cost-Effective

579 4000 Twin 36W fluroescent fitting replaced by new single 37W quad lamp with Cost-Effective

579 3999 Twin 36W flurorescent fitting replaced by new single 37W quad lamp withCost-Effective

579 3997 Twin 36W IND fluorescent fitting replaced by new single 37W quad lamp wCost-Effective

297 571 Two holding freezers on timers. Install time locks. Cost-Effective

455 1923 Ultrasound sensors installation for back of house area toilets using proPotentially Cost-Effective

369 1439 Underground conveyor controls. Cost-Effective

401 700 Underground Hauling - This project combines a number of optimisation Cost-Effective

324 1655 underground water management review Cost-Effective

364 3939 Undertake a more detailed analysis of energy usage (in particular - at Potentially Cost-Effective

575 1535 Undertake co-generation feasibility study to generate electricity and re Potentially Cost-Effective

479 174 Undertake compresed air leak reduction program Cost-Effective

571 3279 Undertake improvements to the economy cycle option Potentially Cost-Effective

561 2690 Undertake improvements to the night purge cycle to maximse the use of Cost-Effective

561 2691 Undertake improvements to the outside air economy cycle to maximise thCost-Effective

374 1162 Undertake manufacturing excellence project to reduce electricity con Cost-Effective

576 2082 Update HVAC -optimal time scheduling.floating space temperature reseCost-Effective

493 6292 Upgrade AC controls to BMS with occupancy control of AC & ventilatioPotentially Cost-Effective

456 6581 Upgrade aged 1 x 402kW reciprocating chiller with screw type chiller h Cost-Effective

466 3151 Upgrade air-conditioning of building Cost-Effective

606 3053 Upgrade based on Continuous Aeration with less tanks. Potentially Cost-Effective

584 5630 Upgrade bathroom light fittings in grandstands Cost-Effective

448 3770 Upgrade BMS field units and user interface and activate trending Cost-Effective

394 3634 Upgrade BMS interface and reprogramme the chillers staging control loCost-Effective

402 3836 Upgrade boiler conveying air motors Potentially Cost-Effective

402 3838 Upgrade boiler FD fan motor to high efficiency Potentially Cost-Effective

402 3837 Upgrade boiler feed water pump motors Potentially Cost-Effective

493 6276 Upgrade boilers to cast iron section higher efficiency including VSD's Potentially Cost-Effective

493 6060 Upgrade chiller & open shaft refrigeration compressors from reciprocatPotentially Cost-Effective

592 1431 Upgrade Hall lighting by replacing Mercury 125W Vapour Lamps with Potentially Cost-Effective

Page 91: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

453 1074 Upgrade control of roof space lighting Cost-Effective

387 1276 Upgrade control system including blower controls. Potentially Cost-Effective

596 4976 Upgrade destratification system Potentially Cost-Effective

448 3787 Upgrade DHW heaters and pump Potentially Cost-Effective

448 3761 Upgrade ELV lamps to 35W Cost-Effective

448 3784 Upgrade ELV transformers to electronic Potentially Cost-Effective

459 5194 Upgrade existing BMCS to current standard Potentially Cost-Effective

488 4119 Upgrade existing Trane chillers with Carrier water cooled screw chillersPotentially Cost-Effective

387 1277 Upgrade flourescent lighting. Potentially Cost-Effective

419 2118 Upgrade Fluorescent Exit Signs to LED Exit Signs Potentially Cost-Effective

429 6557 Upgrade Fluorescent Lighting Cost-Effective

584 5629 Upgrade grandstand light fittings Cost-Effective

486 210 Upgrade Homogenising Furnace PLC and Burner Management system. (ExiCost-Effective

316 4504 Upgrade Hot Water System to heat pump technology Potentially Cost-Effective

488 4125 Upgrade hotel rooms AC controller with key tag link Potentially Cost-Effective

402 3832 Upgrade HS5 Compressor Motor Cost-Effective

576 2081 Upgrade HVAC (Heating,Ventilation,Air Conditioning) - install electronic Cost-Effective

576 2025 upgrade HVAC -install variable speed drives to the fan coil unit fans,outCost-Effective

453 1081 Upgrade inefficient light fittings Cost-Effective

592 1432 Upgrade lighting by replacing twin flourescent 58W tubes Potentially Cost-Effective

448 3786 Upgrade lift controllers and motor Potentially Cost-Effective

493 6317 Upgrade lighting & include occupancy/daylight based control Potentially Cost-Effective

297 6042 Upgrade lighting (1) halophosphate fluorescents to triphosphorous T8 Cost-Effective

568 3491 Upgrade lighting at Hall Potentially Cost-Effective

570 801 Upgrade lighting control and provide after-hour switches Cost-Effective

419 2117 Upgrade Lighting Controls in Flavours Restaurant Potentially Cost-Effective

573 3445 Upgrade lighting Potentially Cost-Effective

427 4509 Upgrade lighting installations Cost-Effective

493 6140 Upgrade lighting to triphosphor Potentially Cost-Effective

493 6277 Upgrade lighting to triphosphor Potentially Cost-Effective

297 549 Upgrade lighting(2): incandescent floods to metal halides Potentially Cost-Effective

297 537 Upgrade lighting: halophosphate fluorescents to triphosphorous T8 Potentially Cost-Effective

402 3839 Upgrade LS1 & LS2 refrigeration compressor motors Potentially Cost-Effective

586 5975 Upgrade main pumps with energy efficient motors and improve the systPotentially Cost-Effective

574 5139 Upgrade of AC2.1 controls Potentially Cost-Effective

574 5142 Upgrade of air conditioning controls Cost-Effective

367 5504 Up-grade of Air Handling Units. Raised floor area managed with conventiPotentially Cost-Effective

578 6580 Upgrade of lighting in office Cost-Effective

396 650 Upgrade office lighting to high efficiency alternative (costs shown as per 2Potentially Cost-Effective

570 802 Upgrade single T8 lamps with T5 retrofit kits to levels that have alrea Cost-Effective

583 2957 upgrade stage lighting Potentially Cost-Effective

488 4117 Upgrade the BMS to one proprietary brand system to integrate lighting,Potentially Cost-Effective

402 3835 Upgrade the boiler ID fan to high efficiency Cost-Effective

575 1519 Upgrade the building management system (BMS) to increase the reliabPotentially Cost-Effective

571 3284 Upgrade the supply air ductworkas part of a building refurbishment Potentially Cost-Effective

484 3543 Upgrade twin 36W fittings to high reflective single 36W Potentially Cost-Effective

592 1395 Upgrade twin flourescent lamps Potentially Cost-Effective

601 2671 upgrading of lighting Cost-Effective

Page 92: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

601 2672 upgrading of lighting Cost-Effective

601 2673 upgrading of lighting Cost-Effective

601 2674 upgrading of lighting Cost-Effective

601 2675 upgrading of lighting Cost-Effective

601 2676 upgrading of lighting Cost-Effective

601 2677 upgrading of lighting Cost-Effective

307 30 Us of pipeline as buffer storage Potentially Cost-Effective

280 4257 Use air knives instead of air sweeps Cost-Effective

388 3466 Use biogas in process boilers, redirecting biogas from flare, and reduciCost-Effective

417 4394 Use Cooling Tower Water on some Reactors Potentially Cost-Effective

301 1148 Use cooling towers to cool product from pasteurisers instead of chilled Potentially Cost-Effective

573 3435 Use dissolved oxygen (or other process-specific) sensors linked to VSDPotentially Cost-Effective

300 2289 Use higher efficiency motors and drives to generally improve the effici Potentially Cost-Effective

371 348 Use of electric lube oil pumps Cost-Effective

502 4521 Use of HEM for motors in the new CH&PP Cost-Effective

371 347 Use of low fire burners - Nitrate boilers Cost-Effective

380 259 Use of Pellet Handling Vacuum Loader exhaust air to dry pellets Cost-Effective

606 3064 Use of valves to control chlorine injection rather than pumps. Potentially Cost-Effective

606 3055 Use of variable speed drives for effluent transfer pumps and aeration bPotentially Cost-Effective

502 4523 Use of VSDs on Maingate 2 conveyor Potentially Cost-Effective

502 4525 Use of VSDs on Maingate 3 conveyor Potentially Cost-Effective

305 1013 Use waste heat from roof vents to preheat feed water to the boilers Potentially Cost-Effective

436 397 Utility air system survey Potentially Cost-Effective

289 1927 V.S.D's Chilled and Condenser water pumps Potentially Cost-Effective

443 5823 Vacuum Pump VSD Cost-Effective

318 4429 valves lagging, costings and paybacks based on per valve Cost-Effective

322 306 Varaible Speed Drives for fans. Potentially Cost-Effective

515 4661 Variable Displacement pumps on the longwall Cost-Effective

335 1763 Variable Flow Chilled Water plant Cost-Effective

342 1157 Variable output air compressor Potentially Cost-Effective

306 779 Variable speed air compressors. Potentially Cost-Effective

343 3959 Variable speed air compressors. Testing of air systems Potentially Cost-Effective

318 4421 Variable speed control for hot water circulation pump Cost-Effective

319 2425 Variable speed control hot water pump transfer Potentially Cost-Effective

318 4437 Variable speed control hot water transfer pump Cost-Effective

319 2418 Variable speed control of Combustion Air Fan for 10MW Boiler Cost-Effective

319 2424 Variable speed control of hot water circulating pumps Potentially Cost-Effective

568 3484 Variable speed drive for reticulation pump – will reduce the speed fr Potentially Cost-Effective

318 4443 Variable speed drive for water feed pumps to boiler Potentially Cost-Effective

353 3358 Variable speed drive installation to 3 main condensor water pumps on tPotentially Cost-Effective

353 3359 Variable speed drive installation to all 5 primary chilled water pumps Potentially Cost-Effective

353 3360 Variable speed drive installation to the Dedicated Condensor water pu Potentially Cost-Effective

293 2772 Variable speed drive pumps Potentially Cost-Effective

599 3217 Variable Speed Drives Potentially Cost-Effective

599 3208 Variable Speed Drives - installation of VSD on some of the Air Conditi Cost-Effective

503 887 variable Speed Drives for Process Pumps Cost-Effective

439 3290 Variable speed drives on the condensor fans and head pressure controlCost-Effective

416 412 Variable speed motor drives. Cost-Effective

Page 93: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

353 3353 Various retail and house lighting projects Cost-Effective

335 1762 VAV AHU Systems Cost-Effective

292 4335 Vendor ante room doors Employee awareness Cost-Effective

322 5954 ventilation re-sizing and control Potentially Cost-Effective

321 295 Ventilation re-sizing and control. Potentially Cost-Effective

335 1760 Ventilation Systems Potentially Cost-Effective

397 4013 Verify efficiency of all water pumping systems Potentially Cost-Effective

453 1113 Verify integration of TRANE chiller controls with BMCS is optimised. Cost-Effective

453 1066 Verify integration of TRANE chiller controls with BMCS is optimised Cost-Effective

569 3641 Villa insulation. Based on insulation leading to a 10% reduction in spacCost-Effective

407 3716 Voltage control - static var compensation system Cost-Effective

343 3955 Voltage control on existing fluorescent lights Potentially Cost-Effective

411 2538 Voltage controller for plant lighting Potentially Cost-Effective

404 2748 Voltage reduction in open plan areas Cost-Effective

579 3987 Voltage reduction unit (for 26 lamps) Cost-Effective

579 4001 Voltage Reduction Unit (for 30 lamps in amenities block) Cost-Effective

579 3985 Voltage Reduction Unit (for 44 lamps) Cost-Effective

579 3992 Voltage Reduction Unit (for 85 lamps for administration block) Cost-Effective

579 3969 Voltage Reduction Unit (for 52 lamps) Cost-Effective

569 3624 VRUs for car park lighting Cost-Effective

565 5266 VSD Potentially Cost-Effective

565 5268 VSD Potentially Cost-Effective

565 5269 VSD Potentially Cost-Effective

282 3158 VSD – Chilled water pump Potentially Cost-Effective

282 3159 VSD – Cooling tower fan Potentially Cost-Effective

282 3185 VSD - Supply air fan Potentially Cost-Effective

282 3190 VSD - Supply air fan Potentially Cost-Effective

282 3160 VSD – Supply air fan Potentially Cost-Effective

328 246 VSD (VVVF) for PS26 Pumps Potentially Cost-Effective

288 5721 VSD and Power Factor Correction Cost-Effective

583 2961 VSD and Smaller Pump Cost-Effective

488 4115 VSD Car park ventilation fans Cost-Effective

341 283 VSD Control for Cyclone Fans Potentially Cost-Effective

469 475 VSD control for new main ventilation system Potentially Cost-Effective

396 646 VSD control of coater atomising fan Cost-Effective

441 2227 VSD control on five (5) Chill water pumps. The pumps with VSD are to Potentially Cost-Effective

318 4439 VSD for all chillers fans Cost-Effective

282 3173 VSD for chilled water pumps Potentially Cost-Effective

312 792 VSD for Corporate chilled water pump Potentially Cost-Effective

414 4825 VSD for Recirculation Pump Potentially Cost-Effective

414 4822 VSD for Effluent Treatment Plant Secondary Feed Pump Potentially Cost-Effective

414 4823 VSD for Feed Water Pump Potentially Cost-Effective

312 795 VSD for High Temperature Dryer (HTD) combustion air fan Potentially Cost-Effective

300 2292 VSD for Hose Water Pump. Use a VSD to control the pressure on the hPotentially Cost-Effective

282 3176 VSD for jacking pump & Saltwater pump instrumentation & control sys Cost-Effective

463 1622 VSD for Vent Fans Cost-Effective

377 4852 VSD for preheater recirculation fans Potentially Cost-Effective

414 4819 VSD for Primary & Secondary FD Fans Potentially Cost-Effective

Page 94: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

330 438 VSD for Process Pumps Potentially Cost-Effective

300 2291 VSD for Process Water Pumps. Use a VSD to control the pressure on tPotentially Cost-Effective

291 4308 VSD hot water pump Potentially Cost-Effective

291 4307 VSD main chilled water pump Potentially Cost-Effective

286 93 VSD Backwater Pump Potentially Cost-Effective

286 82 VSD Condensate Pump Potentially Cost-Effective

286 95 VSD Rejects Pump Potentially Cost-Effective

286 75 VSD Stock Pump to Mach. Chest Potentially Cost-Effective

286 87 VSD Backwater Pump to DAF Potentially Cost-Effective

286 73 VSD Bottom Ply XS Water Pump Potentially Cost-Effective

286 90 VSD Cloudy Filtrate Pump Potentially Cost-Effective

286 83 VSD Heat Ex Cooling Pump Potentially Cost-Effective

286 84 VSD Feed Stock Pump Potentially Cost-Effective

286 92 VSD Top Ply Headbox Pump Potentially Cost-Effective

318 4446 VSD of combustion fan of the boilers Cost-Effective

318 4450 VSD on 150kw screw compressor Potentially Cost-Effective

372 5488 VSD on aeration pumps Potentially Cost-Effective

318 4467 VSD on air compressors Potentially Cost-Effective

289 1928 VSD on Air Handling Units Potentially Cost-Effective

329 1675 VSD on air supply fans on stage 1 Cost-Effective

481 118 VSD on Baler hydrolics Potentially Cost-Effective

334 3804 VSD on boiler feed water pump Cost-Effective

484 3540 VSD on chilled water pumps Potentially Cost-Effective

329 1674 VSD on chilled water pumps Cost-Effective

502 4536 VSD on circulating medium pumps Potentially Cost-Effective

372 5473 VSD on combustion fan Cost-Effective

372 5485 VSD on combustion fan Potentially Cost-Effective

482 419 VSD on Compactor Hydraulics (Replaced only as required) Potentially Cost-Effective

484 3537 VSD on Condensor Water pumps Potentially Cost-Effective

590 2905 VSD on CT, Chilled water pump, condenser pump & Hot water pump. Cost-Effective

373 5515 VSD on circulation pump Potentially Cost-Effective

373 5514 VSD on feed no 1 pump Potentially Cost-Effective

318 4461 VSD on evaporative condenser fans Potentially Cost-Effective

329 1669 VSD on evaporative cooler fan Cost-Effective

318 4428 VSD on extraction and fresh air supply fans Cost-Effective

318 4464 VSD on Extraction fan at the blood plant Potentially Cost-Effective

372 5483 VSD on glycol pump Potentially Cost-Effective

372 5474 VSD on hot air circulating pump Cost-Effective

372 5486 VSD on hot water circulating pumps Potentially Cost-Effective

505 4383 VSD on HVAC Pumps - VSD control on Chill water pumps, Condensor WatPotentially Cost-Effective

506 4332 VSD on HVAC Pumps - VSD control on Chill water pumps, Condensor WatPotentially Cost-Effective

377 4851 VSD on hydraulics Potentially Cost-Effective

309 2662 VSD on Kiln recirculation fans Potentially Cost-Effective

502 4519 VSD on Module 1 dense medium cyclone feed pump Cost-Effective

502 4518 VSD on Module 1 desliming cyclone feed pump Cost-Effective

502 4535 VSD on Module 2 dense medium cyclone feed pump Potentially Cost-Effective

372 5471 VSD on new screw compressor Cost-Effective

318 4468 VSD on oil cooler water pump Potentially Cost-Effective

Page 95: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

290 3408 VSD on primary chilled water pump (PCHWP-1) Cost-Effective

290 3406 VSD on Primary Chilled water pump (PCHWP-3) Cost-Effective

318 4430 VSD on screw compressor 320kw Cost-Effective

372 5481 VSD on screw compressors Potentially Cost-Effective

285 1571 VSD on the lubricant supply pump for the Schnieder Potentially Cost-Effective

318 4452 VSD on water pumps Potentially Cost-Effective

396 635 VSD optimisation of extruder drives Cost-Effective

454 109 VSD to building T condensor fans Cost-Effective

454 105 VSD to Plaza condensor water pumps Cost-Effective

454 104 VSD to Plaza Cooling tower fan Cost-Effective

454 106 VSD to Shed cooling tower fans Cost-Effective

286 68 VSD/small motor water pump Potentially Cost-Effective

286 88 VSDs @415V/ WPP Coarse Screen Pump Potentially Cost-Effective

484 3542 VSDs and CO monitoring on Car Park Potentially Cost-Effective

569 3629 VSDs for chilled water pumps Potentially Cost-Effective

280 4326 VSDs M/C furnace combustion fans Potentially Cost-Effective

280 4265 VSDs M/C machine cooling fans Potentially Cost-Effective

398 1063 VSD's on 7 off cooling tower fans. Control fans using temperature tra Potentially Cost-Effective

290 3410 VSDs on all 3 cooling tower fans Cost-Effective

331 2140 VSDs on concentrator drives Potentially Cost-Effective

398 1060 VSD's on condenser two water pumps serving the low load chillers. Cost-Effective

347 1737 VSDs on high stage refrig compressors and head pressure controls Cost-Effective

502 4513 VSDs on Maingate Conveyor 1 Tripper 1 Cost-Effective

502 4534 VSDs on Module 2 desliming cyclone feed pump Potentially Cost-Effective

365 5456 VSD's on secondary chilled water pumps. Install variable speed drives Cost-Effective

440 6526 VSDs on spiral fans Potentially Cost-Effective

502 4517 VSDs on two Thickener underflow pumps Cost-Effective

386 4070 W5C – Building Upgrade Potentially Cost-Effective

414 4831 Warehouse and Loading Dock Lighting Automation Potentially Cost-Effective

332 4508 Warm filling with ultrasonic defoaming Potentially Cost-Effective

439 3298 Waste cooking oil cogeneration Plant Potentially Cost-Effective

317 4479 Waste heat recovery - finished oil Potentially Cost-Effective

317 4473 Waste Heat Recovery from air compressor Cost-Effective

319 2429 Waste heat recovery from Condenser Potentially Cost-Effective

396 659 Waste heat recovery from main compressor Potentially Cost-Effective

317 4480 Waste heat recovery seed cooker Potentially Cost-Effective

414 4814 Waste Paper Plant Lighting Disconnection Cost-Effective

411 2530 Wastewater treatment plant steam trap Cost-Effective

480 5361 Water Conservation Cost-Effective

314 6483 Water feature pumps speed control Cost-Effective

411 2540 Water supply booster pump VSD Potentially Cost-Effective

379 1176 Water supply pump VSD Cost-Effective

599 3215 Water wise showers - water saver valves on shower roses Cost-Effective

386 4064 Web Energy Management Cost-Effective

366 5681 Office Lighting Upgrade 2. Automatic lighting control through the IntegrCost-Effective

370 1462 Whole site Power Factor Correction Potentially Cost-Effective

370 1456 Whole site: Embedded Generation - WestVAMP Cost-Effective

401 699 Winder upgrade - by increasing the winder Lifting rate from 815 to 95 Cost-Effective

Page 96: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

593 4914 Window film Potentially Cost-Effective

282 3167 Window Tinting Potentially Cost-Effective

282 3170 Window Tinting Potentially Cost-Effective

481 112 WIP area control lighting Cost-Effective

509 6512 Wire secondary lighting circuit and install lighting controls Potentially Cost-Effective

366 5687 Workstation Power Management. Employee enable ENERGY STAR and TCost-Effective

286 65 WPP Bypass Long Fibre Chest Cost-Effective

286 67 WPP GSW ex Pump Potentially Cost-Effective

286 94 WPP Relocate Borewater Contrashear Potentially Cost-Effective

286 76 WPP Smaller Long Fibre Dilution Pump Potentially Cost-Effective

286 56 WPP Steam Isolation Cost-Effective

286 70 WPP VSD Long Fibre Silo Pump to No7/No.8 Potentially Cost-Effective

286 89 WPP VSD Short Fibre Dilution Pump Potentially Cost-Effective

286 81 WPP VSD Short Fibre Silo Pump to No7 Potentially Cost-Effective

286 86 WPP VSD Short Fibre Silo Pump to No8 Potentially Cost-Effective

Page 97: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Equipment Type Estimated cost (Estimated electrEstimated naturaStatus

HVAC $20,065 34 Not to be implemented

HVAC $17,390 34 Not to be implemented

Pool Covers/Heating $130,000 616 Under-investigation

Lighting NULL 8

Behaviour/Education $25,000 315

Behaviour/Education $26,250 331

Behaviour/Education $27,563 348

Behaviour/Education $28,941 365

Behaviour/Education $50,000 1,209

Behaviour/Education $52,500 1,269

Behaviour/Education $55,125 1,333

Behaviour/Education $57,881 1,400

Industrial Equipment $1,000,000 0 Ongoing

Other NULL 81 Ongoing

Power Factor Correction $17,000 NULL NULL Implemented

HVAC $4,000 9,600

Lighting $4,658 10 Implemented

Industrial Equipment $2,000 70

Air compressor $220,000 560 To be implemented

Other $150,000 1,550 Implemented

Other $161,000 720 To be implemented

Air compressor $100,000 560 To be implemented

Industrial Equipment $30,000 98 To be implemented

Industrial Equipment $90,000 270 To be implemented

Other $400,000 1,020 To be implemented

Industrial Equipment $25,500,000 9,010 Implemented

Lighting $140,000 206 Under-investigation

Air compressor $35,000 89 Implemented

Refrigeration $100 104

Computers & Printers $20,000 149

Computers & Printers NULL 1 Implemented

Hot Water System $300 1 24

Hot Water System $500 6

Lighting $2,000 9

Other $50,900 165 Implemented

Boiler $20,000 289

Mixed $13,643 29 Implemented

HVAC NULL 45 Under-investigation

Alternative power generation $1,000 3

Refrigeration $1,000 163 Implemented

Industrial Equipment $45 3 Not to be implemented

Lighting $200 6

Lighting $60 2

Air compressor $55,100 335

Other $18,000 280 Under-investigation

Industrial Equipment $6,500 17,000 Implemented

Other NULL 151 487

Page 98: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment $71,000 1,581

HVAC $5,000 8 Implemented

Air compressor $63,000 49

Mixed $138,700 488 Implemented

Air compressor $9,500 83 Implemented

Air compressor $18,100 26 Implemented

Air compressor $6,365 158 Ongoing

Air compressor NULL 76 To be implemented

Air compressor $54,500 370 To be implemented

Air compressor $437,000 300

Lighting $500 11

Air compressor $258,421 349 Implemented

Air compressor $500,000 4,800 Implemented

HVAC $1,500 33 Ongoing

HVAC $1,500 5

HVAC $1,800 14 To be implemented

HVAC $850 52 Implemented

HVAC $500 110

HVAC $128,000 417 Under-investigation

HVAC $50,000 41

Other $13,000 105

Industrial Equipment $23,000 228

Other NULL 823 Implemented

HVAC NULL 1,172 4,038

HVAC $25,000 309 Under-investigation

HVAC $40,000 717 To be implemented

Cogeneration $25,000 219

Lighting NULL 128 Implemented

Industrial Equipment $1,500,000 1,600

Computers & Printers NULL 17

Lighting $500 2

HVAC $300 18

Industrial Equipment $4,500,000 5,935 To be implemented

Industrial Equipment $4,500,000 5,935 Implemented

Industrial Equipment $4,500,000 5,935 To be implemented

HVAC $1,200 64 To be implemented

HVAC $15,000 98 Implemented

Building Management Systems $1,500 8 Implemented

HVAC $2,175 6 Implemented

HVAC $7,500 21 Implemented

Lighting $17,830 182

HVAC $5,000 4

Industrial Equipment NULL 3,960 Under-investigation

Industrial equipment $17,439 25

Lighting $2,500 70

Hot Water System $26,560 181 Not to be implemented

Lighting $12,000 101

Other $25,000 50 Implemented

Page 99: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment $50,000 245 Implemented

Industrial Equipment $12,500 57

Industrial Equipment $100,000 35 Implemented

Other $20,000 13 Implemented

HVAC $22,000 15

Lighting $300,000 400

Lighting $30,000 20 Ongoing

Ventilation $360,000 1,500

Industrial Equipment $10,000 34 Under-investigation

Industrial Equipment $50,000 557

Industrial Equipment $150,000 711

insulation $120,000 790 Not to be implemented

Behaviour/Education $100,000 NULL NULL Implemented

Industrial Equipment $31,500 96 Not to be implemented

HVAC $3,725 52

Air compressor $28,000 240

Air Compressor $255,000 77

Lighting $66,991 252

HVAC NULL 1,000 Not to be implemented

Industrial Equipment NULL 500 Implemented

HVAC NULL 1,000 Not to be implemented

Alternative power generation $6,600,000 10,000 Implemented

Industrial Equipment $4,000,000 1,500 Not to be implemented

Industrial Equipment $4,000,000 2,238 Not to be implemented

Industrial Equipment $636,000 3,696 To be implemented

Lighting $16,550 59 Under-investigation

Air compressor $64,000 846 Implemented

Air compressor NULL NULL NULL Ongoing

Industrial Equipment $1,440 98 Implemented

Industrial Equipment $12,000 49 Implemented

Other $120 3 Implemented

Industrial Equipment $2,400 15 Not to be implemented

Other $50 10

Industrial Equipment $3,000 12

Industrial Equipment $3,500 62

Refrigeration $150,000 3,494

Industrial Equipment $200 5 To be implemented

Industrial Equipment $1,920 6 Not to be implemented

Air compressor $380,000 2,779 Not to be implemented

Boiler $29,670 1,551 Implemented

Industrial Equipment $19,825 69

Industrial Equipment $400 38

Industrial Equipment $10,000 20

Industrial Equipment $10,000 8

Hot Water System $450 1

Lighting $500 1

ventilation $10,000 10

Industrial Equipment $3,000 8 Not to be implemented

Page 100: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other $480 11 Implemented

Industrial Equipment $600 26

Industrial Equipment $14,000 3,187

Boiler $2,000 314

Air compressor $1,000 110

Other $28,800 13,608

Industrial Equipment $12,000 662

Industrial Equipment $500,000 400 Implemented

Industrial Equipment NULL 42,527 Under-investigation

HVAC $3,000 160

Boiler NULL 19 Not to be implemented

Ventilation $3,680 10 Implemented

Lighting $12,500 181 Implemented

Industrial Equipment NULL 84 Implemented

Hot Water System $137,200 184 To be implemented

Lighting $1,500 14

Lighting $1,500 14 To be implemented

Sub-Metering $25,000 14 To be implemented

Sub-metering $25,000 1,000 To be implemented

Industrial Equipment $20,000,000 180,000 To be implemented

Other NULL NULL NULL Implemented

Other $3,000,000 2,300 30,000 Ongoing

Other $391,000 2,208 Ongoing

Pool Covers/Heating $3,500 105

Waste heat recovery $11,000 79

Other $40,000 2 Implemented

Other $4,000 7

Waste heat recovery $7,360 405

HVAC $1,100 2 Not to be implemented

HVAC $10,000 3 Implemented

Other NULL 32,000 Ongoing

Waste heat recovery $20,000 1,840 Not to be implemented

Boiler $400 145

Waste heat recovery $10,000 300 Not to be implemented

Boiler $90,000 5,050

Boiler $20,000 1,350 To be implemented

Boiler $20,000 1,400 To be implemented

Boiler $28,000 4,730

Industrial Equipment $7,000 31

Boiler $3,000 444 To be implemented

Lighting $1,500 9 To be implemented

Lighting $3,000 28 Under-investigation

Boiler NULL 15,187

Boiler $54,000 100 2,430

Boiler $8,000 388 To be implemented

Boiler $2,200,000 12,889

Boiler $98,000 7,201 Implemented

Boiler $45,500 52 1,828

Page 101: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Boiler $6,000 9 Under-investigation

Power Factor Correction $1,240,000 5,854 Implemented

Industrial Equipment $350,000,000 358,000

HVAC $100,000 8 To be implemented

Building Management Systems $10,000 13 317

Building Management Systems $2,000 25

Building Management Systems $4,000 35 Not to be implemented

Building Management Systems $4,000 35 Not to be implemented

Building Management Systems $3,000 32 191

Industrial Equipment $27,500 180 Not to be implemented

Industrial Equipment $8,000 25 Not to be implemented

Building Management Systems $2,000 12 Not to be implemented

HVAC $2,000 6 340

HVAC $4,000 19 466 Not to be implemented

HVAC NULL 55 Implemented

HVAC NULL 30 Implemented

HVAC $1,000 10 Implemented

Industrial Equipment $30,000 293 Not to be implemented

Building Management Systems $3,000 6

Building Management Systems $3,000 31 250

Industrial Equipment $27,000 32 Not to be implemented

Industrial Equipment $27,000 67 Not to be implemented

Industrial Equipment $16,000 162 Not to be implemented

Lighting $1,100 5 Not to be implemented

Building Management Systems $3,000 32 282

Building Management Systems $12,000 37 370

Building Management Systems $3,000 25 163

Building Management Systems $6,000 18 1,196

HVAC $3,000 45 478

HVAC $1,000 15

HVAC $9,000 38

Building Management Systems $2,000 19 60

HVAC NULL 18 To be implemented

Lighting NULL 15 Implemented

HVAC $6,000 25

Building Management Systems $2,000 16 84

Other $5,000 185

Other $5,000 185

Building Management Systems $100 101

Building Management Systems $2,000 24

Building Management Systems $4,000 32

HVAC $500 171

Building Management Systems $76,000 215

Building Management Systems $1,000,000 476

Building Management Systems $207,822 258 Ongoing

Refrigeration $30,000 215 Not to be implemented

Building Management Systems $3,000 17 86

Lighting $71,754 715

Page 102: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $50 10

Other $10,000 108

Building Management Systems $280,000 523 Not to be implemented

HVAC $56,000 900

Industrial Equipment $15,000 185

Insulation $117,680 601

Industrial Equipment $16,540 211

Industrial Equipment $47,000 487

Industrial Equipment $100,000 730

Lighting NULL 8 Not to be implemented

Lighting $18,000 313 Implemented

Lighting $1,100 26

Waste heat recovery $45,100 213 Not to be implemented

Waste heat recovery $27,000 1,060

Lighting $135,000 603 Implemented

Building Management Systems $178,000 350 Not to be implemented

Lighting $268,218 940 Not to be implemented

Lighting $2,875 11 Implemented

Lighting $1,725 10 Implemented

HVAC $500,000 1,660 Not to be implemented

HVAC $58,000 461 Under-investigation

Industrial Equipment $10,000 36 19,400

Industrial Equipment $40,000 6 3,040 To be implemented

Lighting $400 3 Implemented

Lighting $104,000 520 Implemented

Lighting $50 4

Lighting $64,755 188 Implemented

Lighting $35,806 61 Ongoing

Other $15,000 5,478 Not to be implemented

Lighting $556,500 410 To be implemented

Lighting $20,000 108

Other $120 56 Implemented

Ventilation $4,000 29 To be implemented

Cogeneration $11,000,000 60,704 -218,533

Lighting $36,860 34 Implemented

Lighting $5,200 5

Lighting $10,108 13

Maintenance $50,000 5,127 Implemented

Other $115,000 320 Implemented

Lighting $300 2

Lighting $22,000 251 Ongoing

Industrial Equipment $10,000 37 Not to be implemented

Maintenance $9,000 3,868

Other NULL 3,652 Under-investigation

Lighting $8,000 22 Implemented

Lighting $2,415 3

Lighting $558,600 819

Lighting $6,090 7

Page 103: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Pool Covers/Heating $500 22

HVAC NULL 22 Ongoing

HVAC $500 3 Implemented

HVAC $2,000 24

Other NULL 14,400 Not to be implemented

Building Management Systems $1,000 1 64

Boiler $57,400 1,039

Industrial Equipment $10,000 125

Industrial Equipment $36,000 116 Ongoing

HVAC $59,599 336 Implemented

HVAC $18,000 66

Chiller NULL 1,818 Implemented

Industrial Equipment $10,000 208 Implemented

Maintenance $2,000 71 Implemented

Other $2,000 174 Implemented

Other $2,000 98

Industrial Equipment $34,812 130

Industrial Equipment $42,750 326 To be implemented

Industrial Equipment $54,582 215

Industrial Equipment $4,000 66 Implemented

Chiller $8,000 116

Chiller $9,000 96

HVAC NULL 363 Implemented

Industrial Equipment $480 10

HVAC $600 96 Implemented

Ventilation $1,200 16 Implemented

Other $360 0 Implemented

Other $1,000 4

Lighting $300 14

Other $3,500 63 Implemented

Industrial Equipment $20,000 680 Implemented

Lighting $3,795 11 Implemented

Maintenance $2,000 87

Pool Covers/Heating $1,500 246 Implemented

Behaviour/Education $500,000 9,604 Implemented

ventilation $6,320 8

Ventilation $4,600 6 Implemented

Building Management Systems $283,000 450 Under-investigation

HVAC $96,000 329 Under-investigation

Industrial Equipment $67,500 170 To be implemented

Cogeneration $1,400,000 5,000 Not to be implemented

Cogeneration $16,000,000 75,600 To be implemented

Cogeneration $1,135,000 2,843 -31,698 Ongoing

Cogeneration $8,000,000 33,333 -200,000

Cogeneration $2,900,000 2,900

Cogeneration $1,276,000 1,248 Not to be implemented

Cogeneration $4,404,000 3,599 To be implemented

Cogeneration $810,000 733 409

Page 104: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other $150,000 470 Under-investigation

Industrial Equipment $34,000 292 Not to be implemented

Other $4,750,000 244,367 Not to be implemented

Other $2,000,000 209,945 Under-investigation

Other $500,000 19,620

Boiler $58,000 972 Under-investigation

Boiler $15,000 743 Ongoing

Boiler $34,500 1,995 Implemented

Industrial Equipment $20 0.38 Implemented

Other $91,666 26

Other $91,666 10

Other $91,666 7

HVAC $472 3 Implemented

Other $500 0 Implemented

Industrial Equipment NULL 426 Implemented

Building Management Systems NULL 80 113 Under-investigation

Other NULL NULL NULL Implemented

Industrial Equipment $15,000 NULL NULL Ongoing

Other $51,000 NULL NULL Implemented

Air compressor $52,425 518

Air compressor $3,600 105 Implemented

Air compressor $39,630 283 Not to be implemented

Air compressor $20,000 41 Implemented

Air compressor $144,621 668 Implemented

Air compressor $55,000 630 To be implemented

Air compressor $2,000 57

Air compressor $3,000 29

Air compressor $50,000 1,300

Air compressor $20,000 96 To be implemented

Air compressor $13,000 821 Implemented

Air compressor $13,000 474 Implemented

Air compressor $2,500 132 Under-investigation

Air compressor $15,000 79 Ongoing

Air compressor $15,000 356 Ongoing

Air compressor $15,000 4 Ongoing

Air compressor NULL NULL NULL Ongoing

Air compressor $5,520 63 Implemented

Air compressor $10,000 120 Ongoing

Air compressor $5,600 473

Air compressor $42,640 313 To be implemented

Air compressor $11,000 64

Air compressor $18,000 445

Air compressor $56,000 143

Air compressor $33,500 374

Air compressor $6,000 27 Implemented

Air compressor $56,000 30

Air compressor $3,520 41 Ongoing

Air compressor $10,000 75

Page 105: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Air compressor $200 20 Ongoing

Air compressor $4,950 111 Ongoing

Air compressor $300 20 Under-investigation

Air compressor $120,000 386

Air compressor $176,000 1,201

Air compressor $33,000 400 Not to be implemented

Air compressor NULL 24 Ongoing

Air compressor $150,000 392 Implemented

Air compressor $60,000 83

Air compressor $100,000 278 Under-investigation

Air compressor $3,450 13 Implemented

Air compressor $38,500 556

Air compressor $13,500 285 Implemented

Air compressor $26,000 578 Ongoing

Air compressor $25,000 250 Implemented

Air compressor $15,000 163 Implemented

Air compressor $210,000 1,400 Ongoing

Air compressor $5,500 38

Air compressor $1,600 7 Not to be implemented

Air compressor $200 6 Implemented

Air compressor NULL NULL NULL Implemented

Air compressor $33,000 400 Implemented

Air compressor $30,500 296 Implemented

Air compressor $10,000 100 Implemented

Air compressor $8,000 38

Air compressor $30,000 250 Implemented

Air compressor $202,000 344

Air compressor NULL NULL NULL Ongoing

Air compressor NULL NULL NULL Implemented

Air compressor $15,000 83 Implemented

Air compressor $42,000 284

Air compressor $53,000 300 To be implemented

Air compressor NULL NULL NULL Ongoing

Air compressor $160,000 1,768 Implemented

Air compressor NULL NULL NULL Implemented

Mixed $90,000 320

Computers & Printers $10,200 2

Lighting $48,500 51

Computers & Printers NULL 51 To be implemented

Mixed $65,000 1,100 Under-investigation

Computers & Printers $12,000 24 Implemented

Waste heat recovery $70,000 360 Not to be implemented

Waste heat recovery $9,065 1,906

Other $179,000 4,166 Not to be implemented

Insulation $6,400 373

Industrial Equipment NULL NULL NULL Implemented

Industrial Equipment $59,960 285

Air compressor $2,440 127

Page 106: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Air compressor $2,500 207 Implemented

Air compressor $100 57

Industrial Equipment NULL 4,680 To be implemented

Tariffs $2,500 4

Air compressor $1,920 63

Boiler $8,000 3,400 Under-investigation

Lighting $1,600 5 Implemented

Lighting $1,760 112 To be implemented

Other $1,450 36 1,382 Implemented

Power Factor Correction $45,000 NULL NULL Ongoing

Industrial Equipment $80,000 555 Implemented

Computers & Printers $5,000 15 Not to be implemented

HVAC $14,852 13

Other $5,000 5,000 Under-investigation

Industrial Equipment $18,500 8

HVAC $20,000 500 Ongoing

Lighting $975 7 To be implemented

Lighting $1,000 32

Lighting NULL 35 Implemented

Lighting NULL 1 To be implemented

Industrial Equipment $3,000 82 Not to be implemented

HVAC $10,000 20

Lighting NULL 660

Lighting NULL 189

Boiler $1,000 8 Implemented

HVAC $37,540 22 Under-investigation

Lighting $1,000 16

Air compressor $5,000 150 Not to be implemented

Other NULL 134

Industrial Equipment $4,000 26

Lighting $2,000 2 Not to be implemented

HVAC $2,400 6 Not to be implemented

HVAC $2,400 17 Implemented

HVAC $4,800 8 Implemented

HVAC $4,800 38 Implemented

Lighting $3,400 6

Industrial Equipment NULL 200

Hot Water System $2,900 14

Lighting $7,659 8 Implemented

Lighting $384 4

Lighting $1,242 2 Implemented

Lighting $270 8 Implemented

HVAC $2,500 3 Not to be implemented

Industrial Equipment $9,500 18

Hot Water System $50,000 108

Hot Water System $25,000 29 To be implemented

Lighting $9,070 13 Implemented

Lighting $680 0.28 Implemented

Page 107: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Pool Covers/Heating $392,000 -568 7,859 To be implemented

HVAC $66,513 179 Implemented

Hot Water System $40,420 470 Not to be implemented

HVAC $4,800 6 Not to be implemented

HVAC $4,800 13 Implemented

HVAC $9,600 27 Not to be implemented

Hot Water System $6,000 18

HVAC NULL 2,729 Implemented

Industrial Equipment NULL NULL NULL Implemented

Industrial Equipment NULL 111

Industrial Equipment NULL NULL NULL Implemented

Industrial Equipment $160,000 250 Implemented

HVAC $44,000 417

HVAC NULL NULL NULL Implemented

HVAC NULL 433

HVAC $224,664 1,483

HVAC $14,640 118 Implemented

HVAC NULL 14 Implemented

Industrial Equipment $80,000 450 12,500 Ongoing

HVAC $2,000 21 To be implemented

HVAC $42,000 166 Implemented

Lighting $7,475 35 Implemented

Industrial Equipment $100,000 10,950 To be implemented

Other NULL 168 Ongoing

Mixed $500 47

Industrial Equipment $2,000 22 Not to be implemented

Industrial Equipment $15,000 136 Implemented

Industrial Equipment $25,000 861 Implemented

Lighting $1,500 10 To be implemented

Industrial Equipment $4,400 11 Implemented

Other $20,000 1 800

Lighting $3,000 8

Lighting $19,500 262

Lighting $4,000 13

Lighting $1,250 27

Lighting $4,300 12

Lighting $3,300 10

Lighting $1,500 3

Lighting $9,520 3

Lighting $2,835 5

Other $100,000 477

HVAC $20,000 400 Implemented

Boiler $19,710 343

Hot Water System NULL 189 295 To be implemented

HVAC $80,000 361 1,035 Under-investigation

Boiler $31,040 4,041

Other $60,000 2 1,200

Industrial Equipment $2,615,000 2,000 Implemented

Page 108: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other $50,000 5 Not to be implemented

Lighting $8,000 18 To be implemented

Lighting $1,080 3

Lighting $200 0.68 Implemented

Lighting $945 1 Implemented

Lighting $250 1 Under-investigation

Lighting $360 0

Lighting $2,640 11

Lighting $3,000 12 Implemented

Lighting NULL 48 Implemented

Lighting $3,300 21

Lighting NULL 194 To be implemented

HVAC $200 7

Ventilation $7,560 14 Implemented

Other $20,000 9 Implemented

Air compressor $236,000 970

Hot Water System NULL 3

Hot Water System NULL 3

Hot Water System NULL 1

Hot Water System NULL 2

Hot Water System NULL 4 Implemented

Other $15,000 120

Other $290,000 2,969 Not to be implemented

Air compressor $1 347

Lighting $2,316,500 994 Under-investigation

Lighting $1,433,000 381 Ongoing

Air compressor $5,000 44 Implemented

Industrial Equipment $4,000 1,078 Implemented

Industrial Equipment NULL NULL NULL Implemented

Industrial Equipment $10,000 262 Implemented

Other $700 1

Other $700 1

Other $21,987 42

Other $700 1

Lighting $330 2 To be implemented

Industrial Equipment $1,045 57 Implemented

Chiller $185,000 284 To be implemented

Other NULL 371

HVAC $2,200 9 Implemented

HVAC NULL 26 Implemented

HVAC NULL 3 Implemented

Building Management Systems $1,100 13 Implemented

Other $500 6 Not to be implemented

HVAC NULL 10 Implemented

HVAC $0 8

HVAC $0 8 Implemented

Other NULL 2

Other NULL 6

Page 109: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other NULL 2

Other $480 273 Not to be implemented

Lighting NULL 162

Boiler NULL 1,898 Implemented

Air compressor $10,000 60 Implemented

Lighting $6,300 31

HVAC $23,040 151 141 Implemented

HVAC $11,700 76 59 Implemented

Industrial Equipment $13,440 91 143 Implemented

Industrial Equipment $28,060 181 338 Implemented

HVAC $2,100 6 7 Implemented

Hot Water System $800 23 Implemented

Hot Water System $10,350 14 Implemented

Hot Water System $17,250 25 Implemented

Industrial Equipment $300,000 1,983 Ongoing

Industrial Equipment $5,000 285 Implemented

Other $50,000 7,971 Ongoing

Other $100,000 8,569

Industrial Equipment $5,000 370 Not to be implemented

Boiler $46,000 2,971

Waste heat recovery $90,000 9,785 Ongoing

Air compressor $180,000 1,135 Implemented

HVAC $167,200 686 Ongoing

HVAC $31,500 128

HVAC $3,800 0

HVAC $5,000 8

HVAC $5,000 20

HVAC $3,000 4

HVAC $12,000 32 Implemented

HVAC $3,800 57

Computers & Printers $250 1 Under-investigation

Waste heat recovery $30,000 3,733 To be implemented

Industrial Equipment $60,000 154

Other $22,500 131 To be implemented

Hot Water System $2,000 588 Implemented

HVAC $2,000 10

Other $5,000 7 Not to be implemented

Lighting $500 1

HVAC $6,760 36 Implemented

Waste heat recovery $5,000 5 Not to be implemented

Other $13,000 59

Other $14,000 12

Other NULL 39 Under-investigation

Air compressor $1 265 Not to be implemented

Other NULL 390

Air Compressor NULL 148

Other $168,000 1,268

Other $0 6

Page 110: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Computers & Printers $0 12

Computers & Printers $24,000 72

Other $500 0

Other $500 0

Behaviour/Education $239,530 1,394

Behaviour/Education $15,000 120

Behaviour/Education $6,000 1,528 Under-investigation

Monitoring $15,000 396

Behaviour/Education $23,000 1,700 Implemented

Behaviour/Education $22,000 636

Behaviour/Education $22,000 1,567

Behaviour/Education $22,000 842

Behaviour/Education $15,000 1,529 To be implemented

Behaviour/Education $15,000 202

Behaviour/Education $25,000 730 Ongoing

Behaviour/Education $3,000 14

Behaviour/Education $7,000 396

Behaviour/Education $7,000 202

Chiller $280,000 154

Lighting $155,700 203

Lighting $2,000 0

Lighting $5,000 0

Lighting $5,000 0

Industrial Equipment NULL 219 Under-investigation

Other $12,050 100

Other NULL 18

Other $285,700 1,326

Other $272,500 1,528

Other NULL 325 1,580

Other $120,000 681 Under-investigation

Other $200,000 12,500 Implemented

Lighting $6,000 3

Lighting $10,000 3

Lighting $5,000 4

Lighting $14,933 104

Other NULL 293 Implemented

Lighting $3,000 33 To be implemented

Industrial Equipment $12,000 113 To be implemented

Other $75,000 12,500 Ongoing

Industrial Equipment NULL NULL NULL Ongoing

Pool Covers/Heating $10,000 253

Boiler $5,000 350 Implemented

Behaviour/Education NULL 32

HVAC $240,000 945 Under-investigation

HVAC $15,397 9

Behaviour/Education NULL 160 Implemented

Behaviour/Education NULL 160 Implemented

Lighting $282,000 530

Page 111: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment $20,000 241

HVAC $6,320 50

Industrial Equipment $15,000 4 2,000

Industrial Equipment $750 33 To be implemented

Lighting $16,000 27 Ongoing

Other $700 1 Implemented

Lighting $1,500 12

Lighting $1,000 46

Other $200,000 571 Under-investigation

Lighting $30,000 52 Implemented

HVAC $180,000 425 Not to be implemented

Lighting $28,770 106 Ongoing

Industrial Equipment $21,948 80

Air compressor $65,000 540

Lighting $23,000 313 Ongoing

Lighting $20,000 37

Lighting $1,175 3 Ongoing

Lighting $9,045 30 Ongoing

Industrial Equipment $100,000 810 Not to be implemented

Other $47,000 0 To be implemented

HVAC $3,176 55

HVAC $2,700 15 To be implemented

Industrial Equipment $60,000 31,870 Implemented

Industrial Equipment $29,000 195 Not to be implemented

Lighting $6,375 63

Industrial Equipment $50,000 8 Implemented

Boiler $35,000,000 387,072

Lighting $16,324 20

Other $50,000 263

Hot Water System $350 1 Implemented

Hot Water System $35 0.28 Implemented

Hot Water System $100 0 Implemented

Hot Water System $1,500 2 Not to be implemented

Industrial Equipment $30,000 150

Industrial Equipment $30,000 110

Industrial Equipment $30,000 150

Industrial Equipment $90,000 365

Industrial Equipment $90,000 200

Other NULL 49

Air compressor $2,500 19

Lighting $2,661 21 Not to be implemented

Lighting $35,730 74

Lighting $126,000 215 To be implemented

Lighting $750 2

Waste heat recovery $30,000 875

Waste heat recovery $128,000 4,029 Implemented

Other $12,000 660 Implemented

Industrial Equipment $2,000 43 Not to be implemented

Page 112: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $7,000 22 Ongoing

Lighting $14,500 68 Ongoing

Lighting $326,000 214 Under-investigation

Lighting NULL 86 Implemented

Industrial Equipment $200,000 80,000 Implemented

Maintenance $0 20 To be implemented

Maintenance $0 5 To be implemented

Chiller $5,000 207 Implemented

Industrial Equipment $5,000 170 Implemented

HVAC $12,100 52

Lighting NULL 3

Industrial Equipment $600,000 1,760

Other NULL 1,830

Other $622,314 23,935

Air compressor $301,000 632 To be implemented

HVAC $569,250 1,415 Not to be implemented

Industrial Equipment $70,000 290 Not to be implemented

Ventilation $2,500 8 Implemented

Industrial Equipment NULL 10,228 Under-investigation

Other $25,000 13,636 To be implemented

Industrial Equipment $2,000 2,472 Implemented

Other NULL NULL NULL Under-investigation

Industrial Equipment NULL 133 Implemented

Other $500,000 5,755 To be implemented

Air compressor $10,000 104 Under-investigation

Lighting $16,100 39 Implemented

Chiller $788,400 2,433 -12,607 Not to be implemented

HVAC $300,000 220 -993 Not to be implemented

Industrial Equipment $2,700 0

Air compressor $8,000 75 Implemented

Lighting $16,020 18

Lighting $33,300 31

Lighting $18,720 24

Lighting $50,220 55

Lighting $10,080 10

Lighting $38,160 46

Lighting $56,700 63

Lighting $10,620 11

Lighting $55,980 62

Lighting $156,060 181

Lighting $14,240 44

Lighting $2,000 8 To be implemented

Lighting $2,000 8 To be implemented

Lighting $49,500 59 Implemented

HVAC $5,000 31 Implemented

Industrial Equipment $53,500 417

Other $135,717 224 Not to be implemented

HVAC $13,044 8

Page 113: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment NULL 3,364 Not to be implemented

Behaviour/Education $4,000 32 To be implemented

HVAC $729,300 192

Lighting $73,190 112

Lighting $8,445 39

Refrigeration NULL 22

HVAC $7,903 5

Lighting $1,150 4 Implemented

HVAC $3,077 58 Implemented

Other $14,615 43 Implemented

HVAC $2,403 13 Implemented

HVAC $38,460 104 Implemented

Industrial Equipment $19,999 58 Implemented

Other $2,308 14 Implemented

Industrial Equipment $6,154 35 Implemented

Industrial Equipment $49,229 76 Implemented

HVAC $12,307 65 Implemented

Other $3,077 30 Implemented

Industrial Equipment $10,000 53 Under-investigation

Refrigeration $90,000 602 To be implemented

Refrigeration $45,000 164 To be implemented

HVAC $22,125 44 Not to be implemented

HVAC $54,000 110 Not to be implemented

HVAC $85,000 95 Not to be implemented

Other $60,000 14,206 To be implemented

Other $100,000 21,052 To be implemented

Hot Water System $14,630 32 To be implemented

Hot Water System $14,630 37 To be implemented

Hot Water System NULL -278 3,761

Pool Covers/Heating $64,000 873

HVAC $32,100 60 Implemented

Waste heat recovery $190,000 2,635 To be implemented

Waste heat recovery $1,300 146

Waste heat recovery $1,000,000 2,249 Not to be implemented

Waste heat recovery $30,000 780 Ongoing

Waste heat recovery $60,000 1,170 Under-investigation

Waste heat recovery $179,000 0 Not to be implemented

Waste heat recovery $28,600 1,454 Not to be implemented

Waste heat recovery $175,000 19,190 Not to be implemented

Waste heat recovery $77,000 132 2,634

Waste heat recovery $297,000 9,636 Not to be implemented

Waste heat recovery $108,000 3,075 Implemented

HVAC $12,000 180 To be implemented

Industrial Equipment NULL 294

HVAC $300 17

Industrial Equipment $2,500 2,000 Implemented

Lighting $79,000 118 Under-investigation

Industrial Equipment $6,300 17 Ongoing

Page 114: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment $900 4 Ongoing

Industrial Equipment $8,200 13 Ongoing

Chiller $580,000 237 Implemented

Industrial Equipment $36,200 21

HVAC $200,000 72 Implemented

Industrial Equipment $940,000 1,125 Not to be implemented

Industrial Equipment $520,000 750 Not to be implemented

Industrial Equipment $350,000 500 Not to be implemented

Industrial Equipment NULL NULL NULL Implemented

Industrial Equipment $140,000 247

Industrial Equipment $210,000 806

Industrial Equipment $42,000 111 Not to be implemented

HVAC $7,731 39

Industrial Equipment $78,144 133 Ongoing

Chiller $200,000 716

Other NULL 382 To be implemented

Waste heat recovery $300,000 2,500 To be implemented

Hot Water System $200 2 Implemented

Hot Water System $250 2 Implemented

Hot Water System $1,260 4

Hot Water System $58,000 186 Not to be implemented

Hot Water System $300 56 Implemented

Hot Water System $4,500 15

Other $50,000 1,420 Implemented

Hot Water System $2,000 23 Implemented

Hot Water System $24,000 148

Industrial Equipment NULL 231 Implemented

HVAC $903 3

HVAC $11,094 8

HVAC $50,601 67

HVAC $21,998 46

HVAC $21,998 46

HVAC $15,851 26

HVAC $136,169 77

HVAC $116,700 350 Implemented

HVAC $258,050 1,668 Implemented

HVAC $123,150 233 Implemented

HVAC $57,000 423 Implemented

HVAC $92,650 2,001 Implemented

HVAC $75,958 515 Implemented

HVAC $800 65 Implemented

HVAC $1,450 4 Implemented

HVAC $24,680 43 Not to be implemented

HVAC $33,570 156

HVAC $72,000 120

HVAC $18,950 125 Under-investigation

HVAC $1,725 5 Implemented

HVAC $147,733 81 Implemented

Page 115: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

HVAC $4,600 74 Implemented

HVAC $197,955 446 Implemented

HVAC NULL 2,005 3,898

HVAC $863 7 Implemented

HVAC $2,300 12 Implemented

HVAC $2,875 6 Implemented

HVAC $230 4 Implemented

Industrial Equipment NULL NULL NULL Implemented

Pool Covers/Heating $2,049 361

Other $0 512 Not to be implemented

Other $0 19 Implemented

Air compressor $8,000 290

Air compressor $59,200 487 To be implemented

Other NULL 168

Maintenance $10,000 502 Implemented

Air compressor $4,000 86

Maintenance $2,500 44

Lighting $5,000 202

HVAC $6,000 76

HVAC $61,000 54 To be implemented

Boiler $5,000 112 Implemented

HVAC $15,000 41

Behaviour/Education $12,000 1,108 Implemented

Other $4,000 21

Monitoring $250,000 700 12,000

Sub-metering $50,000 99

Sub-metering $50,000 146 Ongoing

Other $2,000 8 Ongoing

Lighting $80,000 NULL NULL Under-investigation

HVAC $4,000 14 Implemented

Air compressor $1,000 28

Lighting $7,500 74 Not to be implemented

Industrial Equipment NULL 720 Implemented

Other $15,000 255 Not to be implemented

Lighting $40,000 205

HVAC $2,500 12 Implemented

Building Management Systems $5,000 27 Implemented

HVAC $3,600 51 Implemented

HVAC $2,500 8 Not to be implemented

Industrial Equipment $10,000,000 1,540 Under-investigation

Air compressor $1,500 27 To be implemented

Lighting $200 12

Behaviour/Education $500 2 Ongoing

Behaviour/Education $2,000 8 Ongoing

Industrial Equipment $32,550 14,071

Building Management Systems $444,092 909 2,747

Lighting $200 7 Implemented

Behaviour/Education $50,000 2,125 6,721

Page 116: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

HVAC $500 14

HVAC NULL 69

Other $150,000 189 Under-investigation

Industrial Equipment NULL 3,300 Implemented

Industrial Equipment NULL 37,000 Ongoing

Industrial Equipment $10,000 1,041 Ongoing

Industrial Equipment $50,000 1,921 Implemented

Air compressor NULL 965 To be implemented

Air compressor $10,000 2,200 Ongoing

Air compressor $10,000 141

Lighting $100,000 1,072 Implemented

Insulation $2,000 82 Implemented

Lighting $9,700 18 Ongoing

Other NULL 8,906 Implemented

Power Factor Correction $16,000 NULL NULL Implemented

Power Factor Correction $77,500 NULL NULL Ongoing

Maintenance NULL 158

Other $1,000 628

Air compressor NULL 276 Implemented

HVAC $7,000 13 Implemented

Power Factor Correction $24,000 26 Under-investigation

Power Factor Correction $52,200 NULL NULL Implemented

Ventilation $50,000 333 Implemented

HVAC $3,673 9 Implemented

Hot Water System NULL 6,714 Under-investigation

HVAC $12,000 170

HVAC NULL 161 To be implemented

Industrial Equipment $100,000 750 Implemented

Industrial Equipment $100,000 992 Implemented

HVAC NULL 0.50 Implemented

HVAC NULL 0.49 Implemented

HVAC NULL 0.50 Implemented

HVAC $30,954 70 Implemented

HVAC $87,000 263 Implemented

Boiler $50,000 200,000 Implemented

HVAC $93,000 699 To be implemented

HVAC NULL 58

Lighting $1,380 123

Cogeneration NULL NULL NULL Implemented

Power Factor Correction $44,011 382

Behaviour/Education $1,878,000 2,612 Ongoing

Industrial Equipment $50,000 8,700

HVAC $320 58

HVAC $50,000 511 Under-investigation

Boiler $5,000 122 Implemented

Power Factor Correction $18,630 NULL NULL Implemented

HVAC $5,000 8 Ongoing

Insulation $117,450 619 -641

Page 117: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Insulation $42,150 496 -481

Lighting $356,000 148

Lighting $468,200 243

Lighting NULL NULL NULL To be implemented

Lighting NULL NULL NULL To be implemented

Lighting NULL NULL NULL To be implemented

Lighting NULL NULL NULL Implemented

Lighting NULL 1,025 Not to be implemented

Lighting NULL 94 Ongoing

Lighting NULL NULL NULL Implemented

Lighting $40,000 17 Not to be implemented

Lighting $10,000 4 Implemented

Lighting $3,520 32 To be implemented

Air compressor $190,000 470

Lighting $655 4 Implemented

Lighting $2,200 25 Implemented

Cogeneration $476,000 368

Lighting $3,170 25 Implemented

Lighting $3,050 25 Implemented

Lighting $121 0

Lighting $1,365 14 Implemented

Lighting $700 3 To be implemented

Hot Water System $1,300 3 To be implemented

Hot Water System $850 2 To be implemented

Hot Water System $850 2 Implemented

Hot Water System $4,000 10 Implemented

Hot Water System $800 11 To be implemented

Lighting $6,100 13 Implemented

Lighting $12,819 0

Hot Water System $1,200 11 Implemented

Hot Water System $1,250 11 Implemented

HVAC $2,000 57 To be implemented

HVAC $1,000 5 Implemented

HVAC $1,000 2 To be implemented

HVAC $1,000 5 Implemented

HVAC $1,100 8 Implemented

Hot Water System $1,100 14 Implemented

HVAC $4,875 5

Other $3,855 3

Lighting $5,000 25 Not to be implemented

Hot Water System $900 3 Implemented

PV $53,835 16

PV $53,835 16

PV $53,835 16

PV $53,835 16

PV $53,835 16

Lighting $7,200 25 To be implemented

Lighting $7,200 25 To be implemented

Page 118: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $1,150 3 To be implemented

Building Management Systems $1,200 3 Implemented

Hot Water System $150 0.60 Implemented

Hot Water System $150 0.60 Implemented

Lighting $1,800 4 Implemented

HVAC $800 2

HVAC $2,500 17

Cogeneration $900,000 4,212

Cogeneration $1,200,000 11,182

HVAC $7,700 44

Other $9,000 13 To be implemented

Industrial Equipment $31,012 309

HVAC NULL 12 Implemented

Industrial Equipment $30,000,000 618,560

Lighting $375 1 Implemented

Lighting $355 0

Lighting $355 0.93 Implemented

Lighting $635 0.83 Implemented

Lighting $355 1 Not to be implemented

Lighting $355 0.58 Implemented

Lighting $355 0.06 Implemented

Lighting $355 0

Lighting $355 0.90 Implemented

Lighting $355 0

Pool Covers/Heating $35,000 1,072

Lighting $335 0.17 Implemented

Lighting $350 1

Lighting $400 1

Lighting $500 3 Implemented

Hot Water System NULL 0

Lighting $5,000 4 Implemented

Lighting $1,500 35

Lighting $500 4

Lighting $355 1

Industrial Equipment $29,000 42 To be implemented

Industrial Equipment $50 1 To be implemented

Pool Covers/Heating $60,000 -26 To be implemented

Industrial Equipment $42,500 90 Not to be implemented

Industrial Equipment $250,000 569 Implemented

HVAC $800 115 Implemented

HVAC $2,000 4

HVAC $2,000 3 Implemented

Lighting $600 2

Chiller $80,000 170 Implemented

HVAC $42,935 36

HVAC $39,870 21

Industrial Equipment $2,000 520

Industrial Equipment NULL 7,000 Not to be implemented

Page 119: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

HVAC $15,000 20 To be implemented

Industrial Equipment $15,000 250

Lighting $375 1 Implemented

Lighting $375 0.35 Implemented

Industrial Equipment $4,500 8 Implemented

Other $12,000 226

Lighting $1,500 65 Not to be implemented

Lighting $700 3

Lighting $19,400 158 Implemented

Lighting $18,800 150 Not to be implemented

Lighting $10,000 29 Implemented

Lighting $3,184 2

Lighting $2,195 2 Implemented

Lighting $6,587 26 Implemented

Building Management Systems $50,000 114

Building Management Systems $50,000 65

HVAC $20,000 20

HVAC $20,000 20

Building Management Systems $60,000 50

Boiler $160,000 6,820 To be implemented

Hot Water System $58 1 Implemented

Other $6,000 12 To be implemented

HVAC $750,000 100

Other $125,000 1,128

HVAC $6,000 4

Industrial Equipment $4,000 334

Industrial Equipment $6,000 99

Pool Covers/Heating NULL 212 To be implemented

HVAC $6,000 50 To be implemented

HVAC $6,000 50 To be implemented

HVAC $6,000 0 To be implemented

Industrial Equipment $300 0 Not to be implemented

Lighting $785 4 Implemented

Air compressor $1,200,000 7,409

Building Management Systems $1,800 8 Implemented

Lighting $4,000 45 Implemented

Lighting $3,272 6 Implemented

Lighting $770 2 Not to be implemented

Lighting $6,000 57 Not to be implemented

Lighting $5,400 8 To be implemented

Boiler $150,000 2,624 Implemented

HVAC $5,670 9 Implemented

Monitoring $68,400 270 Implemented

Monitoring $44,700 NULL NULL To be implemented

Lighting $12,500 127

Lighting $700 6

Hot Water System $2,500 3

Hot Water System $2,500 3 Implemented

Page 120: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Hot Water System $2,500 7 Not to be implemented

Hot Water System $2,500 3

Hot Water System $5,000 17 Under-investigation

Hot Water System $5,000 115 Under-investigation

HVAC $10,000 28 To be implemented

HVAC $15,000 5

HVAC $5,000 2

HVAC $50,000 60

HVAC $60,000 30

HVAC $25,000 20

HVAC $10,800 28

HVAC $300,000 100

HVAC $3,000 1

HVAC $16,000 39 Implemented

HVAC $10,900 13

Industrial Equipment $5,000 46

HVAC $85,000 242 To be implemented

Lighting $12,000 35 Ongoing

Lighting $14,350 53 Not to be implemented

Lighting $2,350 6 To be implemented

Air compressor $1,200 8 Implemented

Chiller $19,495 17

Air compressor $2,300 36

Chiller $8,500 30

HVAC $26,000 127 To be implemented

Lighting $15,000 27

Lighting $25,000 46 Ongoing

Industrial Equipment $26,120 155 Ongoing

Other $30,000 180

Other $6,000 19

Lighting $2,400 6

Lighting $4,800 7

Other $1,000 3

Lighting $4,800 4

Lighting $11,000 7

Lighting $1,000 0

Lighting $1,000 0

Lighting $2,000 1

Lighting $1,000 0

Lighting $4,000 1

Lighting $4,000 1

Lighting $2,000 1

Lighting $4,000 6

Lighting $2,000 2

Lighting $1,000 0

Lighting $2,000 4

Lighting $1,000 1

Lighting $1,000 1

Page 121: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $2,000 1

Lighting $2,000 2

Other NULL 2

Chiller $46,480 30 Implemented

Lighting $46,350 236 Implemented

Lighting $12,000 70

Lighting $52,000 17 To be implemented

Lighting $8,000 2 To be implemented

Lighting $8,000 17 To be implemented

Other $425,000 1,129

HVAC $30,000 5

HVAC $40,000 5

HVAC $40,000 10

Hot Water System $2,000 11 -38

PV $430,000 66 To be implemented

Waste heat recovery $50,000 500

Waste heat recovery $40,000 10 30

Industrial Equipment $6,940 9

Chiller $198,335 73

Lighting $10,725 10

Lighting $2,505 3

Industrial Equipment $182,595 234 Under-investigation

Other $35,000 288 Implemented

Insulation $25,000 111 Not to be implemented

HVAC $60,000 97 Implemented

Lighting $83,550 274

Other $150 1 To be implemented

Lighting $200 11

Lighting $500 92

Boiler $110,000 6,594 To be implemented

Computers & Printers NULL 1

Computers & Printers NULL 11

Lighting $5,335 4

Lighting $100 0 Not to be implemented

Lighting $3,450 8 Implemented

Lighting $500 1

Lighting $250 1 Implemented

Lighting $250 0.69 Implemented

Lighting $26,050 247 Implemented

Lighting $13,300 55 Implemented

Lighting $38,200 48 Implemented

Lighting $11,900 41 Implemented

Lighting $2,400 0.22 Implemented

Lighting $13,700 66 Implemented

Lighting $1,200 2 Implemented

Lighting $1,000 1.75 Implemented

Lighting $5,000 33 To be implemented

Lighting $500 7 Under-investigation

Page 122: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $30,000 400 Implemented

Lighting $3,060 14 Not to be implemented

Other $400 37

Air compressor $175,000 615

Lighting $375 2 Not to be implemented

Lighting $4,500 6 Not to be implemented

Lighting $1,200 5

Lighting $500 0

Lighting $1,500 4 Implemented

Lighting $500 1

Lighting $3,000 19

Building Management Systems $1,600 8 Implemented

Sub-metering $135,000 333 Implemented

Industrial Equipment $180,000 7,750

Waste heat recovery $120,000 560 Not to be implemented

Boiler $10,000 2,000 Implemented

Lighting $115,000 394

Lighting $10,000 40

Lighting $55,000 181

Lighting $30,000 36 Ongoing

Lighting $17,000 50 Under-investigation

Lighting $15,000 50

Lighting $375 0.37 Implemented

Lighting $3,945 21 Ongoing

Lighting $3,835 17 To be implemented

Lighting $450 0 To be implemented

Lighting $900 2 Implemented

Lighting $4,500 11 Implemented

Lighting $4,200 19 Not to be implemented

Lighting $600 4 Not to be implemented

Lighting $5,100 12 Implemented

Lighting $3,000 10 Implemented

Other $355 0.51 Implemented

Building Management Systems $3,900 10 Implemented

Lighting $1,992 1 Implemented

Lighting $725 2

Lighting $400 1

Lighting $3,600 9 Not to be implemented

Lighting $1,255 4

Lighting $710 2

Lighting $800 8 Not to be implemented

Lighting $1,200 7 Not to be implemented

Lighting $600 3 To be implemented

Lighting $600 3 To be implemented

Lighting $8,000 50 Implemented

HVAC $830 2

Lighting $17,400 36 Implemented

ventilation $50,000 20

Page 123: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

ventilation $50,000 5

ventilation $50,000 10

HVAC $35,000 170

Computers & Printers NULL 600

Sub-metering $105,000 NULL NULL Ongoing

Monitoring $106,500 269

Other $100,000 639 Not to be implemented

Other $84,000 52

Other NULL 40 To be implemented

Cogeneration $893,750 3,280 To be implemented

Lighting $375 1

Lighting $1,125 2 To be implemented

Lighting $750 0.34 Implemented

Lighting $1,500 5 Implemented

Lighting $2,250 4 To be implemented

Lighting $3,750 2 Not to be implemented

Lighting $20,000 50

Lighting $20,000 20

Lighting $830 2

Lighting $3,000 5

Lighting $15,000 5

Lighting $750 2 To be implemented

Lighting $1,000 7 Implemented

Lighting $375 1

Lighting $3,000 3 To be implemented

Lighting $1,000 1 Under-investigation

Lighting $3,388 5

Lighting $750 0

Lighting $2,500 15

Lighting $375 0.52 Implemented

Lighting $9,000 3 To be implemented

Industrial Equipment $1,500 8 To be implemented

Lighting $2,500 1

Lighting $500 1

HVAC $7,260 67

Lighting $2,300 2 To be implemented

Lighting $2,300 3 Implemented

Lighting $2,300 5 Implemented

Lighting $2,300 7 Implemented

Lighting $750 1 Not to be implemented

Lighting $1,500 1

Lighting $4,400 5 Not to be implemented

Air compressor $23,500 81 Implemented

HVAC $1,500 29 52

HVAC $2,000 6 Implemented

HVAC $5,000 36

Lighting $690 10 Implemented

Lighting $1,500 4

Page 124: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $5,500 16 Ongoing

Lighting $308 0.92 Implemented

Lighting $690 24 Not to be implemented

Lighting $15,800 93 Implemented

Lighting $3,200 36 Implemented

Lighting $5,000 5 Implemented

Lighting $400 2 Not to be implemented

Lighting $496 3

Lighting $485 2

Lighting $635 4

Lighting $770 2 Not to be implemented

PV $70,000 8

PV $12,750 12

PV $53,835 16

Other $226 0

Other $226 0

Lighting $226 1

Lighting $226 1

Other $226 0

Other $226 0

Lighting $830 2

Other $226 0

Other $226 0

Pool Covers/Heating $100,000 650 To be implemented

Pool Covers/Heating $10,500 898 Implemented

Power Factor Correction $8,000 0 Implemented

Power Factor Correction $14,000 NULL NULL Implemented

Power Factor Correction $14,000 NULL NULL Implemented

Power Factor Correction $11,600 3 Implemented

Other $45,000 200

HVAC $4,550 16 Not to be implemented

HVAC $3,500 9 Not to be implemented

Building Management Systems $400 4 Not to be implemented

Lighting $125 3 Implemented

Mixed $600 6 Implemented

Building Management Systems $850 4 Implemented

Lighting $500 1 Not to be implemented

HVAC $1,100 3 Not to be implemented

HVAC $2,600 8 Implemented

Hot Water System $200 1

Industrial Equipment $2,300 9 Implemented

Sub-metering $150,000 713 2,567 Not to be implemented

Industrial Equipment $1,500,000 70,000

Lighting $3,800 22

Lighting $1,280 4

Lighting $48,000 237 Under-investigation

HVAC $3,750 7

HVAC $455 2 Implemented

Page 125: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Hot Water System $700 1 Not to be implemented

Hot Water System $2,100 3 Not to be implemented

Hot Water System $1,750 2 Not to be implemented

Hot Water System $700 1 Not to be implemented

HVAC $7,000 23 Not to be implemented

Hot Water System $700 4 Not to be implemented

HVAC $8,050 21 Not to be implemented

Other $1,000 8 Under-investigation

Lighting $1,350 7 To be implemented

Industrial Equipment $3,000 28

Industrial Equipment $3,500 29 Implemented

HVAC $700 5 Not to be implemented

Boiler $50,040 2,604 Not to be implemented

Insulation $6,750 39

Chiller $70,000 191 Not to be implemented

Lighting $4,500 0 To be implemented

Hot Water System $6,235 5 Not to be implemented

Hot Water System $6,965 5

Hot Water System $5,905 2

Hot Water System $8,355 5

Hot Water System $5,905 2

Hot Water System $6,800 5

Hot Water System $6,800 5

Hot Water System $6,800 5

Hot Water System $6,800 5

Hot Water System $6,800 5

Hot Water System $6,800 5

Hot Water System $5,100 6

Pool Covers/Heating $107,670 2,549

Pool Covers/Heating $48,080 1,075 Not to be implemented

Pool Covers/Heating $140,000 152 Not to be implemented

Hot Water System $8,000 50

Hot Water System $30,000 548 Not to be implemented

Hot Water System $30,000 88

Hot Water System $90,000 100 500 Ongoing

Other $3,000 47 Not to be implemented

HVAC $40,000 55

Other $2,400 57

Sub-metering $5,000 22 Implemented

Sub-metering $1,500 22 Ongoing

Lighting $131,760 321 To be implemented

Lighting $3,198 4 Implemented

Lighting $1,021,500 188

HVAC $13,925 16

HVAC $6,965 16

HVAC $6,965 9

HVAC $6,965 16

HVAC $8,500 5 Implemented

Page 126: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $985 8

Hot Water System $1,248 4 9

Building Management Systems $9,800 42 Implemented

Hot Water System $1,800 10

Lighting $9,000 3 Implemented

Industrial Equipment $800 5 13 Not to be implemented

Air compressor $1,000 2

Hot Water System $3,000 12 Not to be implemented

HVAC $200,000 200

Lighting $500,000 300

HVAC $36,000 20

HVAC $10,000 5

Building Management Systems $6,000 13 Ongoing

Computers & Printers $12,050 47

HVAC $2,000 21

Lighting $5,500 9 Under-investigation

Lighting $2,500 3 Under-investigation

HVAC $250 7

Other $2,800 4

Other $2,800 4

Air compressor $500 7 Not to be implemented

Industrial Equipment $350 1 Implemented

Hot Water System $1,745 2

HVAC $3,036 131

Hot Water System $10 0 To be implemented

Other $9,000 32

HVAC $2,000 25

Hot Water System $300 0.51 Implemented

Air compressor $600 1 Not to be implemented

Other $250 1 Under-investigation

HVAC $1,000 0

Hot Water System $1,200 14 Implemented

Hot Water System $800 6 Implemented

Other $10,000 42 To be implemented

HVAC NULL NULL NULL Implemented

Other $33,750 28 Implemented

Lighting $600 2 To be implemented

Air compressor $24,000 70 Implemented

Air compressor $5,000 10

Industrial Equipment $9,500 114

Industrial Equipment $10,500 110

Industrial Equipment $2,610 11 Implemented

Industrial Equipment $3,860 32 Implemented

Boiler $8,800 51 Implemented

Industrial Equipment $4,595 4

Industrial Equipment $15,304 43 Under-investigation

Industrial Equipment $10,000 40 Not to be implemented

Industrial Equipment $10,000 40 Implemented

Page 127: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment $15,000 34 Implemented

Industrial Equipment $66,000 327 To be implemented

Chiller $7,000 29 To be implemented

Industrial Equipment $10,000 40

HVAC $4,875 4

Boiler $45,550 109

Industrial Equipment $82,000 175 To be implemented

Industrial Equipment $10,000 26 Implemented

Other NULL NULL NULL Ongoing

Mixed $212,075 590

Industrial Equipment $70,500 411

Industrial Equipment $7,200 343

Lighting $135,000 210 Implemented

Lighting $96,600 664 Implemented

Lighting $1,700 13

Lighting $1,700 6

Lighting $1,700 2 To be implemented

Lighting $12,000 16

Lighting $23,800 34

Lighting $39,552 257

Lighting $4,000 10 Not to be implemented

Lighting $655 4 Implemented

Lighting $8,050 11 Implemented

Lighting $640 1 Implemented

Lighting $1,700 5 To be implemented

Lighting $641 2

Lighting $1,351 1

Lighting $641 1

Lighting $641 1

Lighting $1,922 1

Lighting $641 1

Lighting $641 2

Lighting $1,922 6

Lighting $2,562 7

Lighting $3,000 4

Lighting $1,500 5 Implemented

Lighting $2,140 4 Not to be implemented

Lighting $21,000 37 Implemented

Lighting $1,000 1 Implemented

Lighting $2,000 5 Implemented

Lighting $4,000 6 Implemented

Lighting $2,000 6 To be implemented

Lighting $641 0

Other $1,500 5 To be implemented

Industrial Equipment $100,000 546 Not to be implemented

Industrial Equipment $210,000 1,431 To be implemented

HVAC $60,000 30

Air compressor $342,270 914 Implemented

Page 128: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Air compressor $66,000 194 Not to be implemented

Industrial Equipment $7,000 6

Industrial Equipment $20,000 3

Industrial Equipment $20,000 6

Industrial Equipment $20,000 8

HVAC $25,000 5

HVAC $40,000 15

HVAC $8,000 5

HVAC $12,000 60

HVAC $40,000 8

HVAC $20,000 5

Industrial Equipment $45,600 217

Chiller $6,000 5

HVAC $7,060 23

HVAC $300,000 300

Industrial Equipment $8,000 55 Implemented

HVAC $5,000 22

Industrial Equipment $6,500 29 To be implemented

HVAC $40,000 5

HVAC $60,000 39 Under-investigation

Industrial Equipment $9,500 30 Not to be implemented

Industrial Equipment $10,500 32 Not to be implemented

HVAC $90,000 314 To be implemented

Industrial Equipment $100,000 214

Industrial Equipment $40,000 278

HVAC $15,000 10

HVAC $30,000 30

Industrial Equipment $40,000 101 Implemented

HVAC $30,000 65 Implemented

Industrial Equipment $10,000 33 Implemented

Industrial Equipment $29,500 156

HVAC $7,935 5

HVAC $45,000 225 Implemented

Industrial Equipment $42,000 170

HVAC $16,200 77

HVAC $25,900 81

Industrial Equipment $80,000 288

Industrial Equipment $37,200 160

Industrial Equipment $20,000 42

Industrial Equipment $12,000 46

Industrial Equipment $30,000 67

Hot Water System $6,640 21

Chiller $270,774 1,090

Industrial Equipment $98,000 350

Industrial Equipment $15,000 49 Not to be implemented

HVAC $35,000 25

Hot Water System $7,920 27

Industrial Equipment $2,000,000 710 Not to be implemented

Page 129: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

HVAC $1,500 38

HVAC $2,270 1

Ventilation $1,500 3 Implemented

ventilation $25,000 24

Industrial Equipment $200,000 176 Ongoing

Other $1,500 18 To be implemented

Hot Water System $19,021 14 Not to be implemented

Cogeneration $300,000 300

Cogeneration $1,500,000 1,600

Power Factor Correction $67,500 NULL NULL Implemented

Cogeneration $2,000,000 7,535 -53,981

Building Management Systems $42,000 389 To be implemented

Building Management Systems $9,000 31 To be implemented

Building Management Systems $50,000 69

Building Management Systems $200,000 811 To be implemented

Building Management Systems $30,000 26

Building Management Systems $40,000 26

Air compressor $10,300 8 Implemented

Hot Water System $22,000 99 Not to be implemented

Pool Covers/Heating $73,645 NULL NULL Implemented

Other $4,700 0.28 Implemented

HVAC $37,000 66 To be implemented

Lighting $1,250 6 To be implemented

HVAC $20,000 20 To be implemented

HVAC $156,000 106 Not to be implemented

Building Management Systems $10,000 38

Building Management Systems $42,500 165 To be implemented

HVAC $200,000 5

HVAC $300,000 20

Cogeneration $1,200,000 1,000

Lighting $1,000 2

Industrial Equipment $18,000 NULL NULL Implemented

HVAC $29,250 8

HVAC $11,350 11

HVAC $68,100 26

HVAC $157,600 56

HVAC $48,750 34

HVAC $50,000 50

HVAC $9,750 8

HVAC $3,000 11 Not to be implemented

Other $20,460 44 Under-investigation

Other $2,280 57 Implemented

Other $3,250 13 Not to be implemented

Other $1,800 6

Other $2,500 6

Other $4,500 13

Other $1,900 8

Other $5,250 8

Page 130: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other $14,200 21

Other $11,500 21 Implemented

Other $7,500 9

Other $5,200 9

Lighting $35,000 91 Not to be implemented

Other $5,600 3 Implemented

Other $6,400 5

Other $4,000 1

Lighting $8,000 3 Implemented

Lighting $24,000 8

Other $20,000 40 Not to be implemented

Other $5,300 21 Not to be implemented

Other $3,170 9 Not to be implemented

Other $5,000 2 Implemented

Other $600 1

Hot Water System $10,000 29 Not to be implemented

Hot Water System $8,500 28 Under-investigation

Hot Water System $5,700 31

Hot Water System $11,400 15

Pool Covers/Heating $112,000 -160 2,879

Pool Covers/Heating $126,000 -188 3,390

Hot Water System $11,400 5

Hot Water System $11,400 4

Hot Water System $11,400 16

Pool Covers/Heating $224,000 -356 6,403

Lighting $14,000 125

Lighting $4,000 2 Implemented

Lighting $3,000 3 Not to be implemented

Other $250 1

Lighting $5,000 5

Lighting $1,000 1 Not to be implemented

Mixed $15,000 30

Mixed $15,000 10

Lighting $1,000 3 To be implemented

Lighting $1,000 4 To be implemented

Lighting $8,500 7 To be implemented

ventilation $40,000 10

HVAC $50,000 10

HVAC $420,000 3,345

Industrial Equipment $4,600 102 Implemented

Lighting $36,000 20

Lighting $15,000 20

Lighting $10,000 5

Mixed $3,000 10 50

Lighting $10,000 10

Lighting $1,600 2 Implemented

Lighting $750 0 Not to be implemented

Lighting $375 0 Not to be implemented

Page 131: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $1,500 1

Other $36,244 7 Under-investigation

PV $214,000 23

PV $284,000 31

PV $142,000 16

Pool Covers/Heating $37,200 1,584 Implemented

Pool Covers/Heating $30,000 1,459

Power Factor Correction $150,000 NULL NULL Implemented

Power Factor Correction $11,000 NULL NULL Implemented

Lighting $30,000 100

HVAC $15,000 20

insulation $10,000 15

Hot Water System $20,500 274 Implemented

Lighting $2,700 3

Lighting $1,100 1 Not to be implemented

Other $2,000 23 Implemented

Other $4,000 8 Implemented

Hot Water System $4,000 3

Hot Water System $14,000 22

Hot Water System $14,000 8

Hot Water System $3,450 3 Not to be implemented

Hot Water System $5,606 39 Implemented

Hot Water System $8,394 49 Under-investigation

PV $120,000 1,260

Sub-metering $10,000 22 Ongoing

Lighting $9,300 5

HVAC $4,000 29

HVAC $1,000 69 Not to be implemented

HVAC $3,000 5

Lighting $5,600 43 Implemented

HVAC $480 2

Hot Water System $3,200 8

Hot Water System $4,200 5

Air compressor $50,000 310 Under-investigation

Industrial Equipment $15,000 42 Ongoing

Industrial Equipment $35,000 123 Not to be implemented

Other $33,000 114 Implemented

Other $30,000 56 To be implemented

HVAC $20,000 86

Industrial Equipment $9,600 47

Other NULL 18

Other NULL NULL NULL Implemented

Industrial Equipment $6,000 23

Industrial Equipment $16,000 9

Industrial Equipment $5,000 2

Industrial Equipment $5,000 2

Chiller $15,000 10

HVAC $15,000 10

Page 132: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment $24,000 34

Industrial Equipment $60,000 72 To be implemented

HVAC $4,000 2

Other $600 3

Other $2,600 3

Other $2,200 3

Other $900 1

Other $3,480 3

Other $2,600 9

Other $16,900 3

Other $11,700 7

Other $12,000 9

Other $13,620 4

Other $10,340 1

Other $15,000 7

Other NULL 131 Ongoing

Industrial Equipment $120,000 708 To be implemented

Boiler $10,000 166

Insulation $7,000 9 Implemented

Insulation $1,500 2 Under-investigation

Insulation $4,800 21 Not to be implemented

Insulation $6,000 48

Insulation $7,600 32

Insulation $2,000 5 To be implemented

Hot Water System $5,472 105 Not to be implemented

Hot Water System $12,000 1,198 To be implemented

Hot Water System $5,758 1,082 To be implemented

Other $52,800 3,361

Insulation $6,500 53 Not to be implemented

Other $74,830 999 Under-investigation

Insulation $105,000 11,489

Industrial Equipment $15,246 1,520 Not to be implemented

Hot Water System $7,200 171 Implemented

HVAC $4,000 8 Implemented

Refrigeration $760 4

Other $6,000 7 Not to be implemented

Insulation $700 180

Insulation $2,800 280 Under-investigation

Hot Water System $15,000 71

Insulation $30,000 1,220 Ongoing

Insulation $3,000 380 Implemented

Other $50,000 1,220 To be implemented

Building Management Systems $10,000 50 Implemented

Industrial Equipment $30,000 40 Implemented

Other $19,000 6,645 To be implemented

Refrigeration $150,000 469 Not to be implemented

HVAC $1,100 13 Implemented

HVAC $1,000 28

Page 133: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other $480 2 Not to be implemented

Industrial Equipment $120 0 Not to be implemented

Other $120 6 Not to be implemented

Other $480 21 Implemented

Other $240 66 Not to be implemented

Boiler $1,250 6 Implemented

Lighting $500 0 Implemented

Industrial Equipment NULL 335 Under-investigation

Behaviour/Education $15,000 24 Not to be implemented

Industrial Equipment $18,800 286 Ongoing

Other $37,000 40 Not to be implemented

Industrial equipment $65,000 23,865 Implemented

Industrial Equipment $7,500,000 1,603 Under-investigation

PV $510,460 106 Implemented

Industrial Equipment $9,500 740

Lighting $1,600 10

Lighting $2,500 6

Lighting $1,800 1

Power Factor Correction NULL NULL NULL Implemented

HVAC $5,000 271

Other NULL 3 Under-investigation

Lighting NULL 8 Under-investigation

Other NULL 52 Implemented

Other NULL 12 To be implemented

Other NULL 12 To be implemented

Other NULL 15 To be implemented

Maintenance $1,500 31 Implemented

Other NULL 7

Air compressor NULL 124 Implemented

Sub-metering $500 0 Not to be implemented

Lighting NULL 5 To be implemented

Other $2,200 3 To be implemented

Other $780 2 Ongoing

Industrial Equipment $10,000 55

HVAC NULL 9 Under-investigation

HVAC $5,800 181 Implemented

Refrigeration $39,850 19

HVAC $19,600 302 Under-investigation

Other $2,000 61

Other NULL NULL NULL Ongoing

Insulation $30,000 26 To be implemented

Other $1,500 NULL NULL Under-investigation

Lighting $250 3

Pool Covers/Heating NULL 11 Not to be implemented

Cogeneration $80,000,000 52,000

Industrial Equipment $278,000 957 Ongoing

Lighting $1,200 4

Boiler NULL 1,800

Page 134: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other NULL 1

Other NULL 57

Other NULL 33

Industrial Equipment NULL 86

Lighting $200 0 To be implemented

Lighting $350 1 To be implemented

Other $720 3 Implemented

Industrial Equipment $0 2 Implemented

Other NULL 203

Air compressor $180,000 897

Pool Covers/Heating $0 437 Not to be implemented

Other $5,000,000 3,000 Implemented

Lighting $10,000 14

Lighting $1,500 3

Lighting $450 1

Lighting $37,000 88

HVAC $15,000 0 Ongoing

Air compressor NULL 250

Industrial Equipment $4,000 20 Not to be implemented

Other NULL 61 Ongoing

Computers & Printers NULL 292 Ongoing

HVAC $40,000 0

Industrial Equipment $150,000 320 Under-investigation

Industrial Equipment $38,000 375 Ongoing

Industrial Equipment NULL NULL NULL Under-investigation

Other NULL NULL NULL To be implemented

Lighting $18,757 134 Implemented

Lighting $186,411 254 Implemented

Lighting $10,062 41 Implemented

Lighting $5,875 16 Implemented

HVAC $39,000 81

HVAC $6,000 17

Building Management Systems $2,000 16

HVAC $3,000 4

Computers & Printers $5,000 19

Industrial Equipment $2,000 140 Implemented

Industrial Equipment $30,000 131

Other NULL 60 Not to be implemented

Lighting $6,670 8

Lighting $2,040 2

Lighting $2,040 1

Lighting $19,000 NULL NULL Implemented

Lighting $19,058 15

HVAC $10,000 41 Implemented

Air compressor $150,000 1,802 Implemented

Chiller $10,000 100

HVAC $25,000 93

HVAC $5,000 37

Page 135: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

HVAC $1,380 20 Implemented

Chiller NULL 3

Lighting $9,000 70

Lighting $9,000 70

Lighting $9,000 70

Lighting $9,000 70

Lighting $3,250 18

Lighting $61,160 254

Lighting $7,645 18

Lighting NULL 350 To be implemented

Lighting $7,500 54 To be implemented

Lighting $16,313 29

Lighting $4,097 12

Lighting $1,220 2

Lighting $5,017 1

Lighting $5,531 11

Lighting $11,432 8

Lighting $2,927 4

Lighting $3,653 4

Lighting $89,570 175

Lighting $84,371 321

Lighting $23,119 12

Lighting $5,189 6

Lighting $4,883 8

Lighting $6,987 9

Lighting $25,412 22

Lighting NULL 870

Lighting $18,400 76

Lighting $9,500 411 Implemented

Lighting $14,000 85 Implemented

Lighting $35,000 159

Lighting $2,000 214

Lighting $900 5 Under-investigation

Lighting $540 5

Lighting $180 3 Implemented

Lighting $28,800 11 Ongoing

Lighting $29,700 109 Ongoing

Lighting $139,440 585 Ongoing

Lighting $1,563 10 To be implemented

Lighting NULL 14 Under-investigation

Lighting $7,355 21

Lighting NULL 493

Mixed $8,682 7

Lighting $20,502 33

Lighting $2,175 13 To be implemented

Lighting $5,000 11 Not to be implemented

Lighting $1,500 7

Lighting $750 5

Page 136: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $1,000 45 Implemented

Lighting $30,500 152 To be implemented

Lighting $33,000 306

Lighting $66,000 538 Implemented

Lighting $2,300 63 Implemented

Lighting $16,486 14

Lighting $61,756 65

Lighting $98,479 139

Lighting $30,896 26

Lighting $19,977 16

Lighting $16,718 13

Lighting $7,179 4

Lighting $15,000 40

Lighting $12,000 107 Not to be implemented

Lighting $95,000 716 Implemented

Lighting $20,000 400 Implemented

Lighting $140,000 463 Implemented

Lighting $28,000 56

Lighting $8,140 17

Lighting $28,400 174 Implemented

Lighting $3,000 7

Lighting $45,000 28 To be implemented

Lighting $500 1 Implemented

Lighting $10,000 5 Under-investigation

Lighting $1,000 1 To be implemented

Lighting $108,000 53 Under-investigation

Lighting $166,727 303 Implemented

Lighting $5,300 18 Implemented

Lighting $228 1 Implemented

Lighting $10,000 250 Implemented

Lighting $4,387 27 Implemented

Lighting NULL 68 To be implemented

Lighting $140,400 303

Lighting $70,200 212

Lighting $150,364 660

Lighting $155,400 269 Not to be implemented

Lighting $12,160 40 Implemented

Lighting $5,335 7

Lighting $1,050 8 To be implemented

Lighting $1,263 9 To be implemented

Lighting $23,000 132 To be implemented

Lighting $531,226 600 Implemented

Lighting NULL 85 Implemented

Lighting $32,415 30

Lighting $15,010 14

Lighting $2,826 1

Lighting $12,371 1 To be implemented

Lighting $21,521 3 To be implemented

Page 137: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $2,507 4 Implemented

Lighting $14,465 13

Lighting $24,150 110 Not to be implemented

Lighting $860,000 520

Lighting $600,000 600 Not to be implemented

Mixed $135,429 135

Lighting $5,240 5

Mixed $850,000 300

Mixed $8,151 7

Lighting $690 4 Implemented

Lighting $644 6 Implemented

Lighting $7,475 112 Implemented

Lighting $230 0.56 Implemented

Mixed $900 8 Not to be implemented

Mixed $225 1 Not to be implemented

Air compressor $50,000 44 Implemented

Mixed $2,025 7 Not to be implemented

Other $5,000 72 Under-investigation

Industrial Equipment $1,000 18

Lighting $2,300 51

HVAC $120,000 190 Not to be implemented

Hot Water System $118,800 4,628

Industrial Equipment NULL NULL NULL Ongoing

Lighting $150,000 NULL NULL Implemented

Industrial Equipment $12,714 2,531

Boiler NULL 7,600 Ongoing

Air compressor NULL 116 To be implemented

Hot Water System $150 5

Other NULL 9

Hot Water System $600 8 Implemented

Lighting $128,480 143

Other $4,000 28 Not to be implemented

Lighting $2,000 25 Not to be implemented

Industrial Equipment $90,000 1,226 To be implemented

Industrial Equipment $6,000 64 Not to be implemented

Industrial Equipment $20,000 938

Industrial Equipment $24,000 446 Implemented

Air compressor $1,599,190 533 Implemented

Lighting $690 8 Under-investigation

Lighting $4,899 20 Under-investigation

Lighting $1,041,100 2,928

Lighting $502,600 1,554

Industrial Equipment $20,000 108 Implemented

HVAC $500 4

Industrial Equipment $2,000 2 1,200

Lighting $1,300 22

Industrial Equipment NULL 264 Implemented

Industrial Equipment NULL 4 0

Page 138: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Maintenance $140,000 476 Not to be implemented

Maintenance $0 7 To be implemented

Maintenance $4,380 28

Building Management Systems $900,000 80 56 To be implemented

Lighting $2,500,000 500 To be implemented

HVAC $120,000 100

Industrial Equipment $15,000 64

Lighting $575 8 Implemented

Lighting $2,300 4 Implemented

Lighting $4,255 8 To be implemented

Lighting NULL 15 Implemented

Lighting $6,000 131

HVAC $10,000 260

HVAC $7,500 45 Ongoing

Industrial Equipment $50,000 4,802 Ongoing

Industrial Equipment $885,000 5,390 Implemented

Lighting $250 1

Boiler $9,000 35 Implemented

Industrial Equipment $7,000,000 5,734 Implemented

Alternative power generation $3,550,000 8,000 Implemented

Other $140,000 238 Not to be implemented

Other $30,000 1,441 Implemented

Lighting $1,500 8

Lighting $1,500 18 Implemented

Lighting $2,000 43 Implemented

Industrial Equipment $100,000 393 Not to be implemented

Industrial Equipment $448,014 291

Other $5,000 250

ventilation $100,000 NULL NULL Under-investigation

Industrial Equipment NULL 1,680 Implemented

Air compressor $500 44 Implemented

Other $150,000 144

HVAC NULL 68

Lighting NULL 8 To be implemented

Lighting $4,485 52

Other $114,000 339 Implemented

HVAC $1,000 66

Industrial Equipment $11,500 36 To be implemented

HVAC $10,000 31

Industrial Equipment NULL 1,300 To be implemented

Other $24,000 164 Implemented

Lighting $450,720 83 Ongoing

HVAC $10,000 10

Monitoring $0 2 231 Not to be implemented

Air compressor $70,000 740 Implemented

Monitoring $400,000 3,306 Ongoing

Monitoring $400,000 2,503 Ongoing

Air compressor $5,000 88

Page 139: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Pool Covers/Heating $0 7

Lighting $750 1

Lighting $27,030 37

Industrial Equipment $12,776 91 Ongoing

Industrial Equipment NULL 30 Ongoing

Industrial Equipment $23,137 137

Industrial Equipment $43,562 258 To be implemented

Industrial Equipment $40,483 138 Implemented

Other $200,000 701

Industrial Equipment $7,000 48

Maintenance NULL 80

Industrial Equipment $19,983 77 To be implemented

Industrial Equipment $4,000 30 Ongoing

Industrial Equipment $30,000 165 Implemented

Industrial Equipment NULL 1,290 To be implemented

Other NULL 437

Other NULL 1,114

Industrial Equipment $23,000 1,029

Industrial Equipment $20,000 3,419

Industrial Equipment NULL 1,360 Ongoing

Other $200,000 713

Other $300,000 1,091

Other $200,000 242

Industrial Equipment NULL 525 To be implemented

Industrial Equipment $20,000 234 Implemented

Industrial Equipment $2,000 18 Ongoing

Lighting $4,000 199

Building Management Systems $9,000 21 Implemented

Lighting $3,400 11 Implemented

HVAC $850 2 Implemented

HVAC $1,800 6 Implemented

Lighting $18,960 8

Cogeneration $205,000 43

Cogeneration $2,080,000 -2,963

Alternative power generation $150,000 1,291

HVAC $200,000 150 Under-investigation

Air compressor $175,260 606

Air compressor NULL 97 Implemented

Pool Covers/Heating $6,900 18 To be implemented

Monitoring $400,000 1,301 10,200

Lighting $75,000 163

Industrial Equipment NULL 200 Implemented

Industrial Equipment $50,000 250

Air compressor $40,000 99 To be implemented

Lighting $240,000 719 Ongoing

Waste heat recovery $70,000 11,465 Not to be implemented

Industrial Equipment $1,300,000 11,588 Implemented

Boiler NULL 139 Implemented

Page 140: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Insulation $7,450 1,734

Industrial Equipment $20,000 237 Not to be implemented

Other $2,000 1,368 Ongoing

Insulation $13,200 6,617

HVAC $10,000 2,226 To be implemented

Insulation $10,920 1,475 Not to be implemented

Industrial Equipment $20,000 237 Not to be implemented

Industrial Equipment $10,000 20,693 To be implemented

Other $15,000 669 To be implemented

Other $3,000 1,632 Ongoing

Insulation $12,430 4,165

Other NULL 592 Ongoing

Industrial Equipment $5,000 1,343 Not to be implemented

Industrial Equipment $5,000 63

Industrial Equipment $8,000 50

Industrial Equipment $10,000 50

Waste heat recovery $50,000 3,550

Air compressor $10,000 166

Industrial Equipment $5,000 840

Industrial Equipment $22,000 148

Waste heat recovery $300,000 22,960

Industrial Equipment $60,000 840

Lighting $5,000 109

Air compressor NULL 857

Waste heat recovery $50,000 2,800

Lighting $5,000 663

Air compressor NULL 134

HVAC $5,000 138

Industrial Equipment $5,000 111

Air compressor $15,000 748

Industrial Equipment $8,000 68

Industrial Equipment $16,000 59 Under-investigation

Air compressor $5,000 24 Implemented

Industrial Equipment $4,000 20 Under-investigation

Other NULL 23,200 Not to be implemented

Air compressor NULL NULL NULL Under-investigation

Industrial Equipment $26,000 131 Under-investigation

Other NULL 12,280 Under-investigation

Waste heat recovery NULL 13,714 Not to be implemented

Waste heat recovery NULL 8,571 Not to be implemented

Other NULL 2,400 Under-investigation

Other NULL 8,868 Not to be implemented

Industrial Equipment NULL NULL NULL Under-investigation

Industrial Equipment NULL NULL NULL Under-investigation

Sub-metering NULL NULL NULL Under-investigation

Air compressor NULL 303 Not to be implemented

Other NULL 1,840 Not to be implemented

Air compressor NULL NULL NULL Under-investigation

Page 141: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment NULL 48 Under-investigation

Waste heat recovery NULL NULL NULL Under-investigation

Other $16,000 59 Under-investigation

HVAC $20,000 400 To be implemented

Industrial Equipment $25,000 1,402

Mixed $10,000 20

Lighting $5,000 5

Building Management Systems $1,200 13

Lighting $2,400 27

Lighting $500 3

Lighting $2,000 25 To be implemented

HVAC $4,140 17 Implemented

HVAC $10,000 32 Implemented

Computers & Printers NULL 133 Implemented

Lighting $1,950 3

Mixed $4,800 26 86 Implemented

HVAC $12,000 89

Lighting $88,335 469 Not to be implemented

Lighting $500 35

Lighting $8,000 18

Lighting $15,060 21 Under-investigation

Lighting $425 0.83 Implemented

Lighting $2,300 8 Implemented

Other $1,800 10

Industrial Equipment $10,000 117 Implemented

Industrial Equipment $500,000 5,500 Implemented

Industrial Equipment $48,000 1,512 Implemented

Other $750 31 Not to be implemented

HVAC $2,180 30 Not to be implemented

HVAC NULL 1 5 Not to be implemented

Industrial Equipment NULL 4 Not to be implemented

Industrial Equipment NULL 275 Implemented

Industrial Equipment NULL 275 Ongoing

Industrial Equipment NULL 642

Ventilation NULL 295 Ongoing

Industrial Equipment $1,000 709 Implemented

Industrial Equipment NULL 1,298

Industrial Equipment $1 86 Implemented

Other $6,000 246 Implemented

Industrial Equipment $3,000 286 Implemented

Industrial Equipment $1,000 299 Not to be implemented

Industrial Equipment $1,000 71 Implemented

Industrial Equipment $25,000 201 Implemented

Industrial Equipment $10,000 1,244 To be implemented

Air compressor NULL 517 To be implemented

Air compressor NULL 307 To be implemented

Behaviour/Education $100 51 Implemented

Industrial Equipment $1,200 41 Not to be implemented

Page 142: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment NULL 11

Industrial Equipment $32,000 444

Industrial Equipment $18,600 200 Implemented

Lighting $2,900 47

Lighting $3,000 18

Lighting $2,000 28

Sub-metering $23,000 141 Implemented

Sub-metering $20,600 88 Implemented

Lighting $220 2 Ongoing

Lighting $4,580 57 Not to be implemented

Air compressor $56,000 299

Chiller $89,500 813

Industrial Equipment $56,500 284

Industrial Equipment $36,000 640 Under-investigation

Industrial Equipment $15,000 490 Implemented

HVAC $4,800 26 Implemented

HVAC $25,065 14

Other $240 4 Implemented

Building Management Systems $89,000 336 Implemented

Other NULL 52 Implemented

Industrial Equipment $5,750 32 To be implemented

Chiller $78,000 749 To be implemented

HVAC $2,700 8 Implemented

HVAC $5,000 15 Implemented

Lighting NULL 49 Ongoing

Industrial Equipment $220,000 710 Under-investigation

Industrial Equipment $220,000 911

Industrial Equipment $55,000 375 Implemented

Industrial Equipment NULL 1,111 Under-investigation

Industrial Equipment $20,000 440 Implemented

Other $4,025 20 Implemented

Industrial Equipment $20,000 1,273 To be implemented

Air compressor NULL 417 Implemented

Building Management Systems $2,550 30 Implemented

Industrial Equipment $600 77

Industrial Equipment $800 106

HVAC $50,000 4,700

Lighting $1,000 5 To be implemented

HVAC $2,500 6 Implemented

HVAC $3,725 53

Industrial Equipment NULL NULL NULL Ongoing

HVAC $500 5 Not to be implemented

HVAC $32,000 36 To be implemented

Industrial Equipment NULL 130 Implemented

Boiler $750,000 29,903 Implemented

HVAC $3,077 31 Implemented

HVAC $3,077 31 Implemented

Industrial Equipment $16,922 43 Implemented

Page 143: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Pool Covers/Heating $4,615 78 Implemented

Pool Covers/Heating $4,615 78 Implemented

Industrial Equipment $6,154 42 Implemented

Industrial Equipment $7,000 39 Not to be implemented

Industrial Equipment $7,000 39 Not to be implemented

Other $1 2,136 Implemented

Other $2,000 49 Ongoing

Industrial Equipment $16,000 162 Under-investigation

Pool Covers/Heating $68,918 778 Implemented

Industrial Equipment $480 82 Implemented

Other $240 129 763 Implemented

HVAC $3,725 78

Industrial Equipment $12,800 18

HVAC NULL 60 To be implemented

Industrial Equipment $6,000 184

Industrial Equipment $24,000 126 To be implemented

Industrial Equipment NULL 2,150 To be implemented

Lighting $2,520 15 Implemented

Other NULL 526 Implemented

Other $4,500,000 1,528 Implemented

Lighting $100 0.27 Implemented

Building Management Systems $700 16 Implemented

Building Management Systems $400 2 Implemented

Lighting $10,000 25

Lighting $26,000 276 Implemented

Lighting $10,000 200 Implemented

Refrigeration $2,000 21

Power Factor Correction $11,267 56 Implemented

Power Factor Correction $26,249 NULL NULL Implemented

Other $20,000 168

Air compressor $10,000 70 Implemented

Industrial Equipment $300,000 2,000 Implemented

Lighting $10,000 50 Ongoing

Lighting $21,950 40

Lighting $1,500 3 Implemented

HVAC NULL 10

Insulation $20,820 5,988

Insulation $28,500 6,297 To be implemented

Insulation $20,860 4,879 To be implemented

Lighting $1,500 4 Implemented

Other $100 2 Implemented

Lighting $1,500 7 Implemented

HVAC $350,000 NULL NULL Ongoing

Industrial Equipment $400,000,000 60,478 Under-investigation

Other $4,117,000 400 Not to be implemented

Industrial Equipment $19,000 100 Not to be implemented

Pool Covers/Heating $32,000 26

Pool Covers/Heating $2,049 352

Page 144: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Boiler $53,000 3,798

Pool Covers/Heating $120,000 1,260

Pool Covers/Heating $120,000 1,260

Other $26,301 130

Industrial Equipment $2,000 3

Power Factor Correction $46,000 NULL NULL Ongoing

Power Factor Correction $395,000 NULL NULL Implemented

Power Factor Correction $20,000 NULL NULL Implemented

Power Factor Correction $161,950 0

Power Factor Correction $12,000 NULL NULL Implemented

Power Factor Correction $12,000 NULL NULL Under-investigation

Power Factor Correction $12,000 NULL NULL Implemented

Power Factor Correction $110,000 0 Not to be implemented

Power Factor Correction $148,886 1,450

Power Factor Correction $180,192 NULL NULL Implemented

Power Factor Correction $30,000 NULL NULL Implemented

Power Factor Correction $250,000 NULL NULL Implemented

Power Factor Correction $250,000 NULL NULL Implemented

Power Factor Correction $145,000 0

Power Factor Correction $257,000 300 To be implemented

Power Factor Correction $35,000 300 Implemented

Alternative power generation $3,600,000 13,140 Not to be implemented

Waste heat recovery $7,900 376

Waste heat recovery $18,500 1,254

Chiller $1,400,000 109 Implemented

Boiler $105,000 2,721 To be implemented

HVAC $1,500 48

Industrial Equipment $7,000,000 30,820

Boiler $80,000 1,350 Not to be implemented

Other NULL 142 Implemented

Other $20,000 78 Not to be implemented

HVAC $0 198 Implemented

Industrial Equipment $300,000 488

HVAC $3,725 48

Hot Water System $200,000 18,330

Other $1,500,000 NULL NULL Implemented

Industrial Equipment $18,000 156 Not to be implemented

Industrial Equipment $33,000 184 Not to be implemented

Industrial Equipment $22,000 228 Under-investigation

Industrial Equipment $22,000 222 Under-investigation

Industrial Equipment $22,000 216 Not to be implemented

Other $93,000 1,463 To be implemented

Boiler $5,800 1,410 Ongoing

Boiler $4,600 594 Implemented

Lighting $100 6 Implemented

Behaviour/Education NULL 155

Chiller $80,000 1,290 Under-investigation

Hot Water System $300 1 13

Page 145: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

HVAC $800 22 Implemented

Chiller $265,000 370

Lighting $10,700 63

Industrial Equipment $4,000 12

Industrial Equipment $4,000 6

Lighting $1,000 13

Lighting $46,000 90

Lighting $18,200 36

Behaviour/Education NULL 7 Not to be implemented

Behaviour/Education NULL 1 Not to be implemented

Behaviour/Education $0 0.56 Implemented

Behaviour/Education $0 0 Not to be implemented

Chiller $100,000 694

Industrial Equipment $4,640 6 Not to be implemented

Pool Covers/Heating $54,400 1,543

Pool Covers/Heating $100,000 336

HVAC $10,200 9

Industrial Equipment $4,000 5

Industrial Equipment $4,000 5

Chiller $15,200 149 To be implemented

Chiller $15,200 103 To be implemented

Industrial Equipment $14,000 78

HVAC $36,000 79

HVAC $55,000 46 Not to be implemented

Other $10,000 1,977 11,760 Implemented

Industrial Equipment $125,000 65

Industrial Equipment NULL 42

Air compressor $311,096 601 Implemented

Air compressor $20,000 75 Implemented

Industrial Equipment $474,047 734 Not to be implemented

Industrial Equipment $4,600 1,100 Not to be implemented

HVAC $4,100 9 Implemented

HVAC $750 4 Implemented

HVAC $200 3 Not to be implemented

Computers & Printers $500 84

Industrial Equipment $300,000 1,200

Industrial Equipment $450,000 1,200

PV $256,133 25

Lighting $712 2 To be implemented

Computers & Printers $60 2

HVAC NULL 39

Refrigeration $30,000 263 Implemented

Refrigeration $75,000 596 Implemented

Air compressor $20,000 110

Other $1,500,000 NULL NULL Implemented

Other $3,000 NULL NULL Implemented

Industrial Equipment $26,000 105

Other NULL 148

Page 146: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other $8,000 74

Industrial Equipment NULL 30

Lighting $1,100 6 Implemented

Lighting $2,000 8 Ongoing

Lighting $1,800 166

HVAC $2,920 11 28 Ongoing

Other $1,500 378 Implemented

HVAC $13,800 75 Under-investigation

HVAC $30,000 294 Implemented

Lighting $5,800 13

Boiler $11,500 326 Implemented

Building Management Systems $31,200 846

Hot Water System $2,300 6 Implemented

Lighting $2,000 49 Ongoing

Industrial Equipment $10,000 1,733 42,983 Implemented

HVAC $5,750 47 Implemented

Lighting $12,500 300 Ongoing

Chiller $3,738 6 Implemented

HVAC $219,419 544 2,194

HVAC $72,272 345 1,365

HVAC $17,940 75 234

Industrial Equipment $500,000 3,787 Not to be implemented

Industrial Equipment $45,000 1 Not to be implemented

Waste heat recovery $3,750 178 To be implemented

Waste heat recovery $9,500 3,600 Implemented

Waste heat recovery $15,000 1,530

Waste heat recovery $19,000 1,888

Waste heat recovery $112,800 1,995 Implemented

Pool Covers/Heating $85,000 2,667 Not to be implemented

Waste heat recovery $15,000 427 Not to be implemented

Pool Covers/Heating $85,000 2,667 Not to be implemented

Waste heat recovery $15,000 427 Not to be implemented

Waste heat recovery $4,000 2,778 To be implemented

Other $25,000 0 Implemented

HVAC $0 95

Hot Water System $500 2 Implemented

Industrial Equipment $20,000 350 Under-investigation

Industrial Equipment $30,000 700 Not to be implemented

Industrial Equipment $50,000 1,400 Under-investigation

Other $160,000 24 13,600 To be implemented

Industrial Equipment $100,000 2,544 63,067 Implemented

Industrial Equipment $100,000 4,564 113,169 Implemented

Behaviour/Education NULL NULL NULL Implemented

HVAC NULL 25 Ongoing

HVAC $0 27 Implemented

Air compressor $15,000 336 Implemented

Air compressor NULL 90 Implemented

Hot Water System $110,000 1

Page 147: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other $16,000 7,300 Implemented

Other $200,000 7,971 Not to be implemented

Air compressor NULL 10 Implemented

Air compressor $100 7 Under-investigation

Hot Water System $150 2 Implemented

Lighting $30,000 300 Implemented

Industrial Equipment NULL 2,000 Under-investigation

Hot Water System $60 1

Other NULL 241 To be implemented

Industrial Equipment $50,000 2,500 Implemented

Industrial Equipment $100,000 2,478 Under-investigation

Chiller $1 166 To be implemented

Industrial Equipment $10,000 570 Implemented

Air compressor $30,000 1,000 Implemented

Lighting $750 22

Industrial Equipment NULL 722 To be implemented

Other $660 67 Implemented

Industrial Equipment $3,000 17 Not to be implemented

Other NULL 242 Not to be implemented

Industrial Equipment NULL 77 Implemented

Boiler NULL 63 Under-investigation

Hot Water System NULL 4 To be implemented

HVAC NULL NULL NULL Implemented

Other $20,000 10,412 Ongoing

Air compressor $3,600 114 Implemented

Other NULL 160

Pool Covers/Heating NULL 50 250 Implemented

Pool Covers/Heating $0 539 Implemented

Pool Covers/Heating NULL 485 Not to be implemented

Pool Covers/Heating NULL 48 Not to be implemented

Other NULL 973

Refrigeration $8,500 53 To be implemented

Refrigeration $15,000 52 To be implemented

Refrigeration $300 1 To be implemented

Refrigeration $50 1 Implemented

Other NULL 3,904 To be implemented

Behaviour/Education $0 6

Other $50,000 1,041 Not to be implemented

Hot Water System $70 0.65 Implemented

Hot Water System $60 0

Chiller $5,988 25 Not to be implemented

Industrial Equipment $1,500 2

Lighting $500 4

Hot Water System NULL 40

Ventilation $2,500 4 Implemented

Hot Water System $300 1

Lighting $300 2

Hot Water System NULL 2 Implemented

Page 148: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Hot Water System NULL 24 Implemented

Industrial Equipment $500 3 To be implemented

Hot Water System $160 1

Hot Water System $60 0

Hot Water System $70 0.23 Implemented

Hot Water System $70 0.25 Implemented

Hot Water System $70 1 Implemented

Lighting $1,000 4

Lighting $500 1

Other $25,000 1,993 Implemented

Industrial Equipment $600 11 Implemented

Other $24,000 2,375 Implemented

Industrial Equipment $1 62 To be implemented

Lighting $7,320 63 Implemented

Industrial Equipment $1,000 108

Industrial Equipment $1,000 89

Air compressor $50,000 233 To be implemented

Industrial Equipment NULL 722 To be implemented

Lighting NULL 175

Lighting $4,000 9 Not to be implemented

Lighting $18,400 33 To be implemented

Air compressor $500 47

Industrial Equipment $1,000 99

Pool Covers/Heating $1,000 340 Implemented

Industrial Equipment $23,600 356 Implemented

Computers & Printers NULL 68

Lighting NULL 75

HVAC NULL 79

Industrial Equipment $575,000 763 Ongoing

Lighting $405 0

Lighting $536 1

Lighting $700 1

Lighting $2,524 4

Lighting $850 0.60 Implemented

Lighting $4,050 4

Lighting $5,400 3

Lighting $1,700 2 Implemented

Lighting $1,941 2

Lighting $810 1

Lighting $327 1

Lighting $1,215 1

Lighting $1,215 1

Lighting $1,170 5 To be implemented

Lighting $1,400 3 Implemented

Lighting $8,500 7

Lighting $15,900 13 Implemented

Lighting $36,450 50 Implemented

Lighting $9,600 8 Implemented

Page 149: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $1,130 3 Implemented

Lighting $1,989 5

Lighting $28,125 398

Other $5,000 12 Implemented

Lighting $675 2 To be implemented

Lighting $7,200 6

Lighting $675 0

Lighting $5,400 4 Implemented

Lighting $1,620 1 Implemented

Lighting $6,200 9 Implemented

Lighting $9,000 21 Implemented

HVAC $2,500,000 230 Implemented

Industrial Equipment $150,000 390

Industrial Equipment $100,000 7,044

Industrial Equipment $3,000,000 150,400

Industrial Equipment $1,000,000 87,766 Under-investigation

Industrial Equipment $5,000 1,174

Industrial Equipment NULL 1,498 Not to be implemented

Industrial Equipment $15,000 77 Implemented

Industrial Equipment $20,000 7,490 Implemented

Industrial Equipment $100,000 7,490 Implemented

Industrial Equipment $5,447,305 192,640 Not to be implemented

Industrial Equipment $4,500,000 85,000 Under-investigation

Industrial Equipment $7,255,000 250,000 Under-investigation

Industrial Equipment $20,000 2,935

Industrial Equipment NULL 1,026

Industrial Equipment $3,000 816 Implemented

Industrial Equipment $5,000 1,498 Implemented

Industrial Equipment $20,000 1,360

Industrial Equipment $140,000 864 Implemented

Industrial Equipment $260,000 34,000 Implemented

HVAC $1,620 65

HVAC $1,620 1,039

Lighting $2,310 14 Not to be implemented

HVAC $9,750 19 Not to be implemented

Industrial Equipment $345 4 Implemented

Lighting $627 1

Lighting $27,500 32 Implemented

Lighting $1,250 13 Implemented

Lighting $200 1 To be implemented

Building Management Systems $50,000 166 Not to be implemented

Lighting $350 2 Not to be implemented

Industrial Equipment $70,000 1,095 To be implemented

Industrial Equipment $8,140,000 611 Not to be implemented

Lighting $41,810 7 Ongoing

Other $32,500 1,357

Air compressor $10,000 319

Hot Water System $100 0.83 Implemented

Page 150: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Chiller $150,000 841

Industrial Equipment NULL 4 To be implemented

Industrial Equipment $2,000 26 Implemented

Industrial Equipment $5,000 6 3,000

PV $1,800,000 800 Not to be implemented

Chiller $150,000 524

Lighting $115,000 41

Air compressor $10,000 307 Implemented

Cogeneration $110,000 22,000 Implemented

Air compressor $2,420 61 Not to be implemented

HVAC NULL 529

Maintenance $2,480 61 23 Implemented

Maintenance $26,000 1,746

Maintenance NULL 5,405

Maintenance $3,000 140 Implemented

Air compressor $10,000 1,000 Implemented

HVAC $5,400 75 Ongoing

Air compressor $23,000 847 To be implemented

Lighting $500 21 Implemented

HVAC $1,700 21 Implemented

Maintenance $500 103 Implemented

Industrial Equipment $1,360 59 Implemented

Maintenance $500 129

Maintenance $6,100 1,926 Implemented

Maintenance NULL 25,902

Maintenance NULL 9,811

Other $760 65

Other $40,000 547 Not to be implemented

Other $5,800 35 Implemented

Lighting $1,142 2

Lighting $1,420 1

Lighting $1,420 1

Lighting $2,500 2 Not to be implemented

Lighting $1,100 3 Implemented

Lighting $1,486 2

Lighting $4,167 4

Lighting $40,000 3 Under-investigation

Lighting $228 0

Lighting $1,485 2

Lighting $7,216 10

Lighting $2,964 2

Lighting $4,060 13

Lighting $2,117 3

Lighting $2,557 2

Lighting $946 0

Lighting $228 0

Lighting $270 0

Industrial Equipment $5,000 2

Page 151: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $2,702 2

Lighting $4,928 19 Not to be implemented

Lighting $3,409 3

Lighting $4,000 18 Implemented

Lighting $1,902 3

Lighting $14,394 10

Lighting $1,556 0

Lighting $242 1

Lighting $8,483 10

Lighting $811 3

Lighting $426 0

Lighting $6,600 5 Not to be implemented

Lighting $8,050 5 Implemented

Lighting $30,000 34

Lighting $646,350 1,416 To be implemented

Lighting $430,900 1,287 To be implemented

Lighting $22,500 55

Lighting $5,139 14 To be implemented

Lighting $806 2

Lighting $457 1

Lighting $457 1

Lighting $946 2

Lighting $6,385 40 To be implemented

Lighting NULL 0 Not to be implemented

Lighting $2,310 65 Implemented

Other $10,200 68

Lighting $4,500 19 Ongoing

Lighting $6,500 9 Implemented

Lighting $3,000 110 Ongoing

Lighting $35 0.28 Implemented

Lighting $7,500 21 To be implemented

Lighting $11,000 70

Lighting $571 1

Lighting $675 1

Lighting $1,339 2

Lighting $276 1 Not to be implemented

Lighting $345 1 Not to be implemented

Lighting $90 0

Lighting $194,400 887 Ongoing

Lighting $108 1 To be implemented

Lighting $2,000 11

Lighting $1,500 12

Lighting $560 10

Lighting NULL 4 Implemented

Lighting $165 0.83 Implemented

Lighting $20 0

Lighting $197,590 991

Lighting $100 2

Page 152: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $32,000 88 To be implemented

Other $14,500 11 Implemented

Lighting $120,000 289

Hot Water System $21,500 26

Lighting $811 1

Lighting $727 1

Lighting $946 2

Lighting $9,526 18

Lighting $9,572 14

Lighting $96 0.23 Implemented

HVAC $50,000 70

HVAC $228,000 434 To be implemented

HVAC $100,000 20

HVAC $300,000 50

Chiller $15,000 2

HVAC $100,000 20

Industrial Equipment $24,000 174

Lighting $400,000 368

Hot Water System $60,000 111 To be implemented

Lighting $22,120 28 Ongoing

Other $800 1

Lighting $17,500 41 Implemented

Lighting $15,000 35 To be implemented

Lighting NULL 7 Not to be implemented

Industrial Equipment $2,500,000 1,970 Implemented

HVAC $19,800 191

Lighting $100 0.82 Implemented

Chiller $400,000 442 Implemented

Other $10,784 256

Lighting $5,200 7

Air compressor $300,000 155 Implemented

Other $1,600 117 Not to be implemented

Chiller $265,000 434

Chiller $136,000 186 Implemented

Chiller $700,000 740 Implemented

Air compressor $4,000 17

Computers & Printers $52,500 41

Boiler $13,000 69 Implemented

HVAC $42,000 671 Implemented

Computers & Printers $9,000 11

Computers & Printers $162,000 117

Computers & Printers $30,000 18

Computers & Printers $30,000 29

Computers & Printers $19,200 14

Computers & Printers $5,400 5

Computers & Printers $7,500 7

Computers & Printers $3,300 2

Computers & Printers $10,750 8

Page 153: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Computers & Printers $1,000 1

Computers & Printers $3,300 1

Computers & Printers $2,700 1

Other $69,600 58

Boiler $120,000 5,124 Implemented

Pool Covers/Heating $5,000 26 Implemented

Industrial Equipment $1,300,000 41,667 Implemented

HVAC $30,000 104 Not to be implemented

Lighting $2,600 3 Implemented

Lighting NULL 3 Implemented

Industrial Equipment $612,500 -19 To be implemented

Hot Water System $9,000 14

HVAC $60,000 20

Hot Water System $36,320 172

HVAC $80,000 10

HVAC $300,000 200

HVAC $45,000 10

HVAC $20,000 5

Boiler $87,000 480

Boiler $55,000 224 -4,642

HVAC $25,000 5

HVAC $30,000 20

Hot Water System $3,000 13 -52

Hot Water System $5,000 5

Hot Water System $8,000 2

Hot Water System $15,000 10

Hot Water System $8,000 20

Hot Water System $8,000 10

Hot Water System $8,000 10

Hot Water System $5,000 1

Hot Water System $5,000 5

Hot Water System $5,000 5

Hot Water System $5,000 5

Hot Water System $8,000 10

Hot Water System $20,000 15

Hot Water System $5,000 1

Hot Water System $10,000 3

Hot Water System $5,000 5

Hot Water System $6,000 5

Hot Water System $5,000 5

Hot Water System $5,000 2

HVAC $20,000 5

Chiller $15,000 129

Lighting $1,300 6 Implemented

Lighting $8,050 23 Implemented

Lighting $5,684 10 To be implemented

HVAC $100,000 5

HVAC $236,366 194 Not to be implemented

Page 154: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $2,240 1

Hot Water System $6,000 51 Implemented

Hot Water System $1,000,000 100

Hot Water System $3,000 5 Under-investigation

Hot Water System $18,000 45 Implemented

Lighting $1,895,080 371 Ongoing

HVAC $44,000 906 Not to be implemented

Lighting $18,040 11 Ongoing

Lighting $1,400 2 Implemented

Lighting $39,520 35

Lighting $14,690 5

Lighting $10,530 1

Lighting $25,870 14

Industrial Equipment $30,000 77

Lighting $700,000 70

Industrial Equipment $688,000 24 4,333 Not to be implemented

Lighting $3,366,880 2,224 Ongoing

Pool Covers/Heating $9,620 58 To be implemented

Lighting $25,000 14

Lighting $13,246 30 To be implemented

Lighting $24,500 28 To be implemented

Lighting $3,200 3

Lighting $61,210 181 To be implemented

Industrial Equipment $234,000 1,349

Building Management Systems $400,000 50 100

Lighting $409,950 482 Ongoing

Lighting $250 0

Lighting $1,200 1

Lighting $9,700 17

Lighting $30,000 93

Lighting $32,300 89 Implemented

Lighting $31,000 99

Lighting $32,800 28

Lighting $34,440 16

Lighting $10,000 30

Lighting $125 0

Lighting $1,275 2

Lighting $325 1

Lighting $1,000 0

Lighting $1,275 2

Lighting $2,700 2 To be implemented

Lighting $240 0 To be implemented

Lighting $30,000 21

Lighting $106,500 424 To be implemented

Lighting $109,620 219 Implemented

Lighting $3,000 6 Under-investigation

Other $150,000 10

Other $150,000 5

Page 155: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other $150,000 10

Other $150,000 10

Other $150,000 10

Other $150,000 10

Other $150,000 5

Industrial Equipment $2,000,000 1,846 Not to be implemented

Other $11,190 11

Lighting $950 6

Lighting $1,520 1 Implemented

Lighting $12 0

Lighting $200 1

Lighting $24 0 To be implemented

Lighting $925 5

Lighting $24 0

Lighting $850 5

Lighting $375 2

Lighting $4,050 11

Lighting $6,000 14

Lighting $875 2

Lighting $125 1

Lighting $2,500 9

Lighting $4,225 14

Lighting $125 1

Lighting $2,250 5

Lighting $2,000 7 Under-investigation

Lighting $50 1

Lighting $180 1 Implemented

Lighting $48 0.46 Implemented

HVAC $500,000 5

Lighting $100 2 Implemented

Hot Water System $2,850 3 Implemented

Other NULL 1,727

Hot Water System $3,000 13 -52

Lighting $20,665 20

Lighting $60,000 100

Lighting $2,000 1

Lighting $25,000 5

Lighting $5,000 5

Lighting $15,000 20

Lighting $15,000 20

Lighting $20,000 10

Lighting $10,000 10

Lighting $10,000 20

Lighting $10,000 20

Lighting $40,000 70

Lighting $150,000 150

Lighting $20,000 20

Lighting $1,000 1

Page 156: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $25,000 20

Lighting $15,000 10

Lighting $5,000 2

Lighting $20,000 50

Lighting $30,000 20

Lighting $45,000 30

Lighting $100,000 166

Lighting $30,000 50

Industrial Equipment $21,000 55 To be implemented

Lighting $1,280 5

Lighting $3,335 5

Lighting $2,100 4 Not to be implemented

Lighting $1,925 2 Implemented

Lighting $200 4 To be implemented

Lighting $5,000 6 Implemented

Lighting $2,000 0 To be implemented

Lighting $7,000 9 Implemented

Lighting $7,000 2

Lighting $6,900 21 Implemented

Lighting $5,000 66

HVAC NULL 698

HVAC $60,000 10

Lighting $10,500 3

Industrial Equipment $5,000,000 228,571 Implemented

Boiler $3,500,000 119,622 Under-investigation

Lighting $4,499 6 Implemented

Air compressor $160,000 1,056

HVAC $6,338 58

Industrial Equipment $20,000 41 Implemented

Chiller $196,800 285 To be implemented

Industrial Equipment $782,880 452

Air compressor $311,000 630

Lighting $350 4

Lighting $300 2 Implemented

Lighting NULL 65 Implemented

HVAC $40,000 43

Lighting NULL 10

Lighting $800 13 Implemented

HVAC $100,000 10

Chiller $140,000 200

HVAC $100,000 4

Other $30,000 5

Industrial Equipment NULL 495 To be implemented

HVAC $480,000 173

Industrial Equipment $88,700 230 Ongoing

Industrial Equipment $87,724 181 Ongoing

Industrial Equipment $342,280 8,644 Ongoing

Industrial Equipment $5,735,100 500 Implemented

Page 157: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

HVAC $8,000,000 500

Industrial Equipment $1,100,000 788 Implemented

Industrial Equipment $9,500 152

Lighting $25,000 113

Lighting NULL 53 Implemented

Lighting $500,000 500

Lighting $675 5

Industrial Equipment $90,000 130

Lighting $14,241 11 Not to be implemented

Industrial Equipment $15,000 8 Implemented

Lighting $28 0

Lighting $12 0.09 Implemented

Lighting $12 0 Implemented

Hot Water System $16,040 0 Not to be implemented

HVAC $300,000 157

Industrial Equipment $3,470 5 Not to be implemented

Lighting $161 1 Not to be implemented

HVAC $49,529 496 Implemented

Lighting $2,380 4 Not to be implemented

HVAC $4,800 54

Lighting $500 4 Under-investigation

Lighting $550 2

Other $5,000 19 Implemented

Other $3,200 1

Lighting $2,750 2 Implemented

Lighting $800 1

Lighting $500 0.44 Implemented

Lighting $30,900 9

Lighting $19,000 10 Implemented

Lighting $1,880 4

Chiller $230,000 458 Ongoing

Industrial Equipment $5,000 38

HVAC $500,000 50

HVAC $200,000 20

Industrial Equipment NULL NULL NULL Under-investigation

Industrial Equipment $1,000,000 345 Implemented

Lighting $12,720 127 Implemented

Industrial Equipment $400,000 545

HVAC $500,000 500

HVAC $40,000 10

Air compressor $180,000 230 Implemented

HVAC $286,848 50

HVAC $95,817 28

Chiller $20,000 50

HVAC $500,000 10

Hot Water System NULL 3 Not to be implemented

Hot Water System NULL 7 Not to be implemented

Hot Water System NULL 30 Not to be implemented

Page 158: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Air compressor $550,000 761 Not to be implemented

Industrial Equipment $350,000 210 Not to be implemented

HVAC $390,000 120 Not to be implemented

HVAC $30,000 1

Industrial Equipment $7,000 7 Ongoing

Computers & Printers NULL 205 Implemented

HVAC $40,000 50

HVAC $1,200,000 60

HVAC $10,000 5

HVAC $40,000 20

Hot Water System $5,000 10

Hot Water System $15,000 20

Hot Water System $5,000 10

Hot Water System $8,000 30

Hot Water System $5,000 2

Hot Water System $5,000 1

Hot Water System $5,000 1

Industrial Equipment $652,625 1,358 Ongoing

HVAC $69,718 8

Hot Water System $106,196 755 Not to be implemented

Lighting $15,220 29

Lighting $269,800 288

Lighting $169,950 211

Industrial Equipment $6,000 99

Lighting $60,000 0

Lighting $53,320 38

Lighting $10,900 3

Lighting $21,990 12

Lighting $27,900 11

Industrial Equipment $125,580 629 Not to be implemented

Lighting $546 1 Implemented

Lighting $2,418 5 Implemented

Lighting $11,400 129

Lighting $346,000 600 Under-investigation

Other $150,000 5

Other $130,000 2

Other $250,000 20

Lighting $160 7 Implemented

Lighting $2,000 8 Implemented

Lighting $200 2 Implemented

Lighting $2,400 4 Implemented

Lighting $20,000 5

Lighting $10,000 2

Lighting $20,000 30

Lighting $10,000 10

Lighting $10,000 5

Lighting $5,000 5

Lighting $15,000 25

Page 159: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

HVAC $30,000 92 Implemented

Lighting $5,250 5 Implemented

Lighting $550 1

Lighting $1,500 1

Other $2,100 3

Lighting $6,000 3

Industrial Equipment $540,000 80

Chiller $150,000 68

Chiller $100,000 50

Chiller $145,000 185

Insulation $250,000 100 300

Industrial Equipment NULL 10

Industrial Equipment NULL 158

HVAC $130,200 565

Other $9,225 31 Implemented

Chiller $400,000 153 Not to be implemented

Industrial Equipment $146,946 1,003 Under-investigation

Other $30,000 6,700 Under-investigation

Lighting $305,820 223

Lighting $3,612,000 513 Ongoing

Other $500 5 Implemented

Lighting $9,500 352 Implemented

Lighting $10,800 36 Implemented

HVAC $17,250 154 Implemented

HVAC $0 15 Implemented

Lighting NULL 27

Industrial Equipment NULL 12

HVAC NULL 38

HVAC NULL 14

HVAC NULL 1

HVAC $0 6 Implemented

HVAC $0 3 To be implemented

Other $0 3 7

Other $15,000 2,390

HVAC $10,000 2,953 6,407

HVAC $25,000 1,762 3,592

HVAC $1,000 397 2,189

Lighting $10,270 14

Other $2,000,000 667 Not to be implemented

Lighting $31,710 83

Lighting $10,030 4 To be implemented

Lighting $13,940 5

Lighting $4,080 2

Chiller $188,000 440 Not to be implemented

Lighting $900 1 Not to be implemented

Lighting $3,600 23 Under-investigation

Lighting $2,550 14

Lighting $2,700 6

Page 160: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $2,550 20

Lighting $2,700 11

Lighting $124,583 345

Lighting $2,850 16

HVAC $43,000 375

Lighting $10,357 5

Lighting $2,600 5 Implemented

Lighting $15,500 15 To be implemented

Lighting $2,500 4 Implemented

Lighting $650 0.68 Implemented

Lighting $1,500 1

Lighting $3,700 8

Lighting $4,200 6

Lighting $2,000 3

Lighting $11,649 10 To be implemented

Lighting $1,309 1 Ongoing

Lighting $2,541 16 Ongoing

Lighting $20,988 52 Ongoing

Lighting $1,315 2 Ongoing

Lighting $2,948 3 Ongoing

Lighting $1,117 1 Ongoing

Lighting $1,623 3 Ongoing

Lighting $919 2 Ongoing

Lighting $4,422 5 Ongoing

Lighting $70,000 99 Ongoing

Lighting $1,620 0

Lighting $7,020 2

Lighting $29,400 19 To be implemented

Lighting $33,184 13

Chiller $94,000 22 Not to be implemented

Lighting $6,210 4 Implemented

Lighting $167,475 208 Implemented

Lighting $113,245 142 Implemented

Lighting $16,240 20 To be implemented

Lighting $12,760 16 To be implemented

Lighting $23,345 20 To be implemented

Lighting $1,620 1 To be implemented

Lighting $1,890 1 To be implemented

Lighting $4,320 2 To be implemented

Lighting $1,450 6 Implemented

Lighting $6,960 9 Implemented

Lighting $23,925 25 Implemented

Lighting $22,910 19 Implemented

Lighting $2,240 1 Implemented

Lighting $1,680 3

Lighting $6,380 10

Lighting $580 1

Lighting $23,925 37

Page 161: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other $1,000 6 To be implemented

Other NULL 6,903

Other $84,000 253 5,680 Not to be implemented

Building Management Systems $5,000 12

HVAC $4,000 22 132

HVAC $3,200 54 Implemented

HVAC $3,200 25

Other $20,000 98 To be implemented

HVAC $70,000 200

Building Management Systems $10,000 45 Implemented

Lighting $10,000 421 Implemented

Lighting $5,000 49 Implemented

HVAC $1,500 20 Ongoing

Boiler $6,000 2,376 Implemented

Chiller $5,000 38 Implemented

Maintenance $1,500 13 Not to be implemented

Lighting $500 6 To be implemented

Lighting $500 6 To be implemented

Air compressor $25,000 1,480 Implemented

HVAC $600 6 Implemented

HVAC $1,000 3 Implemented

Building Management Systems $7,500 161 To be implemented

Sub-metering $143,000 78

Cogeneration NULL NULL NULL Implemented

Waste heat recovery NULL 1,320

Cogeneration $1,200,000 6,204

Cogeneration $21,240,000 69,135

Cogeneration $10,200,000 33,660

Boiler $152,000 1,470 To be implemented

Industrial Equipment NULL 8,877

Industrial Equipment $410,250 1,470 To be implemented

Industrial Equipment NULL 468 To be implemented

Waste heat recovery NULL 1,782 To be implemented

Industrial Equipment $31,000 145 To be implemented

Waste heat recovery $1,920,000 28,650 To be implemented

Waste heat recovery $150,000 8,800 To be implemented

Air compressor NULL 173

Air compressor $12,892 490

Air compressor NULL 103 To be implemented

Air compressor NULL 137 To be implemented

Boiler $1,727,295 26,369 To be implemented

Air compressor $114,000 1,470

Waste heat recovery NULL 1,320 To be implemented

Industrial Equipment $700,000 3,632

Industrial Equipment $3,000 107 Implemented

Hot Water System $3,150 3 Not to be implemented

Industrial Equipment $399,000 5,000 To be implemented

Industrial Equipment $156,000 1,817 To be implemented

Page 162: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment $156,000 3,919 To be implemented

Other $6,000 271

Lighting $1,000 28

Lighting $500 8 Implemented

Lighting $500 2 Implemented

Lighting $2,500 7 Implemented

Lighting $2,000 9

Behaviour/Education $300 116 Ongoing

Air compressor $70,000 576 Ongoing

Air compressor NULL NULL NULL Ongoing

Mixed $2,500 22 Ongoing

Lighting NULL NULL NULL Implemented

Industrial Equipment NULL 374 Implemented

Air compressor $15,280 32

HVAC $3,000 3

Industrial Equipment $3,600 35 Not to be implemented

Industrial Equipment $3,000 22 Implemented

Refrigeration $44,400 67 Not to be implemented

Other NULL 820 To be implemented

HVAC NULL 300 Ongoing

Lighting NULL 200 Ongoing

HVAC $8,775 28 Not to be implemented

Chiller $5,000 374 To be implemented

Lighting $3,000 13 Not to be implemented

Lighting $12,000 13 Not to be implemented

Lighting $1,840 20 Implemented

Lighting $12,000 14 Not to be implemented

Lighting $9,000 8 Not to be implemented

Industrial Equipment NULL 200 To be implemented

Lighting $4,500 57

Lighting $2,100 8

Hot Water System $20,500 274 To be implemented

Hot Water System $20,500 274 To be implemented

Mixed NULL NULL NULL Implemented

Air compressor $30,000 289

Boiler $2,000 722

HVAC NULL 4 Not to be implemented

HVAC NULL 3 Not to be implemented

HVAC NULL 1 Not to be implemented

Industrial Equipment $17,000 90 Not to be implemented

Industrial Equipment $360,000 1,659

Industrial Equipment $85,000 400 Not to be implemented

Monitoring NULL NULL NULL Under-investigation

Industrial Equipment $20,000 4,081

Industrial Equipment $150,000 900

Behaviour/Education NULL 7 Implemented

Tariffs NULL 3,120 Ongoing

Other $1,000 33

Page 163: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Refrigeration $127,680 966 Implemented

ventilation $3,500 26

Other NULL 29,710

HVAC $5,000 23 16 Implemented

Industrial Equipment $17,000 115 Implemented

Industrial Equipment $900,000 687 Implemented

Chiller $27,000 114 Implemented

Behaviour/Education $30,000 166

Lighting $675 2 Implemented

Lighting $675 3 Implemented

Other $480 4

Other $480 2 Not to be implemented

Other $120 110 Implemented

Other $360 67 Not to be implemented

Other $120 6 Not to be implemented

Lighting $4,200 53

Lighting $50,693 72 Implemented

Other $1,100 5

Lighting $500 3

Mixed $1,000 147 Implemented

Hot Water System $60,000 113 Under-investigation

HVAC NULL 2 Implemented

HVAC NULL 50 Implemented

Building Management Systems $0 20 Implemented

HVAC $1,600 7 Implemented

Maintenance $8,000 945

Industrial Equipment $150,000 2,046

Building Management Systems $16,000 123 To be implemented

Industrial Equipment $20,000 203 Not to be implemented

Industrial Equipment $600 26 Implemented

Lighting $1,600 62 Under-investigation

Lighting $7,513 8 Implemented

Lighting $7,513 7 Implemented

Sub-metering $19,500 NULL NULL Under-investigation

Other NULL NULL NULL Under-investigation

Lighting $3,000 66 Under-investigation

Lighting $2,000 22 Under-investigation

Lighting NULL 88

Lighting $1,500 17 Not to be implemented

Industrial Equipment $100,000 36 Not to be implemented

Lighting $8,000 7 Not to be implemented

Lighting $1,500 2

Hot Water System $8,430 13 Implemented

Hot Water System NULL 273 -191

Pool Covers/Heating $29,500 95 To be implemented

Hot Water System $47,980 106

Hot Water System $18,000 162 To be implemented

Pool Covers/Heating $181,403 3,606

Page 164: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Pool Covers/Heating $143,428 1,669

PV $38,174 2

PV $38,735 2

PV $34,436 2

PV $37,966 2 0

PV $37,457 2 0

Hot Water System $19,602 154 Not to be implemented

Other $10,000 1,068 Implemented

HVAC $15,000 735 Implemented

Industrial Equipment $100,000 286 Implemented

Industrial Equipment $25,000 23 Under-investigation

Industrial Equipment $25,000 21 Under-investigation

Industrial Equipment $50,000 283 Under-investigation

Other NULL NULL NULL Implemented

Industrial Equipment $1,300 131 Under-investigation

Behaviour/Education $110,000 109 1,668 Ongoing

Building Management Systems $1,000 112

Other NULL 3 Implemented

Boiler NULL 6,243

Cogeneration $688,600 1,674

Industrial Equipment $10,000 3 To be implemented

Industrial Equipment $10,000 5 Not to be implemented

Maintenance $2,300 1,176 Ongoing

Maintenance $1,800 1,176 To be implemented

Boiler $10,000 314 Not to be implemented

Boiler NULL -238 8,333

Industrial Equipment $250,000 20,000 Ongoing

Other $50,000 9,470 To be implemented

Industrial Equipment $5,000 661 Implemented

Industrial Equipment $12,000 700

Monitoring $4,000 147 To be implemented

insulation $33,174 6,481

Industrial Equipment $3,040 635

Boiler $1,200,000 300 4,900

Waste heat recovery $100,000 1,796 Not to be implemented

Waste heat recovery $200,000 3,240 Under-investigation

Industrial Equipment $5,000 2 1,000

Industrial Equipment $30,000 588 To be implemented

Industrial Equipment NULL 420 To be implemented

Other $20,000 293 Not to be implemented

Lighting $3,250 10

Lighting $47,970 108 Implemented

Industrial Equipment NULL 313

HVAC NULL 114

Industrial Equipment NULL 35,000 Under-investigation

Industrial Equipment NULL 14,000 Under-investigation

Air compressor $1,500 10 Implemented

Sub-Metering $15,834 107

Page 165: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment NULL 1,015 -2,451

Other $2,000 342

Industrial Equipment $30,000 728 Ongoing

Lighting $41,000 10 Ongoing

Air compressor $23,000 83 Implemented

Lighting $2,795 5

Lighting $500 2

Industrial Equipment $100 33

Industrial Equipment NULL 120

Hot Water System $600 1

Lighting $250 0

Lighting $8,700 338

Lighting $750 1

Industrial Equipment NULL 130

Pool Covers/Heating NULL 62 Implemented

HVAC $300 1

Industrial Equipment $1 194 Implemented

HVAC $450 1

Industrial Equipment NULL 169

Lighting NULL 1 Not to be implemented

Lighting $6,000 33

HVAC $4,000 11

Lighting $350 1

HVAC $300 3

Lighting $500 1

Lighting $500 1

Lighting $150 0

Lighting $150 0

Lighting $600 1

Lighting $350 2

Lighting $750 3

Refrigeration $1,000 6

Lighting $500 1

Boiler NULL 9 3,971 Implemented

Behaviour/Education $15,000 800 Under-investigation

Hot Water System $50 5 Implemented

Behaviour/Education $5,000 124 To be implemented

Lighting $900 11 Not to be implemented

Behaviour/Education $87,000 650

Other $100,000 948 Under-investigation

Lighting $129,208 41 Implemented

Lighting $2,990 2

Lighting $5,200 4

Lighting $65,910 48

Lighting $88,000 377

Other $3,000 18 Implemented

Other $10,000 876 Implemented

HVAC $37,590 112 Not to be implemented

Page 166: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

HVAC $38,500 164

insulation $35,000 210

Industrial Equipment $30,000 77

HVAC $20,000 210 To be implemented

Lighting $39,600 87 Ongoing

Other $50 0 To be implemented

Lighting $700 2

Lighting $3,600 24

Hot Water System $1,000 40 To be implemented

Hot Water System $80 29 Implemented

HVAC $4,000 8 Not to be implemented

HVAC $5,000 5

Hot Water System $180 3 Not to be implemented

HVAC $1,000 31

Other $300 8

Other $800 3

Lighting $55,688 231

Industrial Equipment $20,000,000 0

Lighting $282,000 530

Other $30,000 195

Maintenance $100,000 7,024 Implemented

Behaviour/Education $6,981 556

Air compressor NULL 150

Lighting $5,000 58

Behaviour/Education $10,000 313

Chiller $50,000 400 To be implemented

Industrial Equipment $13,500 157

Industrial Equipment $18,000 151 Not to be implemented

Lighting $2,500 9 To be implemented

Waste heat recovery $100,000 3,425 Not to be implemented

Waste heat recovery $140,000 4,355 Under-investigation

Lighting $831 0.55 Implemented

Lighting $3,086 NULL NULL Implemented

Boiler $200,000 6,175

Industrial Equipment $20 1

HVAC $17,000 100

Computers & Printers $8,000 235

Industrial Equipment NULL 14 Under-investigation

HVAC $500 39 To be implemented

Industrial Equipment $4,000 63 Implemented

Industrial Equipment NULL 7 Not to be implemented

HVAC $10,000 110

Lighting $0 3 Implemented

Lighting $355 3

Lighting NULL 77 To be implemented

HVAC $0 12 Implemented

Other NULL 27 Implemented

Computers & Printers $0 3 Ongoing

Page 167: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Boiler NULL 113,641 Ongoing

Industrial Equipment NULL 117 Implemented

Lighting $1,450 1 Implemented

Hot Water System NULL 0

Industrial Equipment $20,000 795 Not to be implemented

Power Factor Correction $20,000 581 Under-investigation

Hot Water System NULL 19 To be implemented

Industrial Equipment $10,000 1,993 Not to be implemented

Lighting $1,096 0.55 Implemented

Lighting $8,139 3 Under-investigation

Lighting $1,187 1 Implemented

Lighting $783 1 To be implemented

Lighting $2,817 2 Implemented

Lighting $313 0.42 Implemented

Lighting $939 1 Implemented

Lighting $2,817 5 Implemented

Lighting $1,565 2 Implemented

Lighting $4,070 9 Implemented

Lighting $1,409 2 Implemented

Lighting $4,696 3 Implemented

Lighting $1,096 0.81 Implemented

Lighting $2,974 3 Implemented

Industrial Equipment $1,000 187

Lighting $19,440 44 Implemented

Industrial Equipment $30,000 1,200

Industrial Equipment $100,000 760

Other $170,000 468 Implemented

Other $84,500 315

Cogeneration $200,000 972

Air compressor NULL 549

HVAC $12,000 22

HVAC NULL 3

HVAC NULL 44

Industrial Equipment $100,000 3,000 Implemented

HVAC $4,686 8 Under-investigation

HVAC $25,000 20

Chiller $36,000 421 To be implemented

HVAC $390,000 116 Implemented

Air compressor $192,000 591

Lighting $4,000 0.97 Implemented

Building Management Systems $45,000 100 50 To be implemented

Building Management Systems $35,000 204 Ongoing

Boiler $2,300 4 Not to be implemented

Boiler $3,240 5 Implemented

Boiler $2,060 3 Not to be implemented

Boiler $50,000 10 50

Chiller $300,000 500

Lighting $14,170 17

Page 168: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $12,000 189 To be implemented

Industrial Equipment $2,100,000 2,040

Other $280,000 293 To be implemented

HVAC $30,000 7 33 To be implemented

Lighting $7,500 15 Implemented

Lighting $10,500 15 Implemented

Building Management Systems $1,200,000 1,899 2,230

Chiller $256,543 84

Lighting $100,000 111

Lighting $12,700 5 Not to be implemented

Lighting $300,000 280

Lighting $16,000 10 Not to be implemented

Industrial Equipment $1,200,000 3,751 Implemented

Hot Water System $21,000 26

HVAC $46,800 35

Air compressor $35,700 333 Implemented

HVAC $67,700 85 20 Under-investigation

HVAC $17,303 26 Under-investigation

Lighting $28,000 131 Under-investigation

Lighting $15,100 18

Other $520,000 30 To be implemented

Lighting $100,000 100

Lighting $1,050 13

Lighting $135 0

Lighting $28,980 62 Implemented

Lighting $2,500 20 Implemented

Lighting $4,000 4

Lighting $1,227,243 2,728 Implemented

Lighting $15,000 20

Lighting $20,000 30

Lighting $9,200 21

Lighting $1,050 2

Air compressor $50,700 81 Not to be implemented

Industrial Equipment $5,000 17 Implemented

HVAC $1,091 3 Implemented

HVAC $2,184 10 Implemented

HVAC $250,000 1,243 Under-investigation

Lighting $8,818 1 Under-investigation

Lighting $163 0 Not to be implemented

Lighting $44,275 128 Implemented

Lighting $57,300 18 Under-investigation

Mixed $190,000 445

Boiler $2,357 6 Implemented

Building Management Systems $140,000 56

Air compressor NULL 43

Lighting $388,800 516 To be implemented

Lighting $32,415 30

Lighting $12,735 20 Implemented

Page 169: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $84,430 111 Implemented

Lighting $44,970 47 Implemented

Lighting $24,285 36 Implemented

Lighting $19,090 18 Implemented

Lighting $11,580 20 Implemented

Lighting $13,245 NULL NULL Implemented

Other $125,000 452 Not to be implemented

Other $19,200 1,051 Implemented

Boiler $170,000 13,192

Waste heat recovery $175,000 400

HVAC $15,000 174

Industrial Equipment $30,000 48

Industrial Equipment NULL 319 Not to be implemented

Industrial Equipment $150,000 106,301 To be implemented

Industrial Equipment NULL 165 Ongoing

Boiler $750,000 113,641 To be implemented

Industrial Equipment $32,000 207

Industrial Equipment NULL 7

Air compressor $140,000 467

Industrial Equipment $600,000 2,228 Implemented

Industrial Equipment $600,000 2,228 Implemented

Waste heat recovery NULL 239,345

Air compressor $75,000 3,103 Under-investigation

Industrial Equipment $64,000 142

Industrial Equipment $9,900 84

Other $700 30 To be implemented

Industrial Equipment $150,000 1,152

Industrial Equipment $35,000 NULL NULL Implemented

Other $85,883 296 Implemented

Air compressor $74,800 609

Air compressor NULL 876 Under-investigation

Air compressor $695,000 1,149

Hot Water System $7,000 74 Not to be implemented

Hot Water System $15,000 26 Ongoing

Hot Water System $8,510 120 Not to be implemented

Industrial Equipment $15,000 56 Ongoing

Hot Water System $15,000 36 To be implemented

Industrial Equipment $9,585 19

Industrial Equipment $10,000 74 Under-investigation

Industrial Equipment $40,400 115

Industrial Equipment $46,000 91

Industrial Equipment $6,200 10

Industrial Equipment $74,500 349

Industrial Equipment $2,000 13 To be implemented

HVAC $49,500 215 Implemented

Industrial Equipment $100,000 800 Ongoing

Industrial Equipment $98,000 478 Implemented

Industrial Equipment $14,000 48 Implemented

Page 170: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $6,000 33

HVAC $83,700 234 Ongoing

Behaviour/Education NULL 38 To be implemented

ventilation $250,000 2,400

Ventilation $150,000 720

ventilation $205,000 603 To be implemented

Industrial Equipment NULL 500 Not to be implemented

Chiller $14,000 433 Ongoing

Chiller $17,200 863 Implemented

Insulation $10,800 26 Implemented

Industrial Equipment $3,300,000 6,000 Under-investigation

Lighting $28,420 63

Lighting $39,000 187

Lighting $35,100 142

Lighting $920 2 Implemented

Lighting $920 0.32 Implemented

Lighting $320 1 Under-investigation

Lighting $920 3 Implemented

Lighting $920 3 Under-investigation

Lighting $10,235 39 Implemented

Other $7,910 3

Other $9,301 11

Other $13,166 12

Industrial Equipment $5,800 8

HVAC $6,700 10 Implemented

Industrial Equipment $7,500 28

Industrial Equipment $5,700 19

Industrial Equipment $5,000 10

Industrial Equipment $800,000 2,692 Implemented

Mixed $328,000 956

Industrial Equipment $15,000 105

Industrial Equipment $18,900 34

Industrial Equipment $200,000 587 Ongoing

Industrial Equipment NULL 10,000 Not to be implemented

Industrial Equipment $4,200 2 Implemented

Industrial Equipment $100,000 260

Industrial Equipment $40,000 98 Ongoing

Industrial Equipment $30,800 12

Industrial Equipment $11,200 34 To be implemented

Industrial Equipment $8,600 52

Industrial Equipment $5,400 27

Industrial Equipment $5,400 35

Industrial Equipment $5,000 24 To be implemented

Industrial Equipment NULL 231 Not to be implemented

Industrial Equipment $63,060 501 Implemented

Industrial Equipment $42,000 42 Not to be implemented

Industrial Equipment $11,200 28

Industrial Equipment $30,100 127

Page 171: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment $500,000 800 Implemented

Industrial Equipment NULL 231 Not to be implemented

Industrial Equipment $6,000 18 To be implemented

Industrial Equipment $22,000 123 To be implemented

Industrial Equipment $21,500 89 Not to be implemented

Industrial Equipment $2,500 22 Not to be implemented

Industrial Equipment $18,000 57 Not to be implemented

Industrial Equipment $19,000 221 Not to be implemented

Industrial Equipment $27,000 193 Not to be implemented

Industrial Equipment $16,000 203 Not to be implemented

Industrial Equipment $14,500 85 Not to be implemented

Industrial Equipment $19,000 157 Not to be implemented

Industrial Equipment $17,000 137 Not to be implemented

Industrial Equipment $14,500 73 Not to be implemented

Industrial Equipment $10,000 NULL NULL Implemented

Industrial Equipment $60,000 161 Implemented

Industrial Equipment $24,000 187 Under-investigation

Air compressor $20,000 38 Under-investigation

HVAC $120,000 138

HVAC $8,000 41

Industrial Equipment $19,000 230 Implemented

Industrial Equipment $13,792 140 Not to be implemented

Industrial Equipment $32,000 104 To be implemented

Chiller $3,000 7

Industrial Equipment $118,500 476 Under-investigation

Industrial Equipment $5,000 39 To be implemented

Industrial Equipment $7,000 32 Under-investigation

Industrial Equipment $46,000 68 Ongoing

Industrial Equipment $20,000 87 To be implemented

Industrial Equipment $3,500 4

Industrial Equipment $6,500 66 Under-investigation

Industrial Equipment $4,000 23 Under-investigation

Industrial Equipment $50,000 75 To be implemented

HVAC $3,000 4

Industrial Equipment $6,210 26 To be implemented

Industrial Equipment $15,000 26 Not to be implemented

Industrial Equipment $5,000 15 Under-investigation

Industrial Equipment $15,000 19 Under-investigation

Hot Water System $7,000 22 Under-investigation

HVAC $190,000 150 Implemented

HVAC $190,000 224 Not to be implemented

Industrial Equipment $10,300 23

Industrial Equipment $30,000 290 Not to be implemented

Industrial Equipment $79,000 165 Implemented

Industrial Equipment $79,000 165 Implemented

Industrial Equipment $79,000 165 Under-investigation

Air compressor $100,000 1,667 Under-investigation

Industrial Equipment $10,000 31 Not to be implemented

Page 172: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment $6,500 14 Under-investigation

Industrial Equipment $6,500 19 Under-investigation

Air compressor $80,000 344 Ongoing

Air compressor $200,000 634 Under-investigation

Industrial Equipment $8,600 62

Industrial Equipment $15,000 18 Implemented

Industrial Equipment $240 22 Implemented

HVAC $26,000 195 Not to be implemented

HVAC $6,000 21 To be implemented

HVAC $6,000 55 To be implemented

HVAC $18,000 175 To be implemented

Industrial Equipment $19,000 330 Not to be implemented

Industrial Equipment $198,000 1,200 Not to be implemented

Other $18,000 24 To be implemented

Industrial Equipment $5,830 9 Implemented

Industrial Equipment $54,000 244

Industrial Equipment $204,000 1,691 To be implemented

HVAC $81,846 97

HVAC $39,000 79 Implemented

Industrial Equipment NULL 400

Chiller $23,274 193

Air compressor $170,000 317

Industrial Equipment $220,000 743 Implemented

Industrial Equipment $100,000 181 Under-investigation

Industrial Equipment $300,000 151

Industrial Equipment $10,000 317 Not to be implemented

Industrial Equipment $77,000 153 Implemented

Other $304,500 36 Implemented

Lighting $6,960 104

Refrigeration $180,000 1,100 3,707 Implemented

Cogeneration $331,000 NULL NULL Ongoing

Waste heat recovery $75,000 18,100 Under-investigation

Waste heat recovery $26,000 1,769 Under-investigation

Waste heat recovery $180,000 8,640 Implemented

Waste heat recovery $26,240 2,131 Not to be implemented

Waste heat recovery $80,000 2,100 Under-investigation

Lighting $200 11

Waste heat recovery $1,300 1,258

Other NULL 830

Other $15,000 100

Industrial Equipment $10,500 47

Industrial Equipment $21,000 155 Implemented

Other $300 39 Implemented

Computers & Printers $400,000 1,550 5,450 Ongoing

Lighting $172,422 1,453 Implemented

Power Factor Correction $500,000 NULL NULL Implemented

Alternative power generation $8,000,000 43,800 Implemented

Industrial Equipment $3,000,000 760

Page 173: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other $2,400 4 To be implemented

ventilation $7,200 66

ventilation $3,240 30

Lighting $3,050 49 Implemented

Lighting $3,800 25

Behaviour/Education NULL 367 Ongoing

Other $20,000 496 To be implemented

Industrial Equipment $20,000 349 Not to be implemented

Other $30,000 101 Not to be implemented

Industrial Equipment $22,000 248 Not to be implemented

Other NULL 2,735 To be implemented

Industrial Equipment $30,000 448 Not to be implemented

Industrial Equipment $16,000 95 Not to be implemented

Industrial Equipment $27,000 247 Not to be implemented

Industrial Equipment $27,000 221 Not to be implemented

Page 174: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

OrgID OppID Measure description Measure Type

378 16 Air Conditioning – Install timer control to office air conditioning units. Cost-Effective

378 17 Die Change Shutdown Procedure Cost-Effective

378 18 Refiner – Improve the pre-steaming of the chip which inturn will reduc Cost-Effective

378 19 Motor Replacement Program – Cost-Effective

378 20 Lighting – Install zone control of the high bay lighting and install timer Cost-Effective

378 21 Compressor Management Cost-Effective

286 60 Steam and condensate leaks Cost-Effective

286 61 Steam and Condensate Leaks Cost-Effective

454 100 Lighting control modifications to three sheds Cost-Effective

454 101 Consider installation of replacement capacitors in PFC equipment Potentially Cost-Effective

481 111 De-lamping Cost-Effective

481 112 WIP area control lighting Cost-Effective

481 113 Paper store control lighting Cost-Effective

481 118 VSD on Baler hydrolics Potentially Cost-Effective

479 157 Ball Plant 3kHz Inverter Upgrade Cost-Effective

486 209 Replace Sniff unit on VDC 1 with an ACD Unit which uses no electricalCost-Effective

486 210 Upgrade Homogenising Furnace PLC and Burner Management system. (ExiCost-Effective

486 211 Replace Bake Oven 1 Ringmain - reduce air leakage and gas flow Cost-Effective

486 212 Installation of U Main balancing dampers Cost-Effective

486 213 Increase shift manning - place Process Technicians on shift to react moreCost-Effective

486 214 Improve current efficiency of ALPYSYS Pot Regulation System Cost-Effective

486 215 Riser Bolted Joints (reduced voltage drop) Cost-Effective

486 218 Air Compressors: Investigate potential savings through: 1) elimination Potentially Cost-Effective

486 223 Improve Anode Stem Machine reliability Potentially Cost-Effective

486 224 Improve anodic voltage drop Potentially Cost-Effective

328 238 Review procedures for U/G conveyor operation Cost-Effective

328 239 Main ventilation fan optimisation Cost-Effective

328 240 Overland conveyor delivery optimisation Cost-Effective

328 241 Housekeeping practices on overland conveyor supply Cost-Effective

328 242 Compressed air leak reduction Cost-Effective

328 243 Power Factor Correction Shaft 3 Potentially Cost-Effective

328 244 Power Factor Correction Sub0 Potentially Cost-Effective

328 245 Other Pump Control Opportunities - eg VSD / Variable Displacement pPotentially Cost-Effective

328 246 VSD (VVVF) for PS26 Pumps Potentially Cost-Effective

328 247 Power factor correction on overland conveyor supply Potentially Cost-Effective

328 248 Level control of compressed air pumps (subject to 10% trial to confirm viPotentially Cost-Effective

328 249 Bore Pumps 3xVVVF & Power Factor Correction Potentially Cost-Effective

341 276 Reduce idle time of mills, associated blowers and vent units via impro Cost-Effective

341 280 New technology & controls for office and plant lighting Potentially Cost-Effective

341 283 VSD Control for Cyclone Fans Potentially Cost-Effective

321 289 Ongoing motor replacement (HEM). Example of 5 x 150 kW units. MarCost-Effective

321 290 Compressed air use reduction (e.g. solenoid, blowers) Cost-Effective

321 296 Lighting control systems (e.g. timers, sensors and dimmers) Potentially Cost-Effective

321 299 Install modulation for second boiler. Cost-Effective

322 300 Ongoing optimisation of Refiners including enhanced operational contrCost-Effective

322 302 HGG Gas Burner Improvement Cost-Effective

322 303 Enhanced Process Control in the Heat Plant Cost-Effective

Page 175: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

322 304 Motor Upgrades - Example presented for selecting 10 x 150 kw high efCost-Effective

355 309 Compressed Air Leaks Cost-Effective

355 310 Install oil cooler on compressor drive (C-06) Cost-Effective

363 323 Review compressed air leakage and establish repair program Cost-Effective

363 324 Monitoring air compressor operations, to ensure miniumum number of aCost-Effective

363 327 Fine Tuning of the holding furnace to reduce excess air levels over firi Cost-Effective

363 331 Install Lighting System upgrades to pot line and replace metal halide li Cost-Effective

371 350 Turn off one boiler Cost-Effective

371 357 Link compressed air systems Cost-Effective

371 358 Speed control - AN1 CDC pusher fan Cost-Effective

371 361 Lighting improvement - demin plant Cost-Effective

371 365 Replace NAP1 Expander Potentially Cost-Effective

371 366 High efficiency fans ammonia cooling tower Potentially Cost-Effective

371 367 Ammonia storage refrigeration plant efficiency Potentially Cost-Effective

371 372 Fire water sustaining pumps Potentially Cost-Effective

436 382 Increase Boiler deaerator pressure Cost-Effective

416 408 Install and repair non-return valves in the mine dewatering system. Cost-Effective

416 409 Replace older motors with high efficiency motors. Cost-Effective

416 410 Install upgraded compressor controller modules to manage loads. Cost-Effective

416 411 Install automatic timers, motion sensorsor photo-electric cells on the suCost-Effective

416 412 Variable speed motor drives. Cost-Effective

482 415 Implement Motor System Efficiency Cost-Effective

482 416 Install Factory Lighting Control Cost-Effective

482 417 Implement an Energy Awareness Program Cost-Effective

482 418 Air Compressor Inlet Air Supply (Heat Exhaust) Potentially Cost-Effective

482 419 VSD on Compactor Hydraulics (Replaced only as required) Potentially Cost-Effective

482 420 Stores Lighting Replacement (Replaced only as required) Potentially Cost-Effective

482 421 Chilled Water Pump Replacement (Further investigation required bas Potentially Cost-Effective

330 431 Monitoring and Management SCADA - Electricity Cost-Effective

330 432 Include Review of Higher Efficiency Motors in Purchasing Procedures Cost-Effective

330 435 Reduce Idle Load on Conveyors and Plant Cost-Effective

330 438 VSD for Process Pumps Potentially Cost-Effective

330 439 Spirals Upgrade Potentially Cost-Effective

330 440 Dragline Digital Drive & Tritronics Installation and Optimisation of OperPotentially Cost-Effective

336 443 Motor Control Measures Cost-Effective

327 446 Reduce leaks in underground compressed air piping Cost-Effective

327 447 Repair leaks in compressed air piping on surface Cost-Effective

327 449 investigate the installation of additional underground tunnels and roadsPotentially Cost-Effective

327 450 Phase out utilisation of air operated diaphragm pumps for mine dewaterPotentially Cost-Effective

359 460 Motor Upgrades - Example presented for selecting a 150 kw high efficiCost-Effective

359 461 Compressor Control Upgrade Cost-Effective

359 464 Steam circuit integration Potentially Cost-Effective

469 469 Drfit conveyor operation control Cost-Effective

469 472 Compressed air leak reduction Cost-Effective

469 473 Compressed air staging controls Cost-Effective

469 474 Surface coal haulage energy efficiency Cost-Effective

469 476 Power Factor Correction for new main ventilation system Cost-Effective

503 490 Improve Control of Lighting Plants Cost-Effective

Page 176: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

500 507 Improve plant power factor correction Cost-Effective

500 508 Reduce plant air leaks Cost-Effective

500 509 Clean up wash line water Cost-Effective

500 510 Improve insulation on tanks and pipe work for pelletiser water system Cost-Effective

500 512 Reduce warehouse lighting Potentially Cost-Effective

477 520 Demand Control Review (load duration curve characteristics for electricCost-Effective

477 522 Install automated high bay lighting contro system Cost-Effective

477 524 Compressed Air leak repair initiative Cost-Effective

344 529 Chilled Water System Initiatives Cost-Effective

344 530 Building Management System, Metering & HVAC plant initiatives Potentially Cost-Effective

344 532 Lighting System Initiative - Refer Section 9.1 of DFS Report dated 7/ Potentially Cost-Effective

344 533 Compressed Air and Vacuum System lnitiaitves Potentially Cost-Effective

504 579 Compressed Air System Comprehensive upgrade - compressor replacemenCost-Effective

504 580 Replacement induction furnace for No.3 Heat Recovery Cost-Effective

504 596 Induction Furnaces fit VSDs to cooling tower fans and pumps - 2 proje Potentially Cost-Effective

504 598 Schedule melting times at times of low cost electricity Potentially Cost-Effective

504 599 Fluorescent Light Controllers - various areas Potentially Cost-Effective

311 610 Implement programmed compressed air system leak detection regime, iCost-Effective

311 611 Install level control to header tank supplied by 150mm water pump (ie Cost-Effective

311 614 Shut down pump 4 and screen 3 when transfer is complete and controCost-Effective

311 615 Fit ultrasonic or radar sensor to control the overflow crusher to avoid Cost-Effective

311 616 Reduce lost time by 12% to improve Plant throughput and avoid energy lCost-Effective

311 617 Reduce lost time (eg from meal breaks, stockpile full, lack of stone, Cost-Effective

311 618 Change plant regime to operate Crushing Plant at full capacity Cost-Effective

396 622 Auto shut-down when idle running timer exceeded Cost-Effective

396 624 Sequenced shutdown for Extruder 3 (feed bin to PEC) based on extrudeCost-Effective

396 625 Dampers for Scrubbers to prevent short circuiting Cost-Effective

396 626 Auto - shutdown for milling operations based on duty requirement Cost-Effective

396 627 Drier auto shut-down when idle time exceeded Cost-Effective

396 628 Connect packaging area 'Climate-master' system to Citect to facilitat Cost-Effective

396 631 Reduce mixing of Dye colour tanks Cost-Effective

396 632 Citect control of Air Handling units (roof & rear factory inlets / roof exhaCost-Effective

396 633 Cease use of P4 cyclone fan Cost-Effective

396 635 VSD optimisation of extruder drives Cost-Effective

396 636 Interlock rotary valve associated with re-seed system Cost-Effective

396 637 auto-sequence shut-down based on drier status Cost-Effective

396 638 Automated oxygen trim for Steambloc boiler Cost-Effective

396 639 Citect Control of dust collectors Cost-Effective

396 643 Optimise auto shutdown on major truck dump Cost-Effective

396 645 Auto shutdown for minor road dump elevator Cost-Effective

396 646 VSD control of coater atomising fan Cost-Effective

396 647 Switch off boiler when Process 1/2 not in use Cost-Effective

381 667 Replace two reciprocating chillers with a single high efficiency chiller. Potentially Cost-Effective

381 669 Converting areas air conditioning olants temperature control set points Cost-Effective

381 671 Investigate compressed air pressure reduction of up to 50 kPa. Cost-Effective

381 672 Investigate Replacement of Large motors with high energy efficient moPotentially Cost-Effective

401 697 Crusher optimisation - Improve primary crusher and conveyor energy pPotentially Cost-Effective

471 707 Install a yearly timer to automatically switch AC units Cost-Effective

Page 177: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

422 721 Introduce water injection to enhance regenerator performance Cost-Effective

491 741 Continue connection of non-networked HVAC systems (progressive) Cost-Effective

491 744 Investigate/monitor operation of Heating/Cooling plant Cost-Effective

478 753 Compressed air leak repair initiative. Cost-Effective

325 761 Operate one duty ventilation fan at mine Cost-Effective

325 762 Replace bath house space heating with heat pumps Cost-Effective

325 763 Replace bath house 5000L boiler with Heat pumps and 2x340L hot watPotentially Cost-Effective

325 766 Compressed Air Review and Ongong 10% Leakage Reduction Potentially Cost-Effective

306 774 MCL3 Electric Launder Cost-Effective

306 775 MG Set replacement Cost-Effective

312 793 Corporate air conditioning return air system. Change 100% outside air Potentially Cost-Effective

312 796 Secondary Manufacturing Department air cooled chiller rationalisation.Potentially Cost-Effective

312 797 Replace boilerhouse chiller number 3 with larger high efficiency chiller. CCost-Effective

570 799 Recommission domestic hot water (DHW) controls Cost-Effective

570 801 Upgrade lighting control and provide after-hour switches Cost-Effective

570 802 Upgrade single T8 lamps with T5 retrofit kits to levels that have alrea Cost-Effective

570 806 Recommission outside economy air-cycles Cost-Effective

570 807 Reschedule all after-hour fans and misc. A/C loads to limit use to 7am Cost-Effective

570 808 Recommission boiler controls and heating valves Cost-Effective

570 809 Install occupancy sensors to main office and staff room lights Cost-Effective

570 810 Install occupancy sensors to office, common room and store lights of buCost-Effective

570 811 Install occupancy sensors to the office, common room and corridor lighCost-Effective

570 812 Install light switches Cost-Effective

570 814 Install push-button timer switch to bar radiators. Cost-Effective

570 815 Survey of site and installation of new air compressor Cost-Effective

570 816 Rewire lighting in building and install occupancy sensors to the lamps Cost-Effective

570 817 Install PE cell control to car park fluorescent and halogen flood lamps Cost-Effective

570 819 Lighting control: Install switches in the car park store room, main stor Cost-Effective

570 820 Lighting: Occupancy sensor control in tea room Cost-Effective

570 822 Lighting: Exterior PE cell control Cost-Effective

570 823 HVAC: Function Rooms - Occupancy Sensor control + Reassignment oCost-Effective

570 824 HVAC: Adjust temperature set- points to widen dead-band Cost-Effective

570 825 Lighting: Levels 1&2 circuits separation + control Cost-Effective

570 826 HVAC controls tuning: time of use Cost-Effective

570 827 Lighting: Incandescent to CFLs upgrade Cost-Effective

570 828 HVAC: Optimum start and stop Cost-Effective

570 830 Recommissioning of chiller control strategy Cost-Effective

570 831 CO Sensors and On/Off controls for car park ventilation fan Cost-Effective

570 832 Install voltage reduction unit to fluorescent lamps in main hall and two lCost-Effective

570 833 Lighting upgrade from T8 to T5 lamps using retrofit kits - two seminar Cost-Effective

570 834 Replace metal halide lamps in car park to T5 fluorescent lamps Cost-Effective

570 837 Masonry Store Lighting: turn off some lighting Cost-Effective

570 838 Domestic hot water: Electric heat pump to replace electric storage typeCost-Effective

570 839 24 hours fluorescent lighting: convert to T5 lamps Cost-Effective

570 841 Masonry Store lighting: occupancy sensor control Cost-Effective

570 842 Improve garage lighting & associated control Cost-Effective

570 843 Bar radiator time delay switches. Cost-Effective

570 844 HVAC: install push-button timers and contactors for 8 units Cost-Effective

Page 178: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

570 845 Cleansing Bay lighting: change to 250W metal halide Cost-Effective

570 847 Car park lighting: dimming control system Cost-Effective

570 848 Car park lighting: separate store area circuits Cost-Effective

570 849 Masonry Store external lighting: Install PE cell control Cost-Effective

570 851 Reinstate time switch control of ventilation fans Cost-Effective

570 852 Domestic Hot Water-solar heat pump system with remote evaporators Cost-Effective

570 853 HVAC 365 day time-switch Cost-Effective

570 854 Offices/Reception areas lighting - voltage reduction Cost-Effective

570 855 Lighting - voltage reduction Cost-Effective

570 856 Lighting controls Cost-Effective

570 857 Community Room - HVAC time control Cost-Effective

570 858 Install boiling hot-water time switch. Cost-Effective

570 861 Off control of manually switched HVAC plant Cost-Effective

570 863 HVAC: 365 day time switch Cost-Effective

337 881 Optimise scheduling of compressors Cost-Effective

337 882 Reduce air leakage throughout site. Cost-Effective

337 883 Install daylight control on external lights Cost-Effective

337 885 Reduce air supply pressure. Potentially Cost-Effective

503 886 Dragline Optimisation/Tritonics Cost-Effective

503 887 variable Speed Drives for Process Pumps Cost-Effective

503 888 Monitoring and Management Cost-Effective

503 889 Include Review of Higher Efficiency Motors in Purchasing Procedures. Cost-Effective

337 1041 Compressed Air Production Cost-Effective

337 1042 Compressed Air Leakage Cost-Effective

337 1044 Compressed air pressure reduction Potentially Cost-Effective

337 1045 Factory Lighting Control System Potentially Cost-Effective

337 1046 Boardline Oven Energy options Potentially Cost-Effective

337 1047 Installed notched type vee belts on drives when belts are due for repla Potentially Cost-Effective

337 1048 Introduce energy efficient electric motors. Potentially Cost-Effective

337 1050 Install energy efficient motors on a replacement basis. Potentially Cost-Effective

453 1065 Program automatic boiler cut-off when ambient temperature high in B Cost-Effective

453 1066 Verify integration of TRANE chiller controls with BMCS is optimised Cost-Effective

453 1068 Ensure regular boiler tuning is included in boiler maintenance program.Cost-Effective

453 1069 Investigate leaving CHW temperature rise (once controls upgrade compCost-Effective

453 1070 Document and implement replacement program (including target dates) Cost-Effective

453 1071 Optimise air conditioning operating times in Bus Bays Cost-Effective

453 1072 Optimise lighting operating times in Bus Bays Cost-Effective

453 1075 Document and implement replacement program (including target dates) Cost-Effective

453 1078 Recommission system and evaluate upgrade options. Cost-Effective

453 1079 Install voltage control units in selected areas. Cost-Effective

453 1080 Photelectric cell control of lights near skylights and windows. Cost-Effective

453 1083 Seasonal adjustment of HVAC Set points in selected areas. Cost-Effective

453 1111 Review boiler tuning strategy and schedule Cost-Effective

453 1112 Program automatic boiler cut-off when ambient temperature high in B Cost-Effective

453 1113 Verify integration of TRANE chiller controls with BMCS is optimised. Cost-Effective

453 1114 Re-commission existing T2 voltage control sytems Cost-Effective

453 1115 Document and implement replacement program (including target dates) Cost-Effective

453 1116 Document and implement replacement program (including target dates)Cost-Effective

Page 179: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

453 1118 Recalibrate space temperature sensors Cost-Effective

453 1129 Repair corroded HHW 3-way control valve Cost-Effective

453 1134 Repair Leaking HHW 2-way control valves Cost-Effective

408 1160 Main compressors - Replace as operational risk Cost-Effective

374 1162 Undertake manufacturing excellence project to reduce electricity con Cost-Effective

374 1163 Replace 400W to the new 300W Pulse start lamps Cost-Effective

379 1166 Motor system efficiency program. Cost-Effective

379 1168 Discontinue steam injection to Hotwell tank Cost-Effective

379 1169 Office boiler and chiller supervisory control Cost-Effective

379 1170 Boiler precision combustion control Cost-Effective

379 1171 Economiser and heat recovery for boilers Cost-Effective

379 1175 Secondary chilled water pump VSD Cost-Effective

379 1176 Water supply pump VSD Cost-Effective

379 1177 Air compressor cooling tower recirculation pump VSD Cost-Effective

379 1184 Energy awareness and management program Cost-Effective

379 1185 General office and canteen lighting Potentially Cost-Effective

379 1187 Economy cycle for office AHU's Potentially Cost-Effective

379 1189 Air compressor and chiller energy management control system. Potentially Cost-Effective

379 1193 Office AHU suppy fan VSD Potentially Cost-Effective

379 1194 Medium Pressure Lead Boiler Feedwater Pump VSD Potentially Cost-Effective

379 1195 Conference Room Occupancy Sensors Potentially Cost-Effective

408 1210 Replace Champion air compressor (Energy Savings and Operational SecuriCost-Effective

408 1213 Main Mill - Shut down NTM/stelmor fans when not used Cost-Effective

408 1214 Reheat Furnace - increase recuperators operating temperature Cost-Effective

408 1215 Reheat furnace - reduce furnace push-out door pen times Cost-Effective

408 1217 Reheat furnace - install continuous excess oxygen monitoring Cost-Effective

408 1219 Motor rooms - interlock operation of motor room fans to Drive Motor opPotentially Cost-Effective

408 1225 Ensure zinc bath is covered with vermiculite (not covered during inspecCost-Effective

408 1229 Some fans left on that don't need to be while plant is down, eg entry a Cost-Effective

408 1230 Baking furnaces in cleaning house tend to all be left on, but can make Cost-Effective

408 1235 FPP - Shut down FPP scrubber fans and pump (2x37kW + 11kW) when nCost-Effective

408 1236 FPP - Chiller - shut down when plating not operating. Cost-Effective

408 1244 Air tower 19(12 kW) compressor runs unloaded much of the time when sPotentially Cost-Effective

387 1272 Insulation of unlagged valves and fittings in the steam system. Cost-Effective

387 1274 Replacement of electric motors with high efficiency units. Potentially Cost-Effective

592 1371 Install 24hr timer on zip boiles. Cost-Effective

592 1381 Convert mercury vapour lamps to metal halide lamps Cost-Effective

592 1383 Install daylight sensor and separate circuits near exterier of carpark. Cost-Effective

592 1398 Convert MV lamps to CFL Potentially Cost-Effective

592 1410 Convert 90 fittings with 50W downlights to 35W LV downlight. Cost-Effective

592 1412 Convert 18 fittings with two 26W Pl-C lamps to single 13W PL-C lampsCost-Effective

592 1416 Convert two 18W PL-C lamps to one 13W PL-C lamp. Potentially Cost-Effective

592 1433 Install temperature reset, time scheduling and demand savings on ac unPotentially Cost-Effective

368 1445 Operating and Maintenance Procedures: Optimise ON/OFF Control of Cost-Effective

368 1448 Operating and Maintenance Procedures: review Ventilation Run Hours aPotentially Cost-Effective

368 1449 Operating and Maintenance Procedures: Optimise ON/OFF Control of MPotentially Cost-Effective

370 1456 Whole site: Embedded Generation - WestVAMP Cost-Effective

370 1457 Mine: Optimisation of underground conveyors operating procedures. Cost-Effective

Page 180: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

370 1459 Washdown water use and sump pump water level management Cost-Effective

370 1460 Repair cell compressor line leak Cost-Effective

370 1461 Address Vacuum Pump V-belt slippage Cost-Effective

370 1462 Whole site Power Factor Correction Potentially Cost-Effective

370 1465 Shut down Shale Belt Potentially Cost-Effective

575 1504 Install 1 voltage reduction unit for Basement car park Lighting Cost-Effective

575 1512 Derate hot water heater in the Centre and lower the top thermostat set Cost-Effective

575 1513 Review air conditioning plant operating schedules to match occupancy Cost-Effective

575 1516 Install 2 Voltage reduction units for Basement car park Lighting Cost-Effective

575 1526 Replace low efficiency shower heads with high efficiency low flow heaCost-Effective

575 1528 Provide 7-day time switch to switch off air conditioning unit overnight. Cost-Effective

575 1529 Install voltage reduction unit for car park lighting Cost-Effective

442 1572 Devise and implement a program to routinely monitor steam trap operatiCost-Effective

442 1573 Devise and implement a program to routinely monitor compressed air syCost-Effective

442 1574 Compressed air system reduction from 7.4 bar to 7.0 bar. Cost-Effective

442 1575 Install electronic condensate drains on the instrument air compressor anCost-Effective

442 1576 Replace standard fluorescent tubes with Tn- phosphor tubes for general Cost-Effective

442 1578 Replacement of main office air conditioning unit and installation of PLC Potentially Cost-Effective

461 1584 Modification of secondary aeration controls Cost-Effective

461 1585 Further optimisation of UV lamps Cost-Effective

461 1586 Reduce operation of RE pumps Cost-Effective

461 1587 Increase operation of cogen unit on nat gas Potentially Cost-Effective

461 1591 Reduce compressed air leaks Potentially Cost-Effective

465 1598 Modify secondary aeration blower controls Cost-Effective

465 1602 Auto bleeders on RAS pumps Potentially Cost-Effective

462 1614 Optimisation of sewage pump selection Cost-Effective

462 1615 Optimise Operation of VSD speed setpoints on Odour Scrubber Fans Cost-Effective

462 1617 Recovery of benefit for cogen exports Cost-Effective

463 1623 Ti 2 to T8 Lighting upgrade - Ongoing replacement Cost-Effective

463 1624 Micro-Hydro Power generation - Feasibility study Potentially Cost-Effective

463 1625 PAR Project: Treating screenings below ground Potentially Cost-Effective

463 1627 New air compressors. Note that this project is linked to a management Potentially Cost-Effective

464 1637 Assess the Feasibility of Implementing a Hydro-Turbine Potentially Cost-Effective

324 1655 underground water management review Cost-Effective

324 1657 audit and repair of the compressed air network Cost-Effective

324 1658 power factor correction Cost-Effective

329 1661 Cultural Change Cost-Effective

329 1678 Building Cost-Effective

329 1679 Building Cost-Effective

329 1680 Tlectronic bar heaters Cost-Effective

400 1735 Low Energy Refiner Plates.Improved design of refiner plates enable highPotentially Cost-Effective

564 1755 Adjust HVAC control, introduce economy cycle and replace A/C unit withCost-Effective

564 1759 installation of a solar pool heating system to replace the exisitng heat Cost-Effective

335 1762 VAV AHU Systems Cost-Effective

335 1763 Variable Flow Chilled Water plant Cost-Effective

335 1764 High Efficiency Chiller Cost-Effective

335 1765 Economy Cycle Cost-Effective

335 1766 Compressed Air System Cost-Effective

Page 181: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

447 1866 Replacement of 1060 room standing lamp incandescant 100 watt lamps Cost-Effective

458 1878 evaporative fluid cooler refurbishment Cost-Effective

458 1882 BMS time clock control building 3 air handling and fan coil units Cost-Effective

455 1917 Appoint an energy Manager Cost-Effective

455 1919 Incorporation of energy efficient motors Potentially Cost-Effective

455 1922 incorporation of variable speed drives to pumps Potentially Cost-Effective

455 1923 Ultrasound sensors installation for back of house area toilets using proPotentially Cost-Effective

566 1998 Disable plant from operating during public holidays Cost-Effective

566 1999 Review and revise BMS control strategies Cost-Effective

566 2000 Installation of power factor correction units Cost-Effective

566 2002 Replace and De-Lamp Cost-Effective

566 2015 Installation of solar hot water to replace current storage tank setup Cost-Effective

576 2029 Retrofit Lighting Cost-Effective

576 2034 Retrofit Lighting Cost-Effective

576 2036 Retrofit Lighting Cost-Effective

562 2059 Install lux sensors to control external lights. Cost-Effective

576 2078 Retrofit of Lighting -Install electronic ballasts and convert twin 36 wa Cost-Effective

576 2079 Retrofit Lighting -install voltage reduction unit, upgrade lamp fittings,ouCost-Effective

576 2080 Retrofit Lighting Cost-Effective

576 2084 Retrofit Lighting Cost-Effective

576 2085 Retrofit Lighting Cost-Effective

576 2086 Retrofit Lighting Cost-Effective

576 2087 Retrofit Lighting Cost-Effective

562 2089 Install two inverter air conditioners, which draw a variable amount of cuCost-Effective

419 2117 Upgrade Lighting Controls in Flavours Restaurant Potentially Cost-Effective

431 2123 Power Factor Correction Cost-Effective

434 2178 Screw Refrigeration Compressor VFD Control Cost-Effective

434 2180 Minimise compressed air delivery pressure Cost-Effective

434 2181 Adjust Suction Pressure on Ammonia Refrigeration Cost-Effective

434 2192 Condenser Fan VFD Control Potentially Cost-Effective

434 2214 Replacement of air Atlas Copco with new compressor Potentially Cost-Effective

604 2234 Refurbishment of water cooled packaged air conditioners with a new chCost-Effective

604 2235 Install a dedicated air cooled system for the printing area air conditioni Cost-Effective

604 2237 Implement optimum start/stop control in conjunction with a morning warCost-Effective

604 2238 Install a photosensor control of lights in the staff dining area Cost-Effective

604 2239 Setback space temperatures in the Function Room when it is unoccupiCost-Effective

604 2240 Installation of Verosol Blinds on the Eastern, Northern and Western e Cost-Effective

604 2242 Schedule cleaning operations to reduce energy consumption Cost-Effective

604 2246 Repair potable hot water circulating pump Cost-Effective

604 2247 Reduce the plant room domestic hot water temperature to 60°C Cost-Effective

604 2249 Install separate controls for hall & 2 and set back the temperature in t Cost-Effective

604 2250 Control the outside air dampers on the air handling units based on C02Cost-Effective

604 2254 Review heat pump staging Cost-Effective

604 2255 Complete commissioning of the ammonia stripping system and fine tuneCost-Effective

604 2258 Reduce the plant room domestic hot water temperature to 60°C Cost-Effective

604 2260 Install variable speed control of the pool filter pump Cost-Effective

604 2262 Review the heat pump control strategy to utilize all eight stages Cost-Effective

604 2263 Install variable speed control of the heat pump circulating system Cost-Effective

Page 182: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

604 2271 Reposition the Block PE cell Cost-Effective

604 2274 Replace pole top 250 watt mercury vapour lamps with 150 watt metal Cost-Effective

604 2279 Provide more specific instructions to staff on office equipment manage Cost-Effective

604 2285 Set the BMCS time of day schedules to core occupancy times Cost-Effective

604 2287 Control the outside air dampers on the air conditioner based on C02 leCost-Effective

604 2288 Convert the outside air economy cycle air conditioner to fully modulatinCost-Effective

604 2295 Convert the air handling systems with bypass damper control to variablPotentially Cost-Effective

604 2296 Install movement sensors to control lights in intermittently occupied ar Potentially Cost-Effective

604 2297 Control the outside air dampers on the air conditioners based on CO2 Potentially Cost-Effective

604 2298 Extend boiling water time clock control to kitchen boiling water units Potentially Cost-Effective

604 2299 Retrofit twin 36 watt fluorescent light fittings with single 28 watt T5 light Potentially Cost-Effective

604 2323 Replace the glasshouse gas heating with solar Potentially Cost-Effective

352 2338 Purchase and install smaller compressor as determined by review Cost-Effective

352 2339 Installation of 900kVAr of PFCE Cost-Effective

352 2340 200kVAr Power Factor Correction Duralie - demand reduction 83kVA Cost-Effective

352 2341 Lighting Management Potentially Cost-Effective

352 2342 Installation of demand management on remote pumping whilst train unloPotentially Cost-Effective

405 2347 Install Daylight Compensation Control in warehouse Cost-Effective

405 2349 Install a VSD on Blower 26 Potentially Cost-Effective

319 2412 Heat recovery from 180kW air compressor Cost-Effective

319 2413 Energy Recovery from Flash Steam Cost-Effective

319 2416 Installation of variable speed control for BAC cooling tower fans Cost-Effective

319 2417 Improve power factor from 0.92 to 0.98 Cost-Effective

319 2418 Variable speed control of Combustion Air Fan for 10MW Boiler Cost-Effective

319 2421 Combustion control for 10MW Boiler Potentially Cost-Effective

319 2423 Biogas Collection from Anaerobic ponds Potentially Cost-Effective

319 2425 Variable speed control hot water pump transfer Potentially Cost-Effective

319 2429 Waste heat recovery from Condenser Potentially Cost-Effective

319 2432 Insulation of tallow storage tanks Potentially Cost-Effective

319 2434 Hot water reduction - Viscera Table Potentially Cost-Effective

357 2481 Compresses Air reciever installation Cost-Effective

357 2488 Compressed air review and ongoing 10% leakage reduction Potentially Cost-Effective

357 2495 Surface Lighting Optimisation Potentially Cost-Effective

423 2559 Optimise chilled water supply temperature Potentially Cost-Effective

600 2566 Lighting technology review Potentially Cost-Effective

600 2569 Installation of pool blankets Potentially Cost-Effective

600 2570 Install T5 retrofit to plant rooms Potentially Cost-Effective

600 2573 Review of lighting opportunities Cost-Effective

600 2574 Replace ladies HWS Potentially Cost-Effective

600 2576 Replace Mercury Vapor high bays Potentially Cost-Effective

600 2577 Development of public lighting strategy Potentially Cost-Effective

508 2645 Lighting - Replace 70W exterior bollard lights with 26W compact fluorescCost-Effective

508 2646 Lighting - Install motion sensors in 38 rooms to switch off 85% of ligh Cost-Effective

508 2647 HVAC - Install Variable Speed Drives on pumps and fans in the HVAC Cost-Effective

508 2649 Lighting - Replace single 40W fluorescent lamps in offices and computePotentially Cost-Effective

508 2650 Lighting - Replace twin 65W fluorescent lamps used in corridors, officePotentially Cost-Effective

508 2651 Lighting - Replace twin 40W fluorescent lights in plant rooms with a sinPotentially Cost-Effective

508 2652 Computers - Replace CRT computer monitors with TFT monitors. Potentially Cost-Effective

Page 183: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

339 2655 Carpark Lighting replace 150 Watt ligh with lower wattage flurorescent Cost-Effective

309 2659 TPM Maintenance Program TRACC Cost-Effective

309 2660 Reduce time to do a size change (1Hr to 0.5Hr) Cost-Effective

309 2661 Reduce board grammage Cost-Effective

601 2671 upgrading of lighting Cost-Effective

601 2672 upgrading of lighting Cost-Effective

601 2673 upgrading of lighting Cost-Effective

601 2674 upgrading of lighting Cost-Effective

601 2675 upgrading of lighting Cost-Effective

601 2676 upgrading of lighting Cost-Effective

601 2677 upgrading of lighting Cost-Effective

601 2678 HVAC upgrade including VSD on the HVAC pump and Heat reclaim. Cost-Effective

601 2681 Heat reclaim and temperature reset controls and timing rescheduling Cost-Effective

601 2684 Solar absorbers at the WAC to produce hot water Cost-Effective

561 2712 Install a movement detector to control the light fittings Cost-Effective

561 2713 Install PE cell to control the lights under the roof eave near the male baCost-Effective

561 2714 Reduce temperature of the hot water system Cost-Effective

561 2715 Install movement detectors to control male staff bathroom light fittings. Potentially Cost-Effective

561 2716 Install a run down timer in each of the six storage bays to control the ligPotentially Cost-Effective

561 2717 Install a movement detector to control the lighting in the Crib Room. Potentially Cost-Effective

561 2718 Install a movement detector to control the opertaion of light fittings in thPotentially Cost-Effective

561 2729 Install auto-transformers to control the car park fluorescent lights. Cost-Effective

561 2730 Turn off the continuosly operating roof pole light when there is adequatePotentially Cost-Effective

561 2731 Install a one hour electro-mechanical timer to turn off the meeting roomPotentially Cost-Effective

561 2732 Reduce the temperature of the hot water system in the Women's Rest Cost-Effective

561 2733 Reduce the temperature of the hot water system Cost-Effective

561 2734 Install a movement detector to control the waiting room lights. Potentially Cost-Effective

561 2735 Install auto-transformer to control the fluorescent light circuits Potentially Cost-Effective

561 2736 Install a movement detector to turn off lighting in the Study/Meeting R Potentially Cost-Effective

561 2737 Install run down timer to control electric heaters in the distribution area.Cost-Effective

561 2738 Reduce the temperature of the residential laundry's hot water system. Cost-Effective

561 2740 Replace incandescent globes with compact fluorescent lamps. Potentially Cost-Effective

561 2741 Install movement detector in the distribution area. Potentially Cost-Effective

293 2760 Boiler Insulation Cost-Effective

293 2762 Compressed Air Leaks Cost-Effective

293 2763 Steam and condensate leaks Cost-Effective

293 2767 Rapid shut doors cold room Potentially Cost-Effective

602 2775 Disable HVAC from operating during public holidays Cost-Effective

602 2776 Power factor correction Cost-Effective

602 2779 Install time motion sensors Cost-Effective

602 2780 Disable HVAC from operating during public holidays Cost-Effective

354 2891 Basement carpark lighting control — motion sensors Cost-Effective

354 2894 Installation high efficiency motors Cost-Effective

354 2897 Replacing tenancy light fittings Potentially Cost-Effective

354 2898 Modify tenancty lighting controls Potentially Cost-Effective

354 2901 introducing photo voltaic cells Potentially Cost-Effective

583 2915 Review of cleaning times (savings based on 6 am start) Cost-Effective

583 2918 installation of sub-metering to raise energy usage awareness Cost-Effective

Page 184: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

583 2919 Retrofit Twin 40 watts Fluro with Single Quad 28 Watt, elect ballast andPotentially Cost-Effective

583 2930 install submetering to promote energy awareness Cost-Effective

583 2949 install submetering to promote energy awareness Cost-Effective

583 2950 Review of lighting and air-conditioning requirements Cost-Effective

583 2960 Close pool in June, July and August Cost-Effective

583 3000 Air Con System Review Cost-Effective

583 3001 Review Lighting Operation Cost-Effective

583 3002 Hot Water Boiling Units Cost-Effective

583 3013 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiCost-Effective

583 3015 Review Lighting Operation Cost-Effective

583 3017 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

583 3018 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

583 3019 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

583 3020 Retrofit Twin 20Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

583 3021 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective

583 3025 Hot Water Boiling Units Cost-Effective

583 3026 Review Lighting Operation Cost-Effective

466 3148 Replace SER drives with VVVF controllers on units 14, 3, 4, 5, 6 and 7Cost-Effective

466 3149 Add stiffening bracings on units Cost-Effective

466 3151 Upgrade air-conditioning of building Cost-Effective

466 3154 Install differential pressure and real-time monitoring of pump efficiency Potentially Cost-Effective

282 3156 Replace chiller with energy efficient chiller Potentially Cost-Effective

282 3159 VSD – Cooling tower fan Potentially Cost-Effective

282 3176 VSD for jacking pump & Saltwater pump instrumentation & control sys Cost-Effective

282 3183 Reprogram C-Bus for lights and AHU Cost-Effective

282 3204 Energy Awareness Program Cost-Effective

599 3208 Variable Speed Drives - installation of VSD on some of the Air Conditi Cost-Effective

599 3214 Time Clocks on Urns - installation of time clocks on the zippy Cost-Effective

599 3215 Water wise showers - water saver valves on shower roses Cost-Effective

599 3225 Installation of Variable Speed Drive Potentially Cost-Effective

571 3245 Replace existing electric storage hot water system with heat pumps Potentially Cost-Effective

571 3246 Install Economy Cycle on the building air conditioning Potentially Cost-Effective

571 3247 Insulate the pool hall return air ductwork Potentially Cost-Effective

571 3248 Reduce the infriltration through the ceiling vents Potentially Cost-Effective

571 3249 Replace the 50m pool pump's motors with high efficiency motors Potentially Cost-Effective

571 3261 Install push button timer control of the aerobics room air conditioning anCost-Effective

439 3290 Variable speed drives on the condensor fans and head pressure controlCost-Effective

439 3291 Economiser and variable speed drive on one RM compressor, serving Cost-Effective

439 3293 Phase out use of compressed air in aligning tins to filling machine Cost-Effective

439 3294 Compressed air leak survey/zoning Cost-Effective

439 3298 Waste cooking oil cogeneration Plant Potentially Cost-Effective

439 3301 Cogeneration Potentially Cost-Effective

290 3378 Migrate production of respules and PE processes from Altis to Nova to Cost-Effective

290 3405 Re-calibrate the automatic TDS senors Cost-Effective

290 3407 Replace existing 400W metal halide lamps with UPS 320W Cost-Effective

290 3409 AHU temperature Set-point setback Cost-Effective

290 3410 VSDs on all 3 cooling tower fans Cost-Effective

418 3415 Dextrin reactors cooling vessels Cost-Effective

Page 185: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

418 3418 Compressed Air Leaks Cost-Effective

573 3422 Review electricity contract pricing (once co-gen equipment operation isCost-Effective

573 3423 Place the central up-lights on a light-sensor override (so thay are alwaysPotentially Cost-Effective

573 3424 Completed automatic doors installed to minimise heat loss Potentially Cost-Effective

573 3425 Reduce pool temperature set points by 1c (26-27C) Potentially Cost-Effective

573 3426 Install solar water heating system on available roof space Potentially Cost-Effective

573 3427 Install power factor correction equipment at this site Cost-Effective

573 3428 Install VSD's on main circulation pumps (eg 80% of usual flow rate overPotentially Cost-Effective

573 3429 Install lighting occupancy sensors in the aerobics room (note: additionaPotentially Cost-Effective

573 3431 Replace kiosk halogen lighting with 20W IRC halogens Potentially Cost-Effective

573 3434 Completed - Soft starters installed on key equipment Potentially Cost-Effective

573 3438 Install power factor correction equipment at this site Potentially Cost-Effective

573 3439 Set air conditioning in control room to minimum 24C-21C Potentially Cost-Effective

573 3443 Install Variable Speed Drives on other key variable-demand equipmentPotentially Cost-Effective

573 3444 Planned - Upgrade of building's HVAC systems (8-12 reverse cycle unitsPotentially Cost-Effective

573 3446 Targeted 4kW reduction in building standby (after-hours audit, install ti Potentially Cost-Effective

573 3447 Investigate and address strange operation of power factor correction Potentially Cost-Effective

573 3450 Completed - Upgrade to more efficient units (some pump stations) Potentially Cost-Effective

573 3451 Investigate opportunities for further saving (including Variable Speed DPotentially Cost-Effective

573 3452 Ensure all pump stations are upgraded, as required to more efficient unPotentially Cost-Effective

573 3453 Install Variable Speed Drives on irrigation pumps and aim to reduce opPotentially Cost-Effective

573 3457 Insulate ceiling (minimum R3.5) and under floor (where accessible) Potentially Cost-Effective

573 3458 Install domestic heat pump hot water system for building Potentially Cost-Effective

573 3459 Install energy efficient hi-bay replacements(~100 fittings) Potentially Cost-Effective

573 3461 Place non-perishable drinks fridges and vending machines on timer swPotentially Cost-Effective

573 3462 Carry out a lighting refit to all T5 LL MT Adaptor System Potentially Cost-Effective

573 3464 Carry out a lighting refit to a T5 LL MT adaptor System Potentially Cost-Effective

360 3472 Switch off redundant vacuum pump for plastics area Cost-Effective

360 3474 Install VSD to control chilled water supply pump - lid line chilled water Cost-Effective

360 3479 Purchase a smaller air compressor and install a more efficient rimmer Potentially Cost-Effective

360 3493 Conduct an air leak survey and instigate a regular repair program Potentially Cost-Effective

338 3522 Repair outdoor lighting contorl Cost-Effective

338 3523 Compressed Air leak repair initiative Cost-Effective

338 3526 Pressure settings for 6 Bar system is currently 7 Bar. Review to asce Potentially Cost-Effective

338 3527 Motive Drives - where cost effective intent to use efficient motors Potentially Cost-Effective

338 3528 Motive drives - where cost effective, intend to use notched type vee bePotentially Cost-Effective

338 3532 consider VSDs on water pumps Potentially Cost-Effective

484 3533 Replacement of CRT monitors with TFT Cost-Effective

484 3534 Revised lighting schedules Cost-Effective

484 3535 Revised Air Conditioning schedules Cost-Effective

484 3536 Energy Star Activation Cost-Effective

425 3545 Review control and temperature settings for air conditioning units in o Cost-Effective

425 3546 Review automatic control of lighting Cost-Effective

425 3550 Review control and temperature settings for air conditioning units in o Cost-Effective

425 3552 Review automatic control of lighting Cost-Effective

302 3559 Upgrade cement milling capacity by installing a new cement mill #7 Cost-Effective

303 3583 Cement mill diaphragm allowing media escape - repair and replace Cost-Effective

350 3600 Improve Compressed Air Performance Cost-Effective

Page 186: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

569 3613 Reduce air conditioner hours- change winter start-up from 4am to 7am Cost-Effective

569 3614 Turn off major appliances at night and weekends (photocopiers etc.). BCost-Effective

569 3615 Staff education and training- this should assist in reducing energy c Cost-Effective

569 3623 Demand based ventilation system Cost-Effective

569 3624 VRUs for car park lighting Cost-Effective

569 3625 Refurbish light fittings Cost-Effective

569 3627 Install TX Valve Potentially Cost-Effective

569 3629 VSDs for chilled water pumps Potentially Cost-Effective

569 3630 Replacement of T-bar with high efficiency type Potentially Cost-Effective

569 3632 Installation of energy efficient shower heads in all villas and amenities Cost-Effective

569 3633 Replacement of incandescent globes with CFL. This should only occur wiCost-Effective

394 3634 Upgrade BMS interface and reprogramme the chillers staging control loCost-Effective

394 3636 Replace 50W Dichroic lamps with 35W units Cost-Effective

569 3640 Hot water system insulation- based on insulation leading to a 10% red Cost-Effective

569 3641 Villa insulation. Based on insulation leading to a 10% reduction in spacCost-Effective

569 3644 Optimise reclaim water pump operation Cost-Effective

382 3665 Cooling tower fans & CW pump VFD control Potentially Cost-Effective

569 3669 Install motion sensors at car park & toilets Cost-Effective

569 3671 Install controls to external lighting & selected circuits Cost-Effective

569 3677 Office lighting upgrade Potentially Cost-Effective

569 3678 Replace all twin 36w fittings Potentially Cost-Effective

407 3713 Reheat furnace - Warm Charging of billets Cost-Effective

407 3715 Reheat furnace - VSD on Combustion Air Fan Cost-Effective

407 3719 Reheat furnace - reduce discharge door open time - observed to be opePotentially Cost-Effective

407 3720 Reheat furnace - improve operation of tempering air fan. Fan runs contiPotentially Cost-Effective

448 3755 Re-commissioning existing lighting controls (time settings, holidays setCost-Effective

448 3757 Install voltage control and re-lamp general office lighting Cost-Effective

448 3758 Install timer delay switches in all store rooms Cost-Effective

448 3759 Install PE cell lighting control in selected areas, eg Café Cost-Effective

448 3760 Delamp selected fittings, eg corridors, breakout areas and café Cost-Effective

448 3761 Upgrade ELV lamps to 35W Cost-Effective

448 3762 Install time clocks on general power equipment to prevent operation a Cost-Effective

448 3765 Implement comprehensive sub-metering system Cost-Effective

448 3766 Decomission existing computer centre supplementary HVAC and assosiCost-Effective

448 3767 Set new computer centre supplementary air conditioning units setpoi Cost-Effective

448 3768 Install advanced chiller controls (eg electronic expansion valves, VSDsCost-Effective

448 3769 Install VSD's on cooling tower fans Cost-Effective

448 3771 Review chiller sequencing to match chiller capacity to load Cost-Effective

448 3772 Implement ambient temperature boiler cutoff in BMS Cost-Effective

448 3775 Review BMS economy cycle setpoints and operation Cost-Effective

448 3777 Implement night purge in BMS Cost-Effective

448 3778 Match HVAC operating times to staff requirements and consolidate AHCost-Effective

448 3779 Implement optimised start strategy for BMS Cost-Effective

448 3783 Install motion activated lighting control in all offices, meeting rooms, u Potentially Cost-Effective

448 3784 Upgrade ELV transformers to electronic Potentially Cost-Effective

334 3803 Air compressor leak reduction Cost-Effective

334 3806 High efficiency motors as motors reach end of life: 49 motors from 1.5 Potentially Cost-Effective

346 3811 opportunistic installation of high efficiency motors Potentially Cost-Effective

Page 187: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

346 3817 Subject to Op5, ductwork on D60 air compressor Cost-Effective

402 3832 Upgrade HS5 Compressor Motor Cost-Effective

402 3835 Upgrade the boiler ID fan to high efficiency Cost-Effective

402 3838 Upgrade boiler FD fan motor to high efficiency Potentially Cost-Effective

433 3851 Repair co-generator Cost-Effective

433 3853 Implement a leak reduction program and compressor control Cost-Effective

433 3854 Power Factor upgrade from 0.91 to 0.96 Potentially Cost-Effective

340 3891 Compressed air system - comprehensive review Cost-Effective

343 3952 Replace selected underground motors with super high efficient motors Potentially Cost-Effective

343 3956 Replace selected mill motors with super high efficient motors Potentially Cost-Effective

343 3957 Replace high-bay lights with special fluroescents Potentially Cost-Effective

343 3958 Replace selected surface motors with super high efficient motors Potentially Cost-Effective

579 3966 Single 50W dichroic fitting replaced with single 11W compact fluoro lampCost-Effective

579 3971 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with rCost-Effective

579 3972 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective

579 3980 Single 50W dichroic fitting replaced with single 11W compact fluoro lampCost-Effective

579 3982 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective

579 3983 Twin 36W fluorescent fitting refurbished to single 37W quad lamp with reCost-Effective

579 3987 Voltage reduction unit (for 26 lamps) Cost-Effective

579 3988 Twin 36W fluroescent fitting replace by new single 37W quad lamp with rCost-Effective

579 3991 Install lighting control PIR sensor in meeting room Cost-Effective

579 3992 Voltage Reduction Unit (for 85 lamps for administration block) Cost-Effective

579 3993 Install lighting control PIR sensor in toilets Cost-Effective

579 3994 Installation of Solar Hot Water System to replace current Electric SystemCost-Effective

397 3995 Reduce electricity consumption of external lights Cost-Effective

579 3996 Triple 36W fluorescent fitting refurbished to twin 37W quad lamp with refCost-Effective

579 3997 Twin 36W IND fluorescent fitting replaced by new single 37W quad lamp wCost-Effective

579 3998 Triple 18W fluroescent fitting refurbished to twin 18W quad lamp with refCost-Effective

579 3999 Twin 36W flurorescent fitting replaced by new single 37W quad lamp withCost-Effective

579 4000 Twin 36W fluroescent fitting replaced by new single 37W quad lamp with Cost-Effective

579 4001 Voltage Reduction Unit (for 30 lamps in amenities block) Cost-Effective

579 4005 Twin 18W fluorescent fitting replaced by new single 18W quad lamp with Cost-Effective

579 4006 Twin 36W fluroescent fitting replaced by new single 37W quad lamp with Cost-Effective

579 4007 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective

579 4010 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective

397 4017 Assess all site electric motor operation for operating efficiency – inclu Cost-Effective

284 4028 Change from continuous operation to 3 out of 4 shifts Cost-Effective

284 4029 Close production areas Cost-Effective

284 4036 Oxygen enrichment to reduce gas consumption Cost-Effective

284 4048 Reduce pit cycle time, soak time Cost-Effective

284 4049 Drossing off, melter practices, sequencing of product - standardisation Cost-Effective

284 4050 Maximise hot charging Cost-Effective

284 4051 Reduce time doors are open (work practices) Cost-Effective

284 4052 Improve burner efficiency by tuning Cost-Effective

284 4053 Improve burner efficiency by tuning Cost-Effective

386 4064 Web Energy Management Cost-Effective

386 4066 Precinct Central Chiller Cost-Effective

386 4070 W5C – Building Upgrade Potentially Cost-Effective

Page 188: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

494 4219 HVAC - control improvements Cost-Effective

494 4221 HVAC - chiller and condensor water systems Cost-Effective

494 4222 HVAC - Holiday scheduling and time of day Cost-Effective

494 4223 HVAC - economy cycle, CO2, outside air and night purge Cost-Effective

494 4224 HVAC - control of personal equipment and general awareness Cost-Effective

494 4225 HVAC - new or refurbished plant Cost-Effective

494 4229 Lighting initiatives Cost-Effective

494 4230 Office and other equipment initiatives Cost-Effective

280 4236 Improve O2 balance on SP2 and SP4 Cost-Effective

280 4237 Air rinse on elevators Cost-Effective

280 4240 Turn off soda ash dust collector Cost-Effective

424 4244 Optimise rail delivery conveyors and stackers. Automate and OptimiseCost-Effective

424 4245 Compressed air. Replace and relocate site air compressors. Replace eCost-Effective

424 4248 Improved power factor correction. Improve Site Power Factor. Supply,Cost-Effective

501 4249 A compressor scheduling system on the high pressure compressors has Cost-Effective

501 4250 Heat relaim on pellet driers on four IMM - as per set-up of new IMM Potentially Cost-Effective

280 4255 Batch house vacuum system Cost-Effective

280 4256 Pulse bubblers SP4 Cost-Effective

280 4257 Use air knives instead of air sweeps Cost-Effective

280 4258 Repair air leaks Cost-Effective

280 4266 Operation of Dessicant dryer. Investigate further Potentially Cost-Effective

280 4268 Improved ventilation compressed air building Potentially Cost-Effective

280 4269 SP3 Air Fuel ration control. Can only be done with control upgrade Potentially Cost-Effective

499 4277 Compressor scheduling package- control both high and low pressure Cost-Effective

506 4279 Car Park Shutdown - Centre security to isolate access to Car Park at 8:Cost-Effective

506 4280 PE Lighting Controls - PE control of selected interior mall and perimeterCost-Effective

472 4282 Install voltage reduction units to the lighting circuits on plantroom. Cost-Effective

506 4284 Lighting Controls Mall & Car Park Areas - Review current zone control, Cost-Effective

506 4285 Domestic Hot Water - Review and adjust temperature control setpoints Cost-Effective

291 4287 Repair steam and condensate leaks Cost-Effective

291 4288 Repair passing steam traps Cost-Effective

291 4289 Recover evaporator condensate to boiler feedwater Cost-Effective

291 4291 Reduce refrigeration load-loss of chilled water for cheese Cost-Effective

291 4295 Milk intake lighting Cost-Effective

506 4322 Escalators - Raise awarness to ensure escalators and travellators are nCost-Effective

280 4323 Temperature Comp. SP2 Comb. Air (investigation needed) Potentially Cost-Effective

472 4328 Install Lighting Controls to nominated areas Cost-Effective

506 4334 Reduce Outside Air - Investigate the reduction of O/A requirement throuPotentially Cost-Effective

473 4336 Install VSDs to AHUs Cost-Effective

292 4339 Building lighting Cost-Effective

292 4343 Milk intake lighting Cost-Effective

292 4345 Effluent plant hot water Cost-Effective

473 4346 Refurbish fluorescent light fittings in the corridors, offices and foyer. Cost-Effective

473 4348 Replace fluorescent light fittings in the plant rooms and MDF. Cost-Effective

473 4350 Install Lighting Controls to nominated areas. Cost-Effective

473 4354 Install voltage reduction units to the lighting circuits in the chiller plant Potentially Cost-Effective

292 4356 Rapid shut doors cold room Potentially Cost-Effective

506 4361 Lighting Lamp Replacement Dichroic 50w to 35w - Replace mall dichroicPotentially Cost-Effective

Page 189: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

474 4365 Refurbish fluorescent light fittings in the corridors and lift lobbies. Cost-Effective

474 4367 Install voltage reduction units to the lighting circuits on plantroom. Cost-Effective

474 4368 Install Lighting Controls to nominated areas Cost-Effective

474 4370 Replace chillers Cost-Effective

505 4374 Lighting Controls Mall & Car Park Areas - Review current zone control, Cost-Effective

475 4375 Refurbish fluorescent light fittings in the corridors and MDF. Cost-Effective

505 4376 PE Lighting Controls - PE control of selected interior mall and perimeterCost-Effective

505 4377 Escalators - Raise awareness to ensure escalators and travellators are Cost-Effective

505 4378 Power Factor Correction - Install PFC equipment (160KVAR) at main swPotentially Cost-Effective

505 4379 Car Park and House Flourescent Lighting - T5 kit lamp conversion of houPotentially Cost-Effective

505 4383 VSD on HVAC Pumps - VSD control on Chill water pumps, Condensor WatPotentially Cost-Effective

505 4390 Lighting Controls Malll & Car Park Areas - Review current zone, cleaninPotentially Cost-Effective

505 4391 Lighting Replacement MV to MH Car Park and Loading Docks - Replace 6Potentially Cost-Effective

505 4393 Lighting Lamp Replacement Dichroic 50W to 35W - Replace mall dichroiPotentially Cost-Effective

475 4398 Install voltage reduction units to the lighting circuits in equipment roomsCost-Effective

475 4399 Install lighting controls to the Office, carpark and equipment room. Cost-Effective

320 4409 Install Hull Diverter Valve Cost-Effective

320 4410 Installation of timed switches on Seed Shed lighting Cost-Effective

320 4415 Change from Pneumatic to Mechanical Meal Conveying Potentially Cost-Effective

320 4417 Dehulling Upgrade Cost-Effective

318 4423 Compressed Air leakages awarness programme Cost-Effective

318 4425 Increasing the power factor from an average of 0.96 to 0.98. Cost-Effective

318 4426 Steam Leaks-steam traps monitoring Cost-Effective

318 4427 Flash steam recovery from faulty traps Cost-Effective

318 4430 VSD on screw compressor 320kw Cost-Effective

318 4431 Lagging hot water steam & condensate pipes, costings & paybacks basCost-Effective

318 4432 Flash steam recovery for Boiler feed water heating Cost-Effective

318 4434 Combustion control to control oxygen to fuel ratio to the boiler Cost-Effective

318 4435 Biofilter Cost-Effective

318 4436 Ammonia pipe lagging Cost-Effective

318 4438 Application fo lumitrols Cost-Effective

318 4439 VSD for all chillers fans Cost-Effective

318 4444 Increasing Boiler drum TDS levels Potentially Cost-Effective

318 4446 VSD of combustion fan of the boilers Cost-Effective

318 4449 Recover heat from the flue gases and utilise for heating the feed water tPotentially Cost-Effective

318 4450 VSD on 150kw screw compressor Potentially Cost-Effective

318 4451 Power Demand Improvement Cost-Effective

318 4452 VSD on water pumps Potentially Cost-Effective

318 4453 Application of occupancy sensors (50 units) Potentially Cost-Effective

318 4454 Fluorescent change to Tri phosphor tubes Potentially Cost-Effective

318 4457 Refrigeration system optimisation Potentially Cost-Effective

318 4462 After Burner gas reduction Potentially Cost-Effective

318 4465 Compressed Air removal for water removal on packages isolation valv Potentially Cost-Effective

317 4471 Install dearator on boiler Cost-Effective

317 4476 Install variable speed drive on boiler combustion fan Cost-Effective

317 4478 Replace desolventiser toaster with new. Potentially Cost-Effective

510 4490 Conveyor Upgrade Cost-Effective

510 4492 Compressor Leak Review Cost-Effective

Page 190: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

510 4493 Hydraulic Circuits Cost-Effective

510 4496 Conveyor Sequencing Potentially Cost-Effective

332 4507 Air Compressors Cost-Effective

332 4508 Warm filling with ultrasonic defoaming Potentially Cost-Effective

427 4509 Upgrade lighting installations Cost-Effective

502 4513 VSDs on Maingate Conveyor 1 Tripper 1 Cost-Effective

502 4517 VSDs on two Thickener underflow pumps Cost-Effective

502 4518 VSD on Module 1 desliming cyclone feed pump Cost-Effective

502 4519 VSD on Module 1 dense medium cyclone feed pump Cost-Effective

502 4521 Use of HEM for motors in the new CH&PP Cost-Effective

502 4523 Use of VSDs on Maingate 2 conveyor Potentially Cost-Effective

502 4525 Use of VSDs on Maingate 3 conveyor Potentially Cost-Effective

470 4527 Install demand management controller for ac units Cost-Effective

470 4529 Offices refurb 50W to 35W downlights Cost-Effective

470 4530 Install VSD fitted compressors on all three circuits Cost-Effective

470 4531 Factory refurb 250W to 200W highbay Cost-Effective

470 4532 Factory refurb/replace flourescent lamps to 1x36W+kw2+E ballast Cost-Effective

470 4533 Factory - refurb 400W to 320W highbay Cost-Effective

511 4551 Raw Coal Feed Upgrade Cost-Effective

511 4552 Product Centrifuge Cost-Effective

511 4553 Paste Thickener Cost-Effective

511 4560 Conveyor Automation. Potentially Cost-Effective

511 4562 Compressed Air system review Potentially Cost-Effective

446 4564 HVAC - Office reschedule controls to switch off the system when not reCost-Effective

446 4565 Lighting factory - lower luminaires and reduce wattage Cost-Effective

446 4566 Lighting Office Technology upgrade Cost-Effective

446 4568 Machines running when not required Cost-Effective

446 4569 Furnaces - rescheduling in line with production levels, resulting reduc Cost-Effective

446 4570 Compressed air - leaks - identify and fix Cost-Effective

446 4572 Furnace area ventilation - requires further investigation Potentially Cost-Effective

446 4573 Cooling Towers control - improved control of cooling towers. Turn off whPotentially Cost-Effective

512 4583 Citect Warning on train loading belts running empty Cost-Effective

512 4586 Raw coal shutdown on no coal Cost-Effective

512 4591 Compressor review Potentially Cost-Effective

513 4599 Reduce time taken to shut down crusher at end of shift Cost-Effective

513 4600 Dewatering pumping system Cost-Effective

513 4601 Shut down crusher over crib Potentially Cost-Effective

514 4612 20 Minute rule on the dragline. Cost-Effective

514 4613 Crusher start and shutdown Cost-Effective

514 4614 Compressor Leak Review Cost-Effective

515 4650 Compressor system review Potentially Cost-Effective

515 4657 Audit of the Compressed Air System Cost-Effective

515 4661 Variable Displacement pumps on the longwall Cost-Effective

582 4690 Refurbish twin light fittings to single fittings – in one building. Potentially Cost-Effective

582 4692 Install a lux sensor in lunchroom Potentially Cost-Effective

582 4693 Install occ sensors in offices Potentially Cost-Effective

582 4696 Install occ sensors in the office & lunchroom Potentially Cost-Effective

582 4715 Install an occupancy sensor in the kitchen to control the 15 x 36W singCost-Effective

Page 191: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

582 4717 Delamp fluorescent light fittings in the office, rear administration area Potentially Cost-Effective

582 4718 Replace the 60W incandescent lamp in the cleaners store with an 11WPotentially Cost-Effective

582 4727 Install an occupancy sensor to control the lighting in the staff lunchroo Potentially Cost-Effective

582 4734 Refurbish twin fluorescent light fittings from twin fittings to single fittingsPotentially Cost-Effective

582 4736 Refurbish twin fluorescent light fittings from twin fittings to single fittingsPotentially Cost-Effective

582 4755 Replace 8 x 60W incandescent lamps in the infant’s playroom (Rear BuiCost-Effective

582 4766 Replace the 60W incandescent lamp at entry to a compact fluorescent Cost-Effective

304 4787 Re-commission fuzzy logic Cost-Effective

304 4793 Recycle kiln dust into finished product Potentially Cost-Effective

582 4798 Replace incandescent lamps with CFLs in staff bathrooms, back of housCost-Effective

304 4799 Recycle spillage from pre-heater Potentially Cost-Effective

582 4804 Replace incandescent lamps with CFLs. Cost-Effective

304 4807 Secondary Crusher replacement Cost-Effective

304 4808 Install photo-detectors on remaining lights Potentially Cost-Effective

390 4858 Turn off three hydraulic pumps if not used Potentially Cost-Effective

390 4859 Review of compressed air system Potentially Cost-Effective

593 4871 Reduce pool temperature to 26C Cost-Effective

593 4876 Install Pool cover & timer on boilers Cost-Effective

598 4886 Improvement to air conditioning control system Cost-Effective

598 4888 Push button time delay switches to control AC unit Cost-Effective

593 4890 Disable plant from operating during public holidays Cost-Effective

593 4891 Reschedule HVAC start time Cost-Effective

593 4892 Install timers to ZIP water boiler units Cost-Effective

593 4893 Replace existing 125W MV foyer lighting with 28W Compact Fluoresc Cost-Effective

593 4894 Install power Factor Correction Cost-Effective

593 4895 Re-lamp existing twin fluorescent 36W fittings with 28W T5 Save It EasPotentially Cost-Effective

593 4896 Replace 50W LVDL with 13W RCF Potentially Cost-Effective

593 4898 Reset HVAC timer to disable plant on Public Holidays Cost-Effective

593 4905 Relamp incandescent lamps with compact fluorescent lamps Cost-Effective

593 4912 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Potentially Cost-Effective

593 4913 Installation of skytube Potentially Cost-Effective

593 4923 Turn off office equipment when not in use Cost-Effective

593 4925 Install timers to ZIP water boiler units Cost-Effective

593 4926 Replace 400W mercury vapour with 250W metal halide lamps Potentially Cost-Effective

593 4927 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Potentially Cost-Effective

593 4929 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Cost-Effective

598 4936 HVAC control, economy cycle and VSD application Cost-Effective

598 4937 T5 lighting upgrade Cost-Effective

596 4940 Installation of Energy Save Units Potentially Cost-Effective

596 4941 Installation of Occupancy Sensors Potentially Cost-Effective

596 4942 Integration of Pumps with SCADA system Potentially Cost-Effective

596 4945 Installation of Energy Save Units to Control Lights in the Car Park Potentially Cost-Effective

596 4950 Replacement of CRT Monitors Potentially Cost-Effective

587 4957 Install 4 timers (30%) Cost-Effective

587 4963 Install 6 x movement sensors in amenities and storerooms, etc (30%) Cost-Effective

596 4965 Installation of external door Potentially Cost-Effective

587 4969 Install inverter type reverse cycle air conditioners Potentially Cost-Effective

587 4971 Install 16 x movement sensors (30%) Cost-Effective

Page 192: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

596 4972 Replacement of incandescent lamps Cost-Effective

596 4973 Commercial refrigerator control Cost-Effective

596 4974 Installation of light sensors to control external lighting Potentially Cost-Effective

587 4986 Install 365 day hot water timer to control 3 x HWHs (30%) Cost-Effective

587 4987 Install 15 x movement sensors (30%) Cost-Effective

587 4993 Install 365 day hot water timers to control 2 x HWSs (30%) Cost-Effective

587 4994 Install 12 x movement sensors Cost-Effective

587 5000 Install 4 x timers for hot water heaters & water coolers (30%) Cost-Effective

587 5001 Install 9 x movement sensors (30%) Cost-Effective

587 5002 Install window tinting (10%) Cost-Effective

587 5008 Implement HVAC Controls - 365 days (50%) Cost-Effective

587 5009 Install 5 x hot water timers (40%) Cost-Effective

587 5010 Install 30 x movement sensors (30%) Cost-Effective

587 5011 Implement staff education program - including appropriate signage. Cost-Effective

587 5017 Lower thermostat temperature of hot water heaters & install timers (30 Cost-Effective

587 5019 Implement staff education program - including appropriate signage Cost-Effective

587 5022 Implement education program - including appropriate signage Cost-Effective

587 5023 Interrogate where the floodlights are being billed. Supposed to be off Cost-Effective

587 5027 Compare bills. We appear to be significantly overcharged Cost-Effective

587 5028 Check time clock program and analyse time use Cost-Effective

594 5055 Install movement sensors on lighting circuits. Cost-Effective

594 5057 Install ECO-Save on remainder of lighting circuits Cost-Effective

594 5062 Integrate Zane solar system into BMS Cost-Effective

594 5063 Replace current gas boilers with Rotex/Rinnai gas package for main poCost-Effective

594 5064 Spa heating using Rotex system Cost-Effective

594 5065 Install VSD's on Circulation Pumps Cost-Effective

594 5069 Replace 400W Mercury Vapour lamps with more efficient 250W HPI P Cost-Effective

594 5073 Install Power Factor Equipment to raise PF from an average.78 to.98 Cost-Effective

594 5077 Alter the control system to increase the aeration delay time Cost-Effective

594 5081 Installation of a Compressor control system to shut down the second Potentially Cost-Effective

594 5085 Install Variable Speed Drive on Outdoor Circulation Pump Cost-Effective

594 5086 Install Metered Power Heads on Storage Van sites Cost-Effective

594 5090 Replace 17 X 80W MV Sphere lights in with more efficient fittings an Cost-Effective

594 5092 Complete the change out of 250W & 400W MV & 310 HPS S/L fittings Cost-Effective

594 5095 Develop and implement procedures to confirm that individual street lighPotentially Cost-Effective

594 5097 Convert system 4 Public Lighting Systems to one of the other systems Potentially Cost-Effective

574 5126 Installation of non return dampers on pool room vents Cost-Effective

574 5131 Prevent unnecessary operation of air conditioning Cost-Effective

574 5139 Upgrade of AC2.1 controls Potentially Cost-Effective

574 5140 Replacement of halogen lighting with IRC or Megaman equipment Potentially Cost-Effective

574 5141 Reduce air conditioning operating times Cost-Effective

574 5142 Upgrade of air conditioning controls Cost-Effective

574 5156 Replacement of halogen with IRC or Megaman equipment Potentially Cost-Effective

574 5159 Installation of a hood Potentially Cost-Effective

574 5166 Replacement of incandescent lighting Potentially Cost-Effective

574 5172 Replacement of Mercury Vapour High Bays Potentially Cost-Effective

580 5181 Carpark - Delamp fluorescent lighting with triphosphor tubes and modifyCost-Effective

580 5231 Investigate the feasibility of consolidating refrigeration in the off-seasonCost-Effective

Page 193: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

580 5232 Turn off kitchen lights and fans in off-season Cost-Effective

580 5233 Turn off main office air conditioner at night Cost-Effective

580 5237 Switch off urn in staff room during winter and use a timer on the urn d Cost-Effective

580 5249 Identify and reduce idle equipment operation baseload Cost-Effective

580 5250 Install voltage reduction units on fluorescent lighting Cost-Effective

580 5280 Repair outside air damper - activate ECO cycle Cost-Effective

580 5283 Investigate and reduce baseload Cost-Effective

580 5301 Install 365 day timer to switch off HVAC during holidays and optimise sCost-Effective

580 5305 Include within the existing air condition maintenance contract a trial Cost-Effective

580 5306 Activate Energy Star on computers Cost-Effective

580 5310 Investigate current circuit setup and potential to install motion detectorsPotentially Cost-Effective

580 5313 Install 7-day timers on the hydro-boil units Potentially Cost-Effective

580 5324 Investigate the current circuit setup and the potential to install motion Cost-Effective

580 5346 Include within the air conditioning maintenance contract a trial to opt Cost-Effective

580 5386 Install 365-day timer to switch off HVAC during holidays and optimise sCost-Effective

580 5389 Include within existing air conditioning maintenance contract a trial t Cost-Effective

580 5396 Install 7-day timers on the hydro-boil units Potentially Cost-Effective

580 5402 Continue retrofitting of twin lamps with single Cost-Effective

315 5426 Focused maintenance campaigns on steam traps and leaks Cost-Effective

315 5427 Long-term replacement of electrical motors (several hundred) with EX-veCost-Effective

315 5428 Long-term upgrade of plant lighting with better quality, higher efficien Cost-Effective

315 5429 Suite (~80) of minor improvement projects, some with energy improvemCost-Effective

595 5451 Installation of Energy Reduction Controllers Cost-Effective

372 5469 Nonworking days energy management Cost-Effective

372 5476 Fluorescent tubes change to triphosphor Cost-Effective

372 5477 Change Mercury Vapour to Metal Halide lamps Cost-Effective

367 5495 IT refresh for client providing energy saving at data centre Cost-Effective

367 5496 IT refresh - It technology refresh for IBM Lotus Notes Applications provCost-Effective

367 5497 CRAC Unit load balance Cost-Effective

367 5500 Exist lighting upgrade to LEDs. Replace 10W fluorescent lighting with Potentially Cost-Effective

367 5501 Service Corridor Lighting Modifications. Rewire corridor lighting to creaPotentially Cost-Effective

373 5511 Change to mercury halide lamps Cost-Effective

563 5516 Variable speed drive to 2 of the 3 Air Handling Units for pool heating Cost-Effective

563 5517 Motion sensors to 4 ventilation fans in sporting hall with a fan cutting i Cost-Effective

563 5518 Replace CF fittings with triphosphor lamps, install 5 light save transfor Cost-Effective

563 5519 Turn off 1 HW circulation pump when 1 boiler runs, and run 1 filtratio Cost-Effective

563 5521 PF- Install 250kVAr power factor correction equipment Cost-Effective

563 5525 MLS using occupancy/daylight sensors Cost-Effective

563 5526 Control modification on space temperature set points Cost-Effective

563 5527 Variable speed drives for 6 condenser water pumps Cost-Effective

563 5533 Voltage controller Cost-Effective

563 5536 VSDs for 2 filtration pumps Cost-Effective

563 5538 Pool covers for indoor and outdoor pools Cost-Effective

563 5539 Time delay switches for 17 electric radiant heaters Cost-Effective

563 5540 PF- Inspect and test existing power factor correction equipment, upgraCost-Effective

563 5541 VSDs for 3 chilled water pumps (1.2 and 3) controlled by CHW differenCost-Effective

563 5542 VSDs for AHU1 fan with a sliding scale signal on O/A temperature: fu Cost-Effective

563 5543 Modify control strategy: reheat set poit to 20+-0.5 degC, space tempe Cost-Effective

Page 194: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

563 5544 Light save transformers Cost-Effective

563 5547 Install new thermostat with accuracy to +-0.5 degC Cost-Effective

563 5548 Install several pool covers on the smallest pool, and regular use of the Cost-Effective

563 5549 Install new thermostat with accuracy to +-0.5 degC Cost-Effective

563 5550 Install several pool covers on the smallest pool, and regular use of pooCost-Effective

563 5551 Replace existing thermostatic expansion valve with electronic expansioCost-Effective

563 5552 Modify control strategy: reheat set point to 20+-0.5 degC, space tem Cost-Effective

584 5564 Install motion sensor Cost-Effective

584 5565 Install variable speed drive to recirculating pump Cost-Effective

584 5578 Implementation of lighting policy with the cleaning contact Cost-Effective

584 5580 Replace low voltage light fittings Cost-Effective

563 5586 Redefine operating hours - Control and AC modification Cost-Effective

584 5613 Install ESM 4000 Abbotly chiller controls Cost-Effective

584 5620 Refurbish 400W MV fittings with 250W MH fittings Cost-Effective

584 5621 Refurbish 250 MH fittings with 150W MH fittings Cost-Effective

584 5622 Replace triple 36W fittings with twin 37W quadphosphor fittings Cost-Effective

584 5623 Replace twin 58W fittings with single 58W triphosphor fittings Cost-Effective

584 5624 Install lighting controls Cost-Effective

584 5628 Install occupancy sensors to administration office to control lighting Cost-Effective

584 5630 Upgrade bathroom light fittings in grandstands Cost-Effective

584 5631 Delamp CFL fittings in function room Cost-Effective

584 5632 Install lighting controls to the function room bathrooms Cost-Effective

584 5633 Replace twin fluorescent fittings with single fittings including new reflecCost-Effective

584 5639 Refurbish carpark office light fittings from twin to single fittings Cost-Effective

584 5640 Replace bathroom lamps from incandescent to compact fluorescent Cost-Effective

584 5643 Refurbish metal halide fittings Cost-Effective

584 5648 Replacement of incandescent lamps with compact fluorescent lamps in Cost-Effective

584 5656 Replace 250W metal halide light fittings with 37W twin quadphosphor ligCost-Effective

584 5660 Refurbishment fluorescent light fittings in carpark Cost-Effective

366 5678 Cafeteria and Corridors Lamp Replacement - Replace 490 100W incandesCost-Effective

366 5679 Refurbishment with new lighting. Replace 203 36W T8 fluorescent lamCost-Effective

366 5681 Office Lighting Upgrade 2. Automatic lighting control through the IntegrCost-Effective

366 5682 Cooling Towers replacement - replace Shinwa Cooling Towers with new Cost-Effective

366 5683 Chillers replacement - 6 chillers will be replaced by 4 Centrifugal Chi Cost-Effective

366 5684 Circulating pumps for HVAC replaced with VSDs Cost-Effective

366 5687 Workstation Power Management. Employee enable ENERGY STAR and TCost-Effective

597 5692 Refine pool temp operation with aim to reduce set points by average 1 Cost-Effective

597 5693 Replace degraded training pool cover with higher quality/high R-value aPotentially Cost-Effective

597 5695 Replace old 36W batten luminaires with energy efficient 36W fittings at vaPotentially Cost-Effective

597 5697 Replace PAR38 spotlights in foyer of theatre paviliion with CFL alternatCost-Effective

597 5698 Install active roof air extraction system for theatre pavilion to minimis Cost-Effective

366 5700 LEDs for Emergency Exit Lighting - all exit lighting is conventional 10WPotentially Cost-Effective

597 5716 Install occupancy sensor on lighting in the access corridor on the bottoCost-Effective

597 5717 Place day-light sensor or timer controls on the up-lighting in the front a Cost-Effective

597 5720 Program the BMS to turn off lighting at the front of the building. CurrentCost-Effective

315 5725 installation of Power Factor capacitance(5 MVAr) with new site substatCost-Effective

485 5727 Electro-mechanical timers for air conditioners Cost-Effective

485 5739 Rectify operation of the heating hot water pump Cost-Effective

Page 195: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

485 5740 Interlock the boiler with the associated air handling plant Cost-Effective

485 5742 Install outside air compensation on levels 2,3 and 4 fan coils' chilled w Cost-Effective

485 5754 Movement detector in rooms Cost-Effective

485 5755 Replace Dichroics with CF and install MDs Cost-Effective

485 5756 Replace Dichroics with IRC types Cost-Effective

485 5757 Replace 36W lamps with T5s Cost-Effective

485 5760 Replace 40W lamps with 36W Cost-Effective

485 5766 Install push button timer control of the mail room Cost-Effective

485 5767 Disable local setpoint adjustments on temperature sensors Cost-Effective

485 5771 Reduce domestic hot water from 70C to 60C Cost-Effective

485 5784 Replace 40 watt rapid start tubes with 32 watt rapid start tubes Cost-Effective

485 5785 Install push button timer control of lights in selected intermittently occ Cost-Effective

485 5793 Replace reading lamps with compact fluorescents Cost-Effective

485 5799 Control HHW pump and boiler to heating demands Cost-Effective

485 5804 Install Movement Detectors in selected rooms Cost-Effective

485 5805 Reprogram Cbus system Cost-Effective

485 5815 Alter the controls on the level 2 common/staff room air conditioners Cost-Effective

485 5816 Alter the controls on the laboratory console air conditioners Cost-Effective

485 5817 Alter the controls on Mechanical SW/BD Cost-Effective

485 5840 Level 4 Research lab Cost-Effective

485 5843 Install movement control of the lights in selected intermittently occupie Cost-Effective

485 5844 Photo-sensor lighting control to select perimeter aeras Cost-Effective

485 5856 Optimise Lecture threatre economy cycle Cost-Effective

485 5857 Optimise Lecture theatre duct heater ops Cost-Effective

485 5858 Movement sensor control to four labs Cost-Effective

485 5859 Movement sensor in room for split a/c Cost-Effective

485 5860 Movement sensor in two rooms split a/cs Cost-Effective

485 5866 Install MDs in four labs Cost-Effective

485 5876 PBT control on the staff room 727 lights Cost-Effective

485 5878 Optimise BMS control functions Cost-Effective

485 5880 Push button timer control of twp training room air conditioners Cost-Effective

485 5885 Install movement control of the lights in selected intermittently occupie Cost-Effective

485 5892 Check all control systems and schedules of HVAC systems Cost-Effective

485 5893 Optimise the operation of the rundown timers Cost-Effective

485 5894 Disable fresh air fan and zone duct heaters when the outside air tempeCost-Effective

485 5908 Repair odour problem and install push button timers with movement seCost-Effective

485 5911 Install movement control of the lights in selected intermittently occupie Cost-Effective

485 5919 PBT for two rooms Cost-Effective

485 5921 PBT for Tutorial Room Cost-Effective

485 5923 Optimum start/stop and scheduling of A/c Cost-Effective

485 5925 Install movement control of the lights in selected intermittently occupie Cost-Effective

485 5926 Selectively de-lamp museum Cost-Effective

485 5932 Install push button timer control on the air conditioner serving laborato Cost-Effective

485 5934 Insulate the flow and return pipework from the potable and non potable Cost-Effective

322 5947 New press plattern. This produces smoother boards hence less sandingCost-Effective

322 5957 Core and Flake Drier Optimisation of gas use and possible fitting of VSPotentially Cost-Effective

586 5966 Switch off pool heat pumps during summer to avoid high monthly dem Cost-Effective

586 5975 Upgrade main pumps with energy efficient motors and improve the systPotentially Cost-Effective

Page 196: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

586 5976 Replace existing indoor T8 fluorescent light fittings with T5 fittings Potentially Cost-Effective

586 5977 Replace low voltage Halogens with more efficient lamps and upgrade witPotentially Cost-Effective

586 5981 Install timers on small hot water services/zip boilers Potentially Cost-Effective

586 5983 Install 275L heat pump hot water system to be used in place of larger unPotentially Cost-Effective

586 5990 Replace existing conventional storage hot water systems with heat pumpPotentially Cost-Effective

586 5992 Replace existing Small MV Lights with 2X14W and 2X24W T5 StreetlightPotentially Cost-Effective

586 5993 Replace existing Fluorescent lights with 2X14W T5 Streetlights or otherPotentially Cost-Effective

586 5994 Replace existing incandescent lights with 2X14W T5 Streetlights or othPotentially Cost-Effective

586 5995 Replace exisying Large MV lights with HP Sodium Streetlights or other Potentially Cost-Effective

329 6032 install new meters Cost-Effective

453 6039 Document and implement replacement program (including target dates) Potentially Cost-Effective

570 6485 Improved HVAC efficiency through improved maintenance -production oCost-Effective

570 6488 Fit timer to ZIP water heater in staff kitchenette Cost-Effective

570 6489 Get the A/C controls recommissioned form a Carrier technician + instalCost-Effective

570 6490 Investigate and resolve high 'base power' issues. Cost-Effective

570 6491 Replace 50W Low voltage down lights with 35W IRC lamps Cost-Effective

570 6493 Remove leaking 50 litre hot water heater and connect piping to existin Cost-Effective

570 6494 Fit timer to ZIP water heater in staff kitchenette Cost-Effective

570 6495 Install voltage reduction unit to the fluorescent lamps in ground floor t Cost-Effective

570 6496 Replace 100W halogen wall lamps with 23W CFLs in the foyers Cost-Effective

570 6497 Install timer to the large refrigerator plug such that the fridge only op Cost-Effective

570 6498 Fit timer to large ZIP water heater in main kitchen area Cost-Effective

570 6499 Replace 50W Low voltage down lights with 35W IRC lamps Cost-Effective

509 6501 Remove/Isolate SMC Desiccant Dryer Cost-Effective

509 6503 General Air Leaks Cost-Effective

509 6504 Install Photocell control and over-ride switch - High mast Cost-Effective

509 6505 Install Photocell control and over-ride switch - Exterior lighting Cost-Effective

509 6506 Install lighting controls Cost-Effective

509 6507 Kilns - correctly apply edge baffles Cost-Effective

509 6511 Replace Timer Valves (Drains) Potentially Cost-Effective

509 6513 Improve lighting efficiency - replace dichroic lamps with UCFLs; pilot d Potentially Cost-Effective

509 6515 High efficiency 150 kW motor Potentially Cost-Effective

509 6516 High efficiency 110 kW motor Potentially Cost-Effective

509 6517 High efficiency 15 kW motor Potentially Cost-Effective

509 6520 Improved Compressor Efficiency & Control Methods Potentially Cost-Effective

440 6527 Discontinue use of Compressed Air Guns Cost-Effective

440 6532 Ammonia Back pressure valves for Spirals Potentially Cost-Effective

578 6543 Installation of shower duration timers Cost-Effective

578 6544 Rearrangement of lighting circuits Cost-Effective

578 6545 Hot water pipe insulation Cost-Effective

578 6546 Opportunistic metering of unmetered sites Potentially Cost-Effective

578 6549 Removal and replacement of existing light fittings as per ECS specificaPotentially Cost-Effective

578 6551 Opportunistic metering of unmetered sites Potentially Cost-Effective

578 6553 Opportunistic replacement of fluorescent lamps with T5 fittings Cost-Effective

511 6599 Compressed air leak review Cost-Effective

511 6603 High efficiency motor review Potentially Cost-Effective

511 6604 Review of compressed air system and usage Cost-Effective

485 6609 Interface tempered air systems to the BMS to provide time of day schedCost-Effective

Page 197: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

485 6611 Selectively relamp triple 40 W rapid start light fittings in a room Cost-Effective

485 6612 Rearrange light switching in the Levels 2 and 3 foyers so that only acceCost-Effective

Page 198: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Equipment Type Actual cost ($) Actual electricit Actual natural gaStart Date

HVAC $410 57 NULL

Industrial Equipment $1,045 57 NULL

Industrial Equipment $14,700 395 NULL

Industrial Equipment $2,698 30 NULL

Lighting $7,800 165 NULL

Air compressor $15,000 452 NULL

Other $2,000 1,368 NULL

Other $3,000 1,632 NULL

Lighting $1,000 45 30/06/06

Power Factor Correction $45,000 20,000 1/07/07

Lighting $0 48 NULL

Lighting $3,050 49 NULL

Lighting $2,520 54 NULL

Industrial Equipment $19,000 230 NULL

Industrial Equipment $1,300,000 0 1/07/06

Industrial Equipment $1,100,000 788 1/10/05

Industrial Equipment $1,200,000 1,042 1/12/05

Industrial Equipment $2,500,000 1,970 1/11/05

Industrial Equipment $500,000 400 1/11/05

Behaviour/Education $1,878,000 2,612 1/04/05

Industrial Equipment $4,500,000 5,935 1/03/06

Other $391,000 475 1/05/06

Air compressor $440,000 2,800 1/02/07

Industrial Equipment $0 3,300 NULL

Industrial Equipment $0 37,000 NULL

Industrial Equipment $24,375 374 1/07/06

Industrial Equipment $18,500 264 1/07/06

Industrial Equipment $30,000 130 1/07/06

Industrial Equipment $20,000 231 1/07/06

Air compressor $13,000 821 1/07/06

Power Factor Correction $250,000 891 1/03/06

Power Factor Correction $250,000 3,000 1/07/06

Industrial Equipment $100,000 111 1/07/07

Industrial Equipment $800,000 2,692 1/07/06

Power Factor Correction $30,000 28 1/07/06

Air compressor $150,000 1,802 1/07/06

Power Factor Correction $260,000 538 1/08/06

Industrial Equipment $33,000 584 NULL

Lighting $240,000 719 NULL

Industrial Equipment $200,000 587 NULL

Industrial Equipment $10,000 117 1/01/06

Air compressor $33,000 400 1/01/07

Lighting $7,500 40 NULL

Boiler $10,000 2,000 1/03/06

Industrial Equipment $500,000 5,500 1/01/06

Industrial Equipment $42,500 10,000 1/06/06

Other $75,000 12,500 1/05/06

Page 199: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment $20,000 0 1/01/06

Air compressor $3,520 42 30/09/06

Air compressor $23,500 83 30/09/06

Air compressor $25,000 1,480 1/01/07

Air compressor $70,000 740 1/01/07

Industrial Equipment $60,000 31,870 1/10/07

Lighting $30,000 400 1/01/07

Boiler $0 113,641 NULL

Air compressor $649,000 692 NULL

Industrial Equipment $100,000 286 NULL

Lighting $500 3 NULL

Industrial Equipment $4,980,000 116,000 NULL

HVAC $150,000 276 NULL

Industrial Equipment $2,000 35 NULL

Industrial Equipment $80,000 28 NULL

Boiler $50,000 200,000 NULL

Industrial Equipment $4,000 8 1/06/06

Industrial Equipment $20,000 41 1/08/06

Air compressor $24,000 70 1/10/06

Lighting $15,000 29 1/06/06

Industrial Equipment $90,000 48 1/12/06

Industrial Equipment $49,000 720 NULL

Lighting $46,350 236 NULL

Behaviour/Education $12,000 1,108 NULL

Air compressor $18,100 26 NULL

Industrial Equipment $46,000 68 NULL

Lighting $47,970 108 NULL

Industrial Equipment $36,000 116 NULL

Monitoring $400,000 2,503 1/10/06

Industrial Equipment $100,000 750 1/07/06

Industrial Equipment $50,000 0 30/11/07

Industrial Equipment $784,698 664 1/07/06

Other $1,215,130 137 1/07/06

Industrial Equipment $1,000,000 1,438 1/07/06

Industrial Equipment $40,483 138 1/07/09

Air compressor $30,000 1,051 30/06/06

Air compressor $10,000 417 1/05/06

Other $5,000,000 553 1/01/07

Industrial Equipment $300,000 263 30/06/06

Industrial Equipment $2,000 63 1/01/07

Air compressor $50,000 600 1/01/07

Industrial Equipment $250,000 20,000 NULL

Industrial Equipment $5,000 285 1/07/06

Air compressor $13,000 196 1/07/06

Air compressor $25,000 250 1/07/06

Industrial Equipment $77,000 728 NULL

Power Factor Correction $180,192 1,200 1/04/06

Lighting $100,000 967 1/07/06

Page 200: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Power Factor Correction $16,000 176 NULL

Air compressor $3,600 82 NULL

Other $3,500 63 NULL

Insulation $2,000 82 NULL

Lighting $7,320 63 NULL

Other $1,000 9 NULL

Lighting $600 39 NULL

Air compressor $15,000 215 NULL

HVAC $59,599 336 1/12/07

Building Management Systems $207,822 258 1/12/07

Lighting $531,226 600 1/12/07

Air compressor $144,621 668 1/12/07

Air compressor $220,000 1,400 NULL

Industrial Equipment $1,000,000 345 NULL

HVAC $5,000 8 NULL

Tariffs $0 3,120 NULL

Lighting $14,500 68 NULL

Mixed $1,000 147 15/10/06

Industrial Equipment $1,000 71 15/10/06

Industrial Equipment $3,000 286 15/10/06

other $6,000 246 15/01/07

Industrial Equipment $1 86 1/11/06

Behaviour/Education $100 51 NULL

Industrial Equipment $1,000 709 1/11/06

Other $240 129 1/03/07

Other $120 110 1/03/07

Industrial Equipment $4,400 11 NULL

Industrial Equipment $1,440 98 1/07/07

Industrial Equipment $480 82 NULL

Other $1,450 36 1,382 1/09/07

Other $660 67 NULL

HVAC $600 96 NULL

Other $120 56 NULL

Industrial Equipment $240 22 1/09/07

Other $480 21 1/12/07

Other $480 11 NULL

Boiler $29,670 1,551 NULL

Ventilation $1,200 16 NULL

Other $240 4 1/01/07

Other $120 3 1/06/07

Industrial Equipment $4,200 2 NULL

Boiler $0 9 NULL

Chiller $230,000 0 NULL

HVAC $0 8 2,700 1/03/06

Air compressor $0 75 1/07/06

Industrial Equipment $278,000 0 NULL

Industrial Equipment $15,000 136 NULL

HVAC $800 115 NULL

Page 201: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial equipment $65,000 23,865 NULL

HVAC $20,000 500 NULL

HVAC $15,000 0 NULL

Air compressor $4,800 118 NULL

Industrial Equipment $48,000 1,512 1/01/07

HVAC $42,000 671 NULL

Boiler $13,000 69 NULL

Air compressor $26,000 578 NULL

Industrial Equipment $885,000 5,390 NULL

Industrial Equipment $7,000,000 5,734 NULL

HVAC $42,000 166 NULL

Chiller $27,000 114 1/08/06

Chiller $400,000 442 1/10/05

Hot Water System $4,230 6 NULL

Lighting $28,980 0 1/07/07

Lighting $44,275 0 1/07/07

HVAC $5,750 47 NULL

HVAC $17,250 0 1/07/06

Boiler $9,150 326 NULL

Lighting $2,300 3 NULL

Lighting $2,300 5 NULL

Lighting $2,300 7 NULL

Lighting $3,450 0 1/06/07

Industrial Equipment $4,160 9 NULL

Air compressor $23,000 83 NULL

Lighting $1,840 0 1/06/07

Lighting $3,150 34 NULL

Lighting $9,250 63 NULL

Lighting $450 1 NULL

Lighting $4,640 4 NULL

HVAC $3,850 12 NULL

HVAC $1,200 7 NULL

Lighting $7,100 112 NULL

HVAC $1,500 74 NULL

Lighting $1,185 6 NULL

HVAC $230 0 1/07/06

Chiller $3,738 0 1/07/06

Ventilation $11,574 6 NULL

Lighting $12,205 11 NULL

Lighting $2,755 4 NULL

Lighting $11,976 21 NULL

Lighting $1,725 0 1/07/06

Hot Water System $6,840 14 NULL

Lighting $4,275 10 NULL

Lighting $4,905 4 NULL

Lighting $11,685 39 NULL

Ventilation $8,100 10 NULL

HVAC $3,600 6 NULL

Page 202: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $7,400 11 NULL

Lighting $6,575 11 NULL

Lighting $2,940 10 NULL

Lighting $3,070 8 NULL

Industrial Equipment $345 0 1/07/06

Hot Water System $22,510 25 NULL

HVAC $1,725 0 1/07/06

Lighting $5,735 8 NULL

Lighting $5,975 4 NULL

Lighting $12,071 35 NULL

HVAC $472 0 1/07/06

Hot Water System $58 0 1/07/06

HVAC $4,140 0 1/07/06

HVAC $1,380 0 1/07/06

Air compressor $0 417 NULL

Air compressor $15,000 336 NULL

Lighting $4,000 45 NULL

Air compressor $0 90 NULL

Industrial Equipment $300,000 1,983 1/07/06

Industrial Equipment $0 0 1/01/07

Monitoring $400,000 3,306 1/10/06

Industrial Equipment $100,000 992 1/10/06

Air compressor $160,000 392 NULL

Air compressor $10,000 120 NULL

Air compressor $0 24 NULL

Lighting $23,000 313 NULL

other $0 32,000 NULL

other $0 131 NULL

Industrial Equipment $18,800 286 NULL

Industrial Equipment $26,120 155 NULL

Boiler $12,500 1,806 NULL

Chiller $17,200 863 31/07/06

Boiler $5,000 350 1/01/07

HVAC $5,800 181 1/09/06

HVAC $23,040 151 141 1/07/06

HVAC $8,000 60 NULL

Lighting $5,000 31 NULL

Industrial Equipment $23,040 42 141 1/10/06

HVAC $15,000 117 NULL

Lighting $17,000 32 NULL

Lighting $10,000 49 31/12/09

HVAC $5,000 6 16 NULL

Boiler $6,000 2,376 30/06/06

Boiler $12,500 1,808 NULL

Chiller $14,000 260 30/06/09

Lighting $2,000 49 NULL

Industrial Equipment $13,440 25 143 1/10/06

HVAC $11,700 21 59 NULL

Page 203: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

HVAC $2,920 8 NULL

Maintenance $2,460 61 23 1/07/06

Maintenance $3,000 140 1/07/06

Air compressor $1,599,190 1,175 NULL

Industrial Equipment $100,000 3,000 NULL

Lighting $3,000 110 NULL

Industrial Equipment $0 1,360 NULL

Boiler $0 1,898 1/10/06

Mixed $4,800 0 0 NULL

Boiler $98,000 0 1/01/08

Waste heat recovery $90,000 9,785 NULL

Industrial Equipment $17,000 0 NULL

Industrial Equipment $21,000 1 NULL

Air compressor $9,500 0 NULL

Behaviour/Education $23,000 0 NULL

Lighting $49,500 59 NULL

HVAC $12,000 0 NULL

Mixed $138,700 0 NULL

HVAC $10,000 0 NULL

Boiler $9,000 3 NULL

Lighting $1,600 5 NULL

Air compressor $300,000 155 NULL

Industrial Equipment $20,000 108 NULL

Industrial Equipment $20,000 7,490 NULL

Industrial Equipment $5,000 1,000 1/11/08

Industrial Equipment $100,000 22,500 1/10/05

Industrial Equipment $30,000 165 NULL

Other $1 2,136 1/03/06

Other $2,000 49 NULL

Industrial Equipment $5,000 680 1/12/06

Industrial Equipment $5,000 170 1/02/10

Chiller $1 207 NULL

Air compressor $1,000 24 NULL

Insulation $10,880 380 NULL

Industrial Equipment $652,625 1,358 NULL

Hot Water System $850 1 8/11/06

Lighting $9,070 13 8/11/06

Lighting $3,272 6 8/11/06

Lighting $340 1 NULL

Lighting $270 6 8/11/06

Lighting $1,242 2 NULL

Lighting $10,108 11 NULL

HVAC $8,500 53 NULL

Industrial Equipment $0 275 NULL

Ventilation $0 703 NULL

Industrial Equipment $0 275 NULL

Alternative power generation $30,000,000 43,800 NULL

Industrial Equipment $0 1,680 NULL

Page 204: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment $4,000 66 NULL

Maintenance $2,000 71 NULL

Industrial Equipment $10,000 208 NULL

Power Factor Correction $0 2,226 NULL

Other $2,000 174 NULL

Lighting $1,608 4 NULL

Hot Water System $0 4 NULL

HVAC $3,200 5 NULL

Lighting $1,608 7 NULL

other $5,800 351 NULL

HVAC $1,643 22 NULL

Lighting $1,779 44 NULL

Industrial Equipment $4,000 500 NULL

Air compressor $5,000 44 NULL

Air compressor $200 3 NULL

Air compressor $1,200 8 NULL

Lighting $0 17 NULL

HVAC $30,000 93 NULL

other $10,000 1,000 1/01/07

Industrial Equipment $0 133 1/01/07

Industrial Equipment $0 77 1/01/07

Cogeneration $30,000 14 NULL

Air compressor $0 10 NULL

other $24,000 164 1/01/07

Industrial Equipment $12,000 0 NULL

Industrial Equipment $15,000 490 1/01/07

Industrial Equipment $55,000 375 1/01/07

Other $100,000 2,220 NULL

Lighting $300,000 588 NULL

Alternative power generation $3,550,000 8,000 NULL

Other $200,000 526 NULL

Air compressor $50,000 0 NULL

Alternative power generation $10,505,575 14,100 NULL

Other $170,000 468 1/07/07

Air compressor $64,000 846 1/01/07

Power Factor Correction $395,000 11 1/07/07

Behaviour/Education $110,000 0 0 NULL

HVAC $120,000 50 29/06/09

HVAC $160,000 30 23/11/09

HVAC $1,000 10 23/11/09

Boiler $200,000 0 1/01/07

Mixed $13,643 29 19/07/05

Pool Covers/Heating $73,645 176 NULL

HVAC $83,700 0 NULL

Other $85,883 0 NULL

Chiller $580,000 237 NULL

HVAC $250,000 0 NULL

Air compressor $20,000 0 NULL

Page 205: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $12,720 127 1/04/08

Other $25,000 0 NULL

HVAC $10,000 100 NULL

Behaviour/Education $100,000 1 1/07/08

HVAC $30,954 70 1/07/08

HVAC $87,000 263 1/07/08

Lighting $19,440 44 1/07/08

HVAC $0 0 NULL

Building Management Systems $20,000 179 NULL

Power Factor Correction $21,000 -44 NULL

Lighting $17,500 29 NULL

Hot Water System $19,000 1,691 NULL

Lighting $2,541 16 NULL

Lighting $1,117 1 NULL

Lighting $919 1 NULL

Lighting $1,500 4 NULL

Lighting $70,000 99 NULL

Lighting $1,309 1 NULL

Lighting $1,315 2 NULL

Lighting $20,988 52 NULL

Lighting $4,422 5 NULL

Lighting $2,948 3 NULL

Lighting $1,623 3 NULL

HVAC $5,600 1 1/04/06

Lighting $2,500 20 1/07/07

Power Factor Correction $20,000 598 1/07/07

Refrigeration $127,680 966 1/07/07

Air compressor $500 44 1/07/07

Refrigeration $1,000 163 1/06/07

Industrial Equipment $19,000 38 NULL

Air compressor $180,000 230 1/09/06

HVAC $2,500,000 230 NULL

HVAC $0 12 NULL

HVAC $3,600 51 NULL

Lighting $500 3 NULL

HVAC $1,600 7 NULL

Other $206,000 1 NULL

Behaviour/Education $0 7 NULL

Industrial Equipment $1,360 59 NULL

Hot Water System $0 2 NULL

Industrial Equipment $3,500 29 NULL

HVAC $4,800 38 NULL

Industrial Equipment $3,000 107 NULL

Industrial Equipment $0 426 NULL

Hot Water System $0 24 NULL

Industrial Equipment $4,000 32 NULL

Industrial Equipment $3,000 22 NULL

Industrial Equipment $4,000 11 NULL

Page 206: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Other $500 6 NULL

Lighting $17,000 133 10/11/08

Behaviour/Education $0 1 NULL

Building Management Systems $0 20 NULL

HVAC $2,400 17 NULL

HVAC $4,800 13 NULL

HVAC $66,513 179 NULL

Lighting $17,400 36 NULL

HVAC $4,800 8 NULL

other $700 1 NULL

Lighting $163,324 330 NULL

HVAC $49,529 496 NULL

Air compressor $20,000 75 NULL

Power Factor Correction $67,500 1 NULL

Power Factor Correction $17,000 1 NULL

Lighting $10,000 5,000 NULL

Industrial Equipment $18,000 1,000 NULL

Building Management Systems $16,000 8 NULL

Industrial Equipment $45,000 284 NULL

Waste heat recovery $30,000 780 NULL

Other $212,000 13,531 1/09/08

Industrial Equipment $15,000 42 NULL

Power Factor Correction $30,000 0 NULL

Industrial Equipment $15,000 56 NULL

Boiler $15,000 743 NULL

Other $4,000,000 0 38,280 NULL

Hot Water System $15,000 26 NULL

Waste heat recovery $180,000 8,640 NULL

Insulation $30,000 1,220 NULL

Other $50,000 1,420 NULL

Air compressor $10,000 100 1/01/07

Air compressor $13,500 285 1/01/07

Lighting $41,000 10 1/07/06

Other $0 52 1/11/06

Lighting $14,100 246 1/03/09

Pool Covers/Heating $37,200 1,584 1/07/08

Lighting $3,198 4 1/07/07

Lighting $47,877 39 1/07/08

Hot Water System $2,850 3 1/07/07

Lighting $4,823 9 1/07/07

Lighting $1,433,000 381 1/07/07

Lighting $180 3 NULL

Lighting $9,500 411 15/06/10

HVAC $75,958 594 NULL

Lighting $28,800 11 1/01/08

Lighting $139,440 585 1/01/08

Lighting $29,700 109 1/07/08

Computers & Printers $12,000 24 1/01/08

Page 207: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $104,000 520 31/12/06

Maintenance $100,000 7,024 NULL

Other $24,000 2,375 NULL

Other $16,000 7,300 NULL

Lighting $12,735 21 31/03/08

Lighting $84,430 117 31/03/08

Lighting $44,970 50 31/03/08

Lighting $24,285 36 31/03/08

Lighting $19,090 19 31/03/08

Lighting $11,580 21 31/03/08

Lighting $13,245 19 31/03/08

HVAC $197,955 440 31/03/08

HVAC $32,100 54 31/03/08

Hot Water System $8,430 9 31/03/08

Lighting $355 1 1/01/10

Lighting $308 1 1/01/10

Hot Water System $70 1 1/06/10

Lighting $1,992 1 1/01/10

Lighting $5,000 4 1/01/10

Lighting $635 1 1/01/10

Lighting $355 1 1/01/10

Lighting $6,587 26 1/01/10

Lighting $1,450 1 1/01/10

Lighting $335 0 1/01/10

Hot Water System $70 0 1/01/10

Hot Water System $70 0 1/01/10

Lighting $355 0 1/01/10

Lighting $2,195 2 1/01/10

Lighting $355 1 1/01/10

HVAC $455 2 1/01/10

Hot Water System $70 1 1/01/10

Lighting $1,520 1 1/01/10

Other $355 1 1/01/10

Boiler $0 139 NULL

Air compressor $200 20 NULL

Maintenance $2,300 1,176 NULL

Refrigeration $30,000 263 NULL

HVAC $0 26 NULL

Power Factor Correction $12,000 1 NULL

Lighting $9,000 2 NULL

HVAC $0 3 NULL

Lighting $12,500 181 30/06/07

Industrial Equipment $200,000 176 NULL

Lighting $3,612,000 513 NULL

Lighting $450,720 83 NULL

PV $510,460 106 NULL

Behaviour/Education $0 0 1/01/09

Sub-metering $10,000 22 NULL

Page 208: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $145,000 96 NULL

Sub-metering $6,000 0 1/01/09

Sub-metering $1,500 22 NULL

Mixed $2,500 22 NULL

Pool Covers/Heating $1,500 246 NULL

HVAC $1,500 33 NULL

Lighting $500 9 NULL

Hot Water System $200 2 NULL

Lighting $1,450 6 NULL

Lighting $0 0 1/10/09

Lighting $6,960 9 NULL

Lighting $23,925 25 NULL

Lighting $22,910 19 NULL

Lighting $6,210 4 NULL

Lighting $2,240 1 NULL

Hot Water System $250 2 NULL

Lighting $500 2 NULL

Industrial Equipment $5,735,100 500 1/07/04

Other $50,900 165 1/07/04

HVAC $390,000 116 1/11/06

Monitoring $66,636 0 1/09/06

Chiller $176,000 70 NULL

HVAC $6,000 3 NULL

Industrial Equipment $80,000 200 NULL

Lighting $7,000 60 NULL

Behaviour/Education $35,000 2,000 1/07/07

HVAC $49,500 215 NULL

Hot Water System $80 29 NULL

other $300 39 NULL

other $33,000 114 NULL

Hot Water System $18,000 46 NULL

HVAC $16,000 39 NULL

HVAC $4,000 8 NULL

Ventilation $2,500 4 NULL

Industrial Equipment $15,000 8 NULL

Mixed $600 6 NULL

Industrial Equipment $98,000 478 NULL

Air compressor $180,000 1,135 NULL

Air compressor $10,000 70 NULL

Air compressor $5,520 64 1/03/09

Cogeneration $331,000 194 NULL

Cogeneration $1,135,000 -3,064 NULL

Other $15,500 27 1/04/07

Other $1,500 105 NULL

Lighting $8,050 23 1/01/07

HVAC $5,000 8 1/10/06

HVAC $39,000 79 1/01/07

Industrial Equipment $10,000 262 NULL

Page 209: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Air compressor $4,950 111 NULL

Cogeneration $0 33 NULL

Lighting $1,000 487 NULL

Other $51,000 0 NULL

Pool Covers/Heating $90 50 250 NULL

Hot Water System $90,000 239 NULL

Power Factor Correction $14,000 53 NULL

Industrial Equipment $10,000 33 NULL

Lighting $1,000 0 NULL

Lighting $100 2 NULL

Other $200 6 NULL

Power Factor Correction $14,000 0 NULL

HVAC $0 2 NULL

other $0 0 NULL

HVAC $350,000 0 NULL

Other $3,000 18 NULL

Power Factor Correction $0 0 NULL

Industrial Equipment $15,000 0 NULL

other $0 0 NULL

Industrial Equipment $0 0 NULL

Industrial Equipment $10,000 26 NULL

Insulation $7,000 0 NULL

Hot Water System $2,500 3 NULL

Lighting $25,000 46 NULL

other $100 1 NULL

Lighting $35,806 61 NULL

Lighting $12,500 188 NULL

Industrial Equipment $1 194 7/01/07

Industrial Equipment $8,000 55 7/05/07

Air compressor $311,096 601 8/02/07

Air compressor $2,500 207 7/10/07

Lighting $500 21 NULL

Air compressor $15,000 100 NULL

Other $0 143 NULL

Industrial Equipment $0 0 NULL

Industrial Equipment $0 30 NULL

Industrial Equipment $80,000 555 NULL

Computers & Printers $0 205 NULL

Lighting $0 200 NULL

HVAC $0 300 NULL

other $0 293 NULL

HVAC $600 6 1/01/07

Lighting $10,000 421 1/07/06

HVAC $1,000 3 1/01/08

Lighting $5,000 0 1/07/06

Industrial Equipment $25,500,000 9,010 1/05/07

Other $150,000 1,550 NULL

Air compressor $10,000 2,200 1/02/07

Page 210: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

HVAC $0 25 30/04/07

other $0 27 1/06/07

other $0 3 1/06/07

Ventilation $7,560 14 1/01/08

Lighting $10,235 39 1/01/08

Lighting $1,130 3 1/01/08

Other $33,750 28 NULL

Industrial Equipment $5,830 9 NULL

Other $9,225 31 NULL

other $2,280 57 1/06/07

Lighting $160 7 1/06/07

Building Management Systems $35,000 204 1/07/07

Lighting $194,400 887 1/12/06

Hot Water System $2,000 23 1/07/07

Insulation $10,800 26 1/10/07

Other $4,025 20 1/01/08

HVAC $35,000 157 12/03/07

Lighting $3,945 21 1/01/08

Lighting $785 0 1/01/08

Lighting $36,860 34 NULL

Lighting $70,000 28 NULL

Industrial Equipment $260,000 34,000 1/06/05

Industrial Equipment $140,000 500 1/12/06

Industrial Equipment $3,000 1,744 1/04/08

Industrial Equipment $15,000 77 NULL

Lighting $12,500 300 1/01/07

Lighting $219,079 113 1/01/07

Building Management Systems $6,000 13 1/01/07

Lighting $5,500 16 1/01/07

Lighting $3,000 10 1/01/07

Lighting $7,500 0 1/01/07

Building Management Systems $9,800 0 1/01/07

Sub-metering $50,000 146 1/01/07

HVAC $500,000 1,499 1/01/07

HVAC $0 0 1/01/07

Chiller $153,574 490 1/01/07

HVAC $30,000 0 1/01/07

Chiller $5,000 0 1/01/07

Boiler $5,000 0 1/01/07

HVAC $1,500 20 1/01/07

HVAC $2,500 0 1/01/07

HVAC $7,500 45 1/01/07

Building Management Systems $5,000 0 1/01/07

Lighting $30,000 36 1/01/07

Lighting $10,500 15 1/01/07

Air compressor $6,365 126 NULL

Industrial Equipment $78,144 133 NULL

Industrial Equipment $2,600 28 NULL

Page 211: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Air compressor $1,500 10 NULL

Air compressor $35,700 333 NULL

Boiler $2,357 6 1/02/07

Boiler $2,357 6 NULL

Cogeneration $250,000 6,111 NULL

Maintenance $10,000 502 NULL

Power Factor Correction $120,890 300 NULL

Air compressor $15,000 163 NULL

Industrial Equipment $342,280 8,644 NULL

Industrial Equipment $88,700 230 NULL

Lighting $109,620 219 1/12/06

Industrial Equipment $87,724 181 NULL

Lighting $7,513 8 1/01/07

Lighting $2,817 5 1/01/07

Lighting $2,817 2 1/01/07

Lighting $7,513 7 1/01/07

Lighting $1,565 2 1/07/07

Lighting $1,187 1 1/07/07

Lighting $920 3 1/01/07

Lighting $4,070 9 1/01/07

Lighting $250 1 1/01/07

Lighting $920 3 1/01/07

Lighting $250 1 1/01/07

Hot Water System $500 6 1/01/07

Lighting $30,000 300 NULL

Lighting $3,086 3 1/01/07

Lighting $2,974 3 1/01/07

Lighting $831 1 1/01/07

Lighting $1,096 1 1/01/07

Lighting $4,696 3 1/01/07

Lighting $920 0 10/01/07

Lighting $1,096 0 1/01/07

Lighting $1,409 2 1/01/07

Lighting $939 1 1/01/07

Lighting $313 1 1/01/07

Industrial Equipment $170,000 0 NULL

Maintenance $50,000 5,126 1/09/07

Behaviour/Education $500,000 9,604 1/09/07

Boiler $750,000 29,903 1/07/07

Other $20,000 10,412 1/01/12

Other $50,000 7,971 1/01/12

Industrial Equipment $50,000 4,802 1/06/11

Other $25,000 1,993 1/01/12

Industrial Equipment $10,000 1,041 1/01/11

Industrial Equipment $10,000 1,921 1/01/11

Computers & Printers $400,000 3,064 1/01/09

Chiller $1,400,000 109 1/01/10

Other $304,500 36 1/04/09

Page 212: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

HVAC $62,945 982 NULL

HVAC $30,761 151 NULL

HVAC $23,622 1,134 NULL

HVAC $14,227 423 NULL

HVAC $1,798 8 NULL

HVAC $53 237 NULL

Lighting $22,017 117 NULL

Computers & Printers $244 581 NULL

Other $0 8,906 NULL

Other $0 823 NULL

Industrial Equipment $0 104 NULL

Industrial Equipment $20,000 440 NULL

Air compressor $30,500 0 NULL

Power Factor Correction $52,200 790 NULL

Air compressor $25,000 205 NULL

Waste heat recovery $139,920 3,760 NULL

Industrial Equipment $0 84 NULL

Other $10,000 1,977 11,760 NULL

Other $19,200 594 NULL

Air compressor $10,000 307 NULL

Industrial Equipment $20,000 201 NULL

Ventilation $25,000 333 NULL

Other $234,000 1,068 NULL

Air compressor $160,600 2,053 10/07/06

Lighting $0 51 NULL

Lighting $18,000 77 10/08/08

Lighting $18,277 5 NULL

Lighting $15,000 358 NULL

Hot Water System $0 11 NULL

Maintenance $5,000 1,926 NULL

Maintenance $500 103 NULL

Waste heat recovery $11,000 3,600 14/09/07

Refrigeration $50 1 NULL

Lighting $1,500 18 NULL

Behaviour/Education $0 51 NULL

Other $10,000 31 NULL

Lighting $18,277 42 NULL

HVAC $0 684 NULL

HVAC $45,000 225 NULL

Lighting $0 15 NULL

Lighting $2,000 43 NULL

Hot Water System $2,000 588 NULL

Lighting $18,260 42 NULL

Lighting $18,260 42 NULL

Lighting $10,956 15 NULL

Lighting $18,260 42 NULL

Refrigeration $75,000 175 NULL

Lighting $38,525 81 10/12/09

Page 213: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $30,295 14 NULL

Lighting $30,295 44 NULL

Lighting $30,295 58 NULL

Chiller $2,100,000 1,480 NULL

Lighting $48,000 200 NULL

Lighting $34,499 93 NULL

Lighting $10,000 116 1/07/08

Behaviour/Education $0 51 NULL

Power Factor Correction $120,000 125 10/08/09

Lighting $135,000 197 NULL

HVAC $260,000 150 NULL

Lighting $95,755 250 20/09/08

Lighting $56,000 53 NULL

Lighting $10,810 23 20/10/09

Lighting $34,499 92 NULL

Lighting $34,499 48 NULL

Other $83,500 264 1/04/07

Lighting $5,400 28 30/10/06

Other $84,500 320 1/03/07

Industrial Equipment $2,600,000 5,000 1/06/05

Air compressor $6,000 27 NULL

Power Factor Correction $18,630 1 NULL

Industrial Equipment $5,000 661 NULL

Other $12,000 660 NULL

Air compressor $80,000 344 NULL

Industrial Equipment $2,000 140 NULL

Waste heat recovery $128,000 4,029 NULL

Boiler $34,500 1,995 NULL

Other $547,684 749 NULL

Industrial Equipment $17,269 245 NULL

Other $20,000 13 NULL

Industrial Equipment $72,352 49 NULL

Boiler $5,000 122 NULL

Industrial Equipment $10,000 1 NULL

Waste heat recovery $115,200 1,995 NULL

Industrial Equipment $60,000 161 NULL

Power Factor Correction $46,000 1 NULL

Industrial Equipment $15,000 18 NULL

Lighting $30,000 20 NULL

Lighting $7,000 22 NULL

Industrial Equipment $575,000 763 NULL

Industrial Equipment $6,500 17,000 NULL

Air compressor $3,450 13 NULL

Boiler $195,000 2,624 NULL

Boiler $8,800 0 184 15/05/08

Industrial Equipment $1,300,000 45,000 1/05/08

Industrial Equipment $160,000 250 NULL

Air compressor $3,000 26 NULL

Page 214: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Industrial Equipment $2,000 4 NULL

Industrial Equipment $90,000 159 NULL

Air compressor $258,421 0 1/01/07

Refrigeration $180,000 2,130 1/01/10

Lighting $1,227,243 0 1/01/07

Industrial Equipment $220,000 743 NULL

Industrial Equipment $77,000 153 NULL

Industrial Equipment $79,000 181 NULL

Industrial Equipment $79,000 165 NULL

Industrial Equipment $0 10 NULL

Industrial Equipment $660,000 2,228 31/10/08

Industrial Equipment $660,000 2,228 1/01/08

HVAC $5,670 9 NULL

Lighting $425 1 NULL

Air compressor $342,270 914 NULL

Lighting $1,175 3 NULL

Lighting $9,045 30 NULL

Lighting $28,770 106 NULL

Other $1,500,000 134 NULL

Other $1,500,000 1 NULL

Other $4,500,000 0 NULL

Industrial Equipment $140,000 563 NULL

Air compressor $74,000 670 NULL

HVAC $1,450 8 20/08/07

Lighting $28,400 174 20/08/07

Lighting $2,000 27 1/07/07

Industrial Equipment $24,000 446 1/07/07

Industrial Equipment $2,000 10,277 20/08/07

Air compressor $3,600 105 20/08/07

Ventilation $2,500 8 20/08/07

HVAC $14,640 118 20/08/07

Other $360 2 NULL

Other $3,000 80 NULL

Air compressor $1,500 14 NULL

Industrial Equipment $600 11 NULL

Industrial Equipment $50,000 0 NULL

Industrial Equipment $600 26 NULL

Other $0 81 NULL

Industrial Equipment $25,000 861 NULL

Air compressor $150 1 NULL

Air compressor $58,000 527 NULL

Air compressor $58,000 527 NULL

Industrial Equipment $35,000 477 NULL

Lighting $4,000 12 NULL

Lighting $106 1 NULL

Lighting $212 5 NULL

Lighting $412 0 NULL

Lighting $500 1 NULL

Page 215: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $4,400 3 NULL

Lighting $300 0 NULL

Lighting $109 0 NULL

Lighting $1,950 3 NULL

Lighting $1,315 1 NULL

Lighting $96 0 NULL

Lighting $12 0 NULL

Industrial Equipment $10,000 0 49,221 30/09/06

Industrial Equipment $400,000 20,063 1/07/07

Lighting $180 1 NULL

Industrial Equipment $100,000 36,000 1/09/06

Lighting $48 1 NULL

Industrial Equipment $900,000 687 30/06/07

Lighting $5,000 5 1/01/07

Industrial Equipment $4,000 63 NULL

Air compressor $70,000 576 NULL

Pool Covers/Heating $0 539 NULL

Pool Covers/Heating $5,500 0 NULL

HVAC $2,954 9 NULL

HVAC $5,107 9 NULL

HVAC $0 6 NULL

HVAC $0 6 NULL

Hot Water System $294 10 NULL

Lighting $13,232 8 NULL

Power Factor Correction $8,638 0 NULL

Lighting $40,106 36 NULL

Other $14,500 18 NULL

HVAC $1,223 4 NULL

Lighting $1,250 23 NULL

Lighting $2,600 3 NULL

Other $3,849 0 NULL

Computers & Printers $0 3 NULL

Hot Water System $294 2 NULL

Lighting $12,207 14 NULL

Lighting $910 1 NULL

Lighting $840 0 NULL

HVAC $23,286 41 NULL

Lighting $129,208 41 NULL

Other $5,600 3 1/11/06

Lighting $1,600 2 1/03/07

Industrial Equipment $30,000 40 1/07/07

Lighting $8,000 3 1/01/07

Industrial Equipment $7,000 7 1/11/06

HVAC $1,100 8 NULL

Building Management Systems $1,200 3 NULL

Other $5,000 2 1/05/07

HVAC $60,000 97 NULL

Lighting $3,050 25 NULL

Page 216: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $2,000 8 1/11/06

Industrial Equipment $20 0 1/11/06

Lighting $4,000 2 1/11/06

Hot Water System $1,200 11 NULL

Lighting $3,170 11 NULL

Hot Water System $1,250 11 NULL

Lighting $2,200 25 NULL

Hot Water System $1,100 8 NULL

Lighting $1,800 4 NULL

Ventilation $1,500 3 NULL

HVAC $4,000 14 NULL

Hot Water System $900 3 NULL

Lighting $6,100 13 NULL

Behaviour/Education $2,000 8 NULL

Hot Water System $600 8 NULL

Behaviour/Education $500 2 NULL

Other $2,000 8 NULL

Lighting $500 0 NULL

Other $500 0 NULL

HVAC $500 3 NULL

Lighting $8,000 50 1/12/07

Lighting $12,000 35 1/12/07

Building Management Systems $10,000 50 1/01/08

Boiler $120,000 5,124 1/01/08

HVAC $15,000 735 30/06/08

Industrial Equipment $40,000 101 1/01/08

Lighting $4,500 19 1/01/08

Power Factor Correction $11,600 3 1/01/08

HVAC $15,000 98 1/10/07

Air compressor $10,300 8 1/01/08

Industrial Equipment $10,000 40 1/01/08

Sub-metering $135,000 333 1/07/08

Lighting $10,000 4 1/07/08

Lighting $0 94 1/01/08

Lighting $1 1 1/10/07

Lighting $1 1 1/10/07

Industrial Equipment $2,540 102 1/01/07

HVAC $0 198 1/01/07

HVAC $1,400 3 1/01/07

Lighting $475 1 1/01/07

HVAC $0 27 1/01/07

HVAC $2,184 10 1/01/07

Lighting $2,418 5 1/01/07

Other $4,700 0 1/07/07

Lighting $2,400 4 1/01/07

Lighting $5,250 9 1/07/07

Lighting $400 3 NULL

Industrial Equipment $0 2 NULL

Page 217: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $0 3 NULL

HVAC $0 12 NULL

Hot Water System $50 5 NULL

Other $0 19 NULL

Lighting $1,500 4 NULL

HVAC $1,700 21 NULL

Other $0 52 NULL

HVAC $1,000 5 NULL

HVAC $0 1 NULL

Computers & Printers $0 1 NULL

Other $2,012 2 NULL

Hot Water System $150 0 NULL

Other $1,811 3 NULL

HVAC $0 1 NULL

HVAC $1,000 5 NULL

HVAC $0 1 NULL

Hot Water System $150 1 NULL

Lighting $0 35 NULL

Industrial Equipment $500,000 267,000 1/01/02

Industrial Equipment $8,490,000 2,575 1/01/02

Lighting $750,000 876 NULL

Mixed $500,000 0 40,000 NULL

other $11,500 18 NULL

other $0 296 NULL

Lighting $0 86 NULL

Lighting $22,000 126 NULL

Computers & Printers $0 1,371 NULL

other $0 61 NULL

Other $0 168 NULL

Lighting $16,000 27 NULL

Lighting $10,000 72 NULL

Lighting $8,000 22 NULL

HVAC $38,460 171 NULL

Industrial Equipment $6,154 14 NULL

Lighting $10,062 16 NULL

Industrial Equipment $6,154 0 760 NULL

Power Factor Correction $26,249 252 NULL

Lighting $186,411 304 NULL

HVAC $3,077 11 NULL

Industrial Equipment $49,229 14 NULL

Lighting $5,875 16 NULL

Industrial Equipment $16,922 45 NULL

Pool Covers/Heating $68,918 0 2,415 NULL

HVAC $2,403 13 NULL

Power Factor Correction $157 56 NULL

Industrial Equipment $19,999 58 NULL

HVAC $12,307 65 NULL

Other $3,077 30 NULL

Page 218: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $18,757 42 NULL

HVAC $3,077 0 154 NULL

Pool Covers/Heating $4,615 0 381 NULL

HVAC $3,077 0 152 NULL

Pool Covers/Heating $4,615 0 377 NULL

Other $14,615 46 NULL

Other $2,308 16 NULL

Lighting $375 0 NULL

Industrial Equipment $15,000 34 NULL

Lighting $200 7 NULL

Lighting $5,000 6 NULL

Behaviour/Education $0 17 1/07/08

Chiller $46,480 30 NULL

Lighting $1,700 2 NULL

Lighting $850 1 NULL

Lighting $2,750 2 NULL

Lighting $500 0 NULL

Lighting $1,200 2 NULL

Lighting $375 1 NULL

Lighting $4,000 1 NULL

Lighting $200 1 NULL

Lighting $2,400 0 NULL

Lighting $19,000 10 NULL

Lighting $1,400 3 NULL

Lighting $100 1 NULL

Other $5,000 12 NULL

Lighting $200 2 NULL

Lighting $4,000 18 NULL

Lighting $9,000 21 NULL

Lighting $330,000 214 NULL

Lighting $30,000 52 NULL

Lighting $270,000 827 NULL

HVAC $0 14 NULL

Chiller $850,000 1,385 NULL

HVAC $77,000 363 NULL

Behaviour/Education $0 367 NULL

Pool Covers/Heating $1,000 340 1/01/09

Pool Covers/Heating $5,000 26 NULL

Lighting $4,499 6 NULL

Lighting $300 2 1/01/09

HVAC $2,000 3 NULL

Lighting $488,000 31 NULL

Lighting $1,000 7 1/01/09

Lighting $1,500 4 1/01/09

Lighting $100 6 1/01/09

Power Factor Correction $250,000 2,447 NULL

HVAC $6,760 36 NULL

Hot Water System $500 2 NULL

Page 219: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Boiler $1,250 6 NULL

HVAC $2,000 6 NULL

Building Management Systems $9,000 21 NULL

Lighting $2,600 3 NULL

Lighting $1,000 3 NULL

Lighting $8,050 5 NULL

Lighting $35 0 NULL

Building Management Systems $850 4 NULL

Building Management Systems $1,100 13 NULL

Hot Water System $150 2 NULL

Lighting $2,310 65 NULL

Lighting $125 3 NULL

Lighting $800 13 NULL

Boiler $1,000 8 NULL

Building Management Systems $3,900 10 NULL

Lighting $10,800 36 NULL

HVAC $2,175 6 NULL

HVAC $7,500 21 NULL

Building Management Systems $1,500 8 NULL

HVAC $10,000 41 NULL

Lighting $900 2 NULL

Lighting $1,500 3 NULL

HVAC $5,000 15 NULL

HVAC $2,700 8 NULL

Lighting $3,400 11 NULL

HVAC $850 2 NULL

HVAC $1,800 6 NULL

Building Management Systems $1,600 8 NULL

Lighting $100 0 NULL

Building Management Systems $89,000 336 NULL

HVAC $750 4 NULL

Lighting $4,500 11 NULL

HVAC $0 22 NULL

Building Management Systems $2,550 30 NULL

HVAC $2,200 9 NULL

HVAC $5,400 75 NULL

Lighting $5,100 12 NULL

Building Management Systems $700 16 NULL

Building Management Systems $400 2 NULL

HVAC $2,500 6 NULL

Lighting $3,000 10 NULL

Lighting $675 2 NULL

HVAC $2,600 8 NULL

Hot Water System $7,200 171 NULL

Industrial Equipment $0 200 1/03/07

Industrial Equipment $80,000 3,922 NULL

Pool Covers/Heating $0 62 NULL

Industrial Equipment $5,000 17 NULL

Page 220: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $1,400 2 NULL

Lighting $1,925 10 NULL

Hot Water System $300 1 NULL

Hot Water System $4,000 10 NULL

Hot Water System $6,000 51 NULL

Lighting $3,366,880 2,224 NULL

Lighting $1,895,080 371 NULL

Lighting $18,040 11 NULL

Lighting $409,950 482 NULL

Sub-metering $105,000 239 950 NULL

HVAC $2,100 2 7 31/07/06

HVAC $7,000 0 1/07/06

Hot Water System $250 0 NULL

HVAC $5,000 0 1/07/06

Maintenance $1,500 0 1/07/06

Lighting $1,250 4 NULL

Hot Water System $100 1 NULL

Hot Water System $250 2 NULL

Lighting $3,820 1 NULL

Lighting $2,550 3 NULL

Industrial Equipment $1,450 1 NULL

Hot Water System $350 0 1/07/06

Lighting $1,500 1 NULL

Industrial Equipment $2,000 26 NULL

Air compressor $8,000 75 NULL

Lighting $3,200 36 NULL

Lighting $15,800 93 NULL

Lighting $26,050 246 NULL

Industrial Equipment $38,000 375 NULL

other $5,000 19 NULL

Lighting $9,700 18 NULL

Industrial Equipment $8,200 13 NULL

Industrial Equipment $6,300 17 NULL

Industrial Equipment $900 4 NULL

Air compressor $255,000 276 NULL

Air compressor $10,000 60 NULL

Other $25,000 50 NULL

other $25,000 23 7/03/06

Lighting $2,000 8 7/03/06

Hot Water System $300 0 7/03/06

Sub-metering $90,000 141 NULL

Lighting $41,810 7 NULL

Sub-metering $20,600 88 NULL

Lighting $220 2 NULL

Air compressor $28,000 255 NULL

Industrial Equipment $100,000 84 NULL

Air compressor $28,100 256 NULL

HVAC $1,100 13 NULL

Page 221: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Lighting $675 3 NULL

Lighting $1,100 6 NULL

Page 222: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

Completion DateStatus

31/03/07 Implemented

31/01/08 Implemented

31/07/07 Implemented

NULL Ongoing

30/03/08 Implemented

30/06/10 Implemented

NULL Ongoing

NULL Ongoing

31/12/06 Implemented

1/04/10 Ongoing

1/09/06 Implemented

29/09/06 Implemented

29/09/06 Implemented

7/07/10 Implemented

30/06/07 Implemented

31/01/06 Implemented

28/02/06 Implemented

31/03/06 Implemented

31/05/06 Implemented

NULL Ongoing

31/12/06 Implemented

NULL Ongoing

31/12/08 Implemented

NULL Implemented

NULL Ongoing

30/06/07 Implemented

31/12/06 Implemented

30/06/08 Implemented

30/06/08 Implemented

31/12/06 Implemented

NULL Implemented

30/06/07 Implemented

30/06/09 Ongoing

30/06/08 Implemented

30/06/08 Implemented

30/06/07 Implemented

NULL Implemented

31/03/08 Implemented

31/12/08 Ongoing

30/06/09 Ongoing

31/12/09 Implemented

31/01/08 Implemented

30/06/08 Implemented

30/04/06 Implemented

31/12/09 Implemented

30/09/08 Implemented

31/12/07 Ongoing

Page 223: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/12/09 Implemented

1/01/10 Ongoing

31/10/06 Implemented

31/12/07 Implemented

31/12/08 Implemented

30/09/08 Implemented

31/12/08 Implemented

NULL Ongoing

1/01/08 Implemented

31/12/07 Implemented

31/12/07 Implemented

30/04/08 Implemented

31/05/09 Implemented

31/12/08 Implemented

1/01/08 Implemented

NULL Implemented

30/06/06 Implemented

31/08/06 Implemented

31/10/06 Implemented

30/06/06 Implemented

1/01/10 Implemented

31/12/08 Implemented

31/12/07 Implemented

31/12/06 Implemented

31/03/07 Implemented

31/12/10 Ongoing

31/12/07 Implemented

31/12/09 Ongoing

31/12/09 Ongoing

31/12/08 Implemented

31/12/09 Implemented

30/04/07 Implemented

31/01/08 Implemented

31/12/09 Ongoing

30/06/10 Implemented

31/12/08 Implemented

30/06/08 Implemented

24/10/07 Implemented

31/12/07 Implemented

31/12/10 Ongoing

31/12/08 Implemented

NULL Ongoing

30/06/07 Implemented

30/06/07 Implemented

30/06/07 Implemented

31/12/08 Ongoing

31/12/06 Implemented

1/09/07 Implemented

Page 224: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

NULL Implemented

NULL Implemented

NULL Implemented

NULL Implemented

NULL Implemented

NULL Implemented

NULL Implemented

31/07/09 Ongoing

30/06/10 Implemented

NULL Ongoing

31/10/09 Implemented

21/12/10 Implemented

31/01/08 Ongoing

31/01/08 Implemented

NULL Ongoing

NULL Ongoing

NULL Ongoing

17/02/07 Implemented

1/11/06 Implemented

30/11/06 Implemented

28/02/07 Implemented

15/12/06 Implemented

NULL Implemented

15/12/06 Implemented

24/04/07 Implemented

31/12/08 Implemented

14/12/07 Implemented

31/12/08 Implemented

24/04/07 Implemented

30/11/07 Implemented

1/03/07 Implemented

31/07/07 Implemented

1/10/06 Implemented

31/12/08 Implemented

31/12/08 Implemented

24/04/07 Implemented

14/02/07 Implemented

30/01/08 Implemented

7/04/09 Implemented

7/04/09 Implemented

3/01/07 Implemented

30/01/08 Implemented

NULL Ongoing

1/03/06 Implemented

1/03/07 Implemented

NULL Ongoing

NULL Implemented

28/02/07 Implemented

Page 225: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

NULL Implemented

NULL Ongoing

NULL Ongoing

31/07/09 Ongoing

30/06/07 Implemented

30/04/09 Implemented

30/04/09 Implemented

30/06/11 Ongoing

30/06/07 Implemented

31/12/06 Implemented

30/09/09 Implemented

1/12/07 Implemented

30/07/06 Implemented

31/08/07 Implemented

30/01/09 Implemented

30/06/08 Implemented

6/07/07 Implemented

30/06/09 Implemented

31/08/07 Implemented

29/06/07 Implemented

29/06/07 Implemented

29/06/07 Implemented

30/01/09 Implemented

29/06/07 Implemented

25/07/07 Implemented

30/12/09 Implemented

10/06/07 Implemented

30/06/08 Implemented

31/08/09 Implemented

31/10/07 Implemented

2/07/07 Implemented

2/07/07 Implemented

3/08/07 Implemented

2/07/07 Implemented

3/08/07 Implemented

30/06/09 Implemented

30/06/07 Implemented

10/08/07 Implemented

23/07/07 Implemented

2/07/07 Implemented

15/08/07 Implemented

30/01/09 Implemented

23/07/07 Implemented

3/07/07 Implemented

6/07/07 Implemented

6/07/07 Implemented

3/07/07 Implemented

6/07/07 Implemented

Page 226: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

30/06/07 Implemented

15/06/07 Implemented

13/07/07 Implemented

6/07/07 Implemented

30/06/07 Implemented

23/07/07 Implemented

30/01/09 Implemented

27/07/07 Implemented

3/08/07 Implemented

21/09/07 Implemented

30/06/09 Implemented

30/06/07 Implemented

30/06/09 Implemented

30/06/09 Implemented

NULL Implemented

NULL Implemented

NULL Implemented

31/03/09 Implemented

31/12/10 Ongoing

31/12/10 Ongoing

31/12/09 Ongoing

31/12/08 Implemented

NULL Implemented

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Ongoing

30/06/09 Ongoing

30/06/07 Implemented

30/06/07 Implemented

30/06/07 Implemented

30/06/07 Implemented

31/07/08 Implemented

30/06/09 Ongoing

30/06/07 Implemented

30/11/08 Implemented

30/06/09 Implemented

NULL Ongoing

30/06/07 Implemented

30/06/07 Implemented

31/07/08 Implemented

NULL Ongoing

30/06/09 Ongoing

30/06/07 Implemented

30/06/07 Implemented

Page 227: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/12/09 Ongoing

31/10/06 Implemented

30/06/07 Implemented

1/12/08 Implemented

1/01/08 Implemented

NULL Ongoing

NULL Ongoing

1/11/06 Implemented

31/12/09 Implemented

1/12/09 Implemented

1/01/11 Ongoing

31/12/09 Implemented

31/12/08 Implemented

31/12/08 Implemented

31/12/09 Implemented

31/12/08 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

30/12/09 Implemented

31/12/08 Implemented

1/01/09 Implemented

1/02/09 Implemented

30/11/06 Implemented

1/12/09 Implemented

31/12/08 Implemented

31/01/07 Implemented

30/06/06 Implemented

1/12/06 Ongoing

25/12/07 Implemented

1/03/10 Implemented

1/10/08 Implemented

30/03/10 Implemented

31/05/07 Implemented

31/07/10 Ongoing

30/06/07 Implemented

30/06/07 Implemented

30/06/07 Implemented

30/06/07 Implemented

30/06/07 Implemented

30/06/07 Implemented

30/06/07 Implemented

30/06/07 Implemented

31/03/07 Implemented

31/07/09 Ongoing

31/12/07 Ongoing

28/02/07 Implemented

30/06/07 Implemented

Page 228: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/10/07 Implemented

31/12/06 Implemented

31/07/07 Implemented

31/08/08 Implemented

31/12/07 Implemented

30/09/07 Implemented

30/09/07 Implemented

28/02/07 Implemented

30/09/07 Implemented

31/10/07 Implemented

30/11/08 Implemented

30/09/07 Implemented

NULL Implemented

30/03/08 Implemented

NULL Implemented

NULL Implemented

NULL Implemented

NULL Implemented

30/06/07 Implemented

30/06/07 Implemented

30/06/07 Implemented

1/05/10 Implemented

NULL Implemented

1/05/09 Implemented

31/07/07 Implemented

1/12/09 Implemented

31/07/07 Implemented

1/11/07 Implemented

31/12/11 Ongoing

1/02/10 Implemented

1/11/09 Implemented

31/07/09 Implemented

19/05/11 Implemented

31/12/07 Implemented

31/12/07 Implemented

1/04/10 Implemented

NULL Ongoing

15/07/09 Implemented

7/12/09 Implemented

7/12/09 Implemented

NULL Ongoing

30/09/05 Implemented

31/07/08 Implemented

30/06/09 Ongoing

30/06/09 Implemented

30/01/08 Implemented

30/06/11 Ongoing

30/06/09 Implemented

Page 229: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

7/04/08 Implemented

31/01/08 Implemented

31/05/08 Implemented

30/11/08 Implemented

30/03/09 Implemented

30/10/09 Implemented

30/03/09 Implemented

30/06/07 Implemented

21/04/06 Implemented

18/09/07 Implemented

17/07/10 Implemented

26/11/07 Implemented

31/12/10 Ongoing

31/12/11 Ongoing

31/12/11 Ongoing

30/06/08 Implemented

1/08/09 Ongoing

31/12/09 Ongoing

31/12/09 Ongoing

30/06/10 Ongoing

30/06/11 Ongoing

30/06/11 Ongoing

31/12/11 Ongoing

30/06/08 Implemented

30/09/07 Implemented

30/04/09 Implemented

30/06/08 Implemented

31/12/07 Implemented

30/06/08 Implemented

30/11/08 Implemented

30/06/07 Implemented

30/06/10 Implemented

30/06/10 Implemented

30/06/10 Implemented

31/12/09 Implemented

30/06/10 Implemented

30/06/08 Implemented

31/12/09 Implemented

30/06/09 Implemented

30/06/09 Implemented

14/09/10 Implemented

14/09/10 Implemented

30/06/10 Implemented

30/06/09 Implemented

30/06/09 Implemented

30/06/10 Implemented

30/06/10 Implemented

30/06/10 Implemented

Page 230: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

30/06/09 Implemented

30/06/10 Implemented

30/06/10 Implemented

30/06/10 Implemented

30/06/10 Implemented

30/06/10 Implemented

30/06/10 Implemented

30/06/09 Implemented

30/06/10 Implemented

30/06/10 Implemented

1/07/09 Implemented

30/06/09 Implemented

1/02/11 Implemented

1/12/10 Implemented

1/06/09 Implemented

1/03/10 Implemented

1/01/10 Implemented

NULL Implemented

NULL Implemented

NULL Ongoing

31/05/09 Implemented

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Ongoing

1/05/11 Implemented

NULL Ongoing

NULL Implemented

30/06/07 Implemented

30/06/07 Implemented

NULL Ongoing

1/01/07 Implemented

30/06/11 Implemented

20/02/10 Implemented

30/06/11 Implemented

30/06/11 Implemented

30/06/08 Implemented

14/05/10 Implemented

31/12/09 Ongoing

NULL Implemented

24/09/10 Implemented

NULL Implemented

NULL Ongoing

NULL Ongoing

NULL Ongoing

1/09/09 Implemented

Page 231: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/01/07 Implemented

30/06/09 Implemented

30/06/08 Implemented

30/06/08 Implemented

31/03/09 Implemented

31/03/09 Implemented

31/03/09 Implemented

31/03/09 Implemented

31/07/09 Implemented

31/03/09 Implemented

31/03/09 Implemented

31/03/09 Implemented

31/07/09 Implemented

31/03/09 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/01/08 Implemented

31/08/07 Ongoing

NULL Ongoing

NULL Implemented

31/12/07 Implemented

31/12/09 Implemented

30/06/08 Implemented

31/12/07 Implemented

31/05/08 Implemented

NULL Ongoing

NULL Ongoing

NULL Ongoing

31/12/10 Implemented

NULL Ongoing

30/06/12 Ongoing

Page 232: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

30/06/11 Implemented

30/06/09 Implemented

30/06/12 Ongoing

30/06/12 Ongoing

30/06/10 Implemented

30/06/12 Ongoing

30/06/10 Implemented

30/06/10 Implemented

30/12/11 Implemented

12/11/09 Implemented

30/12/11 Implemented

30/12/11 Implemented

30/12/11 Implemented

30/12/11 Implemented

30/12/11 Implemented

30/06/10 Implemented

30/06/10 Implemented

30/06/08 Implemented

30/06/08 Implemented

30/06/07 Implemented

1/04/09 Implemented

30/09/06 Implemented

31/05/06 Implemented

30/09/08 Implemented

30/09/07 Implemented

NULL Ongoing

28/02/08 Implemented

31/03/07 Implemented

31/03/07 Implemented

NULL Implemented

30/11/08 Implemented

30/06/09 Implemented

30/11/08 Implemented

31/03/09 Implemented

30/06/09 Implemented

31/12/08 Implemented

31/12/08 Implemented

31/12/08 Implemented

31/12/08 Implemented

1/03/09 Implemented

NULL Ongoing

NULL Ongoing

30/04/07 Implemented

NULL Implemented

1/06/07 Implemented

31/12/06 Implemented

1/07/07 Implemented

31/12/07 Implemented

Page 233: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/03/08 Ongoing

1/07/09 Implemented

1/07/09 Implemented

31/12/08 Implemented

31/12/08 Implemented

31/12/12 Ongoing

1/07/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/08 Implemented

30/06/10 Implemented

31/12/09 Implemented

31/12/08 Implemented

30/06/10 Ongoing

NULL Ongoing

1/07/09 Implemented

31/12/08 Implemented

NULL Ongoing

NULL Ongoing

NULL Ongoing

1/07/09 Implemented

30/06/10 Implemented

31/12/09 Implemented

NULL Ongoing

30/06/10 Implemented

NULL Ongoing

30/08/09 Implemented

7/02/07 Implemented

7/10/07 Implemented

31/12/08 Implemented

8/10/07 Implemented

NULL Implemented

31/03/08 Ongoing

NULL Implemented

NULL Ongoing

NULL Ongoing

NULL Implemented

1/06/06 Implemented

NULL Ongoing

NULL Ongoing

31/12/07 Implemented

1/11/08 Implemented

31/12/06 Implemented

1/11/08 Implemented

31/12/06 Implemented

1/10/07 Implemented

NULL Implemented

31/12/07 Ongoing

Page 234: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

7/09/07 Ongoing

1/10/07 Implemented

1/06/08 Implemented

20/06/09 Implemented

20/06/09 Implemented

20/06/09 Implemented

NULL Implemented

NULL Implemented

NULL Implemented

1/06/08 Implemented

1/06/08 Implemented

1/06/08 Ongoing

1/12/10 Ongoing

1/01/08 Implemented

1/10/08 Implemented

1/06/09 Implemented

22/02/08 Implemented

30/06/09 Ongoing

1/01/08 Implemented

13/08/08 Implemented

1/08/09 Ongoing

1/06/08 Implemented

1/03/09 Implemented

1/07/08 Implemented

13/01/07 Implemented

1/11/07 Ongoing

30/04/09 Implemented

1/12/11 Ongoing

1/12/11 Ongoing

30/07/10 Implemented

1/12/09 Implemented

1/12/09 Implemented

1/12/11 Ongoing

1/03/10 Implemented

1/12/09 Implemented

30/04/09 Implemented

1/12/09 Implemented

1/12/09 Implemented

1/12/09 Implemented

1/12/11 Ongoing

1/12/09 Implemented

1/12/11 Ongoing

1/12/09 Implemented

1/12/11 Ongoing

1/11/08 Implemented

1/08/10 Ongoing

NULL Ongoing

31/07/08 Implemented

Page 235: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

1/05/07 Implemented

28/02/07 Implemented

31/07/07 Implemented

31/07/07 Implemented

2/03/08 Implemented

1/12/09 Implemented

1/06/09 Implemented

31/01/08 Implemented

NULL Ongoing

NULL Ongoing

30/06/07 Implemented

NULL Ongoing

26/11/07 Implemented

5/02/08 Implemented

5/02/08 Implemented

26/11/07 Implemented

23/11/07 Implemented

5/02/08 Implemented

12/02/08 Implemented

5/02/08 Implemented

10/12/07 Implemented

12/08/08 Implemented

10/12/07 Implemented

30/06/08 Implemented

1/08/07 Implemented

10/12/07 Implemented

10/12/07 Implemented

10/12/07 Implemented

10/12/07 Implemented

10/12/07 Implemented

12/02/08 Implemented

10/12/07 Implemented

26/11/07 Implemented

5/02/08 Implemented

30/06/08 Implemented

1/08/07 Implemented

1/01/08 Implemented

1/01/10 Implemented

1/01/08 Implemented

NULL Ongoing

NULL Ongoing

NULL Ongoing

30/08/12 Implemented

NULL Ongoing

1/04/11 Implemented

1/12/11 Ongoing

30/08/10 Implemented

5/01/10 Implemented

Page 236: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/10 Implemented

31/12/08 Implemented

31/12/10 Implemented

31/03/07 Implemented

31/03/07 Implemented

1/01/08 Implemented

1/05/08 Implemented

1/06/09 Implemented

1/07/07 Implemented

30/06/07 Implemented

30/11/06 Implemented

30/04/07 Implemented

31/12/07 Implemented

30/08/07 Implemented

30/06/07 Implemented

30/06/08 Implemented

30/06/08 Implemented

31/01/08 Implemented

10/01/07 Implemented

30/11/07 Implemented

26/06/09 Implemented

31/03/07 Implemented

15/02/08 Implemented

15/02/07 Implemented

1/11/07 Implemented

1/07/07 Implemented

NULL Implemented

31/10/07 Implemented

31/01/08 Implemented

18/06/07 Implemented

31/01/08 Implemented

31/03/07 Implemented

6/08/08 Implemented

31/05/07 Implemented

30/06/07 Implemented

31/07/07 Implemented

31/12/07 Implemented

31/05/07 Implemented

31/05/07 Implemented

31/05/07 Implemented

31/05/07 Implemented

31/01/08 Implemented

30/04/10 Implemented

Page 237: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/03/07 Implemented

31/03/07 Implemented

31/03/07 Implemented

31/12/08 Implemented

15/11/08 Implemented

31/03/07 Implemented

30/06/09 Implemented

20/06/08 Implemented

20/05/10 Implemented

2/11/08 Implemented

20/02/11 Implemented

20/12/09 Implemented

28/06/08 Implemented

30/01/10 Implemented

31/03/07 Implemented

31/03/07 Implemented

15/05/07 Implemented

5/12/06 Implemented

15/08/07 Implemented

31/05/08 Implemented

1/12/08 Implemented

1/12/10 Implemented

1/12/07 Implemented

1/12/07 Implemented

1/12/11 Ongoing

1/12/08 Implemented

1/12/06 Implemented

1/12/08 Implemented

31/05/07 Implemented

31/05/07 Implemented

1/12/08 Implemented

1/12/11 Ongoing

1/12/10 Implemented

1/07/07 Implemented

31/05/07 Implemented

1/12/10 Implemented

1/12/11 Ongoing

1/07/09 Implemented

1/12/10 Ongoing

1/12/11 Ongoing

1/12/11 Ongoing

1/12/07 Implemented

1/12/08 Implemented

1/06/07 Implemented

1/06/08 Implemented

31/05/08 Implemented

30/06/06 Implemented

31/12/08 Ongoing

Page 238: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

30/06/07 Implemented

31/12/09 Implemented

1/03/07 Implemented

31/08/10 Implemented

30/06/07 Implemented

30/11/07 Implemented

31/03/08 Implemented

30/09/07 Implemented

31/01/08 Implemented

NULL Ongoing

28/02/09 Implemented

30/11/08 Implemented

NULL Implemented

NULL Implemented

NULL Implemented

NULL Ongoing

NULL Ongoing

NULL Ongoing

30/06/09 Implemented

31/07/10 Implemented

31/12/08 Implemented

31/12/07 Implemented

31/12/08 Implemented

1/06/09 Implemented

29/02/08 Implemented

26/05/08 Implemented

20/05/08 Implemented

10/01/08 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/10/07 Implemented

31/07/07 Implemented

31/07/07 Implemented

NULL Ongoing

31/07/07 Implemented

30/09/07 Implemented

31/03/06 Implemented

30/06/07 Ongoing

31/07/10 Implemented

31/07/08 Implemented

1/03/10 Implemented

NULL Ongoing

1/06/09 Implemented

30/06/08 Implemented

30/06/10 Implemented

30/06/10 Implemented

30/06/10 Implemented

30/06/08 Implemented

Page 239: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

30/06/08 Implemented

30/06/08 Implemented

30/06/10 Implemented

30/06/08 Implemented

30/06/08 Implemented

30/06/09 Implemented

30/06/09 Implemented

30/06/07 Implemented

30/06/08 Implemented

30/06/09 Implemented

30/06/08 Implemented

30/06/09 Implemented

NULL Implemented

NULL Implemented

31/12/08 Implemented

NULL Ongoing

16/01/07 Implemented

16/01/07 Implemented

30/12/07 Implemented

30/12/07 Implemented

28/09/07 Implemented

28/09/07 Implemented

17/07/07 Implemented

24/06/08 Implemented

26/06/07 Implemented

25/10/07 Implemented

24/06/08 Implemented

17/10/07 Implemented

16/10/07 Implemented

25/10/07 Implemented

13/06/07 Implemented

NULL Ongoing

14/09/07 Implemented

18/05/10 Implemented

1/03/09 Implemented

1/03/09 Implemented

30/03/08 Implemented

30/03/08 Implemented

28/02/07 Implemented

30/06/07 Implemented

31/10/07 Implemented

31/05/07 Implemented

28/02/07 Ongoing

31/03/07 Implemented

30/12/07 Implemented

30/06/07 Implemented

31/12/09 Implemented

30/09/07 Implemented

Page 240: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/12/06 Implemented

30/11/06 Implemented

28/08/07 Implemented

30/09/07 Implemented

30/09/07 Implemented

30/09/07 Implemented

30/09/07 Implemented

30/09/07 Implemented

30/09/07 Implemented

31/12/07 Implemented

30/09/07 Implemented

30/09/07 Implemented

30/12/07 Implemented

NULL Ongoing

30/09/07 Implemented

NULL Ongoing

NULL Ongoing

30/09/07 Implemented

30/09/07 Implemented

31/12/07 Implemented

1/06/11 Implemented

30/06/12 Ongoing

25/06/08 Implemented

25/06/08 Implemented

30/06/09 Implemented

30/06/09 Implemented

30/06/12 Ongoing

1/07/08 Implemented

1/07/08 Implemented

30/08/09 Implemented

7/05/10 Implemented

31/01/10 Implemented

30/09/09 Implemented

30/06/10 Ongoing

30/06/10 Implemented

30/06/10 Implemented

30/06/08 Implemented

30/06/08 Implemented

30/06/08 Implemented

30/06/08 Implemented

30/06/08 Implemented

30/06/08 Implemented

30/06/08 Implemented

30/06/08 Implemented

30/06/08 Implemented

30/06/08 Implemented

31/12/07 Implemented

31/12/07 Implemented

Page 241: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

NULL Implemented

NULL Implemented

1/01/08 Implemented

NULL Implemented

NULL Implemented

31/12/07 Implemented

NULL Ongoing

NULL Implemented

15/07/08 Implemented

1/01/08 Implemented

NULL Implemented

NULL Implemented

NULL Implemented

1/07/07 Implemented

30/06/06 Implemented

NULL Ongoing

31/12/06 Implemented

31/12/07 Implemented

15/05/09 Implemented

NULL Ongoing

NULL Implemented

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Ongoing

1/09/10 Implemented

31/05/08 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

30/04/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

Page 242: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

31/12/07 Implemented

30/05/08 Implemented

31/12/07 Implemented

2/02/08 Implemented

31/07/08 Implemented

31/10/07 Implemented

31/05/08 Implemented

31/05/08 Implemented

31/03/08 Implemented

31/03/08 Implemented

31/03/08 Implemented

31/03/08 Implemented

31/03/08 Implemented

31/03/08 Implemented

31/03/08 Implemented

31/03/08 Implemented

28/02/08 Implemented

30/09/07 Implemented

31/03/08 Implemented

31/03/08 Implemented

31/03/08 Implemented

31/03/08 Implemented

31/12/08 Implemented

30/06/08 Implemented

31/12/08 Implemented

30/09/08 Implemented

30/09/08 Implemented

30/08/08 Implemented

30/09/08 Ongoing

31/12/09 Implemented

30/07/09 Implemented

30/06/09 Implemented

31/12/09 Implemented

30/06/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

12/09/06 Implemented

31/12/09 Implemented

31/12/09 Implemented

Page 243: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/12/10 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/10 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/10 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Ongoing

31/12/10 Implemented

31/12/09 Implemented

31/12/11 Ongoing

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/10 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/09 Implemented

31/12/11 Implemented

1/07/07 Implemented

NULL Ongoing

31/07/07 Implemented

31/07/07 Implemented

Page 244: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/07/08 Implemented

28/02/09 Implemented

31/08/09 Implemented

NULL Implemented

NULL Implemented

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Ongoing

30/06/07 Implemented

30/10/09 Implemented

13/07/07 Implemented

30/06/09 Implemented

30/06/08 Implemented

30/07/07 Implemented

12/07/07 Implemented

27/07/07 Implemented

27/07/07 Implemented

27/07/07 Implemented

13/07/07 Implemented

30/06/07 Implemented

20/07/07 Implemented

30/09/08 Implemented

30/09/08 Implemented

1/12/08 Implemented

31/01/09 Implemented

31/01/09 Implemented

NULL Ongoing

30/09/08 Implemented

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Ongoing

NULL Implemented

1/10/09 Implemented

1/11/09 Implemented

31/12/09 Implemented

7/06/06 Ongoing

1/09/09 Implemented

1/04/09 Implemented

NULL Ongoing

1/04/09 Implemented

1/01/12 Ongoing

31/12/07 Ongoing

31/12/08 Implemented

31/12/08 Ongoing

31/12/09 Implemented

Page 245: [XLS] · Web view1 280 2750 110169.33 2247454.4 1/1/2006 12/31/2006 2007 281 2647 16733 190566 5/1/2005 4/30/2006 2007 282 2011 61705.076999999997 11491.9 5/1/2005 4/30/2006 2007

31/12/09 Implemented

31/12/09 Implemented