Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

28
www.wagner.c om Development of long span composite truss bridges Marcus O'Dempsey

Transcript of Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

Page 1: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Development of long span composite truss bridges

Marcus O'Dempsey

Page 2: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Contents

• WCFT products

• WCFT solutions

• Developing composite truss bridges

Page 3: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

WCFT Product

Page 4: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Section properties

Physical properties Characteristic values

Insert

End Cap

Page 5: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

WCFT ProductProduct guide- Characteristic value of mechanical properties

and physical properties- ASTM 7290

Design guide- ASCE Pre-standard (final ver.)- Work examples

ASTM 7290 -Standard Practice for Evaluating Material Property Characteristic Values for Polymeric Composite for Civil Engineering Structural ApplicationsASCE Pre-Standard for Load and Resistance Factor Design (LRFD) of Pultruded Fiber Reinforced Polymer (FRP) Structures (Final) (2010)

Page 6: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Electrical crossarm

Wagners Solutions

Page 7: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Boardwalk

Wagners CFT Solutions

Marina

Page 8: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Timber Bridge Rehabilitation

Wagners Solutions

Page 9: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Page 10: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Timber Bridge Rehabilitation

Page 11: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Timber Bridge Rehabilitation

Pile Strengthening Bridge Widening

Page 12: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Page 13: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Composite Bridge

Wagners Solutions

Page 14: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Baio Bridges, Whyanbeel QLD

Page 15: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Page 16: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Page 17: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Page 18: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Page 19: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Engineering Development • Stage 1

– Truss composite bridges bridge– Post-cure bolt joint for 80°C design temperature

• Stage 2– Grout filled composite truss bridge for long span– Ambient cure bolt joint for 80°C design temperature

• Design criteria (AS2156, AS5100, AS1170)- Dead Load : 0.3 KPa- Live Load : 5.0 KPa (Pedestrian)- Vehicle load : 4 ton (Emergency vehicle at low speed)- Deflection Limit: L/250- Design temperature : up to 80 °C

Page 20: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Stage 1 • Structural specification

Span: 12 - 14 meters / Height : 2.0 meterTop-chord - 2 x 125SHS / Bottom-chord - 2 x 125 SHS / Webs - 1 x 250BRB

• Bolted jointDevelop post-cure glue system for 80°C design temperature Evaluate design strength for both ambient and 80°C design temperature

• Truss systemPerformance under static design load (Proof loading: AS/NZ 1170.0)Prove fatigue performance with 1,000,000 cycles of loading

Page 21: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Stage 2 • Structural specification

Span: 23 meters / Height : 2.2 metersTop-chord - 2 x Grout-filled 250 BRB / Bottom-chord - 2 x 250 BRB / Webs - 1 x 250 BRB

• Bolted jointFurther development, ambient cure glue system for eliminating post-cure procedure Evaluate design strength for the range of design temperature between ambient and 80°C

• Grout filled truss systemPerformance under static design load (Proof loading: AS/NZW 1170.0)Comparative study with and without grout-filling method

Page 22: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Stage 1 - 1,000,000 cycles of loading (Fatigue)

Page 23: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Stage 2 - Grout-filled truss (Comparative study)

31%

Page 24: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Stages 1 and 2 - Bolted jointWith post-cure glue (Stage 1)

With ambient-cure glue (Stage 2)

# 10 repeated test results, $ Determined in accordance with ASTM D7290

Test results – Stage 2

Page 25: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Stage 1 – Clewley Park FootbridgeToowoomba, QLD

Page 26: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Page 27: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com

Stage 2 - Mercy Footbridge replacementDalby QLD

Page 28: Www.wagner.com Development of long span composite truss bridges Marcus O'Dempsey.

www.wagner.com