Page 1 KERALA PUBLIC WORKS KOTTAYAM ROADS D PROGRESS FOR THE MONTH Sl.No LA Constituency Name of Project Estimate Amount A.S No. Date & Amount Name of Contractor 1 2 3 4 6 7 8 9 10 11 I BUDGET WORKS 2007-08 1 Kanjirappally 2008-09 2 Ettumanoor 2009-10 3 Puthuppally 4 Kanjirappally KSCC .Ltd 5 170 Kaduthuruthy 193.5 lakhs 2010-2011 6 Poonjar 7 Kaduthuruthy, Pala, 8 Vaikom 2011-12 Budget Page no.& item no Budget Provisions in lakhs T.S No. Date & Amount Agt.No & Date Construction of Kanjirappally Bye-pass G.O(Rt) No.1998/2008 PWD dtd.28/711/2008 Rs.925 L GO(RT)1173/2014 PWD DT 6.8.15 Constn. Of a bridge at Pulikuttissery across Meenachil river in Kottayam District GO(RT)1044/09pwd. DT.14-07-09, 230 L CE/R&B/10554/09/ KTM dt.01-12-2009 235 L 59/ SESC/ 10-11 dtd- 17/05/2 010 A.P.Rajapp an ,Hope Constructi on, Constn. Of Kampanikkadavu Bridge across Meenachil river in Ettumanoor Ayarkunnam road in Kottayam District GO(RT)NO.1044/2009/pwd. Dtd.14-07- 2009 1000 L CE/R&B/5081/KTM/ 2009 dtd 20/02/2014 Raju Chacko Impts.to Elamkadu- Valiyentha-Kolahalamedu-Vagamon road ch.0/00 to 8/065 (Work terminated, Balance schedule submitted for re-tender) G.O(Rt) No.1045/2009 PWD dtd.14/7/2009 Rs.1875 L 931/CE/12/2009- 10/955 342/ SESC/ 2009-10 dtd.29/ 3/10 Impts. to PK road Providing Drainage Facilities and Foot path construction at Peruva Jn. GO(Rt)No.1045/2009/PWD dt.14/07/2009 Rs. 170.00 lakhs 138/CE/R/ 14- 15/138 for Rs.176 L dt. 24.02.2015 42/ SESC/ 15-16 dated13 /08/201 5. Sri. Manoj Krishna Constn. Of Thenpuzha Bridge across Pullakayar connecting Kottayam and Idukki districts GO(RT)1222/2010/pwd. Dt.28-07- 2010 200 L Improvements to Kidangoor - Kadaplamattom - Uzhavoor - Veliyannoor - Koothattukulam road ch: 0/000 to 22/000 (Dr. K.R. Narayanan memorial road) Balance work G.O.(Rt) No. 750/2010/PWD dt. 05.05.10 for Rs. 2550 Lakhs No. KTM/2016- 17/2016/1490, Dated 7.1.17, Rs.215.2 L (Final TS, IVth) VKJ & Company Constn. Of Valayil Bridge in Murinjapuzha Kunnel Peedika road in Chempu Grama Panchayath GO(RT)1222/10/pwd. Dt.28-07-2010 Rs. 726 L

Transcript of keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view ·...

Page 1: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 1

KERALA PUBLIC WORKS DEPARTMENT KOTTAYAM ROADS DIVISION

PROGRESS FOR THE MONTH OF OCTOBER 2017

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13I BUDGET WORKS

2007-08

1 Kanjirappally

2008-09

2 Ettumanoor

2009-10

3 Puthuppally

4 Kanjirappally KSCC .Ltd

5 170 Kaduthuruthy 193.5 lakhs 17219803 18385008

2010-2011

6 Poonjar

7 Kaduthuruthy, Pala,

8 Vaikom

2011-12

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

Construction of KanjirappallyBye-pass

G.O(Rt)No.1998/2008

PWD dtd.28/711/2008Rs.925 L

GO(RT)1173/2014 PWD DT 6.8.15

Constn. Of a bridge at Pulikuttissery across

Meenachil river in Kottayam District

GO(RT)1044/09pwd. DT.14-07-09, 230 L

CE/R&B/10554/09/KTM

dt.01-12-2009 235 L

59/SESC/10-11 dtd-

17/05/2010

A.P.Rajappan ,Hope Constructi

on,

Constn. Of Kampanikkadavu Bridge across Meenachil river in Ettumanoor Ayarkunnam road

in Kottayam District

GO(RT)NO.1044/2009/pwd. Dtd.14-07-2009 1000 L

CE/R&B/5081/KTM/2009 dtd 20/02/2014

Raju Chacko

Impts.to Elamkadu-Valiyentha-Kolahalamedu-

Vagamon road ch.0/00 to 8/065(Work terminated,Balance schedule

submitted for re-tender)

G.O(Rt)No.1045/2009

PWD dtd.14/7/2009Rs.1875 L

931/CE/12/2009-10/955

342/SESC/2009-

10dtd.29/

3/10

Impts. to PK road Providing Drainage Facilities and Foot

path construction at Peruva Jn.

GO(Rt)No.1045/2009/PWD dt.14/07/2009 Rs. 170.00 lakhs

138/CE/R/ 14-15/138 for Rs.176 L dt. 24.02.2015

42/SESC/15-16 dated13/08/20

15.

Sri. Manoj Krishna

Constn. Of Thenpuzha Bridge across Pullakayar connecting Kottayam and Idukki districts

GO(RT)1222/2010/pwd. Dt.28-07-2010 200 L

Improvements to Kidangoor - Kadaplamattom - Uzhavoor - Veliyannoor - Koothattukulam

road ch: 0/000 to 22/000 (Dr. K.R. Narayanan

memorial road) Balance work

G.O.(Rt) No. 750/2010/PWD dt. 05.05.10 for Rs. 2550 Lakhs

No. KTM/2016-17/2016/1490, Dated 7.1.17,

Rs.215.2 L (Final TS, IVth)

VKJ & Company

Constn. Of Valayil Bridge in Murinjapuzha Kunnel Peedika

road in Chempu Grama Panchayath

GO(RT)1222/10/pwd. Dt.28-07-2010 Rs. 726 L

Page 2: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 2

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

9 161579053 148512732 Puthuppally

10 201222856 241095474 Ettumanoor

11 8486086 10209146 Ettumanoor

12 47545319 57452533 Puthuppally

13 Kanjirappally .........

14 Pala 101000000/- Rs.100086436/- Rs.75070400/-

15 Kaduthuruthy

16 Poonjar KSCC

17 Poonjar 40000000/- Rs.45976343/- Rs.35047271/-

18 8488044 9755937 Kaduthuruthy Joseph A.J.

2012-13

Construction of Pattithanam- Manarcadu Bypass from7/000

to 12/285 ( 1 st Reach )G.O.(Rt)

238/12/PWD Dt 16/02/2012

CE/R&B/KTM/15/2012

Dt 04/03/2013 - 1495 L

156/SESC/2013-14 14d 26/12/2

013

Sri.Charls Mathew

Construction of Pattithanam- Manarcadu Bypass from 1/790

to 6/530 (2nd Reach )G.O.(Rt)238/12/PWD dt: 16/02/2012 7200.00 L

CE/R&B/KTM/1142/2013

Dt 30/03/2013 - 2415.00 L

114/SESC/ 2013-14 dt:

8/10/2013

Sri. K.I. Paulose

Environmental pollution around Ettumanoor Mahadeva temple-

Construction of drain along Thiruvanchoor Road

Connecting drainage of MC Road and Ettumanoor Poonjar

SH

1408/2011/ PWD dtd 17/10/2011; 99 Lakhs

358/CE/R/2011-12/358

Dt 30/01/2012- 104.00 L

90/SESC2012-13 dt. 21-

06-2012

Blue Earth Contracto

rs Company

Construction of Ayarkkunnam-Kuttillam By pass ch: 0/000 to

1/250kmG.O.(Rt)278/13/PWD dt:

26/02/2012 CE/R&B/KTM/3284/2013 dt:

30/03/2013 575 L

112/SESC/13-14

dt: 17/10/2

013

Construction of Bye-pass road for Mundakkayam town

G.O(Rt)349/14/PWD dtd.3/3/14

110/SESC/2015-

16dtd.3/10/2015

Rajesh Mathew

Pala Town Ring Road Ist reach Ch:0/000 to 2/380

GO (Rt ) No 238 / 2012 /PWD Dated 16 /02/2012for Rs 4500.00 L

GO(RT)1468/2015 PWD

224/SESC/

23.01.17Sri. Rajesh Mathew

Constn. Of Cherpunkal parellel Bridge across Meenachil river in

Cherpunkal Kozhuvanal roadGO(RT)549/2012/pw.d ,Tvm.

Dt.31-03-2012 945 L

Improvements to Chamapara - Teekoy Estate - Marmala Aruvi

road Km 0/000 -2/900GO (Rt ) No 238 / 2012 /PWD

Dated 16 /02/2012for Rs 475.00 L

129/SESC/

12-13/DT

Impts to Chemmalamattom - Karimpanoli- Kokkarani - Vengathanam - Malika road0/000 - 5/200

GO (Rt) No 274/2012/PWD Dt 23/02/2012 Rs 400.00 L

183/SESC/12-13/DT-

17/9/2012

Rajesh Mathew

Construction of Link road at Kuravilangad town (Balance work) ch: 0/242 km to 0/540

km

GO(Rt) No. 1540/2011/PWD dt. 09.11.11 for Rs. 100 Lakhs

94/SESC/12-13

dt. 22.06.1

2

Page 3: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 3

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

19 Pala

20 345 Kaduthuruthy 345 lakhs 34411455 41703223

21 changanassery Changanassery Western Bypass

2013 - 2014

22 1234.50 L Ettumanoor

23 30,20 lakhs Ettumanoor

24 250 Lakhs Ettumanoor

25 327Lakhs Ettumanoor

26 Kanjirappally

27 Kanjirappally

28 Kanjirappally

Construction of Lalam Bridge Jn to Karoor - Payappar road Ch

0/000 to 3/000 km

GO (Rt ) No 313 / 2013 /PWD Dated 02 /03/2013 for Rs 500.00

L333/CE/R/12-13 Rs

575 L

No 41 / SESC/13-14 dt 26.03.2

013

Sri.T.P.Antony

Providing BM & BC to Arunassery-Kattampakku-

Kuravilangadu road ch:2/000-8/800.

GO (Rt) No 313/2013/PWD dt 2/3/2013 Rs.300 Lakhs

152/CE/R/2013-14 dated 11/6/2013

Rs345 Lakhs

101/SESC/15-16 dtd

1/10/2015

Sri. Manoj Krishna

G.O (Rt) No.238/12/PWD dated 16-03-2013 for 5700 Lakhs100L

Improvements to Medical college - maniyamparambu

roadG.O.(Rt)No.209/14/PWD Dated:

TVM 11/2/2014.

CE/R&B/KTM/2606/2014,dtd:01/02/2016 -1234.5

Lakhs

207/SESC/

16-17,

dated:05/12/16

Sony Mathew

Vol

II,P

art I

,Pag

e 52

6,A

nnex

II V

ol

II,P

art I

V,P

age

115,

Improvements to Cheeppunkal - Maniyaparambu road ch:

0/000 to 5/500 km.G.O.(Rt)No.209/14/PWD Dated:

TVM 11/2/2014.CE/R&B/KTM/

2607/2014,dtd:01/02/2016 -3020 Lakhs

Improvements to Athirampuzha Town

G.O.(Rt)No.209/14/PWD Dated: TVM 11/2/2014.

Improvements to Arumanoor Road ch. 0/000- 7/000 km.

GO (Rt) No. 627/2016/PWd dated 11/02/2014 for Rs. 327 L

Impts.to Thoppilpady-Thachappuzha road ch.0/00 to

7/500 km

G.O(Rt) No.961/13/PWDdtd.8/7/

2013191.5 L

232/CE/R/2013-14/232

dtd.29/8/13

134/SESC/13-14

dtd.8/11/13

Kurian Joseph

Strengthening the road by providing BM & BC with 3 years

gurantee to Ponkunnam -Azeeckal Kuruvamoozhy road

ch.0/00 to 12/200 Km

G.O(Rt)No.1237.//2013

PWD dtd.13/9//2013Rs.800 L

11/CEC/2013-14 dtd.4/12/13 800 L

78/SESC/

17/11/14

M/SBegorra

Providing BM & BC with 3 yearguarantee to Mundakkayam-

Koruthodu-Mookkenpetty-Pampavally road ch.11/00 to

21/250- km.

G.O(Rt)No.1237/2013/PWD dtd.

13/9/2013800 L

12/CE/2013-14 dtd.4/12/2013.

800 L

77/SESC-

14-15dtd.17/11/14

M/S KavumnkalRoads&Builders

Page 4: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 4

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

29 Kanjirappally

30 Kanjirappally

31 Kanjirappally

32 Kanjirappally

33 Kanjirappally

34 Pala 30000000/- Rs.28679009/- Rs.25495523/-

35 Pala Sri.K.I.Issac Rs.35129211/- Rs.42963595/-

36 Pala Rs.20114825 Rs.27134899/-

Impts.to Eruthavapuzha-Kanamala (Pampavally)parallel Road 0/00 to

2/300 km.

G.O(Rt)No.376/14/PWDdtd.4/3/

2014630 L

52/CE/R/15-16 dt.04.12.1650L

33/SSESC/15-16

dtd.4/3/15

Mulamoottilconstru

ction

Impts.to Koruthode-116 Colony SC/ST Colony-

Pachimal road ch.1/750 to 3/750 km

G.O(Rt)No.376/14/PWDdtd.4/3/

2014222 L

42/CE/R/15-16 dt.17.09.1243L

19/SSESC/15-16

dtd.2/7/15

JubyM.M

Mathew

Impts.to AngelvallyPallipady-Kulangarapadyroad ch.0/00 to 1/500 km

G.O(Rt)No.376/14/PWDdtd.4/3/

2014160 L

44/CE/R/15-16 dt.17.09.14 168L

SibyJoseph

Impts.to MTHS-Karithode road ch.0/00 to 1/700 km.

G.O(Rt) No.209/14/PWDdtd.11/2/

2014120.00L

366/CE/R/13-14 dt.04.12.1136

71/SSESC/15-16

dtd.16/9/15

RajuKurian

Impts.to Angelvally-Moolekayam Road ch.0/00 to

2/800 km.

G.O(Rt)No.376/14/PWDdtd.4/3/

2014377 L

43/CE/R&B/14-15 dtd.7/9/2014

Rs.410 L

70/SESC/15-16

dtd.15/9/2015

M/s George Kuruvila

Impts to Kandathimavu - Maryland - Pious Mount Road Ch 0/000 to 5/100

GO (Rt ) No 1239 / 2013 /PWD Dated 19/09/2013 for Rs 200.00 L

325/CE/R/13-14 dt.04.01.14 Rs 300 L

6/SESC/

2014-15 Dtd.28/05/2014

Sri.Jacob Punnose

Impts to Pandiamavu - Kulathilkandam - Kurishinkal road Ch 0/000 to 3/500 KM

36700000/-

GO (Rt ) No 1239 / 2013 /PWD Dated 19/09/2013 367.00L

59/sesc/

2014-15 Dated

13/10/2014

Impts works to Valavoor - Erattayani - Chittar Road Ch 0/000 to 2/800

18000000/-

G.O(Rt)No. 209/2014/PWD dated 11.02.2014 180.00L

98/SESC/14-

15 Dtd.18/12/2014

Sri.E.C Cheriyan

Page 5: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 5

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

37 Pala 41400000/- Rs.41201685/= Rs.50238164/-

38 72901269 Pala Rs.57495470/- Rs.72901261/-

39 Pala Rs.45572980/- Rs.55197386/-

40 Pala Do - for Rs. 250.00 L Rs.23511600/- Rs.19607557/_

41 12507107 Pala Do for Rs. 150.00 L Rs.14981189/- Rs.12507107/-

42 Pala

43 Kottayam Rs. 700 L

44 Kottayam

45 Poonjar

46 Poonjar

Improvement to Vilakkumadom - Chathankulam -Vattappara - Kanjiramattom - Madamala - Edamattom Road ch.0/000 to 6/900

G.O(Rt)No. 209/2014/PWD dated 11.02.2014 360.00L

390/CE/R/13-14 DT.25.02.2014 415L

97/SESC/15-

16 dtd.30/09/2015

Sri Manoj Mathew

Improvements to Ramapuram Pizhaku Vylliyath kandanadu road 0/000 to 6/400 provoding BM&BC construction of CD work and protective works

58000000/-

G.O(Rt)No. 209/2014/PWD dated 11.02.2014 580.00L

GO (RT)971/2015 PWD/dt 06.05.2015

218/ASESC/2015-16 dtd.24/02/2016

Raji Mathew

Improvements to Mutholi- Poovarani road Ch 0/000 to 5/300

43000000/-

G.O(Rt)No. 209/2014/PWD dated 11.02.2014 430.00L

367/CE/R/2013-14 dt 20.02.2014

98/SESC/15-

16 dt 01.01.20

15

Sri. E.M. Madhu

Gradient correction and connecting Vattolikadavu bridge approach of Ettumanoor - Poonjar S H Way near Bharananganam

25000000/-

GO Ms 235/16/PWD/dt

03/2/2016 Rs 250 L

29/SESC/16-

17 dt 25.05.20

16

Pious Antony

Impts to Azhikanni - Mary land road @ Ch. 0/000 to 2/000 Km.

15000000/-

125/CE/R/15-16 dt 24.02.2016

68/SESC/16-

17 dt 31.05.20

16

Baby Constructio

ns

Improvement work to Kozhuvanal Town including LA

G.O(Rt)No. 209/2014/PWD dated 11.02.2014 for Rs.48.40L

Part TS issued for Rs. 7L

Land to be obtained

Construction of Kolladu- Nagapurathukadavu and bridge across Kodoor River

GO(RT) No.209/14/pwd. dtd.11-02-2014 -700 Lakhs

Construction of parallel bridge to Kodimartha

bridge across Kodoor river at Kodimatha in Kottayam district

GO(RT) No. 682/2013/pwd,Thiruvananthapura

m,. DT.03-05-13 984 L

13/CEC/13-14 Dated 24.01.2014

999L

104/SESC/2014-15 Dt.

26.12.14

Mathew Korah

Impts to Erattupetta - Byepass Cause way to MES Jn Road

GO (Rt ) No 1433 / 2013 /PWD Dated 04/11/2013 1000.00L

CE/R&B/KTM/2550/2014 dt 28.08.2014

Improvements to Erattupetta Byepass causeway to MES Jn.

Road GO(RT) No. 1433/2013/pwd.

dtd.04-11-2013 296 LCE/R&B/KTM/

2550/2014 dtd 28/02/2014

128/SESC/16-17

dtd.30.06.201

6

K.T Mathew

Page 6: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 6

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

47 Poonjar

48 Kaduthuruthy

49 56716554 460 Lakhs Kaduthuruthy

50 200 Vaikom 200 lakhs KSCC Ltd. 22965126 26754943

51 changanassery

2014-15

52 Pala 120800000/- 120691433.00 92449589.00

53 Pala Rs.48267207/- Rs.5214373/-

54 Pala Rs.57948602/- Rs49060084

55 Pala Rs.78365290/- Rs66272457/-

Constn. Of Aruvithura Parralel Bridge across Meenachil river in

Kottayam districtGO(RT) No. 209/14/pwd. DT.11-

02-2014, 384 LCE/R&B/KTM/

2550/2014 dtd 28/02/2014

68/SESC/2014-15, dt. 15.11.1

4

M.M.Mathew

Improvement work to Kurichithanam Junction in Pala -

Kozha Road including LAG.O(Rt)No. 209/2014/PWD dated

11.02.2014for Rs 49.60LBibin

Mathew

Improvements to Kaduthuruthy - Neezhoor road ch: 0/000 to

5/500 kmGO(Rt) No. 209/2014/PWD dated.

11.02.2014 for Rs.450 Lakhs

394/CE/R/2013-14/394 Dtd.

26.02.2014, Rs. 460 Lakhs

25/SCSE/15-16

dt. 10.07.2

015

Mathew Joseph

Providing BM & BC works to Vaikom-Vechoor

road(Alapuzha-Madhurai SH way) ch:0/000-12/200 (from

Vaikom-Thalayazham)

GO(Rt)No.209/2014/PWD dt.11/02/2014 Rs. 200.00

427/CE/R/2013-14/427 dt.

28/02/2014 for 230Lakhs

10/SESC/15-16 dtd

18/05/2015

Improvements and widening carriage way Anchuvilakku-

Pandakasalakadavu perunna temple road 0/150 to 0/500 km

.A.S No. G.O (Rt) No.209/14/PWD dated 11-02-2014 for 100 Lakhs

Improvements to Parallel Road from R.V.Junction in Pala - Kozha Road to Bye pass Junction at Puliyannoor in Eattumanoor - Poonjar Road.

GO(Rt) No 1328/2014/PWD Dated 22/09/2014 for Rs 2700.00L

GO(Rt)No1173/2015pwd 6.08.15

217/SESC/16-17 DT.13.12.16

Sri. Sajeev Mathew

Impts to Kappilukunnu - Vilakkumaruthu - Palakkad - Kizhaparayar Road Ch 0/000 to 9/000

50000000/-

G.O(Rt)No. 1004/2014/PWD dated 16/07/2014 for Rs. 500L

125/CE/R/14-15 dt 31.12.2014 500L

121/SESC/15-16 dt19-11-2015

Pious Antony

Impts to vilakkumadam -Vazhamattom -pinnakkanadu road ch 0/000 to 7/000 km

60000000/-

GO(RT) No 1930/2015/PWD /22.01.2015 for Rs.600.00L

196/CE/KTM/15-16 dt17.02.2016

33/SESC/16-

17dt 24.05.20

16

M/S Palathra

Constructions

Impts to Kayyoor-Kurumannu-Plassanal road

80000000/-

GO(RT) No 1930/2015/PWD /22.01.2015 for Rs.600.00L

CE/R&B/410/KTM/2016/dt.12/02/2016

222/SESC/2016-

17dt06/01/2017

Sri. Shibu Mathew

Page 7: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 7

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

56 Pala Do- do for Rs.245.00 Lakhs Rs.24094409/-- Rs. 19036131/-

57 Pala Rs.38044594/- Rs.39851712/-

58 Kaduthuruthy

59 Kaduthuruthy

60 Poonjar Yes

2015-2016

61 44587420 44587420 Puthuppally & Kanjirappaly

62Kerala Budget 15-16 Volume II Part I Page No 678100 Lakh Puthuppally Rs.250L

63 18118189 Puthuppally 185 lacs

64 31436695 39948012 Puthuppally

Impts to Ramapuram-Mullamattom-Kurisupally road

24500000/-

28/SESC/2016-

17Dtd.23/05/20

16

Sri. Pious Antony

construction of duct in pala parallel road

38500000/-

G.O. (Rt) No. 1026/14/ PWD/dt. 21/07/2014 for Rs.345.00Lakhs.

62/CE/14-15 dt 23.10.2014 Rs385 L

60/SESC/

2016-17 dt

30.05.2016

Manoj Mathew

Construction of Kaduthuruthy Bye Pass road from ch: 0/190 to 0/785 km - phase - II, Part I

(Formation, Bridge & culverts)

G.O.(Rt) No. 1397/14/PWD dt. 08.10.14 for Rs. 2550 Lakhs

G.O.(Rt.) No. 175/2016/PWD.

Dtd. 27.01.2016. Rs.960 Lakhs (Part

TS,1)

Construction of Kaduthuruthy Bye Pass road from ch: 0/190 to 0/785 km - phase - II, Part 2 (Construction of Fly over)

G.O.(Rt) No. 1397/14/PWD dt. 08.10.14 for Rs. 2550 Lakhs

No. KTM/2016-17/2016/4283

DaTed 10.1.17 Rs.818.30L

Part TS II

Mathew Koreh

Construction of Block office Valiachanmala road from Ch. 0/000 to 2/000 Km.in Poonjar

constituency.

GO(Rt)No :810/2015 PWD TVPM Dated 20/03/2015 for Rs.70.00L

Sri Pious Antony

Improvements to Pampady Anickadu Road Ch 0/00 to

7/600KmG.O(Rt)No.970/2015/PWD dtd 8-7-

2015 Rs.450Lakhs

134/CE/R/15-16/134 Dt.

26.12.2015 Rs. 450 lacs

62/SESC/16-17

dt 30.05.2

016

Sri Sony Mathew

Improvements to Oravakkal Poothiri Kannankunnu Road Ch

0/00 to 4/00KmG.O(Rt)No.1930/2015/PWD dtd

22.12.2015 Rs.250Lakhs196/CE/R/15-16 dt18.02.2016

Rs.250L

86/SESC/16-17 dated

14.06.2016

Sri Pious Antony

Improvements to Chuvannaplavu Kozhuvanal Road Ch 0/00 to 2/500 Km

G.O(Rt)No.1930/2015/PWD dtd 22.12.2015 Rs.185Lakhs

198/CE/R/15-16/198 Dt.

08.02.2016 Rs. 185 lacs

53/SESC/2016-

17 date 27.05.2

016

Sri. Thomas Mathew

Improvements to Ayarkkunnam Pampady Road Ch 0/00 to

7/450 KmRs.400La

khsG.O(Rt)No.1930/2015/PWD dtd

22.12.2015 Rs.400Lakhs193/CE/R /15-16

dt.08.02.16Rs.400Lakhs

85/SESC/16-17 dated

14.06.2016

Sri Pious Antony

Page 8: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 8

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

65 64775552 Puthuppally

66Kerala Budget 15-16 Volume II Part I Page 438200 Lakh Puthuppally 200 lakhs

67 18237554 19950432 Puthuppally 200 lakhs

68 Puthuppally

69 Puthuppally & Kanjirappaly

70 Puthuppally

71 Puthuppally

72 Puthuppally & Kanjirappaly

73 changanassery

Improvements to Vettathukavala Meenadom Road Ch 0/00 to 7/850 Km

Rs. 650 lacs

G.O(Rt)No.1930/2015/PWD dtd 22.12.2015 Rs.650Lakhs

194/CE/R/15-16/194 DT.

8.2.2016 Rs. 650 lacs

63/SESC/16-17 dated

30.05.2016

Sri. Sony Mathew

Improvements to Pothenpuram (Pampady Dayara) Road Ch

0/00 to 3/500 KmG.O(Rt)No.1930/2015/PWD dtd

22.12.2015 Rs.200Lakhs197/EE/15-16

dt.08.12.16 200L

87/SESC/16-17 dated

14.06.2016

Sri Pious Antony

Improvements to Chennampally Kangazha Road

Ch 0/00 to 4/00 KmG.O(Rt)No.1930/2015/PWD dtd

22.12.2015 Rs.200Lakhs

199/CE/R/15-16/194 DT.

8.2.2016 Rs. 200 lacs

66/SESC/2016-

17 dated

31.05.2016

Sri. Thomas

Sebastian

Widening and renovation of roads leading to K R Narayanan

National Institute of Visual Science and Arts ( Part1)

Improvements to Mattakkara -Kummannoor Road km. 0/000 to 7/500 (Part11) Chengalam Kdakkuzhy Kochukottaram

Vilakkumaruthu road km 0/000 to 6/500

GO(Rt) No. 632/2016/PWD dated 04.03.2016 RS. 1600.00 lacs

Improvements to Anickad Chengalam Road km 0/000 to 4/000 ( Part 1) and Chengalam

Kallukuzhy Kochukottaram Thazhavelly Poovarani Road 0/000 to 3/6000 ( Part 11)

GO(Rt) No. 624/2016/PWD dated 04.03.2016 RS. 560.00 lacs

Improvements to Manjamattom Kezhuvankulam road 0/000 to

11/000 kmGO(Rt) No. 628/2016/PWD dated

04.03.2016 RS. 750.00 lacsImprovements to Mannoorpally Pallikkathodu 0/000 to 8/300

GO(Rt) No. 625/2016/PWD dated 04.03.2016 RS. 540.00 lacs

Improvements to Kaniparambu Chathanpara PHC Koovapoika

Road 0/000 to 2/900GO(Rt) No. 633/2016/PWD dated

04.03.2016 RS. 298.00 lacs

Changanassery Western Bypass

G.O (Rt) No.238/12/PWD dated 16-03-2013 for 5700 Lakhs100L

Page 9: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 9

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

74 Kanjirappally

75 Kanjirappally

76 Poonjar

77 400 Lakh Puthuppally

78 Puthuppally

79 200 Lakh Puthuppally

80 200 Lakh Puthuppally

81 Puthuppally

82 Puthuppally

N.S.S Padi - Cherumakkal Road 0/000 to 0/450

.A.S No. G.O (Rt) No.1930/15/PWD dated 22.12-2015 for 200 Lakhs

Agreement No. 237/SE

SC Dated

10/03/2017

Sri. Charls Mathew

Malam - Manthuruthy- Thypparambu road 0/000 to

4/370 km. .A.S No. G.O (Rt) No.1930/15/PWD dated 22.12-2015 for 200 Lakhs

231/SESC/16-17 DTD.

22.2.17

Johney Cheriyan

Vellikulam Kariyadu chettu para vagamon

Kerala Budget 15-16

Volume II Part I Page

No 161

Improvements to Ayarkkunnam Pampady Road Ch 0/00 to

7/450 KmG.O(Rt)No.1930/2015/PWD dtd

22.12.2015 Rs.400Lakhs

85/SESC/16-17 dated

14.06.2016

Sri Pious Antony

Kerala Budget 15-16

Volume II Part I

Improvements to Vettathukavala Meenadom Road Ch 0/00 to 7/850 Km

G.O(Rt)No.1930/2015/PWD dtd 22.12.2015 Rs.650Lakhs

194/CE/R/15-16/194 DT.

8.2.2016 Rs. 650 lacs

63/SESC/16-17 dated

30.05.2016

Sri. Sony Mathew

Kerala Budget 15-16

Volume II Part I Page

438

Improvements to Pothenpuram (Pampady Dayara) Road Ch

0/00 to 3/500 KmG.O(Rt)No.1930/2015/PWD dtd

22.12.2015 Rs.200Lakhs

87/SESC/16-17 dated

14.06.2016

Sri Pious Antony

Kerala Budget 15-16

Volume II Part I

Improvements to Chennampally Kangazha Road

Ch 0/00 to 4/00 KmG.O(Rt)No.1930/2015/PWD dtd

22.12.2015 Rs.200Lakhs

199/CE/R/15-16/194 DT.

8.2.2016 Rs. 200 lacs

66/SESC/2016-

17 dated

31.05.2016

Sri. Thomas

Sebastian

Widening and renovation of roads leading to K R Narayanan

National Institute of Visual Science and Arts ( Part1)

Improvements to Mattakkara -Kummannoor Road km. 0/000 to 7/500 (Part11) Chengalam Kdakkuzhy Kochukottaram

Vilakkumaruthu road km 0/000 to 6/500

GO(Rt) No. 632/2016/PWD dated 04.03.2016 RS. 1600.00 lacs

Constn. Of Chuvannaplavu Bridge across Pannagom Thodu

in Kottayam District.GO(RT)NO.583/2016/pwd.

Dtd.04.03.2016 350 L Availabl

e

Page 10: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 10

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

83 Pala

84 Pala

85 Pala Rs,10637845/- Rs.8520249/-

86 Kaduthuruthy 25400000/- Rs.26646524/- Rs.28693545/-

87 400 Kaduthuruthy 39760609 31807932

88 Ettumanoor

89 Ettumanoor 30000000

2016-17

90 Pala

91 Pala

92 Pala

93 Pala

Construction of Extension of river view road LA and

construction of road up to 15th mile in Ettumanoor - Poonjar SH

ways

GO (Rt ) No1452/ 2015/PWD Dated 30/09/2015for Rs 4750.00

Lacks

Impts to Link road connecting parallel road to hospital

junction @ Ch. 0/000 to 0/514 Km.

GO (Rt ) No 948/2015 /PWD Dated 04/07/2015 for Rs. 375.00 L

Impts to Mevida- Kizhakkekara road at Ch. 0/000 to 1/200 Km

10650000/-

GO (Rt ) No 695 / 2015 /PWD Dated 22/05/2015 for Rs 100.00 L

124/CE/r 15-16 DT.23.12 15 Rs.

106.50L

58/SESC/16-

17 dtd.28/05/2016

Sri.Bibin Baby

Impts to Mar Bishop Vallopally road Ch 0/000 to 3/500 for providing BM & BC

GO(Rt) No 1484/2014/PWD Dated 24/10/2014 For Rs.254.00Lakhs

167SESC/15-16

Dtd.16/01/2016

Sri. Pious Antony

Piravam-Palachuvadu-Kummatha-Marangoly-

Vakkadu-Kuravilangadu-road (BM&BC)1st phase

Rs. 400 lakhs

GO(Rt)No:1930/2015/PWD dated 22/12/2015 for Rs 400 lakhs

KTM/2015-16/946/

dated4/03/2016

151/SCSE/2016-

17 dated12/08/20

16

Baiju Joseph

Reconstruction of retaining wall at Arupara in Kottayam -

Kumarakom road by the side of Meenachil River

Improvements to Kallungathara - Cheepunkal road at ch.1/750

to 4/250GO(Rt)No:1930/2015/

PWD,dated:22-12-2015 300 Lakhs

R.P. 2016-17- Providing BM & BC to Inchukavu-Neeloor road

@ ch. 0/000 to 3/700 kmGO(MS) No.18/2017/PWD dt.

13.03.2017 180.001087/17-

18/29.05.17 180.00

R.P. 2016-17- Kadappattoor-Cathedral Church Pala road at ch. 0/000 to 6/000 (9ncluding

Cherupushpam - Mukalelpeedika road)

GO(RT) No.179/2017/PWD dt. 14.02.2017 40.00

3810/16-17/27.03.17

40.00

TD Chandrasekharan.

Providind BM & BC surfacing to Plassanal-Pravithanam road ch.

0/000 to 7/300 kmGO(MS) No.18/2017/PWD dt.

13.03.2017 30.003842/16-

17/27.03.17 30.00TD

Chandrasekharan.

R.P. 2016-17 - Providing 20mm C.C. to Kurumannu-Kayyoor road ch. 0/000 to 5/400 km

GO(RT) No.179/2017/PWD dt. 14.02.2017 50.00

3791/16-17/27.03.17 50.00

TD Chandrasekharan.

Page 11: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 11

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

94 Pala

95 Pala

96 Pala Baby Luka

97 Pala

98 Pala

99 Pala

100 Pala

101 Pala

102 Pala

103 Pala

104 Pala

105 Pala Pious

106 Pala

107 Pala

R.P. 2016-17 - Providing 20mm C.C. to Paikadapeedika-

Kurumannu road ch. 1/200 to 4/600 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 20.50

4319/16-17/31.03.17 20.00

TD Chandrasekharan.

R.P. 2016-17 - Providing 20mm C.C. to Kanjiramkavala-

Valakam-Mechal-Narimattomroad @ ch. 0/000 to

16/000 km

GO(RT) No.179/2017/PWD dt. 14.02.2017 30.00

3661/16-17/24.03.17 30.00

TD Chandrasekharan.

R.P. - 2016-17- 20 mm C.C. To Anthiyalam - payappar road

Ch.1/00 to 2/600. GO(MS) No.18/2017/PWD dt.

13.03.2017 25.00 3553/16-

17/22.03.17 25.00R.P. - 2016-17- 20 mm Close

graded surfacing To Puliyannoor

Kanikkamandamom road ch. 0/000 to 2/000 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 20.00

3667/16-17/24.03.17 20.00

TD Chandrasekharan.

R.P. - 2016-17- 20 mm bit C.C. To Mutholy-Kongandoor road @

ch. 0/000 to 6/300 kmGO(MS) No.18/2017/PWD dt.

13.03.2017 20.003812/16-

17/27.03.17 20.00TD

Chandrasekharan.

R.P. 2016-17 - Providing 20mm Bit C.C. to Pravithanam-

Valiyakavumpuram - Ullanadu-Kodumpidi (Alanadu-Ullanadu-Anthinadu road ch. 0/000 to

8/000 km)

GO(MS) No.18/2017/PWD dt. 13.03.2017 30.00

3811/16-17/27.03.17 30.00

TD Chandrasekharan.

R.P. 2016-17 - Providing 20mm Close graded. to Pravithanam-Mankara-Kollappally road ch.

1/000 to 2/600 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 25.00

3809/16-17/27.03.17 25

TD Chandrasekharan.

R.P. - 2016-17- 20 mm Close graded To Mutholy-Kozhuvanal road @ ch. 0/000 to 2/000 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 20.00

3807/16-17/27.03.17 20.00

TD Chandrasekharan.

R.P. 2016-17 - Providing 20mm C.C. to Kozhuvanal-Thokkadu-

Kanjiramattom roadGO(MS) No.18/2017/PWD dt.

13.03.2017 30.003668/16-

17/24.03.17 30.00TD

Chandrasekharan.

R.P. 2016-17 - Providing Close graded to Pravithanam-

Edappady road ch. 0/000 to 4/000 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 19.00

3843/16-17/27.03.17 19.00

TD Chandrasekharan.

R.P. 2016-17 - Providing 20mm bit C.C. to Manathoor-

Maniyakkupara road @ ch. 0/000 to 5/500 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 21.00

3804/16-17/27.03.17 21.00

TD Chandrasekharan.

R.P. 2016-17- Ezhacherry Bank Junction - Kollappally road at

ch. 0/000 to 6/000 kmGO(RT) No.179/2017/PWD dt.

14.02.2017 20.003665/16-

17/24.03.17 20.00

R.P. 2016-17 - Providing bit C.C. to Ampara-Mancombu road @

ch. 6/600 to 7/600 kmGO(RT) No.179/2017/PWD dt.

14.02.2017 10.003792/16-

17/27.03.17 10.00TD

Chandrasekharan.

R.P. 2016-17 - Providing 20mm bit C.C. to Vakakkadu-

Kalathookadavu-Njandukallu-Teekoy road ch. 0/000 to 2/000

km

GO(MS) No.18/2017/PWD dt. 13.03.2017 10.50

TD Chandrasekharan.

Page 12: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 12

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

108 Ettumanoor

109 Ettumanoor

110 Ettumanoor Rs. 3,67,91,000

Arumanoor Ettumanoor

112 100 Ettumanoor

113 Ettumanoor

114 Ettumanoor

115 Ettumanoor

116 Ettumanoor

117 90 Vaikom 90 lakhs 8599591 6715829

4 350 Vaikom 350 lakhs 34378858 28627055

119 284 Vaikom 284 lakhs 28399107

Providing BM & BC and and allied works to Ettumanoor

Athirampuzha University Amalagiry Medical college road

ch:5/000 to 8/800 km.

Rs. 7,43,37,0

00

GO(Ms)No:18/2017/PWD,dated:16/03/2017-743.37

Lakhs

KTM/2017-2018/2016/7751 dtd. 04.07.2017 Rs. 7,38,60,000/-

Budget work 2016-17 Providing BM & BC to

Shutterkavala Pallikkunnu Aruvakkuzhinji road ch:0/000

to 7/700 km.

GO(MS) No.18/2017/PWD dt. 13.03.2017 778.33

KTM/2017-2018/2017/364

dtd. 04.07.2017 Rs. 778.20 Lakhs

Budget work 2016-17 Providing BM & BC to Old M C Road road ch:2/700 to 5/800

km.

Rs. 3,67,91,0

00

GO(Ms)No:18/2017/PWD,dated:16/03/2017-367.91

Lakhs

KTM/2017-2018/2016/7711 dtd. 19.05.2017 Rs. 3,67,91,000/-

M/S Palathra

Constructions

Budget work 2016-17 Improvements to Athirampuzha

junction including LA.GO(MS) No.18/2017/PWD dt.

13.03.2017 358.46

KTM/2017-2018/2016/7749 dtd. 04.08.2017

Rs. 6,86,000/-

Budget work 2016-17 Providing BM & BC to Adichira Mannanam Road ch:2/000 to

3/900 km.

GO(MS) No.18/2017/PWD dt. 13.03.2017 278.29

4602/16-17 dt.31.03.17

278.00

71/SESC/

17-18,DTD9-6-17

M/S Palathra

Constructions

Budget work 2016-17 Providing BM & BC

toEttumanoor Town Busstand Road ch:0/000 to 0/600 km.

GO(MS) No.18/2017/PWD dt. 13.03.2017 93.86

3628/16-17 dt.24.03.17 93.86

06/SESC/

17-18,

dated:03/05/17

M/S Palathra

Constructions

Improvements to Kanjiram - Panampady road chainage

0/000 to 1/800kmGO(MS) No.18/2017/PWD dt.

13.03.2017 234.314592/16-17

31.03.17 234.31Arun K

Abraham

Providing BM & BC to Kumarakom - Vechoor Road

4/950 to 6/350kmGO(MS) No.18/2017/PWD dt.

13.03.2017 238.384597/16-17

31.03.17 238.00

M/S Palathra

Constructions

Improvements to Kudayampady - Parippu road ch 1/900 to

3/000GO(MS) No.18/2017/PWD dt.

13.03.2017 99.783672/16-

17/24.03.17 90.00sl no 311,

page no 111 of budget proposal 2016-17

Providing drain and culverts in V.T. road ch:2/500-7/000

G.O.(Rt) No.179/2017/PWD

dt. 14.02.2017 for 90 lakhs

3672/16-17 dt.24.3.17 for 90

lakhs

12/SESC/2017-18 dt.

08.05.17

Joby Kurian

sl no 268, page no 108

of budget proposal 2016-17

Providng BM & BC works to Moothedathukavu-Kottachira-

Kothavara-Ullala road ch:0/000-3/400.

G.O.(Ms) No.18/2017/PWD dt.

16.03.2017 for 350 Lakhs

984/17-18 dt 20.5.17 for 350

lakhs

120/SESC/17-18

dt. 28.07.1

7

Joby Kurian

sl no 270, page no 108

of budget proposal 2016-17

Providng BM & BC works to Pulinchuvadu-Cherinchuvadu

road ch:0/000-2/012.

G.O.(Ms) No.18/2017/PWD dt.

16.03.2017 for 284 Lakhs

1178/17-18 dt. 15.6.17 for 284

Lakhs

134/SESC/17-18

dt 09.08.1

7

Manoj Krishna

Page 13: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 13

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

120 80 Vaikom 80 lakhs 7984717

121 80 Vaikom 80 lakhs 7998409 6236536

122 35 Vaikom 35 lakhs 3495193 2621429

123 Poonjar

124 Poonjar

125 Poonjar

126 Poonjar EM Madhu

127 Poonjar

128 Poonjar EM Madhu

129 Poonjar

sl no 309, page no 111

of budget proposal 2016-17

Providing drainage facilities in Pulinchuvadu-Cherinchuvadu

road ch:0/000-2/012

G.O.(Rt) No.434/2017/PWD

dt. 31.03.2017 for 80 lakhs

641/17-18 dt. 11.5.17 for 80

lakhs

126/SESC/17-18

dt 02.08.1

7

Manoj Krishna

sl no 313, page no 111

of budget proposal 2016-17

Providing drainage facilities to Ettumanoor-Ernakulam road ch:27/000-27/500, 28/500-

29/000 and 30/000-30/500 (At Vaikom Valiyakavala,

Udayanappuram Junction and Nanadom School)

G.O.(Ms) No.18/2017/PWD dt.

16.03.2017 for 80 lakhs

3627/16-17 dt. 24.3.17 for 80

Lakhs

13/SESC/2017-18 dt.

05.05.17

Joby Kurian

sl no 310, page no 111

of budget proposal 2016-17

Providing drainage facilities to Thekkenada road ch:0/150-

0/600

G.O.(Ms) No.18/2017/PWD dt.

16.03.2017 for 35 lakhs

3504/16-17 dt. 21.03.2017 for 35

lakhs

71/EE/2017-

18

dt. 02.06.2

017

Shaji Joseph

R.P. 2016-17 - Providing 20mm bit C.C. to Aruvithura-

Poovathodu road @ ch. 0/000 to 5/400 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 38.00

3801/2016-17 dt.27.03.18 38.00

R.P. 2016-17 - Providing 20mm bit C.C. to Veilukanampara-Madamkunnu road including

Poonjar-Kaippally-Endayar road ch. 0/000 to 13/500 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 93.00

3725/2016-17 dt.25.03.18 93.00

R.P. 2016-17 - Providing Close graded premix surfacing to

Erattupetta-Chennadu - Malika road ch. 0/000 to 10/500 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 83.00

3724/2016-17 dt.25.03.18 83.00

Pious Antony

R.P. 2016-17 - ProvidingClose graded premix surfacing to

Teekoy-Anayilappu-Vettiparambu-Poonjar road ch.

0/000 to 2/900 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 37.00

3840/2016-17 dt.27.03.18 37.00

R.P. 2016-17 - Providing 20mm bit C.C. to Pathazhappadi-

Thevarupara-Njandukallu road at ch. 0/000 to 1/500 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 38.00

Jeeva Sunil

R.P. 2016-17 - Providing Close graded premix surfacing to Perunilam-Panachipara road

including (kavumkadavu-Valathookku road ch. 0/000 to

2/400 km)

GO(MS) No.18/2017/PWD dt. 13.03.2017 37.00

R.P. 2016-17 - Providing 20mm Close graded premix surfacing.

to Pinnakkanadu-Pazhoothadam -Parathodu road

ch. 0/000 to 5/650 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 42.00

Palathra Constructi

ons

Page 14: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 14

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

130 Poonjar

131 Poonjar

132 Poonjar

133 Poonjar

134 Poonjar

135 Kaduthuruthy

136 Kaduthuruthy

137 30.3 Kaduthuruthy 3030000 2442266

138 41 Kaduthuruthy 41 lakhs 4100000 4509568

139 Kaduthuruthy

140 Kaduthuruthy

141 Kaduthuruthy

page-639. Sl No:-9779

Improvements to Irumboonnikkara -

Koyikkakkavu road ch 0/000 to 2/000 km

G.O.(Rt) No.179/2017/PWD datd 14.02.2017. 28 lakhs

KTM/2016-2017/2016/7791 Dated:21-03-

2017. 28 lakhs

12/EE/17-18 dated

20/04/2017

Siby Joseph

Improvements to Bankpadi-10 Acre - Pattalakkunnu-

Channaplavu road ch 1/000 to 2/400 km

G.O.(Rt) No.179/2017/PWD datd 14.02.2017. 55 lakhs

KTM/2016-2017/2016/7790 Dated:24-03-

2017. 55 lakhs

64/SESC/17-18 dated

01/06/2017

Raju Kurian

Improvements to 26 th mile -Mukkali Edakkunnam Road Ch

000-4/000 KmGO(MS) No.18/2017/PWD dt.

13.03.2017 55.003671/16-

17/24.03.17 55.00

Improvements to Inchiyani - Pulickalkada Vellanady Road Ch

1/200-2/050 KmGO(MS) No.18/2017/PWD dt.

13.03.2017 65.003625/16-17

/24.03.17 65.00Mathew Thomas

Providing 20 mm CC to Mundakkayam Koottikkal Road Ch 1/300-2/500 & 4/750-5/400

& 6/500 -8/650

GO(MS) No.18/2017/PWD dt. 13.03.2017 55.00

3623/16-17 /24.03.17 55.00

R.P. 2016-17 - Providing 20mm bit C.C. to Manthadikavala-

Paduva road ch. 0/000 to 4/000 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 60.00

3574/16-17/23.03.17 60.00

M/S. Palathara Constructi

onsR.P. 2016-17 - Improvements to Kidangoor Temple-Chempilavu-Cherpunkal road @ ch. 0/000 to

4/750 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 70.00

3587/16-17/23.03.17

70.00

M/S. Palathara Constructi

ons

Re construction of damaged small bridge in Kunnappally-

Kanjiramattom road.Rs.30.3 lakhs

G.O.(Rt) No.179/2017/PWD

dt. 14.02.2017 for 30.3 Lakhs

3412/16-17 dt19.3.17 for 30.3

lakhs

16/EE/17-18

dt24.04.17

Joby Kurian

Improvements to Peruva-Monippally road bet ch:2/300-

5/200

G.O.(Ms) No.18/2017/PWD dt.

16.03.2017 for 41 lakhs

4019/16-17 dt.29.3.17 for 41

lakhs

89/EE/17-18

dt 11.07.1

7

K.P.Thankachan

Improvements to Avarma - Mulakulam road ch. 0/00 to

2/700kmGO(MS) No.18/2017/PWD dt.

13.03.2017 40.004020/16-17

dt.20.03.17 40.00K P

Thankachan

Budget work 2016-17- Providing 20mm close graded

premix surface to Kothanelloor Onamthuruth road, Ch 0/000-

3/630 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 40.00

3664/16-17 dt.27.3.17 40.00

Thankachen KP

Budget work 2016-17-Providing 20mm close graded premix surface to Uzhavoor

Edakoli road, Ch 0/000-5/700km

GO(MS) No.18/2017/PWD dt. 13.03.2017 80.00

3722/16-17 dt.25.3.17 80.00

RadhaKrishnan

Page 15: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 15

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

142 Kaduthuruthy

143 Kaduthuruthy

144 Kaduthuruthy

145 Kaduthuruthy

146 Changanassery

147 Changanassery

148 Changanassery Reji T.Chacko

149 Changanassery

150 Changanassery

151 Changanassery

152 Changanassery

153 Changanassery

154 Kanjirappally Alvin Jose

Budget work 2016-17-Providing 20mm close graded

premix surface to Kurichithanam Poovathinkal

road, Ch 0/000-2/200km

GO(MS) No.18/2017/PWD dt. 13.03.2017 60.00

3669/16-17/24.03.17

60.00

M/S. Palathara Constructi

ons

Budget work 2016-17-Providing 20mm close graded premix surface to Maduraveli Kurupanthara road, Ch 0/000-

3/160km

GO(MS) No.18/2017/PWD dt. 13.03.2017 45.00

3645/16-17/24.03.17

45.00

S. Unnikrish

nan

Budget work 2016-17-Providing 20mm close graded premix surface to Uzhavoor

Neerurutti Puthuveli road0/000-3/100km

GO(MS) No.18/2017/PWD dt. 13.03.2017 45.00

3873/16.17/28.03.17 45 L

Thankachen KP

Budget work 2016-17-Providing 20mm close graded

premix surface to Vayala Koodalloor market - Padiyara Koodalloor market road, Ch

0/000-3/200km

GO(MS) No.18/2017/PWD dt. 13.03.2017 40.00

3798/16-17/23.07.17 40 L

Improvements to Paipadu Mammood Road Ch 0/000-

6/638 kmGO(MS) No.18/2017/PWD dt.

13.03.2017 154.001076/17-

18/29.05.17 154.00

George M.Philip

Improvements to Kurichy-Karunattuvala Road Ch 0/000-

2/272 kmGO(MS) No.18/2017/PWD dt.

13.03.2017 38.003491/16-

17/21.03.17 38.00Antony

Kuttikandom

Construction of foot path in Changanassery By Pass Road

Ch 1/500-5/200 kmGO(MS) No.18/2017/PWD dt.

13.03.2017 66.00

Improvements to Thengana -Punnakkunnam -Karikkandam

Road Ch 0/000-1/800 kmGO(MS) No.18/2017/PWD dt.

13.03.2017 53.00Antony

Kuttikandom

Improvements to Changanassery Rest House

Road Ch 0/000-0/601kmGO(MS) No.18/2017/PWD dt.

13.03.2017 15.203489/16-

17/21.03.17 15.20

Improvements to Thrikkodithanam -

Kunnumthanam Road Ch 0/000-3/895 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 134.00

240/17-18/2.05.17 134.00

Jacob thomas M.D.Plakakattu Granite

Improvements to Kunnamkery-Kumarankery-Paral Road Ch

5/035-8/310 kmGO(MS) No.18/2017/PWD dt.

13.03.2017 47.503593/16-

17/23.03.17 47.50Palatra Construction

Improvements to Poovathummood -Chanjody

Road Ch 0/000-4/250 kmGO(MS) No.18/2017/PWD dt.

13.03.2017 56.003630/16-

17/24.03.17 56.00Palatra Construction

Improvements to 12th Mile-Nedumkunnam -Chettimukku-Mailady-Kannanchira-Kalavara

Road Ch 0/000-7/259 km

GO(MS) No.18/2017/PWD dt. 13.03.2017 150.00

242/17-18/2.05.17 150.00

Page 16: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 16

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

155 Kanjirappally

156 Kanjirappally

157 Kanjirappally

158 Kanjirappally

159 100 Kottayam

T.P.

Anto

ny

160 100 Kottayam

161 Kottayam

P.J.M

athe

w

162 Kottayam

P.J.M

athe

w

163 100 Kottayam

164 Kottayam

165 Puthuppally

Improvements to Chamampathal

Thekkethukavala-ch 0/000-4/830 km

GO(RT) No.179/2017/PWD dt. 14.02.2017 82.00

3586/16-17/23.07.17

82.00Improvements to Mangadu

Kadayanikadu Road Ch 0/000- 3/580km

GO(MS) No.18/2017/PWD dt. 13.03.2017 53.00

3575/16-17/23.07.17

53.00Improvements to Pathanad

Kulathoor Thazhathuvadakara Kulathoormoozhy Road Ch

0/000-8/000km

GO(MS) No.18/2017/PWD dt. 13.03.2017 150.00

page-641. Sl No:-9797

Improvements to Shobhana club - Pazhayidam road ch

0/000 to 1/800km

GO ( Ms ) No 18/2017/PWD/Tvm dt 16/03/2017

150 lakhs

Volume/Part/ Page No/

Serial No : II/II/619/9561

Construction of Retaining wall in Vadavathoor -

Thembravalkadavu - Moscow Road at Ch. 2/400 - 2/525 km, Providing bit C.C. to 0/000 to

3/611 and raising and relaying the interlocking tiles

GO(MS) No.18/2017/PWD dt. 13.03.2017 98.45

Volume/Part/ Page No/

Serial No : II/II/619/9567

Widening the carriage way 1/350 to 2/050, 4/000 to 6/000

and Providing 20mm C.C. to Pallom - Thottackadu road Ch

0/000 to 6/000km (Bormakavala - -Pannimattom -

Paruthumpara-Parakkulam)

GO(MS) No.18/2017/PWD dt. 13.03.2017 188.64

As per the request of

M.L.A

Providing 20mm C.C. to Pallom loop 1/800 to 4/490km ( Pakkil

junction to Gomathikavala)GO(MS) No.18/2017/PWD dt.

13.03.2017 49.69

Included in M.L.A's

priority listProviding 20mm C.C. to Pakkil loop road Ch 0/000 to 2/410km

GO(MS) No.18/2017/PWD dt. 13.03.2017 38.06

Volume/Part/ Page No/

Serial No : II/II/619/9572

Widening the carriage way and Providing 20mm C.C. to

Lakshmeepuram landing - Panachickadu Temple road Ch

2/600 to 4/420km

GO(MS) No.18/2017/PWD dt. 13.03.2017 40.00

Augu

stia

n Th

omas

Providing BM& BC to newly constructed Road from Erayil

kadav to ManipuzhaGO(MS) No.18/2017/PWD dt.

13.03.2017 170.00

Budget work 2016-17 Improvements to Thandassery

Parekkadavu road ch:0/000 to 4/600 km.

1,88,67,000

GO(Ms)No:18/2017/PWD,dated:16/03/2017-188.67

Lakhs

KTM/2017-2018/2016/8519 dtd. 19.05.2017 Rs. 1,88,50,000

Page 17: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 17

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

166 Puthuppally

167 Kottayam

2017-18

168 Kottayam

169 372.68 Puthuppally 376.28 G.O.(Ms) No. 18/2017/PWD

170 Poonjar ,

II NABARD

1 Pala

2 Pala

3 Pala

Improvements to Karakkakuzhy Thottackad road (Estimate ID

2016/7620)GO(MS) No.18/2017/PWD dt.

13.03.2017 376.28

Providing BM& BC to newly constructed Road from Erayil

kadav to ManipuzhaGO(Ms)NO.18/2017/pwd.

Dtd.16.03.2017 -170 Lakhs

Reconstruction of retaining wall at Arupara in Kottayam -

Kumarakom road by the side of Meenachil River

kerala budget 15-16,part

2/volume2/page622/item9

608

IMPROVEMENTS TO KARACKAKUZHY THOTTAKKAD

ROAD CH 0/00 TO 5/500Km

.KTM/2017-2018/2016/7620           Dated:28-07-

2017

Providing 20 mm C.C to Madukka- Kombukuthy TR &T Thottamkavala road ch 1/500-

5/500 km

Included in the list of proposals for Budget works 2017-18 as seril

no. 65

NABARD RIDFX IX– Impts toMoonnilavu - kadavupuzha -

Mudikunnu - Mechal - Thoranakunnu- Chakkikavu

road at Ch 0/000 to 7/800 Km

GO (Rt) No 1130 / 2013 / PWD Dated 20/08/2013 For Rs.780.00L

25/SESC/2014-15Dtd.10/07/2

014

Sri. K C Antony

NABARD RIDFXIX– Impts to Thekkummuri - Andoor -

Padinjattinkara - Thamarakulam Road

GO (Rt) No 251 / 201 / PWD dated 18 / 02 / 2014 Tvpm fo

Rs.1085L

168/SESC/2015-

16dtd.16/01/20

16

Sri. Pious Antony

NABARD RIDF XVIII – Toursim Development : 2012 – 2013 -

Improvements to road Connecting – Nellappara-

Pazhukkakanam – Illiikkalkallu – Tourist centre road at Ch 0/000

to 5/500

GO (Rt ) No 170 / 2010 /PWD Dated 02/02/12 for Rs 800.00 L

24/SESC/2013-

14 dtd.24/05/201

3

Sri.P.I. Kuriachen

Page 18: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 18

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

4 Pala

5 Kanjirappally

6 Kottayam

7 Ettumanoor 275 Lakhs 275 Lakhs 1,90,92,060.30

3 KIIFB

2016-17

1 Ettumanoor Ettumanoor Ring Road 32.00

2 Vaikom 15.00

3 Vaikom & Kaduthuruithy 20.00

4 Vaikom 20.70

5 Vaikom 15.00

6 Poonjar 25.00

7 Pala 10.00

8 Vaikom Moolekkadavu Bridge 25.002017-18

NABARD RIDF XX :-Impts to Kollapalli- Thamaramukku- Anthiyalam- Fathimagiri-

Chakkampuzha Nirappel- Road and Bridge in Kottayam Dist

G.O (Rt) No 68/2015/PWD Dated 14/01/2015 For Rs 848.00 Lakhs

73/CE/R/15-16 DT.01-06-15 Rs 848.00 Lakhs

118/SESC/16.17

dt. 29.06.1

7

M/s. Sajeev

Mathew & Co.

DB2-341/14 dtd 2/2/16 of

SE south circle TVM

NABARD RDIF-XX Construction of

Mundolikadavu Bridge and approach road across

Meenachil River (Manimalayar ) in Kottayam District.

GO(Rt) 68/2015/pwd. Dt.14/01/2015,Rs.775 L

K,T.Mathew

NABARD RIDF XVIII - Construction of Two new

bridges along with approaches from Cement Kavala at MC road

to Graminchira -Parechal-Thiruvathukkal Road from

0/000 to 3/526 km in Kottayam Dt.

GO(RT)59/2013/pwd. Dt.15-01-2013,Rs.5742L

CE/R&B/NB/18/B-08/12 dtd.30-03-2013 Rs-5742L

97/SESC/2013-

14 Dtd-11/9/13

M/S Kerala state

construction

corporation

NABARD RIDF XXII 2016-17

ImprovementS to Thavalakuzhy - Mangarakalungu road Ch:

0/00 - 2/100 km

G.O.(Rt.)No. 1608/2016/PWD dtd. 23.11.2016(275 Lakhs)

KTM/2016-17/2016/3685 dtd.

03.02.2017

242/SESC/2016-

17 dtd. 28.03.2

017

Sri. Byju Joseph

GO(RT)1192/2016/pwd. Dt.20.08.2016

2327/2016-2017 Dated:14-12-2016

Vaikom Vechoor Road including Anchumana Bridge

GO(RT)1192/2016/pwd. Dt.20.08.2016

Vakkethara Kallara Kapikkad Road

GO(RT)1502/2016/pwd. Dt.01.11.2016

Construction of Vayalil Bridge formation of Kunneparambu Murinjapuzha Road in Chempu Panchayat

GO(RT)1496/2016/pwd. Dt.31.10.2016

Construction of Akkarapadam Bridge across Moovattupuzha river in Kottayam District

GO(RT)1496/2016/pwd. Dt.31.10.2016

2398/2016-2017 Dated:19-12-2016

Erattupetta Peermade Road (Work entrusted to RICK)

GO(RT)1192/2016/pwd. Dt.20.08.2016

2395/2016-2017 Dated:19-12-2016

Mutholi Bharananganam Road

GO(RT)1192/2016/pwd. Dt.20.08.2016

GO(RT)1496/2016/pwd. Dt.31.10.2016

Page 19: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 19

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

1 Kanjirappally Pathanad - Edayirikkapuzha 20.00

2 Pala Pala Town Ring Road Second 45.00

3 Kottayam Pathinarilchira - Nattakom R 20.00

4 Poonjar Arivithara - Bharananganam 20.00

5 PLY/ETR 20.00

6 PALA/ETR Irattupetta - Poonjar Road 20.00

7 Poonjar Vilangupura - Parathodu Roa 20.00

8 Changanassery 20.00

9 PLY/KTM Kodimatha - Kalathilkavala R 140.00

10 Ettumanoor Thiruvarpu - Kumarakom Roa 15.00

11 Vaikom Vaikom Toll Chemmanakari R 10.00

12 Ettumanoor Kottayam - Kumarakom Road ( 120.00

13 Kaduthuruthy Kaduthuruthy Railway Over b 30.00

14 Changanassery Construction of Flyover at R 90.00

15 Kaduthuruthy Kuruppanthara Railway Over 33.00

4 MLA ADS

GO(RT)942/2017/pwd. Dt.10.07.2017

GO(RT)942/2017/pwd. Dt.10.07.2017

GO(RT)942/2017/pwd. Dt.10.07.2017

GO(RT)942/2017/pwd. Dt.10.07.2017

Idakoli Kottayam Medical College Road

GO(RT)942/2017/pwd. Dt.10.07.2017

GO(RT)942/2017/pwd. Dt.10.07.2017

GO(RT)942/2017/pwd. Dt.10.07.2017

Bormmakavala - Thrikkothamangalam High

School Junction RoadGO(RT)942/2017/pwd. Dt.10.07.2017

GO(RT)942/2017/pwd. Dt.10.07.2017

GO(RT)942/2017/pwd. Dt.10.07.2017

GO(RT)942/2017/pwd. Dt.10.07.2017

GO(RT)942/2017/pwd. Dt.10.07.2017

GO(RT)942/2017/pwd. Dt.10.07.2017

GO(RT)942/2017/pwd. Dt.10.07.2017

GO(RT)942/2017/pwd. Dt.10.07.2017

Page 20: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 20

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

ADS 2015-16

1 Puthuppally Rs. 13,97,781/- Rs. 14 Lakh Rs. 1,58,761/-

2 Changanassery

Improvements to P.P Jose Road

3 Changanassery

4 Changanassery

5 Changanassery

ADS 2016-17

1 Kaduthuruthy 2499687 2376522

2 Kaduthuruthy 2499331 2277341

3 Kaduthuruthy 2499892 2310645

4 Kaduthuruthy 2498229 2330035

5 Kaduthuruthy 2498850 2271859

6 Kaduthuruthy 2499221 2267484

7 Kaduthuruthy 1997178

One time maintenance work 2015-16 - Improvements to Njanilathupadi Chethikulam

Road

G.O.(MS) No. 107/2015/PWD dtd. 21.12.2015 Rs. 14 Lakhs

452/2016-17 dtd. 28.07.2016 Rs.

14Lakhs

188/SESC/2016-

17 dtd. 03.10.2

016

Sri. Augustine Thomas

Improvements to Accident prone area and easening the curve at Changanassery - Vazhoor Road km. 10/000 near Mammoodu Town

Construction of waiting Shed Thengana village officejunction in CW Road leftside and contruction of waiting shed at Sbschool

MLA - LAC -ADS 2015 Improvements to Attumalipady - Devayanippadi road (Komenkerychira) in Changanassery LAC

Improvements to Valakuzhy - Pookadu - Vellakkavu - Irumukham link road

1089/2015/LSGD dt. 09.04.2015, Rs. 25 Lakhs

115/EE/14-15 dt.

25.11.2015

Tiji Sebastain

Improvements to Marangattupally Town Link

road 1089/2015/LSGD dt. 09.04.2015,

Rs. 25 LakhsBaiju .M.

ManiImprovements to Kurianadu -

Kozha connecting roads1089/2015/LSGD dt. 09.04.2015,

Rs. 25 LakhsBaiju .M.

ManiImprovements to Kurichithanam -

Nellithanathumana - Nellikkal - Sasthampara link road

1089/2015/LSGD dt. 09.04.2015, Rs. 25 Lakhs

M&T Constructi

onImprovements to Valiyapara -

Palakkattumala connecting roads

1089/2015/LSGD dt. 09.04.2015, Rs. 25 Lakhs

M&T Constructi

onImprovements to Paikkadu - Valiyapara - Nedumpara -

Karamala link road 1089/2015/LSGD dt. 09.04.2015,

Rs. 25 LakhsJoby

Kurian

Improvements to Marangattupally - Andoor

connecting roads 1089/2015/LSGD dt. 09.04.2015,

Rs. 20 LakhsM&T

Construction

Page 21: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 21

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

8 Changanassery Manoj A.M

9 Kanjirappally 2500000

10 Kanjirappally 2500000

11 Changanassery 5488000

12 Changanassery 2500000 1691803

13 Ettumanoor 100lakhs

14 Ettumanoor 80lakhs

15 Ettumanoor 100lakhs

16 Ettumanoor 100 lakhs

17 Ettumanoor 100 lakhs

18 Ettumanoor 100 lakhs

MLA - LAC -ADS 2015 Improvements to Attumalipady

- Devayanippadi road (Komenkerychira) in Changanassery LAC

G.O ( Rt) No.521/2016/PWD/TVM

dtd.02/03/16. 31.50 Lakhs

75/EE/16-17 dtd.

01/09/16

MLA - LAC -ADS 2016-17 Improvements to Pallippady -

Pongamthra - Perumthra -Sanjeevani - Chelakkompu

road

27/EE/16-

17Dt 23/04/1

7

SibyRaj Joseph

MLA - LAC -ADS 2016-17 Improvements to Pallippady - Kondyadathupady - Parackal

road

28/EE/16-

17Dt 03/05/1

7

SibyRaj Joseph

MLA - LAC -ADS 2016-17 Improvements to Kottamury -

Chempumpuram - Peedikappady road

G.O ( Rt) No.2875/2016/LSGD/TVM

dtd14/10/2016 54.88 LakhsReji T

Chacko

MLA - LAC -ADS 2016-17 Improvements and providing

drainage facility to Valiyakulam - Cheranchira road Ch 0/000

to 0/650

G.O ( Rt) No.197/2017/PWD/TVM

dtd.18/02/2017. 25 LakhsReji T

Chacko

Asset Development scheme 2013-14 Improvments to Attipeedika Kari road And

Construction of Karttable bridge in Kumarakam PanchayathAsset Development scheme

2013-14 Construction of Sastham kadavu Vettikkadu road Thiruvarp panchayath

K V Thomas

Asset Development scheme 2013-14 Improvments to

Thiruvarp UP school Thumbekalam road

Joshy Chandy

Asset Management 2012-13 Improvements to Cheepunkal-Mallijetty - Manjadikkari road

ch. 0/00-4/500km

Joshy Chandy

-do- Construction of 6.00x6.00m Twin Box Culvert, connecting Athirampuzha and Neendoor Gramapanchayathu

across Pennar thodu in Mannanam-Kaipuzha road

E.C. Cherian

-do- Improvements to Kallungethara-Cheepunkal road

ch. 0/00-4/500kmE.C.

Cherian

Page 22: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 22

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

19 Ettumanoor 25 lakhs

20 Ettumanoor 25 lakhs Shanat A George

21 Ettumanoor 25 lakhs Shanat A George

22 Ettumanoor 45 lakhs

23 Ettumanoor 80 lakhs Saji T Chacko

24 Ettumanoor 36 lakhs Mathew Joseph

25 Kottayam 20.9 lakhs Mathew Joseph

26 Kottayam George M Philip

27 Kottayam Tony Augustian

Asset Development scheme 2013-14 Improvemetns to

Chozhiyapappara-Maniyamthuruthu road in

Ettuamnoor LA ConstituencyAsset Development scheme 2013-14 Improvemetns to

Thonnamkuzhy -Kunnumpuram - Thoppilparambukadavu-

Varickapally-Villoonni road in Ettumanor LA ConstituencyAsset Development scheme 2013-14 Improvemetns to

Kazhuthady-Pallimala-Aruvakurinjii road in Ettumanor

LA ConstituencyAsset Development scheme

2013-14 Widening of Nettiyakukal Bridge in

Kaippuzhamuttu-Malichira road from CSI church to Malichira including Kochu Narayanan

Bridge in Kottayam Dist.Asset Development scheme

2013-14 Improvments to Thoombukal PHC Kareemadom

Road including approch of thumbunkal Bridge at CH 0/00

to 3/000 Arpookara panchayathAsset Development Fund2015-16 Providing 20 mm Chipping

carpet to Puthettu Neelimanagalam Road ch.0/000

to 1/500 kmAsset Development Fund2015-

16 Maintenanace/Reconstruction of ICH Palamattom Junction to

Vadakkanathu road in Kottayam Municipality

Reconstruction of Damaged side drain and cross drain in

Nethaji Road infront of Lourdes School at Kottayam

G.O.(Rt) No. 1346/2015/LSGD dt. 05/05/2015

Asset Development Fund for M.L.A.’s – Providing 20mm C.C.

to Purathiyattupadi- Poovathumali – Madom junction road in ward no- 6 of Kottayam

Municipality

Page 23: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 23

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

28 Kottayam George M Philip

29 Kottayam Sony

30 Kottayam T.J.Mathew

31 Kottayam M/s Begora

32 Kottayam Anil k Kurian

33 Poonjar 215/EE/2015-16 Dtd.1/03/2016 Yes

34 Poonjar Yes Sri.Romel

35 Poonjar Yes

36 Poonjar Yes

37 Poonjar 225/SESC/15-16 dtd.29/02/2016 Yes Sri.Romel

38 Poonjar 226/SESC/2015-16 dtd.29/02/2016 Yes Sri.Romel

Asset Development Fund 2015-16 Construction of Road from

Pezhuvelikunnu to Thamarasserry in Ward No XI & XII of Vijayapuram Panchayath

LAC - ADS 2015-16 Improvements to Erayilkadavu - Muppayikadu road Ch. 0/200 to

0/850kmAsset development Fund 2015-

16 Maintenance of Ozhatthil lane Road in Ward XIV of

Kottayam MunicipalityAsset Development scheme 2013-14 Improvemetns to

Railway line Thuruthumelchira road in Kottayam Municipality

ch. 0/000-0/618km & improvements to Kodimatha -

Muppaykkad road

GO(Rt)No.330/14/PWD Dt. 28.02.14 Rs. 43 lakhs

Asset Development scheme 2013-14 Side protection and

tarring works of the road Vaippippunnappady -

Thoombunkal-Chiramattathumali road in

Vijayapuram Gram Panchayath in Kottayam LA Constituency

GO(Rt)No.286/14/PWD Dt. 24.02.14 Rs. 42.60 lakhs

LAC ADF 2014-2015 Impts to Chiitanikkara Asramam -

Moonamthodu Road Ch 0/000 to 0/600 and 0/800 to 1/200 KM

in Thidanad GP

GO(Rt)No : 2956/2014 LSGD TVPM Dated 12/11/2014 For rs.

25.00LMuhammed Bekker

LAC ADF 2014-2015 Construction of Watch tower at

Karikad Top in Erattupetta - peerumedu Road

GO(Rt)No : 832/2014 PWD TVPM Dated 20/06/2014 for Rs.40L

LAC ADF 2014-2015 Construction of Bridge & Road

at Muringapuram - Kadaladimattom

GO(Rt)No : 832/2014 PWD TVPM Dated 20/06/2014for Rs.30.00L

Lorrence Joseph

LAC ADF 2014-2015 Road at 0/000 to 0/570 of Chanakkulam

- Chettuthodu road

GO(Rt)No : 2956/2014 LSGD TVPM Dated 12/11/2014 For Rs.

25.00L

Sri. Thomas

JohnLAC ADS 2015-2016

Construction of Almanar Bye pass road in Poonjar L A

Constituency.

GO(Rt)No : 1230/2015 PWD TVPM Dated 19/08/2015 For Rs172.00L

LAC ADF 2015-2016 Improvements to Kulathunkal - Manjapra Mavady Road at Ch.

5/500 to 6/700 Km. in Poonjar L A Constituency.

GO(Rt)No : 1229/2015 PWD TVPM Dated 19/08/2015 for Rs.150.00L

Page 24: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 24

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

ADS 2017-18

1

2

3

4

5

6

7

8

9

10

11

12

ADF 2016-17 - Improvements to Kolladu - Kalathikadavu - Punnackal Bund Road

G.O.(Rt) 845/2017/LSGD Dated 24.03.2017 Rs.100 Lakhs

ADF 2016-17 - Improvements to Kunnappally Kalayil Kavala Kolladu Pump House Road

G.O.(Rt) 845/2017/LSGD Dated 24.03.2017 Rs.79.50 Lakhs

ADF 2016-17 - Connecting of Vazhachirakadavu Road in Ward No.38, Kottayam Municipality Ch.0/000 to 0/300

G.O.(Rt) No. 1322/2017/LSGD Dated 26.04.2017 Rs.12,73,585/-

ADF 2016-17 Improvements to Kuzhimattom - Pallikkadavu Koombady Road

G.O.(Rt) No. 716/2017/LSGD Dated 16.03.2017 Rs.31 Lakhs

ADF 2016-17 - Improvements to Chingavanam Market to Vettithara Kavala Road

G.O.(Rt) No. 1340/2017/LSGD Dated 26.04.2017 Rs.49 Lakhs

MLA ADS 2016-17 - RP - Providing 20 mm Chipping Carpet to Plakkalpady Nellavoor Road at Ch.1/000 to 2/000

G.O.(Rt) No. 599/2017/PWD Dated 05.05.2017

Rs.25,00,000/-

KTM/2017-2018/2017/591 Dated

02.08.2017Rs.25,00,000/-

LAC - ADS 2015-16 - Improvements to Kadamkulam Kochalunkal Ropad Ch.0/000 to 0/800 in Vellavoor Gramapanchayath

G.O.(Rt) No. 1205/2016/LSGD Dated 04.03.2016 Rs.15,00,000/-

KTM/2017-2018/2017/7311 Dated 25.09.2017

Rs.15,000/-

MLA ADF 2017-18 - Completion of the Foot bridge at St.Agnes School, Muttuchira in Kaduthuruthy Constituency

MLA LAC ADS Edge Protection of Changanacherry - Vazhoor PWD Road at Kurishummoodu and Industrial Estate Main Gate

G.O.(Rt) No. 802/2017/PWD Dated 09.06.2017 Rs.11,40,000/-

KTM/2017-2018/2017/2938Dated 20.10.2017

Rs.11,40,000/-

MLA LAC ADS 2016-17 Improvements to Madappally Block Junction in Thalakkulam Venkotta Road

G.O.(Rt) No. 978/2017/PWD Dated 13.07.2017 Rs.11,45,000/-

KTM/2017-2018/2017/3693Dated 20.10.2017

Rs.11,45,000/-

MLA LAC ADS 2016-17 Improvements to Valiyakulam Cheeranchira Road Km 0/650 to 4/050

G.O.(Rt) No. 1016/2017/PWD Dated 19.07.2017 Rs.40,00,000/-

KTM/2017-2018/2017/3707Dated 20.10.2017

Rs.40,00,000/-

MLA LAC ADS 2016-17 Improvements to Shoulders in between Kollapuram Junction and Uizhathilpady Junction in 82'nd Mile MC Road to 5'th Mile CW Road

G.O.(Rt) No. 1016/2017/PWD Dated 19.07.2017 Rs.13,60,000/-

KTM/2017-2018/2017/3855Dated 20.10.2017

Rs.13,60,000/-

Page 25: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 25

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

13

14

5 DEPOSIT WORKSNIL

6 SLTF

SLTF 2017-18

1

Pala

2

Pala

3

Pala

4

Pala

5

Pala

6

Pala

7

Pala

8

Pala

LAC ADS 2016-17 - Improvements to Kuzhichalippadi Velluparambu Road Ch.0/000 to 1/600 (Excluding Ch.0/250 - 0/900

G.O.(Rt) No.1342/2017/LSGD Dated 26.04.2017

Rs.19,81,435/-

ADS 2017-18 - Improvements to Thareppady Mammodu Road Ch.0/000 - 1/600

G.O.(Rt) No.1341/2017/LSGD Dated 26.04.2017

Rs.23,58,560/-

Providing drainage facilities in Ettumanoor-Poonjar road near Bishop House to St. Thomas School. Ch:14/000 to 14/500

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SR 2017 -18 Reconstruction of culvert @ ch. 7/000km of Ampara - Mankombu road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Providing drainage facilities in Pala-Mevida road Ch:4/000 to 4/600

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Providing drainage facilities to Ampara - Mankombu road Ch.10/000 to 10/100km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Providing drainage facilities to Ettumanoor - Poonjar SH ways Ch 11/800 (Andoor Jn)

CE/R&B /TF/KTM/2017-18 dt29.05.2017

S.R, 17 - 18, Providing D.R Masonry Retaining wall, Surface drain for widening of narrow wide road and provide Crashbarrier for traffic safety for dangerous curve in Chamappara - Vellani Road @ ch 2/000 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

R.P, 2017 -18, Providing 20 mm Close Graded Bit Chipping carpet to Pravithanam – Alanadu - Edappady Road Road @ ch 3/800 to 4/500 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Providing drainage facilities to vakakkadu - Thazhackavayal - Njandukallu road Ch. 2/800 to 3/200km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 26: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 26

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

9

Pala

10

Pala

11

Pala

12

Pala

13

Pala

14

Pala

15

Pala

16

Pala

17

Pala

18

Pala

19

Pala

Urgent patch work repairs to Kochukuttaram - Pachathodu road Ch 0/000 to 1/400

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Constructing retaining wall and drainage facilities to Anthinadu - Melukavu road Ch:0/200 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Rectification & Drainage facilities to the damaged surface at General Hospital Jn to parallel road and in Ettumanoor - Poonjar SH way at Pala

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SR 17-18 .Construction of retaining wall in Neloor-Njallikunnu road Ch:0/500 to 2/000.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Constructing culvert @ ch.12/000km of Kanjiramkavala - Mechal - Nellappara - Narimattom road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Constructing culvert @ ch. 3/500km of velliyath - Neloor road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Strengthening the carriage way Of Pala river view road at Ch 0/900 including maintanance of link road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

S.R, 17 - 18, Construction of C.C Drain in Nellappara - Pazhukkakanam - Illickakkallu Tourist Centre Road .Ch:0/000 to 1/000

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Constructing culvert @ ch.1/000km of Kadanadu - Kavumkandom road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Providing drainage facilities to Allanadu - Ullanadu - Anthinadu road Ch.5/500km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Providing drainage facilties & Berm concreting bet Ch 4/000 to 4/800 and 1/200 Pala - Kozha road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 27: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 27

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

20

Pala

21

Pala

22

Pala

23

Pala

24

Pala

25

Poonjar

26

Poonjar

27

Poonjar

28

Poonjar

R.P, 2017 -18, Providing 20 mm bit Chipping carpet to Valavoor - Chakkampuzha road bet Km 0/000 to 2/700

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Cherukara - Mankombu road 0/000 to 5/000

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Teekoy - Thalanadu - Moonilavu Road @ ch 1/000 to 3/800 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Ellumpuram - Nelloor road @ ch.1/500 to 3/500km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Kanjiram kavala mechal Nellappara Narimattom road km 5/00 - 10/000

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF - O.R, 2017 -18, Providing 20 mm Close Graded Bit Chipping carpet to Poonjar - Adivaram Road @ ch 3/000 to 3/800 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF-OR-17-18-Providing Urgent Patch work repairs to Parathodu-Pazhoomala-Chanakakulam road ch :0/000-3/800 (Except ch:1/000-2/500 Km)

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF-RP 17-18 Providing 20mm CC to Parathodu-Kalluvely-Vengathanam

road ch.2/000-3/100kmCE/R&B /KTM/ Substitution -

1/2017-18 dt25.10.2017

SLTF-RP 17-18 Providing DR Prtotection wall at Ch: 4/900 & resurfacing work at

Ch: 3/200 -3/650 of Parathodu-Kalluvely-Vengathanam road

CE/R&B /KTM/ Substitution -1/2017-18 dt25.10.2017

Page 28: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 28

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

29

Poonjar

30

Poonjar

31

Poonjar

32

Poonjar

33

Poonjar

34

Poonjar

35

Poonjar

36

Poonjar

37

Poonjar

38

Poonjar

39

Poonjar

40

Poonjar

SLTF-OR-17-18-Providing Urgent Patch work repairs to Thenpuzha-Elamkkadu road ch -3/000-5/850Km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF - O.R, 2017 - 18, Ordinary Repairs to Thidanadu - Pathazha Kondoor - Aruvinthura Road. Ch. 1/500 t o 3/300 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF-O.R 17-18 Providing 20mm CC to Mookanpetty - Angel Valley Road ch.4/000-6/600km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF-O.R 17-18 Providing 20mm CC to Karinilam - Pachima Road ch.0/000-7/000km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF-RP 17-18 Providing 20mm CC to Chittady-Inchiyani-Vattakkavu road ch.2/000-3/000km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF-OR 17-18 Providing Urgent patch work repairs to Edakkunnam-Vattakkavu road ch.3/000-4/600km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF - O.R, 2017 -18, Providing 20 mm Close Graded Bit Chipping carpet to Poonjar - Adivaram Road @ ch 5/000 to 5/800 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF - O.R, 2017 - 18, Providing 20mm thick chipping carpet to Poonjar - Kochuveetilpeedika - Chennadu road @ ch. 0/000 to 3/500 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF - O.R, 2017 - 18, Using 20 mm open graded Premix Chipping carpet provide Urgent Patch Work Repairs to Malayinchipara - Mannam - Chotti Road @ ch 1/700 to 3/000 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF-OR-17-18-ProvidinG Urgent patch work repairs to Mycology road ch 0/000-3/650 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF - OR-17-18-ProvidinG Urgent patch work repairs to Karinilam - Punchavayal - 504 colony - Kuzhimavu Road ch 0/000 - 8/000 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF - OR-17-18-Providin urgent Patch work repairs to Karithode-Vayanasala- Mattannoorkara- Nedumkavayal Road ch:0/000-7/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 29: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 29

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

41

Poonjar

42

Poonjar

43

Poonjar

44

Poonjar

45

Poonjar

46

Poonjar

47

Poonjar

48

Kanjirappally

49

Kanjirappally

50

Kanjirappally

51

Kanjirappally

52

Kanjirappally

53

Kanjirappally

54

Kanjirappally

SLTF-OR- 17-18 Providing urgent patch work repairs to Mundakkayam-Koottickal Road ch.2/500-4/750 & 5/400-6/500

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF-OR-17-18-ProvidinG Urgent patch work repairs to 26th Mile Hospital jn-Palampra-Karikulam Church road ch 0/000-4/500km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF - O.R, 2017 - 18, Ordinary Repairs to Kaduvamoozhy - Thelliyamattom - Plassanal - Inchiyalakavu Road Ch. 0/000 to 3/000 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF - O.R, 2017 - 18, Poonjar - Kunnoni - Alumthara u Road Ch. 3/000 to 4/000 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF-SR-2017-18-Providing drainage facilities at ch: 6/500 of Mnimala-

azhayidom-Chenappady-Erumely roadCE/R&B /TF/KTM/2017-18

dt29.05.2017

SLTF-FDR-17-18- Providing Protection wall at Ch-5/020 of Kanjirappally-Erumely road .

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF-SR-2017-18-Side protection work:-Construction of DR Masonry Retaining wall in Almannar Byepass Road.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF RP-17-18-Providing 20 mm CC to Kappadu -Elikkulam road ch: 2/250-2/900 & 4/000-5/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF RP-17-18-Providing 20 mm CC to Ponkunnam-Kappadu road ch:4/000-4/900 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF RP-17-18-Providing 20 mm CC to Nedumkunnam-Attakkulam Road ch:0/000- 1/3000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF RP-17-18-Providing 20 mm CC to Pampady-Nedumkunnam road ch:5/5000-7/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF RP-17-18-Providing Bit CC to changanassery - Vazhoor Road ch 15/000 to 22/000

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF RP-17-18-Providing 20 mm CC to Poovam- Cheruvally-Ullayam-Kanam road ch:6/825-8/850 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF RP-17-18-Providing 20 mm CC to Kanam -Chamampathal road ch: 0/000-2/850 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 30: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 30

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

55

Kanjirappally

56

Kanjirappally

57

Kanjirappally

58

Kanjirappally

59

Kanjirappally

60

Kanjirappally

61

Vaikom

62

Vaikom

63

Vaikom

64

Vaikom

65

Vaikom

66

Vaikom

SLTF RP-17-18-Providing 20 mm CC to Charuvelly- Poovatholy-Valiyamthottam- Cheruvally Road ch:1/100-3/100 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF OR--17-18-Providing 20 mm bit CC to Charuvelly- Poovatholy-Valiyamthottam- Cheruvally Road ch:3/200-6/600 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF OR--17-18-Providing 20 mm bit CC to Kalaketty-Aalurumpu- road ch: 1/000-2/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Reconstruction of damaged culvert and approach road at ch:2/000 & ch:2/900 km of 13/600 CW Road to Pathanad

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF RP-17-18-Providing 20 mm CC to Kalluthekkel=Sasthamkavu road ch: 0/000-1/400 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF OR--17-18-Providing 20 mm CC to Nedumkunnam- Attakulam road ch: 2/900-5/180 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18 - Surface repairs and allied works to Aiyerkulam - Kavarappady road and Aiyerkulam Chettimangalam Road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18 - Surface repairs and allied works to Aiyerkulam - Arattukulam road and Aiyarkulam - Valiyanappuzha road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18- Jungle clearing, stripping elevated berms, surface repairs and allied works in Vadakkenada road, Vaikom town Link road, Chalaparambu road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18 - Urgent bit repairs and allied works to Indamthuruthyppadi -Kovilakathum kadavu Road 0/000 - 0/710

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18 - Urgent bitumen patchwork repairs and allied works to Thekkenada Road 0/000 to 0/500km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18 Urgent bitumen patch work repairs to VadayarKallattipuramMuttuchira Road ch. 0/000 – 6/000 km

CE/R&B /KTM/ Substitution -1/2017-18 dt25.10.2017

Page 31: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 31

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

67

Vaikom

68

Vaikom

69

Vaikom

70

Vaikom

71

Vaikom

72

Vaikom

73

Vaikom

74

Vaikom

75

Vaikom

76

Vaikom

OR 2017-18 - Urgent bitumen patchwork repairs and allied works to East of BHS Road 0/000 to 0/600 & North of BHS Road 0/000 to 0/600 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18 - Urgent bitumen patchwork repairs to E V Road ch 0/600 to 1/200 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18 - Urgent bitumen patchwork repairs and allied works to K.V. Canal South bank Road ch. 0/000 to 0/600 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent bitumen patch work repairs and allied works to KV Kanal North Bank road ch:0/000-1/600

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patchwork repairs to Vadayar chandhapalam Mulakkulam Road ch 0/000 to 0/400 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18-Urgent bit patch repairs and allied works to Elamkavu temple road ch. 0/000 to 1/900 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 -Urgent bitumen patchwork repairs to Krishnaswami temple Road ch 0/050 to 3/100km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Providing bit patch repairs and allied works to Vadayar-Chandhapalam- Mulakkulam Road ch 3/100 to 5/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18-Urgent bit patch repairs and allied works to Moothedathukavu-Kalpakasserry Temple road 1st & 2nd reach ch: 0/000 to 4/050

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patchwork repairs and allied works to Keezhoor Temple Pothi hospital Road ch 0/000 to 1/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 32: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 32

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

77

Vaikom

78

Vaikom

79

Vaikom

80

Vaikom

81

Vaikom

82

Vaikom

83

Vaikom

84

Vaikom

85

Vaikom

86

Vaikom

OR 2017-18-Providing bit CGPC and allied works to Painumkal-Chemmanathukara-Kottarappally-T.V.Puram Road ch 0/000 to 3/000

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18 Urgent bitumen patchwork repairs to Velloor police station Enthunkalppadi Road ch 0/000 to 1/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18-Urgent bit patch repairs and allied works to Kunneparambu - Murinjapuzha Road ch 0/000 to 1/800

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18-Urgent bit patch repairs and allied works to Cherikkal-Chemmanathukara-Valiyathara Road ch 0/000 to 2/000

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18-Urgent bitumen patchwork repairs and allied works to Chembangady-Chembkassery kadavu-Brammangalam Road ch 2/000 to 3/000

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18-Urgent bit patch repairs and allied works to Neerpara-Thattaveli - Alinchuvadu Road ch 0/000 to 4/000

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18-Cuttingof branches of trees, eviction, maintenance of various roads under Vaikom Section.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Providing bit 20mm Open Graded Premix and allied works to Vadayar-Chandhapalam- Mulakkulam Road ch 6/500 to 8/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch repairs and allied works to Kalambukadu-Kallara road ch:0/000-2/500

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch repairs and allied works to Thalayolaparambu market-Palamkadavu road ch:0/000-0/900

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 33: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 33

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

87

Vaikom

88

Vaikom

89

Vaikom

90

Vaikom

91

Vaikom

92

Vaikom

93

Vaikom

94

Kaduthuruthy

95

Kaduthuruthy

96

Kaduthuruthy

97

Kaduthuruthy

OR 17-18 Urgent bitumen patch repairs and allied works to Ambathanam-Kallumkalkkadavu road ch:0/000-1/500

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch repairs and allied works to Karthyayani Temple road ch:0/000-1/000

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch repairs and allied works to Vettikkattumukku Timber Depo road ch:0/000-0/600

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bit patch repairs and allied works toTV Puram- Moothedathukavu road road ch:0/000-0/400

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bit patch repairs and allied works toAttuvelakadavu- Udayanapuram road ch:0/000-0/400

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bit patch repairs and allied works toValiyarambathu - Manamelkadavu road road ch:0/000-0/400

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent BC patchwork repairs to Kalambukad Kallara Road ch 0/000 to 2/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Providing BC and allied works to Kuruppanthara - Kalambukadu road 0/000 to 2/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Adithyapuram Manvettom road 1/500 to 2/600 Km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to kanakkary vempally road 0/000 to 2/000 Km and MC road Kanakkary Vempally Link road ch. 0/000 to 0/200 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kanakkary - Thottuva road 0/000 to 4/200 km and Eluveli Munduveli road ch 0/000 to 1/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 34: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 34

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

98

Kaduthuruthy

99

Kaduthuruthy

100

Kaduthuruthy

101

Kaduthuruthy

102

Kaduthuruthy

103

Kaduthuruthy

104

Kaduthuruthy

105

Kaduthuruthy

106

Kaduthuruthy

OR 17-18 Urgent bitumen patch works and allied works to Vempally - Kothanalloor road ch. 0/000 to 2/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kuruppanthara - Neendoor road ch. 3/000 to 4/300 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to OLD EE road Kaduthuruthy Town Link road ch. 0/000 to 2/000 km and Valachira seed farm railway gate MM ITC road ch 0/000 to 1/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kuzhikkattupadi jayagiri Kalluveli road 0/000 to 2/000 Km and vilayamkodu Thottakkutty Rubberfactory Road ch 0/000-0/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Manjoor south Poovassery Manvettom 0/500 to 2/500 Km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kappumthala Kuruppanthara road 0/000 to 2/000 Km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kaduthuruthy - Appuzha road ch. 1/500 to 2/850 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Mangattukavala Pulikoottummel madathiparambu road 0/000 to 2/500 Km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Muttuchira Hospital - Kunnasserrikkavu - Govindapuram - Thaliyil Mahadev Temple road ch. 0/000 to 1/500 km and 7/2 EE road to Ayamkudi ch. 0/000 to 1/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 35: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 35

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

107

Kaduthuruthy

108

Kaduthuruthy

109

Kaduthuruthy

110

Kaduthuruthy

111

Kaduthuruthy

112

Kaduthuruthy

113

Kaduthuruthy

114

Kaduthuruthy

115

Kaduthuruthy

116

Kaduthuruthy

OR 17-18 Urgent bitumen patch works and allied works to Nambiakulam parepally road 0/000 to 1/500 Km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Madhuraveli Rationkada - Pulithuruthu - Ezhumanthuruthu road ch. 1/500 to 3/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to muttuchira Kurisinmood Vallikanjiram Alphonsabhavan Link road 0/000 to 1/500 Km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Ayamkudi Puthusserrikkara Valachira Seed farm road ch. 0/000 to 2/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kothanelloor Thuvanisa Kunampuram Manjapetti Colony Road ch. 2/000 to 4/000 Km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kothanalloor - Pallithazham railwaygate Chammakkala road 0/000 to 1/800 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Vellasseri Koothattukulam road Ch. 0/000-3/000km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Arunassery - Kuravilangad road Ch. 0/000-2/000km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Parollikkal Muttappally road Ch. 0/000-3/000km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kappu - Thuruthippally road Ch. 0/000-3/900km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 36: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 36

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

117

Kaduthuruthy

118

Kaduthuruthy

119

Kaduthuruthy

120

Kaduthuruthy

121

Kaduthuruthy

122

Kaduthuruthy

123

Kaduthuruthy

124

Kaduthuruthy

125

Kaduthuruthy

126

Kaduthuruthy

127

Kaduthuruthy

OR 17-18 Urgent bitumen patch works and allied works to Nambiakulam Vedagiri road Ch. 0/000-2/800km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent sholder maintenance and strengthening works to Meenachil- Kaduthuruthy road , Ch. 2/000 to 3/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Vayala - Myladumpara - Marangattupilli raod Ch -3/500 to 5/740 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kadaplamattom -Vempally raod Ch -1/000 to 6/900 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kuriyanadu -Veliyanoor raod Ch -0/000 to 4/800 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Madayakunnu -Claret Bhavan raod Ch -0/000 to 1/000 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 16-17 Urgent bitumen patch works and allied works to Kappukala piosmount 0/00-2/800 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Poovathunkal -Maniyakkumpara -Mundiyanippuram raod Ch -0/000 to 2/850 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Uzhavoor -Pulppara -Kudakkachira raod Ch -0/000 to 3/640 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Uzhavoor -Sasthakullam raod Ch -0/000 to 1/490 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Pulluvettam -Kurichithanam raod Ch -0/000 to 3/200 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 37: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 37

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

128

Kaduthuruthy

129

Kaduthuruthy

130

Kaduthuruthy

131

Kaduthuruthy

132

Kaduthuruthy

133

Kaduthuruthy

134

Kaduthuruthy

135

Kaduthuruthy

136

Kaduthuruthy

137

Kaduthuruthy

OR 17-18 Urgent bitumen patch works and allied works to Arreekara -Keeripemala -Koodappulam raod Ch -0/000 to 2/400 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Chenkallel -Komakki raod Ch -0/000 to 2/000 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Monipilli -Kuzhipilli -Pious Mount raod Ch -0/000 to 2/500 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Elackadu - Kuravilangadu Pallithazhem - Madayakunnu road Ch -0/000 to 2/500 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Jawan Santhoshkumar road (Pattithanam - Chettiparambu road) Ch -0/000 to 1/500 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kadaplamattom - Andoor limit road Ch -0/000 to 2/420 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kadappoor Temple - Kanjirappara road Ch -0/000 to 2/000 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Kulangara - Chundelikattupady road Ch -0/000 to 1/300 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Nellikunnu - Kattampally - Madayakunnu road Ch -0/000 to 2/200 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Pattithanam Ebenzer School - Kuriachira - Malola road Ch -0/000 to 2/000 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 38: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 38

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

138

Kaduthuruthy

139

Kaduthuruthy

140

Kaduthuruthy

141

Kaduthuruthy

142

Kaduthuruthy

143

Kaduthuruthy

144

Kaduthuruthy

145

Kaduthuruthy

146

Kaduthuruthy

147

Kaduthuruthy

OR 17-18 Urgent bitumen patch works and allied works to Pattithanam Pally - Muthirakalapady road Ch -0/000 to 1/000 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Ramapuram - Kadampanattuvathil - Kizhithiri road Ch -0/000 to 2/100 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Thavalakuzhy - Clamattom - Kadappoor road Ch -0/000 to 1/500 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Koodalloor road Ch -0/000 to 2/200 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Muttunkal - Mukkuvalakunnu road Ch -0/000 to 1/900 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Uzhavoor Chettukulam road Ch -0/000 to 2/900 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patch works and allied works to Puthuveli Veliyannoor Thamarakkadu Anichuvadu Poovakkulam Karamala road Ch -6/000 to 7/670 Km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Providing 20mm bitumen CC to Mutholapuram - Achikkal road ch. 0/000-1/000km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 - Providing Providing 20 mm CC to Marangattupally - Alakkapally Road Ch. 0/000-1/500

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 - Providing Providing 20 mm CC to Koovalloor - Valiyamaruthu - Kunukkumpara -Elakkdu Harigen colony RoadC.0/000-2/500

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 39: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 39

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

148

Kaduthuruthy

149

Kaduthuruthy

150

Kaduthuruthy

151

Kaduthuruthy

152

Kaduthuruthy

153

Kaduthuruthy

154

Kaduthuruthy

155

Kaduthuruthy

156

Kaduthuruthy

157

Kaduthuruthy

158

Kaduthuruthy

OR 17-18 - Providing Providing 20 mm CC to Cherpunkal - Andoor Road Ch.1/500-3/800

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Eviction and maintenance of various roads under Thalayolaparambu section

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 -Urgent bitumen patchwork repairs to Peruva-Monippally Road ch 5/200 to 9/060 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 -Urgent bitumen patchwork repairs to Kozha- Njeehzoor Road ch 0/000 to01/200km and 03/800 to 06/100 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18-Urgent bitumen patchwork repairs to Peruva - Chethikatumala - Santhipuram Road ch 2/700 to 3/300 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18-Urgent bitumen patchwork repairs and drainage facilities to Keezhoor Pulluvettathumala Road ch 0/000 to 1/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patchwork repairs to 8/7 TK road to Njeezhoor Market Road ch 0/000 to 5/550 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18-Providing bit 20mm Open Graded Premix , and allied works to Santhipuram Elanji Road ch 0/000 to 2/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patchwork repairs to Kunnappally Kanjiramattom road ch 0/00 to 2/00 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patchwork repairs to Vadayar Chandhappalam Mulakkulam road ch 10/100 to 11/700 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patchwork repairs to Arunassery Kuravilangadu Road ch 2/000 to 4/200 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 40: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 40

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

159

Kaduthuruthy

160

Kaduthuruthy

161

Kaduthuruthy

162

Kaduthuruthy

163

Kaduthuruthy

164Puthupally

165

Puthupally

166Puthupally

167

Puthupally

168Puthupally

169Puthuppally

170Puthuppally

171

Puthuppally

172

Puthuppally

173Puthuppally

OR 17-18 Urgent bitumen patchwork repairs and allied works to Manikavu Vateedhikkal Road ch 0/000 to 1/400 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Surface repairs and allied works to Njeezhoor Kattampath Mukkavalakkunnu Road ch 0/000 to 1/700 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patchwork repairs to Kudakkachira HS Panthanmavu Road ch 0/000 to 2/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patchwork repairs and allied works to Kurichithanam LPS Kudakkachira Road ch 0/000 to 1/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent bitumen patchwork repairs and allied works to Kurichithanam village office Nellithanathmala Road ch 0/000 to 1/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

repairs to Manarkadu - Kidagoor in Ch 0/00 to 0/200

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Reconstruction of damaged culvert near Padinjatukara Jn Ch 5/450 in Puthuppally- Vennimala road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Bit BC to Pampady - Kooroppada 0/00 to 4/200 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Bit BC to Thiruvanchoor -Chengalam road at Ch 00/00 to 11/500

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Bit Bc to Oravackal - Koorali road at ch 00/00 to 13/550

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Bit Bc to Manarkadu - Kidagoor in Ch 0/200 to 4/00

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Providing Bit BC to Manarcadu Thenganal road 0/00 to 4/00

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Reconstruction of broken side wall near Chelikuzhy in Vazhoor puliyannoor road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Providing 20 mm CC to Puthuppally Puthussery road 0/00 to 1/800

CE/R&B /TF/KTM/2017-18 dt29.05.2017

patch work in Diet pady -Muriankalpady ch 6/00 to 8/00

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 41: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 41

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

174Puthuppally

175

Puthuppally

176

Puthuppally

177

Puthuppally

178

Puthuppally

179Puthuppally

180

Puthupally

181

Puthupally

182Puthupally

183

Puthupally

184

Puthupally

185

Puthupally

186

Puthupally

187

Puthupally

188

Puthupally

works repairs to Tharakkunnu - Pallikkathodu in Ch 0/00 to 1/300

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent Patch works repairs to Kuttikkattukavala - Munduvalelkone in Ch 7/00 to 9/00

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repaires to Payappady- Ayarkunnam road in Ch 3/00 to 5/00

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patchwork repairs to Elamkavu Mooleppedika road elamkavu to arattukavala

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 2017-18 urgent patch work repairs to Arumanoor road 4/00 to 7/00

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repaires to Areepparampu- Pampady road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repaires to Pulinchuvadu - Moscow road in Ch 3/700 to 6/00

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Padinjattinkara bridge handrails construction and Lining concrete to Manjamattam- Kezhuvankulam road at Ch 1/500

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Patch workto Mundakappady Nellikkunnu road 0/0 to 1/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

urgent patchwork repairs to thannikkappady eruthupuzha road final reach from eruthupuzha to Lakattoor

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work and Bit CC to Puthuppally Vennimala Road 0/0 to 3/100 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Providing 20 mm CC to Thottakkadu Kuttikkal road 0/0 to 1/500

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repaires , Drainage facilities and damaged parapets renewal to Kavungumpalam - Naiplavu in Ch Anicadu Church-Chngalam Hospital

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Reconstruction of damaged culvert near Podimattam Jn in Areepparampu- Pampady road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent pach work repairs and parapet reconstrction in various chainages to Kaniparampu -Thachilangadu road

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 42: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 42

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

189

Puthupally

190Puthupally

191

Puthupally

192

Puthupally

193

Puthupally

194

Changanassery

195

Changanassery

196

Changanassery

197

Changanassery

198

Changanassery

199

Changanassery

200

Changanassery

201

Changanassery

Urgent patch work repairs and bit CC to Manarcadu Keechel road 0/00 to 2/210 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

urgent bit BC ro Manarcadu Kidangoor road 4/00 to 10/00

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patchwork repairs toMundakappady Nellikkunnu road1/500 to 3/183 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent Patch work repairs to Vennimala temple road 0/0 to 1/207

CE/R&B /TF/KTM/2017-18 dt29.05.2017

urgent patch work repairs to Thottakkadu Azapathrypady Checkenchirakkavala ezhukunnelpady ezhuthupally road 0/0 to 5/00

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs to Changanacherry - Wazhoor road Ch. 0/000 - 1/300 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs to Changanacherry - Wazhoor road Ch. 1/000 -2/170 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs to Changanacherry - Wazhoor road Ch. 2/170 - 3/600 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs and bit CC in Ezhuvanthanam - Kochupally road Ch. 0/000 - 4/600 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs and bit CC in Nadakkappadam - Venkotta road Ch. 0/000 - 1/200 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs and bit CC in Nadakkappadam - Venkotta road Ch. 1/200 - 2/450 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs and bit CC in Thalakkulam - Venkotta road ( Ezholikkal kurisupally- Azhakathupady) Ch. 0/000 - 2/880 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs to Kurichy - Pathamuttam road Ch. 0/000 - 2/910 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 43: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 43

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

202

Changanassery

203

Changanassery

204

Changanassery

205

Changanassery

206

Changanassery

207

Changanassery

208

Changanassery

209

Kottayam

210

Kottayam

211Kottayam

212

Kottayam

213

Kottayam

214

Kottayam

SLTF 2017-18 Urgent patch work and allied works in Venkotta - Santhipuram r road Ch. 0/000 - 2/300 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs to Kannanperoor - Chethippuzha road Ch. 0/000 - 3/000 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs and bit CC in Pathikkamukku - Enachira road Ch. 0/000 - 2/300 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs and bit CC in 82nd Mile MC roar - 5th Mile CW road Ch. 0/480 - 8/190 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs to Changanacherry - Wazhoor road Ch. 10/000 - 15/000 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs and bit CC inPerumpanachy - Thottakkadu road Ch. 0/000 - 3/000 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF 2017-18 Urgent patch work reairs and bit CC in 7th Mile CW road to Mallappally road Ch. 0/000 - 2/200 km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs and bit BC to Kottayam Karapuzha road Ch 0/000 to 1/895

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patchwork repairs and side protection works to Vadavathoor road Ch 0/000 to0/900

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patchwork repairs to Pallom- Puthuppally 0/00 - 0/900

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Providing road furniture and thermoplastering painting works to various roads in Kottayam town.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Providing bit BC patch work repairs to Kanjikuzhy-Iranjal-Thiruvanchoor road ch. 0/000 to 6/190km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs, bit BC and improvement works to Boat Jetty road Ch 0/000 to 0/465 except ch 0/150-0/250

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 44: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 44

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

215

Kottayam

216

Kottayam

217

Kottayam

218

Kottayam

219

Kottayam

220

Kottayam

221

Kottayam

222

Kottayam

223

Kottayam

224

Kottayam

225

Kottayam

226

Kottayam

227

Kottayam

228

Kottayam

229

Ettumanoor

Urgent patch work repairs to Pullarikunnu road at ch. 0/000 to 2/000km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Kurichy-Pathamuttam road at ch. 0/000 to 2/910km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Kuzhimattom road at ch. 0/000 to 1/640km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Puthanangadi-Aruthootty road ch. 0/000 to 0/600km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Pallom-Thottakkadu road at ch. 6/000 to 9/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to 2nd mile CW road to Pallom-Thottakkadu road at ch. 0/000 to 8/776km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Parakkulam- Ennacherrykadavu- Thrikothamangalam-Kadamuri-Chakkanchira-Thattakadu road at ch. 0/000 to 6/850km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Thiruvatta-Nattasserry road at ch. 0/000 to 1/550km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs and allied works to Sub jail road ch. 0/000 to 0/400km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs and allied works to Temple road ch. 0/000 to 0/565 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs and allied works to Veloor road ch. 0/000 to 2/082km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to SH Mount road at ch. 0/000 to 1/600km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Parakkulam-Ennacherrykadavu-Thrikkothamangalam-Kadamuri -Chakkanchira-Thottakadu ch. 0/000 to 1/200km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Puthuppally-Puthusserry road at ch. 0/000 to 4/200km.

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF SR 2017-18 Improvements to Thiruvatta- Kallumada road at ch 0/00-0/200km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 45: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 45

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

230

Ettumanoor

231

Ettumanoor

232

Ettumanoor

233

Ettumanoor

234Ettumanoor

235

Ettumanoor

236

Ettumanoor

237

Ettumanoor

238

Ettumanoor

239

Ettumanoor

240

Ettumanoor

241

Ettumanoor

242

Ettumanoor

243

Ettumanoor

SLTF SR 2017-18 Improvements to Thiruvatta- Kallumada road at ch 1/00-1/500km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Rp Providing 20mm CC to Approach road to Kumarakom HS & its extension 0/000 to 1/950km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Kochupalam-Kochambalam road 0/000 to 0/850km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF - O.R. 2017-18 - Urgent patch work repairs to Thavalakkuzhy Clamattom Kadapoor Road from Ch:1/200 to 4/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to River bank road 3/400 to 5/400km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Kottayam- Parippu road 3/000 to 7/000km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF R/P 2017-18 - Providing bit CC to Ambady- Chamathara Jayanthy road at ch 3/00km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Urgent patch work repairs to Nazrethpally road 0/000 to 2/100km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Babu Chazhikkadan Road Ch: 0/000 to 1/600 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Parolickal Muttappally Road Ch: 0/000 to 2/650 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Pattithanam Chumaduthangi Mangarakalingu Road Ch: 0/000 to 1/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Athirampuzha Nalpathimala Ottakanjiram Ch: 0/000 to 2/400 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Punnathura Tile Factory Road Ch: 0/000 to 3/100 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Mannanam Kaipuzha Road from Ch: 0/000 to 0/900 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 46: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 46

LA C

onst

itue

ncy

Name of Project

Esti

mat

e Am

ount

A.S No. Date & Amount

Nam

e of

Con

trac

tor

Esti

mat

e PA

C

Agre

ed. P

AC

1 2 3 4 6 7 8 9 10 11 12 13

Sl.No

Budget Page no.&

item no

Budg

et P

rovi

sion

s in

la

khs T.S No. Date &

AmountAgt.No & Date

244

Ettumanoor

245

Ettumanoor

246

Ettumanoor

247

Ettumanoor

248

Ettumanoor

249

Ettumanoor

250

Ettumanoor

251

Ettumanoor

252

Ettumanoor

253

Ettumanoor

254

Ettumanoor

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Athirampuzha Liesue Kaippuzha Road from Ch: 0/000 to 3/300 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Thiruvatta Kallumada Road from Ch: 0/000 to 2/870 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Thiruvatta Kudamaloor Road from Ch: 0/000 to 0/700 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Mannanam Pulikkuttissery Road Ch: 0/000 to 4/500 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Adichira - Mannanam Road from Ch: 0/000 to 2/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Arumanoor Road from Ch: 0/000 to 0/700 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

SLTF - O.R. 2017-18 - Urgent patch work repairs to Alphonsa Bhavan Manaleppally Road from Ch:0/000 to 1/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 - Urgent Bitumen Patch Work repairs to Thiruvatta Kallumada Road from Ch: 0/300 to 0/900 and 1/600 to 2/870 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

O.R. 2017-18 -Providing bit CC and urgent patch work repairs to Chengalam-Enadi road at ch. 0/000 to 1/760km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent BC patchwork repairs to Anamala Kurumalloor Road ch 2/000 to 3/700 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

OR 17-18 Urgent BC patchwork repairs to Onamthuruthu Kurumalloor Road ch 0/000 to 2/000 km

CE/R&B /TF/KTM/2017-18 dt29.05.2017

Page 47: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 47

KERALA PUBLIC WORKS DEPARTMENT KOTTAYAM ROADS DIVISION

PROGRESS FOR THE MONTH OF OCTOBER 2017

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20BUDGET WORKS

2007-08

2008-09

18 month 22-03-2010 9/21/2011

2009-10

Tender Sanction awaited

18 Month 16/4/10 18/9/11 12/31/2015 90%

8 months 22/8/2015 21/04/2016applied for TOC up to30/09/2017 works in progress 65%

2010-2011

Initial level reported Initial level reported

2011-12

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

File Handed over to the G.M ,roads &Bridges

Deve.Corp.of Kerala Ltd Kochi,RBDCK

L.A in progress

Extended up to 30-05-2012 then extended upto

30-12-2013(with fine Rs.115000/-)

Bridge proper completed(2 span). Construction of

retaining wall completed .Approach road filling 50% completed. Work

stand still. Notice issued to the Contractor

Terminated on 17/3/16 vide Order No.DB.14(9)/6309/09 of

SE,R&B,South Circle,Tvm. Formation completed Black

topping for 2.KM completed. .Sub base metal

supply (partly) reported to CTE.

Proposel submitted to include the work in KIIFB

Page 48: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 48

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Work completed 100%

60%

18 Month 10/3/2015 4/2/2017 85%

12months 15/03/2016 14/1/2017 1st Reach work in progress 60%

Revised GD to be obtained.

18 Months 15/03/2013 9/14/2014 50%

15 months 26/09/2012 25/12/2013 70%

25.10.13 20% Retaining wall completed

2012-13

Retender procedures under progress

60% work completed and work to be closed

Tender cancelled due to non availability of land

Raft Slab foundation for Retaining wall

completed.Retaining wall 95% completed. Filling 80%

completed.

Bridge completed , work terminated

Metal supply in progress for chipping carpet.

Page 49: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 49

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

12 Months 3/7/2013 3/6/2016 Work to be cancelled

6 months 9/10/2015 8/4/2016 Completed

LA work in progerss

2013 - 2014

80%

Work Tendered

Cocurrence awaited from Govt.

10 Months 11/13/2013 9/12/2014 3/31/2015 100%

8 Months 11/18/2014 7/17/2015 6/16/2016 100%

9 months 11/27/2014 8/26/2015 30.10.16 100%

Land of KSRTC is to be handed over.

Land to be acquired is wet land. Application for wetland excemption

was submitted to agricultural production commissioner and oommen V oommen committee visited the stie.

But sanction not obtained.

BM&BC completed except the approach of Maniyaparambu

bridge

Land acquisition work to be done

completed

Page 50: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 50

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

12 Months 4/25/2015 4/24/2016 30.01.17 Completed 100%

10 months 4/21/2015 2/20/2016 Completed 100%

Completed 100%

6months 9/19/2015 3/18/2016 15.06.16 Completed 100%

4/21/2015 Completed 100%

18 months 28/05/2014 30/12/2015 Work completed 100%

10 months 13/10/2014 6/12/2015 30/6/2016 Work completed 100%

12months 1/5/2015 12/4/2015 31/05/2016 work in progress. 50%

Page 51: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 51

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

8 months 10/9/2016 6/8/2016 Work completed 100%

10months 3/4/2016 12/3/2016 3/12/2017 work nearing completion 98%

8 months 10/9/2015 6/8/2016 Work completed 100%

8months 6/1/2016 1/31/2017 work nearing completion 98%

6months 11/30/2016 31.05.17 Formation work in progress. 75%

work completed

18 month 01.01.2015 `

LA work in progress

18 month 05.02.2016 04.08.2017

application of TOC submitted upto

30/06/2017

30.06.2016 Extended

up to 31.03.2017

Deck slab work A1-P1 andP1-P2 completed. Retaining wall

completed at Ettumanoor side.

35% of LA fund is deposited to revenew to start the LA work

2 span completed.Land for abutment at MES to be

obtained. Approach road work in progress.

Page 52: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 52

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

18 month 25.11.2014 24.01.2016

Agreement executed

20.07.15 19.05.16 72%

27/05/2015 Completed

2014-15

18 months 3/1/2016 8/31/2017 50%

8months 10/20/2015 6/19/2016 28.02.17 Work completed 100%

12months 6/1/2016 5/31/2017 Work Completed 100%

12months 7/1/2017 6/1/2018 nearing completion 96%

Deck slab P1-P2,P2-P3 ,P3-P4,P4-P5 and P5 -

A2completed.Deck Slab A1-P1 to be completed .

All works except bridge completed. Revised proposal submitted and TOC extended upto 19.11.16. 72% of work

completed. Contractor has filed writ petition before the Hon'ble High Court seeking closing of

his work.

Requisition submitted to District collector for Direct purachase

Planted boundary stone. Combined inspection completed.

Work in progress.Formation and duct work in progress

Page 53: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 53

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

8months 5/30/2016 1/29/2017 Formation work in progress 60%

8 months 1/6/2016 31/01/2017 Work completed 100%

Work completed 12/30/1899

2015-2016

9 M

onth

s

08.0

6.2.

16

completed 100%

6 m

onth

s

16/6

/16

15/12/2016 15/07/17 completed 100%

6 m

onth

s

04.0

6.20

16

Work completed 100%

10 m

onth

s

16.0

6.20

16

15/04/2017 42916 42916 completed 100%

Work Tendered and to be awarded

Work Tendered and SN to be issued

Work Tendered and SN to be issued

Extended upto 30.04.2017 again ext to 15/07/17

Page 54: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 54

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

10 m

onth

s

01.0

6.20

16

Completed 100%

16/6

/16

15/12/16 15.07.2017 completed 100%

6 m

omth

s

03.0

6.20

16

work completed 100%

Extended upto 15.07.2017

concurrence from finance dept required

concurrence from finance dept required

concurrence from finance dept required

concurrence from finance dept required

concurrence from finance dept required

Land to be acquired is wet land. Application for wetland

excemption was submitted to agricultural production

commissioner and oommen V oommen committee visited the stie. But sanction not obtained.

Page 55: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 55

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

12m

18.3

.17

17.3

18 work completed

30m

2.3.

17

1.9.

19 widening in progress 80%

20% completed

16/6/16 15/4/16 98% completed

10 month 42375 30.3.17 No completed

16/6/16 15/12/16 Ongoing

10 month 42435 42412 30/4/17 completed

GD to be obtained.

nearing completion

Extended upto 31.05.2017

Road formation, improvements to carriage way CD works etc

BM& BC,Road formation, improvements to carriage way CD

works, Road safety works etc

nearing completion

Extended upto 30.04.2017

All works upto and including surfacing completed berm

concrete drainage work and road safty work in progress

Road formation, improvements to carriage way CD works etc

Concurrence from Financial Dept required. Estimate for TS

prepared.

Page 56: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 56

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

T.S. to be obtained

L A work to be completed.

6months 5/3/2016 11/2/2016 Work completed 100%

6months 21/01/2016 20/07/2016 Work completed 100%

10 months 19/8/2016

18-0

6-20

17

60%

2016-17

Work to be started

Work to be started

Agreement executed

applied for TOC up to 31.10.2017

Widening completed. supply reported & O G P C works in

progress

Special sanction to be obtained. Detailed design to be obtained

from design wing. Request submitted. Soil Investigation

workin progress

Work tendered tender sanction awaited

work started PRICE ID: 2016/8263

Page 57: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 57

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Agreement executed

Agreement executed

Work to be started

Work to be started

Agreement executed

Agreement executed

10% work started

Work to be started

supply in progress

Agreement executed

25% work started

Agreement executed

Agreement executed

work completed, bill under preparation

Page 58: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 58

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

12 Months Work tendered

12 Months 50%

12 Months

12/6

/201

7

11/6/2018 NA 60%

12 Months 4/5/2017 3/11/2017 Nil 60%

6 months Culvert Work started

7 months 05.08.17 04.03.18

12 months. 14.08.17 13.08.18 Initial levels started

Price ID No.2017/364 , work started

Spreading WMM work started. Retaining wall 110m completed.

Drain 100m completed.

Land Acquisition under processing (Price ID

No.2016/7749) ,

BM work completed Price ID No.2016/7750 ,

BM work completed,Price ID No.2016/7756

Levels in progress ,Price ID No.2016/7286

Work in progress , BM completed,Price ID

No.2016/7287

Revised AS to be issued since there is change in the chainage

Initial levels reported, Drain work and Dr Work is in

progress.

Page 59: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 59

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

4 months 08.08.17 07.12.17 Agt. Executed

4 months Work completed

4 months Drain works is progress

work to be started

5% Work Just started

5% Work Just started

5% Work Just started

35% Work Just started

5% Work Just started

5% Work Just started

Page 60: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 60

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

3 Months 26/04/2017 25/07/2017 30/09/2017 80% Road concreting in progress. 0.2

6 Months 42984 42959 15% 0.15

work to be started

work to be started

6months 08.03.17 30.06.17 Completed

3 months Supply reported

Initial levels taken

Agreement Executed

Retaining wall construction completed. Initial levels preparation ongoning

LMR Submitted Price ID 2016/7804,

work started Price ID 2016/7799,

Price ID 2016/8260, LMR Submitted

All works except tarring work completed.

Page 61: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 61

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Agreement Executed

Work to be started

Agreement Executed

work in progress

40% work started

DR work and filling work in progress

Agreement executed TS ID NO. 2016/8299

work in progress (Opening Dt. 08.05.2017) ID 2016/8350

Qoutation invited no response ID Estimate Changed

2016/8336

Agreement executed PriceID NO. 2016/8385

Agreement executed ID 2016/ 8357

Agreement executed ID - 2016/8297

Agreement executed ID 2016/7863

Page 62: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 62

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Levels in progress

Selection notice issued

3 Months Work in progress

3 Months Work in progress

3 Months Agreement executed

TS to be obtained.

12 Months Work tendered.

LMR Submitted, Price ID 2016/7686,

LMR Submitted, Price ID 2016/7736,

work tendered, Price ID 2016/7681,

AS Obtained. Estimate resubmitted for obtaining

TSpending in CE office

Page 63: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 63

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Revised AS to be obtained

2017-18

Tendered

NABARD

16+months 7/15/2014 11/14/2015 10/31/2016 60%

9months 10/1/2015 6/30/2016 100% Work completed

12 months 5/24/2013 5/23/2014 4/30/2015 100% Work completed

Estimate submitted in price after incorporating CTE

directions. Now after rate revision, the estimate was returned for limitting the

estimate to AS amount. Now the estimate was corrected and

submitted for TS through price

Special sanction to be obtained. Detailed design to be obtained

from design wing. Request submitted. Soil Investigation

work tendered

Work Replaced by another one and is recorded

Work in progress.Formation 80% completed

Page 64: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 64

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

18 months 2/15/2016 8/14/2017 50%

18 month 2/6/2016 8/5/2017

(30 months) 2/7/2013

18 Months 07.04.2017 06.10.2018 Nil Work ongoing 12/30/1899

KIIFB

2016-17

DPR submitted

DPR submitted soon2017-18

Formation work&Protection work in progress

A1-P1, P1-P2 Beam & Slab completed. Beam & Slab work

P2-P3 and P3- A2 in progress.Retaining wall nearing

completion.

01-01-2016 Extension applied up

to 31.05.2017.

Side drain work in progress. Spreading of WMM completed.

Investigation work completed, report to be obtained. Alignment to be approved.Investigation work completed, report to be obtained.Investigation work completed, report to be obtained.

Investigation work in progress

Investigation work completedInvestigation and survey work completed. DPR Under preparation.

Page 65: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 65

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

MLA ADS

Investigation work Tendered

Investigation work Tendered

Investigation work to be arranged

Investigation work to be arranged

Investigation work to be arranged

Investigation work to be arranged

Investigation work to be arranged

Investigation work to be arranged

Investigation work to be arranged

Investigation work to be arranged

Investigation work to be arranged

work tendered , No response Quotation invited

Investigation work to be arranged

Investigation work to be arranged

Investigation work to be arranged

Page 66: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 66

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

ADS 2015-16

07.10.2016 06.12.2016 Work completed 12/31/1899

Completed

Completed

Work in progress

ADS 2016-17

09.12.15 08.03.16 Work completed 12/31/1899

09.12.15 08.03.16 Work completed 12/31/1899

3 months Work completed 12/31/1899

3 months Work Completed 12/31/1899

3 months Work Completed 12/31/1899

3 months Work completed 12/31/1899

3 months Work completed 12/31/1899

2 Months

Page 67: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 67

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

9/6/2016 Work in progress 80% completed

Work completed

Work completed

work started

Work completed

Work cancelled

Work completed

Work completed

work completed

Work to be cancelled and substituted

work completed and bill submitted

Page 68: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 68

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Shanat A George

Shanat A George

Estimate prepared

Work completed

Work completed

Work completed

Work to be cancelled and substituted

work completed and bill submitted

work completed and bill submitted

work completed and bill submitted

work completed and bill submitted

Page 69: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 69

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Initial level taken

Work completed

Work completed

Work completed

Work completed

3/1/2016 5/31/2016 Work completed 12/31/1899

Work in progress 12/30/1899

Work completed 12/31/1899

Work completed 12/31/1899

15/03/2013 9/3/2016 Work completed 12/31/1899

26/09/2012 9/3/2016 Work completed 12/31/1899

Page 70: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 70

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

ADS 2017-18

Page 71: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 71

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

DEPOSIT WORKS

SLTF

SN issued

SN issued

SN issued

SN issued

SN issued

SN issued

Retendered

SN issued

Page 72: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 72

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Retendered

work started

SN issued

SN issued

SN issued

SN issued

SN issued

SN issued

SN issued

SN issued

work started

Page 73: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 73

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

SN issued

LMR call for

SN issued

SN issued

Retendered

Retendered

SN issued

TS to be issued

Sabstituted work

TS to be issued

Sabstituted work

Page 74: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 74

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

SN issued

Retendered

Retendered

Retendered

Retendered

LMR call for

No Response

LMR call for

Retendered

SN issued

Tendered

Tendered

Page 75: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 75

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Tendered

SN issued

SN issued

SN issued

Tendered

Retendered

Retendered

Retendered

LMR call for

Retendered

LMR call for

SN issued

Retendered

Page 76: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 76

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Retendered

Retendered

Retendered

SN issued

Agreement executed on 20/10/17

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

TS to be issued

Page 77: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 77

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Tendered

Tendered

Tendered

Tendered

Tendered

Retendered

SN issued

SN issued

SN issued

Tendered

Page 78: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 78

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Retendered

Tendered

SN issued

LMR call for

Tendered

LMR call for

Tendered

Retendered

Agmt executed on 1.11.17

Tendered

Page 79: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 79

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Tendered

Tendered

Tendered

Retendered

Retendered

Tendered

Tendered

Agmt executed on 27.10.17

Agmt executed on 25.10.17

SN issued

SN issued

Page 80: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 80

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Agmt executed on 28.10.17

SN issued

Agmt executed on 26.10.17

SN issued

Agmt executed on 31.10.17

Agmt executed on 26.10.17

Agmt executed on 1.11.17

SN issued

SN issued

Page 81: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 81

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Agmt executed on 31.10.17

SN issued

Agmt executed on 31.10.17

SN issued

Agmt executed on 26.10.17

Agmt executed on 26.10.17

SN issued

SN issued

Agmt executed on 31.10.17

Agmt executed on 28.10.17

Page 82: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 82

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Agmt executed on 31.10.17

Agmt executed on 31.10.17

Agmt executed on 28.10.17

Agmt executed on 28.10.17

Agmt executed on 31.10.17

Agmt executed on 27.10.17

SN issued

Agmt executed on 30.10.17

Agmt executed on 28.10.17

Agmt executed on 30.10.17

Agmt executed on 28.10.17

Page 83: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 83

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Agmt executed on 28.10.17

SN issued

Agmt executed on 28.10.17

Agmt executed on 28.10.17

SN issued

Agmt executed on 1.11.17

SN issued

Agmt executed on 31.10.17

Agmt executed on 26.10.17

Agmt executed on 28.10.17

Page 84: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 84

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Agmt executed on 31.10.17

Agmt executed on 31.10.17

Agmt executed on 28.10.17

Agmt executed on 28.10.17

SN issued

Agmt executed on 28.10.17

Agmt executed on 30.10.17

Agmt executed on 28.10.17

Agmt executed on 1.11.17

SN issued

Page 85: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 85

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Agmt executed on 28.10.17

Tendered

Tendered

SN issued

Tendered

Tendered

SN issued

Tendered

Tendered

Tendered

Tendered

Page 86: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 86

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Retendered

Retendered

Retendered

Retendered

Tendered

LMR call for

Tendered

Retendered

SN issued

Page 87: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 87

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

SN issued

SN issued

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Retendered

Page 88: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 88

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Tendered

Tendered

Tendered

Tendered

Retendered

Retendered

Retendered

Retendered

LMR call for

LMR call for

LMR call for

Tendered

Retendered

Page 89: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 89

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

LMR call for

Tendered

Retendered

LMR call for

LMR call for

Tendered

Retendered

Tendered

Tendered

Tendered

Tendered

Retendered

Retendered

Page 90: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 90

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

LMR call for

Page 91: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 91

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Retendered

Retendered

Tendered

Retendered

Tendered

Retendered

SN issued

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Tendered

Page 92: keralapwd.gov.inkeralapwd.gov.in/keralapwd/eknowledge/U… · XLS file · Web view · 2017-12-06Asset Development scheme 2013-14 Widening of Nettiyakukal Bridge in Kaippuzhamuttu-Malichira

Page 92

Actu

al D

OC

Present Status of works

14 15 16 17 18 19 20

Peri

od o

f Co

mpl

etio

n in

m

onth

s

Dat

e of

sit

e ha

ndin

g ov

er

Dat

e of

com

plet

ion

as p

er a

gree

men

t

Exte

nded

dat

e of

co

mpl

etio

n

Phys

ical

Pro

gres

s (%

)

Tendered

Tendered

Tendered

Retendered

Tendered

Tendered

Tendered

SN issued

Tendered

Tendered

Retendered