Transcript of WZS PowerGen Sdn Bhd Company Profile 2014 IIwzspowergen.com/WZSCompanyProfile2014_Final.pdf · WZS...
WZS PowerGen Sdn BhdCompany Profile
Your Power Specialist for Critical Applications
WZS
Reliability Competency Customer Centric
Table Of ContentsI. Introduction of WZS PowerGen Sdn BhdII. Company InformationIII. Mission StatementIV. Management & OrganizationV. Quality Health, Safety, Environment Policy (HSE) VI. Business Model – What we do VII. Description of Product & ServicesVIII. Operations & ProductionsIX. Past Experiences
Reliability Competency Customer Centric
Introduction of WZS PowerGenWith more than 30 years of combined experience of various disciplines in the oil and gas industry, WZS PowerGen Sdn Bhd was formed to cater to the power needs of the very niche markets of the O&G industry as well as the setting up of Power Plants.
With a team of qualified engineers and a fully fledged fabrication facility located in the heart of Kuala Lumpur, Malaysia WZS PowerGen is working towards being the first choice for our clients Power needs in critical applications, be it Offshore Zone 2 usage or Temporary Power Plant setups, our in‐house design team will be able to assist you with your requirements.
What sets us apart from the rest of our competitors is that we are not committed to a specific brand, as such we are proud to tailor manufacture individually according to our clients need. With the vast knowledge that our employee's have in this industry we are able to source for the most competitive prices from around the globe, whilst maintaining brand and specification integrity.
Reliability Competency Customer Centric
Company InformationStructure & Corporate DataWZS PowerGen is a subsidiary of WZ Satu Bhd listed on KLSE formed in order to penetrate the energy sector in Oil & Gas Industry & Power Plant Industry.
WZ Satu Berhad is a listed company in Malaysia with a market capitalization of RM200million.
WZ Satu Berhad has ventured into different segment of business consisting of ‐1. Manufacturing2. Engineering3. Construction4. Oil & Gas5. Natural Resources
Reliability Competency Customer Centric
Company InformationCONTACT INFORMATIONWe know how important your needs are, so we encourage you to contact us with any questions or concerns. We’ll be happy to provide you with the information you need to make an informed decision.
Head OfficeWZS POWERGEN SDN BHDLot 1890, Jalan KPB 9, Kawasan Perindutrian Balakong43300 Seri Kembangan, Selangor Darul Ehsan, MalaysiaT : +603 89622228 (Hunting Line)F : +603 89622226Website : www.wengzheng.comEmail : [email protected]
Reliability Competency Customer Centric
Mission Statement • Reliability
As our main business is providing power for critical applications, we know that reliability is the utmost priority for our clients, as such we have instilled a company philosophy in our employees that any products chosen or used by us must have been thoroughly tested and proven in the industry.
• CompetencyOur team of competent in house engineers & technical team as well as consultants will be able to assist our clients every needs.
• Customer CentricCustomer expectations & behaviors constantly changing over years and we here in WZS PowerGen position ourselves to be able to meet every customers’ needs and expectations at every interactions. Customer‐centricity is embedded into every one in WZS PowerGen in return for customers’ loyalty.
Reliability Competency Customer Centric
Management & OrganizationExecutive Director Dato’ Ir. Mohd Ghazali Bin Kamaruzaman, a Malaysian, aged 48, was appointed to the Board on 24 October 2013. He is a member of Institute of Engineers Malaysia and Board of Engineers, Malaysia. He holds a Bachelor degree of Civil Engineering from Footscray Institue of Technology, Melbourne Australia and a MSC in Project Management from UiTM . Dato’Ghazali has over 23 of years of experience and knowledge in the civil engineering works i.e. plan & design, earthworks & drainage, building & road construction.Executive DirectorDominic James How Eng Li, 31 years old, Malaysian was appointed to the board of WZS PowerGen SdnBhd in the year 2014 during its initial set up. He graduated with a Bachelor of Physics & Electrical Engineering from the University of New South Wales in Sydney, Australia. Dominic James How has a considerable experiences in the oil & gas industry whereby he started his career in Kentz Qatar LLC based in Doha, Qatar. In the year 2008, he left and join Global Equipment Engineering Solutions SdnBhd as a Project Director specializing in Power Generations and Fire & Gas Suppression System in the Oil & Gas sector.Senior Manager, Business Development & Finance ‐ Edwin Pe Siew Seong, 30 years old, Malaysian was being selected to join the management team of WZS PowerGen during its initial set up. He graduated with a Bachelor of Finance & Accounting from Univeristy of Queensland, Australia. He also holds a Master degree in Finance from the University of Sydney, Australia. He commenced his career in the financial industry with HSBC Malaysia. In the year 2009, he left and join the engineering field with Malaya Engineering Sdn Bhd as a Project & Finance Director. With the diverse knowledge in Finance & Engineering, he will assist to contribute to WZS PowerGen in gaining commanding market share in the Oil & Gas Industry.
Reliability Competency Customer Centric
WZS PowerGen Sdn BhdWZ Satu Berhad
Board Of Directors
Executive Director
Senior Manager Business
Development & Finance
Sales & Marketing Operation Accounts &
Finance
Manager Project/ Technical
Production Manager
Electrical Mechanical Fabrication Piping & Instrumentation
Project Co‐ordinator
Draftsman Quantity Surveyor
Design Engineer
Document Controller
Field Service Engineer
QA/QC Engineer
Safety Officer
Quality Assurance
Executive Director
Reliability Competency Customer Centric
Quality, Health, Safety, Environment Policy
• To strive for the improvement of a safe, healthy as well as the security of our people at all work sites;
• To eliminate downtime at all work sites;• To make sure that the client is always satisfied
with our progress and work ethics ;• To set and maintain QHSE standards and
objectives, and to measure and continuously improve on processes, services as well as product quality ;
• To have plans in place for business disruption, emergencies as well as any accidents ;
• Have plans in place for disaster recovery;• Minimize the impact of contamination to the
environment through the reduce of natural resources consumption, pollution prevention and also getting into the recycling habit;
• Applying our skills as engineers in the design and engineering of our equipment with regards to all the HSE aspects;
• Communicate as well as be receptive to criticism from clients as well as the public in respect to our HSE policy and continuously improve and update them;
• Reward outstanding HSE performances
The success of WZS PowerGen very much depends on how we improve the quality of our products whilst protection our people and the environment.
WZS PowerGen requires all its employees and contractors to adhere to the following QHSE as a minimum whilst conducting work in and out of our compound.
A SAFE WORK PLACE IS A HAPPY WORK PLACE We get it done the WZS Way
Business Model – What We DO?At WZS PowerGen, our aim is to provide our clients with the best possible service in the design, assembly, supply and project management of Diesel Generator sets for the onshore as well as off shore market. Our specialty ranges from Zone 2 Hazardous Location, Unmanned Platforms as well as Rig Safe installations.
WZS PowerGen knows that the Hazardous Areas with potentially explosive atmospheres demands only the best and reliable equipment, thus we at WZS PowerGen only use the best proven equipment’s will full certifications as well as warranties.
With our vast knowledge and experienced we know that the Oil & Gas industry as well as the Temporary Power Plants demands the highest standards and certifications, with that knowledge in hand at WZS PowerGen we strive to provide our clients as well as end users the very best in their Power needs.
Reliability Competency Customer Centric
What We DO?
WZS PowerGen Sdn Bhd
Zone 2 / Hazardous Area Diesel Generators
Rig Safe / Unmanned Platform Diesel
Generators
Power Plant Setup with Diesel
GeneratorsPermanent / Temporary
Fire & Gas Detection & Suppression Systems –
O&G Industry
Diesel Generator / F&G Control Systems
Auxiliary Equipment ‐Value added Services
Reliability Competency Customer Centric
What We Do
Hazardous Area Packages consist of the following items as a minimum ; IP Rated Alternator Increased Safety Junction Boxes / Battery Boxes Pneumatically / Electrically Operated Dampers Local (and/or) Remote Genset Control Panels in Ex’d’ Enclosures Fuel Cut‐Off Solenoids Air Intake Shut‐Off Valves Anti‐Static Drive Belts Spark Arrestor
Units can also be customized to meet the following Specs; Group : II Category: 3G Gases group: IIBTemperature class: T3Reference to Standards and Directives: 94/9/CE “ATEX” – EN1834‐1 Ambient temperature: ‐20 < Tamb < 50°C
Units with the above Specs, will come with the following as a minimum including all the above; Flame Proof Inlet Manifold Flame Proof Exhaust Manifold ( Water Cooled) Flame Proof Heat Exchanger (Water Cooled) Water Cooled Turbo Heavy Duty Radiator Spark Arrestor Atex Zone 1 Alternator ( 12 V 25 A) Atex Zone 1 Starter Motor Atex Zone 1 Starter Battery (12 V 100Ah)
Hazardous / Zone II Area • ATEX Certified Zone II
Diesel Generator Rental Packages
• ATEX Certified Diesel Engines for the purpose driving pumps and other auxiliary equipment
• Project Specific ‐ Diesel Genset Design from 10 Kva– 2500 Kva
Reliability Competency Customer Centric
Hazardous Area Diesel Generator Sets
Diesel Generator Installed in SS316 Canopy, with Hydraulic Starting Skid
2 Units of Gumusut Diesel Generators sets In Sound Proof Canopies
Reliability Competency Customer Centric
Hazardous Area Diesel Generator Sets
Diesel Generator Installed in SS316 Canopy, with Hydraulic Starting Skid
SS316L Genset Canopy
Reliability Competency Customer Centric
What We Do Rig Safe Diesel Generator sets are commonly used in the safe area of the O&G Platform or Facility. The units require added safety features though not as stringent as units which are used in the zone 2 area these units also could potentially pose a safety hazard if certain requirements are not followed, we at WZS PowerGen SdnBhd with our combined expertise know that certain minimum standards need to be fulfilled with these units when placed offshore,
• Flame Arrestors • DNV Lifting Frame – certified or non certified
With the minimum requirements fulfilled, we are more than capable of customizing units for different clients needs and specifications, be it for short term rental or an out right purchase, WZS PowerGen will definitely have a solution for you.
Rig Safe / Unmanned Platforms
• Project Specific Detailed Design
• Genset Rentals • Logistics
Reliability Competency Customer Centric
What We Do With power being the main driving force for the economy these days, reliable power plays an important role in a developing economy. With this WZS PowerGen Sdn Bhd can help develop a reliable Diesel Generator Power Plant Locally here in Malaysia as well as Overseas, with vast knowledge and an experience team on the setup and management of these plants we can definitely deliver the best possible solutions to our clients. We can offer the following services ;• Diesel Generators• Step‐Up / Step Down Transformers• Cable installations • Site Preparations • Generator Management – data logging and reporting • Total Maintenance
At WZS PowerGen we can assist our clients by providing very flexible rental and rent‐to‐buy packages this is done to assist our clients with their cash flow. As we have been in this industry for over 5 years we know what our clients require.
Power Plants SetupWith Diesel Gensets
• Initial Study• Equipment Sizing • Installations• Site Management• Hook – Up
Reliability Competency Customer Centric
Power Plants Setups
20 Mw Site setup with Step‐Up Transformers installation in Malaysia
Reliability Competency Customer Centric
Power Plants Setups
Generator Sets hooked up to the Step‐Up transformers, and also ground preparation works
Reliability Competency Customer Centric
Power Plants Setups
Generator Sets ‐ Hooked up to the fuel lines , incoming & return lines.
Reliability Competency Customer Centric
Power Plants Setups
Diesel Fuel Tanks for the Generating Sets
Reliability Competency Customer Centric
What We Do Gaseous systems • A gaseous system has different agents which are used to
suppress a fire, suppression agents which we provide are as follows;
• Carbon Dioxide• FM‐200• Clean agents – inert gasses . i.e. NOVEC 1230• A typical system consists of the agent as well their storage
containers, agent release valves, detectors & detection equipment, finally the dispersion nozzles.
• These systems are designed for maximum protection, minimum storage space therefore reducing our client’s expenditure.
Water based Systems • The system we use is known as the Hi‐Fog system by Marioff, in
partnership with our Australia dealer, we supply and install these systems for different industries here in Malaysia. This system is revolutionary – fighting a fire with the least amount of water. This will save you not only from expensive clean‐ups but also this system can be used where machinery as well as expensive electronic equipment is present.
• This system uses high pressured Nitrogen gas as a propellant, to drive the water stored in storage cylinders out specially designed spray heads to fight the fire. Upon discharge, the water is a fine mist which basically starves the fire of oxygen, hence extinguishing it.
Fire & Gas Suppression Systems
• Gaseous Systems
• Watermist Systems
Reliability Competency Customer Centric
Marioff Hi‐Fog Watermist Installation
Kebabangan Marioff Hi‐Fog Watermist InstallationWith Pressure Switches & Explosion Proof Junction
Boxes
Marioff Hi‐Fog Watermist system Witness TestingWith Marioff Expert & TMJV Clients for the
Malikai Project
Marioff Hi‐Fog Watermist Installation with Associated SS316l Tubing and Explosion Proof Junction
Boxes
Reliability Competency Customer Centric
Carbon Dioxide (Co2) Installation
F14 – Sarawak Shell Installation of CO2 Pipe Work &Associated Cabling D12,F14 & LAILA Co2 Bottles and Stand which was
custom designed to customer specifications
Reliability Competency Customer Centric
What We Do Fire and Gas Detection plays an important role in assets as well as people protection, this small initial investment will give clients a piece of mind knowing that their assets and people are protected around the clock by the market leading brands offered by us.
Gas Detectors Sieger Gas Detectors
– Flammable Gas Detectors – Toxic Gas Detectors– Open Path Gas Detectors
Flame Detectors Spectrex Flame Detectors
– Triple IR Flame Detectors – UV Flame Detectors
Heat & Smoke Detectors Tyco / Kidde Fenwall
– Rate of rise Heat Detectors
Fire & Gas
Detection Systems • Gas Detectors
• Flame Detectors
• Heat / Smoke Detectors
Reliability Competency Customer Centric
Detection Equipment
Heat Detector Installed into the Genset CanopySpectrex Triple IR Flame Detectors keep watch
For any signs of flames in the EnclosureSieger Gas Detectors installed in the Gas
Intake Area
Reliability Competency Customer Centric
What We Do Control Panel design is a very specialized industry, at WZS PowerGen we have the experience as well as the know how to design and fabricate Diesel Generator as well as Fire & Gas Control Panels.
Control Panel design can consist of very basic control logics to extremely complicated SIL 2 or 3 designs and setups. WZS PowerGen can definitely design and advise our clients with the best possible control philosophy, with out in house engineering and design team we are able to produce • Block Diagrams• Control Logic Circuitry• Panel Internal Schematic Diagram• Cause & Effect Matrix
Working closely with Allen‐Bradley as well as a few other PLC suppliers, we are able to remain competitive in the market.
Diesel Generators Sets / F&G Control Systems
• Basic Controllers• PLC Controllers• SIL 2/3 Controllers
Reliability Competency Customer Centric
Diesel Genset / F&G Control Systems
Sil 2 PLC F&G Control Panel for South Acis ProjectAllen Bradley was chosen by the Client
Remotely Mounted Diesel Generator Control Panel SIL 2 PLC F&G Control Panel for Malikai Project, Designed in house to accommodate 4 PLC’s & 2
Annunciators as space was an issue
Reliability Competency Customer Centric
What We Do At WZS PowerGen, we are here to assist our clients with a one‐stop‐shop solutions for their engineering needs, as such our setup is done in such a way where by we can assist our clients to Design, Procure, Install and test all the related equipment, be it Safe Zone or Explosion Proof equipment. This is done to reduce our clients overall cost as well as time spent dealing with other sub‐contractors. WZS PowerGen can basically design the whole Power system as well as the overall protection of the whole system for our end user, not forgetting that all these equipment's will also be used on other parts of the O&G facility, as such WZS PowerGen can also assist our client in the overall installation and hook‐up of these equipment's. Brands which we deal in together with our suppliers;
• MoFlash Beacons & Sounders • E2S Beacons & Sounders • Roxtec MCT • Swagelok Tubing • SS316L Piping including installation • Various ICE 331 & 332 Cables • Instrumentation Installations & Testing & Commissioning
Works • Weidmuller, Cooper as well as Excen Junction Boxers
AuxilliaryEquipment – Value Added Services
• Explosion Proof Beacon / Sounders /Push Buttons
• MCT – Cable Trucking Systems
• O&G Cable / Piping / Tubing / Instrumentation Installations
• Ex’e’ & Ex’d’ Junction Boxes
Reliability Competency Customer Centric
Auxiliary Equipment
E2S Beacons & Sounders Terminated in to a SS316L Weidmuller Junction Box
E2S Beacon & Sounder together with E2S Puch ButtonTerminated into a Weidmuller SS316L Junction Box
E&I Installation
Reliability Competency Customer Centric
Operations & ProductionsI. LocationsWZS PowerGen is currently based in a 2‐acres industrial factory lot in Balakong, Kuala Lumpur. The group operates its main operation and daily manufacturing arms there. The facility can accommodate up to a 1.5 acre land of warehousing space.
II. Service Capacity & EquipmentCurrently, we have the facility which can accommodate lifting of equipment up to 10tonne and a factory lot uniquely segregated to focus on the manufacturing & packaging of our generator set.
III. Engineering & Technical SupportWe have the flexibility and ability to supply clients with required resources for their operations to work under the guidance from our top management to our technical support team. Our objective is to assist with qualified, experienced and quality personnel in a timely and efficient manner.
Reliability Competency Customer Centric
Past ExperiencesProject Title End User Description CiliPadi Shell Design of F&G system for DG & consulted on the Diesel Generator set Design
Gumusut ‐Kakap Shell & Murphy Designed the Watermist F&G system for DG and consulted on various parts of the Diesel Generator Sets
St Joseph Shell Design of the F&G System
Kebabangan Shell Design of the Watermist F&G system
Serendah Murphy‐Oil Design, Installation, Commissioning of the Watermist F&G system, as well as the F&G control panel including all cabling and tubing work.
F‐12 Sarawak Shell Design, Installation, Commissioning of the Co2 F&G system, including all the auxiliary equipment relating to the safe operation of the Genset
D‐14 Sarawak Shell Design, Installation, Commissioning of the Co2 F&G system, including all the auxiliary equipment relating to the safe operation of the Genset
Laila Sarawak Shell Design, Installation, Commissioning of the Co2 F&G system, including all the auxiliary equipment relating to the safe operation of the Genset
Tapis – R Exxon Design, Installation, Commissioning of the Watermist F&G system, as well as the F&G control panel including all cabling and tubing work.
South Acis Murphy Oil Design, Installation, Commissioning of the Watermist F&G system, including the F&G SIL 2 PLC Controlled Panel, including all cabling and tubing works
Malikai Shell Design, Installation, Commissioning of 2 units Watermist F&G system, for 2 Gensets, including a Common SIL 2 PLC Controlled, which includes all associated cabling and tubing installations.
Reliability Competency Customer Centric