X-Stream Gas Transport Concept Rev
Transcript of X-Stream Gas Transport Concept Rev
-
Asle Venas, Director Pipelines
20 Jan 2012
X-Stream Gas transport concept
Press conference, London
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
The challenge
2
An increasing challenge:
Long distance gas transport-ation in deep waters
More and more harsh environment
The time of easy oil is over
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Deepwater and ultra-deepwater gas pipelines
3
Large diameter Thick wall:
Difficult to produce Limited number of pipe mills Heavy pipes difficult
handling and logistics
Difficult to weld
Extremely thick and costly buckle arrestors
Limited number of pipe-lay vessels
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
X-Stream
4
Idea:
Reduced wall thickness of long distance deepwater gas pipelines by controlling the differential pressure
The objective:
Reduce the cost of deepwater gas pipelines within current safety regime
About X-Stream:
A DNV innovation project
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
X-Stream
5
Codes and standards:
The new concept fulfills common pipeline
codes like ISO and DNV-OS-F101
Basis:
The concept is based on a combination of already established and field proven technology in an innovative way
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
X-Stream
6
Inspired by the HIPPS concept There are already more than 20 HIPPS systems in use worldwide today
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Video 1
7
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
X-Stream
In order to control the differential pressure
DNV introduces
i-HIPPS (Inverted-HIPPS)
8
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Video 2
9
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
X-Stream main principle in a lifecycle perspective
1. Install pipeline water filled fully or partly
2. Carry out normal flooding, cleaning and gauging of the pipeline
3. Dewater and dry the pipeline
4. Maintain a certain minimum internal pressure in the pipeline during the entire life of
the pipeline by use of i-HIPPS
10
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Example
Product: treated associated gas (pipeline export)
Distance to shore: 400 km
- 300 km in deep waters
- 100 km in shallow waters
Water depth: 3,000 meters (ultra-deep waters)
Pipeline export:
- Diameters analysed: 4 off (18, 24, 28 and 32)
- Installation method: J-lay
- Installation: Partially water-filled
- Safety Class: Medium
- Operational pressure: 250 bar
- Minimum internal pressure: 200 bar (in i-HIPPS area)
- With and without concrete coating (specific gravity
1.1)
11
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Installation
12
Collapse Depth
Flood Level
Factor of Safety
Seabed
Level
Empty Pipe
Flooded Pipe
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Required wall thickness
13
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Top tension vs. flooding level
14
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
15
Reduced wall thickness Example for 18 diameter
Pipeline data Traditional
pipeline
X-Stream
without
concrete
X-Stream
with concrete
OD (m) 0,457
0,457 0,457
Wall thickness (mm) 25
17 16
Concrete thickness (mm)
minimum 12
Wall thickness saving 32% 36%
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Reduced costs four diameters
Reduced cost due to less steel required
Reduced installation costs due to reduced welding times
16
-40 %
-35 %
-30 %
-25 %
-20 %
-15 %
-10 %
-5 %
0 %
18" 24" 28" 32"
-32 %-30 % -29 %
-28 %
-36 % -36 % -37 % -37 %
X-Stream without Concrete
X-Stream with Concrete
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
How can the X-stream concept work safe and reliable?
17
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
How can the X-stream concept work safe and reliable?
18
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
How can the X-stream concept work safe and reliable?
19
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
How can the X-stream concept work safe and reliable?
20
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
How can the X-stream concept work safe and reliable?
21
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
How can the X-stream concept work safe and reliable?
22
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
i-DBB concept
DNV has run a concept risk analysis and one major issue came up:
There will at least be required to have a 100% leak tight secondary valve as a leak or rupture may take time to repair.
- We have therefore also developed a very simple and reliable system that will give a 100%
internal leak tight valve.
- The system is an inverted double-block-and-bleed system we call i-DBB
23
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Video 3
24
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Main benefits
Reduced steel quantity
More pipe mills can deliver linepipe
Easier to manufacture higher grades
Reduced weight of linepipe
Reduced welding times
Increased lay rates
May not need buckle arrestors
Equal safety level
25
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Some of the planned deepwater pipelines
26
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Conclusion
27
Fulfils common pipeline codes and standards, i.e. ISO and DNV-OS-F101
Based on established and field proven technology combined in an innovative way
A safe and reliable system that ensures significant savings in terms of wall thickness, handling and installation time
-
Det Norske Veritas AS. All rights reserved.
X-Stream Gas transport concept
20 Jan 2012
Safeguarding life, property
and the environment
www.dnv.com
28