Transcript of Document
Vikranth Ikkalaki, Team Leader -SAP PP at Tata Technologies
Follow
Published on Feb 28, 2013
Sap pp shop floor control configuration 7,986views
Share Like
0 4 0 2
1. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsTable of ContentsObjective
........................................................................................................................... 4IMG Menu – The
Starting Point ......................................................................................... 5An Overview of the SAP
Production Orders ...................................................................... 6The Bills of Materials in relation to the
Shop Floor Production Order ................................ 7Start of the SAP Production Order Configurations
............................................................ 9Define the Production Order Types
................................................................................... 9How to configure the Production Order User
Status?...................................................... 12Where-is the Production Order Type used?
.................................................................... 16Define the Production Order Type-dependent Parameters
............................................. 16Define Checking
Control.................................................................................................. 24Define Confirmation
Parameters ..................................................................................... 25Define Scheduling Parameters for
Production Orders..................................................... 30Define Number
Range..................................................................................................... 33Define selection profiles for
the Order Information System ............................................. 35Where-is the Selection Profile
used?............................................................................... 36Define the Production Operations Control
key ................................................................ 37Where-is the Control key used?
...................................................................................... 38Define formula parameters for Work
Center.................................................................... 39Where-is the Work Center Formula
Used?...................................................................... 42Define the Production Scheduling Profile
........................................................................ 42Define Production
Scheduler........................................................................................... 45Where-is the Production
Scheduling Profile and Production Scheduler Used?............... 45Define User Exits Selection
............................................................................................. 46Select Routing Automatically
........................................................................................... 47Where do you define the Usage and
Status? .................................................................. 48Define Default Values If No Routing Exists
..................................................................... 48Define Priorities for BOM
Usages.................................................................................... 50Define Applications for BOM
Explode.............................................................................. 50Define Alternative Determination for
Production.............................................................. 52Define Checking Group
................................................................................................... 53Define Checking
Rule...................................................................................................... 54Define Scope of
Check.................................................................................................... 54Define Checking Rule for
Backorder Processing............................................................. 56Specify Scheduling Type
................................................................................................. 57Define Standard Value Keys
........................................................................................... 58Where-is the Standard Value Key
used?......................................................................... 60Define Scheduling Margin Key
........................................................................................ 60Define Capacity
Categories............................................................................................. 61Where-is Capacity Categories
used? .............................................................................. 62Define Single Screen Entry for Time Ticket
Confirmations.............................................. 63Maintain Language-Dependent
Texts.............................................................................. 66Define Reasons for Variances for Production
Scrap ....................................................... 67Where-is the Production Reason Code used?
................................................................ 68Define Print Control for Shop Floor Papers
..................................................................... 68Preparing the Initial Implementation of the PP Shop Floor
Sap pp shop floor control configuration
Control Module..................... 72Static versus dynamic data conversion
........................................................................... 73A Sample Note to users regarding the Uncompleted
Production Orders......................... 73@ www.sap-img.com Page 1 of 79 SAP Version 4.6c
2. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsAppendix A: The Production
Order Status Business Process Flow................................. 74Appendix B: How to make enquiry on Open
Production Orders?.................................... 76Appendix C: What is Backflushing and Where is the
Indicator Set?................................ 77@ www.sap-img.com Page 2 of 79 SAP Version 4.6c
3. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsCopyright© 2004 www.sap-
img.com. All rights reserved.www.sap-img.com makes no warranties or representations with respect to
the content hereof andspecifically disclaims any implied warranties of merchantability or fitness for any
particular purpose.www.sap-img.com assumes no responsibility for any errors that may appear in this
document. Theinformation contained in this document is subject to change without notice.www.sap-
img.com reserves the right to make any such changes without obligation to notify any person ofsuch
revision or changes.www.sap-img.com makes no commitment to keep the information contained herein
up to date.TrademarksABAP/4 is a registered trademark of SAP AG.SAP, R/2, R/3, SAPoffice, Smart
Forms, SAPscript, SAP EarlyWatch, and SAP Business Workflow areregistered trademark of SAP AG.All
other products mentioned in this documentation are registered or unregistered trademarks of
theirrespective companies.@ www.sap-img.com Page 3 of 79 SAP Version 4.6c
4. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsObjectiveThe objective of this
paper is to provide the SAP PP consultant with a step-by-step guidesat configuring the SAP PP Shop
Floor Control module. It is structure in the form of how-to-do configurations method.When you do the
SAP configuration, sequence is not really important as long as allthe PP Shop Floor Control modules
Features that need to be used have beenconfigured.Notes:Initial IMG Action : Required (this are
dynamic data which are unique to the company)Initial IMG Action : Usually Not required (it depends on
the customer requirement)Initial IMG Action : Not required (normally this kind of configuration is quite
static, mostof the customer will accept the SAP default and may request for changes after going livefor a
period of time)@ www.sap-img.com Page 4 of 79 SAP Version 4.6c
5. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsIMG Menu – The Starting
PointBefore doing any SAP Configuration, all SAP consultants MUST be aware of thetransaction SPRO.
This transaction code is the heart of the whole SAP configuration.Click the button and you will be shown
all the configuration tree for thevarious SAP modules like SD, PP, FI, CO etc.Transaction SPROThe SAP
IMG configuration tree for all the modules@ www.sap-img.com Page 5 of 79 SAP Version 4.6c
6. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsAn Overview of the SAP
Production OrdersAs the name implies, Production Orders is a work processes that a company uses
toproduced the Finished Goods that the Customer Need.In the Production Orders, the Production
Planner (after finding out from the Productionstaff) will define the raw materials, semi-finished materials
required to be processed (Billsof Materials), at which location, at what time, how much work is required
and the worksequence that need to be carried out (Routing). It also defines which resources are to
beused and how the costs are to be settled.The Materials Requirement Planning will generate a Planned
Orders from theCustomer Sales Orders or a Company-Internal Requirement (known as
PlannedIndependent Requirement for Orders that are not firmed).The Planned Orders will be reviews by
the Production Planner who will decide whether toconvert the Planned Orders into Production Orders
and then RELEASE it for actualProduction.A firm SAP Production Order will contains information such
as: What is to be produced. When the Actual Production will take place. Which Machine or Labour
capacity to used to process the Order. How much will it cost to produce the Finished Goods?In the SAP
system, a Production Orders can be created in the following methods: Convert from the Planned Orders
generated by the SAP MRP system. Using an assembly order. Creating it manually from the SAP
system.Once a Production Order is created, the system will perform the following actions: Select the
Routing that contains the operations and sequences and copy it to the Production Order. The Bill of
Materials is exploded and the items in the BOM are transferred to the Production Order. Reservations
are created for those Bill of Materials Item held in stock. The planned costs for the Production Order are
generated. The Capacity requirements are generated for the work centers define in the Routing. The
Purchase Requisitions are generated for non-stock items and externally processed operations.The
Master data for the Routing and BOM will only be copy once during the ProductionOrder creation
UNLESS you click the Re-COPY functions (CO02 – Functions – ReadPP Master Data). Any further
changes done to the Production Order for the Routing andBOM etc. will ONLY affect the Production
Order and vice versa.Therefore, don’t be surprised if you found that the Original Routing and BOM
structure tobe difference with the one in the Production Order as users have the right to change it,
ifnecessary.@ www.sap-img.com Page 6 of 79 SAP Version 4.6c
7. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsThe Bills of Materials in
relation to the Shop Floor Production OrderAs you know, a bill of material is a complete structure list of
the components (or rawmaterial/semi-finished) that make up a product (Finished Good).In SAP, you
create the BOM level by level with Tcode “CS01”. The system can cater fordifferent type of BOM
(referring to the different modules of SAP). For production you’llchoose BOM usage 1. This BOM will be
copied into the Production Order whenevera new Order is created.As you can see after you enter the
screen, you define the BOM level by level.@ www.sap-img.com Page 7 of 79 SAP Version 4.6c
8. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsNow, let us look at a simple
example:FERT requires the raw materials RAW 1 and semi-finished goods SEMI.SEMI requires the raw
materials RAW 1 and RAW 2.Therefore, you’ll define two single BOM with Tcode CS01.The SAP system
automatically LINK the Multi-level BOM structure for you.Now, when a user create a Production Order
for FERT, two different Production Orderwill be created. One for FERT, and the other for SEMI. The
reason is because FERTand SEMI requires different manufacturing process to be completed. FERT
RAW 1 SEMI RAW 1 RAW 2You can used Tcode CSMB to view the Multi-level BOM. Click the button
Start theMaterial BOM Browser.The system will quickly find the BOM relationship automatically for
you.@ www.sap-img.com Page 8 of 79 SAP Version 4.6c
9. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsStart of the SAP Production
Order ConfigurationsThe SAP PP modules is closely related to the Controlling modules which takes care
ofthe Costing for the Production Order. Therefore, a PP consultant will have to workclosely with the CO
consultant and try your best to learn how Cost is being calculated forthe Production Order.Define the
Production Order TypesInitial IMG Action : RequiredIn this configuration, you need to find out from your
FICO consultant which SettlementProfile (under the Cost Controlling section) are you using although
most of the time thedefault standard SAP profile PP01 is used.You have to assign every Production
Order to an order type. An order type containscontrol information that you need for managing
orders.Most customers will request more Production Order Types to differentiate the differentProduction
Order for report analyzing purpose. For e.g.PPRW – Rework Production OrderPPPT – Trial Run
Production Order etc…To create New Order Type, copy it from the Standard Order Type “PP01”.Listed
below are all the transaction for each New Order Type that you need to create.All these configurations
will be copied to the Production Order in transaction code “CO01”when the user create the production
order. Transaction : Menu Path : OPLH IMG – Production – Shop Floor Control – Master Data – Order –
Define Order Types OPL8 IMG – Production – Shop Floor Control – Master Data – Order – Define order
type-dependent parameters OPJK IMG – Production – Shop Floor Control – Operations – Availability
Check – Define Checking Control OPK4 IMG – Production – Shop Floor Control – Operations –
Confirmations – Define Confirmations Parameters (this will determine whether confirmation is allow for
this Order Type) OPU3 IMG – Production – Shop Floor Control – Operations – Scheduling – Define
Scheduling Parameters for Production Orders CO82 IMG – Production – Shop Floor Control – Master
Data – Order – Define number ranges for order (if different number range are required for different
Order Type)@ www.sap-img.com Page 9 of 79 SAP Version 4.6c
10. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsIn the Production Order type,
you define the following: CO (Controlling) partner updateYou can specify whether a totals record is to be
written per order if a CO partner object(for example, a cost center) is assigned to an order of this order
type.This indicator is used to reduce the number of totals records and thus the storagecapacity needed
in the database. Order classificationHere, you specify whether orders of this order type are to be taken
into account inclassification for order summarization and the order selection. Order residence timeFind
out from the user how long completed orders are left in the SAP System before theyare
archived.Reorganizing an object (e.g. order, project) normally requires three steps: 1. Setting the delete
flag (can be reset) 2. Setting the final deletion indicator (cannot be reset) 3. Reorganizing (writing the
object to a sequential dataset and physically deleting it from the system)Residence time 1 determines
the time interval (in calendar months) that must elapsebetween setting the delete flag (step 1) and
setting the deletion indicator (step 2).If you leave this field blank, you can still archive the Production
Order using theArchive Management transaction SARA – Object Name - PP_ORDER Settlement Profile
(IMG – Controlling – Product Cost Controlling – Cost Object Controlling – Product Cost by Period –
Period-End Closing – Settlement – Create Settlement Profile)Find out from the FICO consultant which
settlement profile are you using to settle thisOrder Type. Collective order with goods movementThis
indicator controls whether goods movements can take place for production ordersthat are linked to a
collective order. Status Profile ManagementAn order can go through several processing statuses.
Among other things, the statuscontrols which business transactions are allowed in the order. Number
Range GeneralSAP have pre-assign the number range. If you want to change it, you can re-assign it toa
new number range for each new order type. Transaction : Menu Path : IMG – Production – Shop Floor
Control – Master Data – OPJH Order – Define Order TypesDouble click on the Production Order Types
to reach the definition screen.@ www.sap-img.com Page 10 of 79 SAP Version 4.6c
11. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsThe order category “10”
which stand for production order is a fixed setting andcannot be changed. The order categories are
predefined in the SAP System andcharacterize the technical properties of the orders.Click the Number
range general button to assign a different number range to eachorder type. Refer to the section on
Define Number Range if you need to assign aNumber Range for the Production Order Type.You’ll notice
that the IMG for the Production Order type is quite straights forward.@ www.sap-img.com Page 11 of 79
SAP Version 4.6c
12. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsHow to configure the
Production Order User Status?A user status is activated by the user and can be created as an addition
to the existingsystem status. You can define and activate any number of user statuses. To define a
userstatus, you need to have created a status profile, which is created per order type inCustomizing.
You can activate any number of status in a production order.The steps to configure the User Status:1.
First create a Status Profile. Transaction : Menu Path : IMG – Production – Shop Floor Control – Master
Data – BS02 Order – Define Status ProfileClick the Create button and type the followings:2. Type in the
followings User status and Click the Object types button to assign thecorresponding to the status profile.
This means that User Status 1 will be active first,then follows by the next 2 User Status.@ www.sap-
img.com Page 12 of 79 SAP Version 4.6c
13. A Step-by-Step Guide to the SAP PP Shop Floor Control Configurations3. Scroll down and Tick the
followings so that the status profile can be used in ProductionOrder Header as well as the Operations
Level. Finished, click the Back button to gotothe Step 2 Screen.4. Assign the corresponding Business
Transaction to each of the User Status exceptUser Status1 as the Initial Status was tick. Double click on
User Status 2 in the screenfor Step 2.You will then see a screen with no information. Click the Create
button to view the all theBusiness Transactions.@ www.sap-img.com Page 13 of 79 SAP Version 4.6c
14. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsAuto move the User
StatusNow, we assume that once the Order is release, it will automatically move from UserStatus 1 to
User Status 2. On the Line Item Release, you click Allowed and Set button.This means that On Release
of the Production Order, the status will changed to 2.Restrict the Business TransactionTo restrict any
Business Transaction on a particular User Status, scroll down to theBusiness transaction line item and
click Disallowed and No action. Upon User Status 3,which is the Complete Process, you can tick
Disallowed for those Business transactionthat you do not want the user to do.5. Finally, assign the New
Created Status Profile to the Production Order Type (OPJH).For this demo, we assign it to the
Production Header.@ www.sap-img.com Page 14 of 79 SAP Version 4.6c
15. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsThis is how the Production
Order Screen will look like with the User Status just below theBusiness transaction status.You can click
the Status button to view the Status Details.@ www.sap-img.com Page 15 of 79 SAP Version 4.6c
16. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsWhere-is the Production
Order Type used?Users have to choose the Production Order Type in order to create a Production
Order intransaction CO01 and the configuration will be copied to the Production Order.Define the
Production Order Type-dependent ParametersInitial IMG Action : RequiredFor each Production Order
Type, you can define their unique IMG behavior. For eg.whether this Order Type allow automatic or
manual selection of Production Version. Transaction : Menu Path : IMG – Production – Shop Floor
Control – Master Data – OPL8 Order – Define order type-dependent parametersDouble click on the
Production Order Types to reach the definition screen.You define the parameters that are valid for each
order type and plant. The parametersare split up as follows on the tab pages:@ www.sap-img.com Page
16 of 79 SAP Version 4.6c
17. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsPlanning TabstripsMaster
dataFor you to define the data that influences master data selection or order master
datamaintenance:Production Version You can decide whether production versions are selected
automatically or manually. For manual production version, you can change the Production Versions in
MRP 4 screen in MM02. Click on the ProdVersions then click the Details. For e.g. here you can set
validity dates for the version or you can also set lot sizes. Based on the quantity of the order, a certain
version will be picked. Or, the version will be picked if it falls in the date range.RoutingApplication The
task list application is predefined as P. However, you can also specify an additional task list
application.Selection ID The routing selection ID defines, for example, the ranking order for routing
selection. Routing selection defines whether routings are to be selected and if so, how (manually or
automatically) and whether reference operation sets can also be selected.Sequence exchange
Alternative sequences and sequence exchange define whether alternative sequences are permitted and
how the sequences are to be exchanged.Task list type The task list type defines which routing type is
permitted for production orders.Operation dtl check Operation dtl check defines whether operation detail
screens are to be checked when the operations are transferred to the order.Routing text Routing text
defines that the text from the routing header is copied into the order.OperationsEntry/tool You can
activate the entry tool for operations to help you when you create operations.Increment for automatic
operation/activity numbering Increment used when operations or activities are automatically
numbered.Reduction strategy per operation/activity Key which specifies the strategy for reducing the
lead time of an operation or activity (PS). For each reduction strategy you can define up to six reduction
levels.BOM application BOM application defines how the BOM alternatives are to be automatically
selected. (point to the configuration OPJM – Define Applications)@ www.sap-img.com Page 17 of 79
SAP Version 4.6c
18. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsBatch Determination Search
procedure defines how batch determination is to take place.GeneralAssignmentSubstitute MRP ctrl
Substitute MRP controller/substitute production scheduler are proposed when you create production
orders if an MRP controller or production scheduler are not specified in the material master (MM01 /
MM02), or if there is no reference to material.Purchase RequisitionsReservation/Purch.req.
Reservation/Purch. req. specifies whether certain order objects (operation, components) are relevant to
MRP.Collective purch.requisit Collective purch.req. enables collective purchase requisition per order for
externally processed operations or non-stock items.Quality InspectionInspection type Inspection type
defines how a quality inspection is to be carried out.@ www.sap-img.com Page 18 of 79 SAP Version
4.6c
19. A Step-by-Step Guide to the SAP PP Shop Floor Control Configurations@ www.sap-img.com Page
19 of 79 SAP Version 4.6c
20. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsImplementation
TabstripsStatus change documentsHere, you define whether you want change documents to be written
if a status changeoccurs. You also define the level at which the change documents are to be written.A
status change document contains the following: which status has been changed who changed the status
whether the status has been activated or deactivated the transaction in which the status change has
been carried outIn the production order , you can define the status at the following levels: order header
level operation level material component level production resource/tool levelStatus change documents
can also be defined independently of each other, at each ofthese four levels.Note: If you have defined
these parameters such that status change documents arewritten for a particular order level, the SAP
System only writes a status change documentfor a status change from this point in time if the order (or
operation/component/PRT) hasbeen created since the status change documents have been
activated.Please take note that SAP does not keep track of every Fields changes done to theProduction
Order.Shop Floor Information System You can specify, for example, whether order data is to be stored
in the Shop Floor Information System. The user can then generate reports using transaction COOIS for
example, by materials, orders and work centers.Documentation of goods movements Here, you can
specify that goods movements are to be documented with reference to an order. Then you can display
goods movements, for example, using the order information system (Tcode COOIS). You can enter a
profile for displaying documented goods movements on the tab page "Display profiles".PDC PDC active
allows data to be exchanged with a PDC system.Workflow Workflow for PO chg. defines that a workflow
is generated when quantities or dates that affect existing purchase orders are changed in the order. In
addition, a default rule for the split is displayed on this screen. So that this indicator is also valid for
production orders the appropriate settings must be made in Customizing for the Project
System.Progress confirmation in orders You can determine that progress values are calculated for order
progress reports.@ www.sap-img.com Page 20 of 79 SAP Version 4.6c
21. A Step-by-Step Guide to the SAP PP Shop Floor Control Configurations@ www.sap-img.com Page
21 of 79 SAP Version 4.6c
22. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsControlling
TabstripsControllingHere, you define the parameters relevant to controlling, such as, for example,
costingvariants for planned and actual costs and a results analysis key.ControllingTo set the Costing
Variants (The costing variant refers to a valuation variant)IMG - Production - Shop Floor Control – Order
Costing - Define Costing VariantsCosting variant for planned costs Key that specifies which costing
variant is used to determine the planned costs.Use Product Cost Collector as Cost Object Specifies
whether the costs are collected on a manufacturing order, (production order, process order), or product
cost collector.Costing variant for actual costs Key that specifies the costing variant that is used to
determine the actual costs.Results Analysis Key Key that defines the valuation of the order during
period-end closing.Cost Collector - Indicator: Determine plan costs: 1/2/3 Determines whether planned
costs are automatically calculated when you save the network.Net Order Price - Ind.: Copy net price
from requisition into purchase order Indicator which specifies that the net price cannot be changed when
copied over from the purchase requisition into the purchase order.Distribution ruleDefault rule Default
(distribution) rule defines an automatically generated distribution rule for CO settlement.@ www.sap-
img.com Page 22 of 79 SAP Version 4.6c
23. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDisplay profiles
TabstripsCollective order display Graphics profile defines how the collective order is to be
displayed.Graphic Here, you define parameters for displaying graphics of operations and sequences in
the order.Missing parts list ProfMissPrtsLstOrdNo/PrfMissPrtLstCollOr defines how the missing parts list
is to be displayed.Documentation of goods movements Goods movements defines which profile is used
for displaying documented goods movements.@ www.sap-img.com Page 23 of 79 SAP Version 4.6c
24. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Checking
ControlInitial IMG Action : Usually Not requiredNormally, companies will used the same checking rule for
all the Production Order Type.The following are the purpose of defining the checking rule: whether an
availability check is to be carried out when you create or release an order whether an availability check
is to be carried out when you save an order that has been created or released which checking rule is to
be used what effect a material shortfall is to have on the creation or release of an order Transaction :
Menu Path : IMG – Production – Shop Floor Control – Operations – OPJK Availability Check – Define
Checking ControlHere, you define the check control. The checking rule together with the checking
groupspecify the scope of the check.The checking rule as well as the actual check itself dependent on
the followingparameters: • plant • order type • business functions – this control whether the check is
done during production order 1 – Order Creation or 2 – Order ReleaseControl parameters for the
Business functions createIn addition to this, you can specify whether a planned order can be converted
to aproduction order or process order using collective conversion in the case of: • missing parts •
missing PRTs or • insufficient capacityrelease control parameters for Business functionsIn addition, you
can control whether an order can be released in the case of • missing materials • missing PRTs •
insufficient capacity@ www.sap-img.com Page 24 of 79 SAP Version 4.6c
25. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Confirmation
ParametersInitial IMG Action : Usually Not requiredHere, you define the confirmation parameters for
each plant and order type. This affectthe user confirmation transaction screen CO11N – Enter time ticket
for production order.The parameters are split up as follows on tab pages.Generally valid settingsControl
data• The properties of the control key Process control are defined elsewhere in Customizing (it can also
be called using the symbol next to the control key). It controls the execution of the confirmation
processes.• You can define how quantities are determined for automatically generated confirmations
(milestone/progress confirmation).@ www.sap-img.com Page 25 of 79 SAP Version 4.6c
26. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsChecksUsing checks you can
define• what happens when the sequence of operations is not adhered to during confirmation For e,g,
there are two operations 10 follows by 20, user tried to confirm operation 20 first before 10, if you
configure as an Error, system will not allows it to happened. or what happens when you want to confirm
a larger quantity than was confirmed for the preceding operation You can choose between a termination
message, an error message, a warning message and an information message.• whether you want the
total confirmed quantity of an operation checked for underdelivery or overdelivery tolerance in the order
header• what effect a QM result recording has on the confirmation.• whether dates (for example, posting
date, end of lead time, etc) should also be displayed with a date that is further in the future than the time
of creationHR UpdateYou can decouple HR and PP with the No HR update indicator.• SelectionYou
specify that only open orders are selected in the collective order.• Propose time unitsYou can select a
time unit that is to be proposed during confirmation.• Goods movementsUsing the all components
indicator, you can specify that the system should display allthe components assigned to the operation in
the goods movement overview (in otherwords, not only backflushed components). However, if you do
not branch to thematerial overview at confirmation, the system only posts backflushed
components.General individual entryConfirmation function except fast entryYou can define here whether
a partial confirmation, a final confirmation or a finalconfirmation with clearing of open reservations is to
be proposed for the confirmation.Error handling/logsYou can use the indicator Actual costs to specify
that the log is also displayed if thereare no error messages (thus only warnings or information
messages). You can use theError handling indicator to specify that an error log is displayed for incorrect
items ingoods movements (for backflush or automatic goods receipts). You then have
anotheropportunity to correct the items with errors before saving, with the aid of the
materialoverview.Operation indiv. entry using initial scrn TabsrtipsPropose data to be confirmedYou can
have the system propose the open confirmation data for entry. For the quantitiesand activities, the SAP
System proposes the difference between the standard values andthe confirmed values. Otherwise, the
standard values are proposed as confirmation data.Display confirmed data/display standard valuesYou
can have the system display both the confirmed data and the standard values forinformation
purposes.Screen control time ticket@ www.sap-img.com Page 26 of 79 SAP Version 4.6c
27. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsIf you do not select an entry
screen on the initial screen, you can control the followingalternative entry screens by parameterization:•
Screen with the most important actual data without a display of the values already confirmed and the
standard values• Screen with quantities and activities and a display of the values already confirmed and
the standard values• Screen with quantities and activities, forecasted standard values and a display of
the values already confirmed and the standard valuesYou define that confirmable or confirmed
operations are also selected during theexecution of the confirmation processes Transaction : Menu Path
: IMG – Production – Shop Floor Control – Operations – OPK4 Confirmation – Define Confirmation
ParametersDefine the parameter settings for the confirmations in your plant for the possible ordertypes.
Double click on the line items to configure the detail settings.@ www.sap-img.com Page 27 of 79 SAP
Version 4.6c
28. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsGenerally valid settings
Tabstrips@ www.sap-img.com Page 28 of 79 SAP Version 4.6c
29. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsGeneral individual entry
TabstripsOperation indiv. entry using initial scrn Tabsrtips@ www.sap-img.com Page 29 of 79 SAP
Version 4.6c
30. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Scheduling
Parameters for Production OrdersInitial IMG Action : Usually Not requiredHere, you define for each
plant, order type and production scheduler the parameters forscheduling production orders. This
comprises maintaining • scheduling levels (detailed, production-rate and rough-cut scheduling) • date
adjustment when dates are exceeded • date control for detailed scheduling • reductionThe parameters
are described in what follows in details:In detailed-, rate-based and rough-cut scheduling you define for
every schedulinglevel • how production dates are to be calculated • whether capacity requirements are
generated • which routing is the basis for schedulingIf a production version exists in the material master
then the routing is selected using thisversion. If no version exists for a scheduling level then a routing is
selected according tothe selection ID that you have given for the scheduling level. In Adjust dates you
specify whether and how the basic dates are adjusted to the production dates (for example, when
deadlines are exceeded) and how dates for dependent requirements are to lie. In Scheduling control for
detailed scheduling you specify the control parameters for detailed scheduling, among other things the
scheduling type (most manufacturing companies will used the Backwards Scheduling where the system
will calculate bottom up from the lowest BOM level to determine the Basic Start date required by the
Production Order for producing the Finished Product). Start date in the past Here you specify how many
days an order may lie in the past before today scheduling is triggered. Automatic scheduling Here you
specify whether scheduling is carried out automatically on saving. Automatic log Here you specify
whether the log is displayed automatically on scheduling. Latest date f. materialHere you specify where
the required date of a component should be with respect to anoperation. Scheduling with break Here
you specify that the exact time a break occurs must be taken into account. From production dates Here
you specify that when you create or change an order the user must enter schedules dates (production
dates) instead of basic dates. Shift order Here you specify whether the order can be moved if partially
confirmed operations exist. Reduction type@ www.sap-img.com Page 30 of 79 SAP Version 4.6c
31. A Step-by-Step Guide to the SAP PP Shop Floor Control Configurations• whether in the order or in
the collective order all the operations are to be reduced or only those along the critical path.• Reduction
along the critical path is only possible for networks, production orders and planned orders with parallel
sequences and for collective orders that contain production orders or planned orders. Maximum
Reduction level up to which maximum reduction level the reduction takes place % reduction in floats to
what percentage the float before and after production in every reduction level is to be reduced.Note that
scheduling is always carried out for all scheduling levels that you havespecified. For example, if you
make changes in the order that are relevant to scheduling(basic dates, quantities) and schedule it again
then scheduling is carried out not only fordetailed planning but also for production-rate and rough-cut
planning.This is very performance-intensive because data must be read from the database.Therefore it
is recommended that you only maintain levels relevant to scheduling.Whereas you can choose between
several scheduling types for detailed scheduling,rough-cut and production-rate scheduling always use
backward scheduling. Reductionsare also only relevant for detailed scheduling. Transaction : Menu Path
: IMG – Production – Shop Floor Control – Operations – OPU3 Scheduling – Define Scheduling
Parameters for Production OrdersDefine the scheduling parameters for production orders. When
finished, you can test thescheduling parameters by creating a Production Order with transactions
“CO01”.@ www.sap-img.com Page 31 of 79 SAP Version 4.6c
32. A Step-by-Step Guide to the SAP PP Shop Floor Control Configurations@ www.sap-img.com Page
32 of 79 SAP Version 4.6c
33. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Number RangeInitial
IMG Action : RequiredNumber ranges for OrdersThe Number ranges for orders are preset in the SAP
default settings.Some companies may request to have different number range for different Order
Types.This is an example on how to define the number ranges for order: Transaction : Menu Path : IMG
– Production – Shop Floor Control – Master Data – CO82 Order – Define number ranges for orderClick
the Intervals button to configure the number ranges.Click the Groups button to assign the Production
type to the number rangesIf you have a new Production Type, scroll down to view those Production
Type notassigned.To assign the Production type, park your cursor at the Production Type and click the
(Select Element) button.Finally, tick the box of the main group and click the (Assign ElementGroup)
button to assign the Production Order Type.@ www.sap-img.com Page 33 of 79 SAP Version 4.6c
34. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsTo Change the Group text,
tick the group box and click the Menu Group -> Maintain textIn the standard SAP R/3 System, number
ranges for the followings are preset. Transaction : Menu Path : CO80 IMG – Production – Shop Floor
Control – Master Data – Order – Define number ranges for confirmations CO83 IMG – Production –
Shop Floor Control – Master Data – Order – Define number ranges for reservations CO81 IMG –
Production – Shop Floor Control – Master Data – Order – Define number ranges for operations CO84
IMG – Production – Shop Floor Control – Master Data – Order – Define number ranges for capacity
requirements@ www.sap-img.com Page 34 of 79 SAP Version 4.6c
35. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine selection profiles for
the Order Information SystemInitial IMG Action : Not requiredHere, you define the selection profiles that
you can use to specify status combinations forselecting objects (for example, orders or operations). A
selection profile is especiallyuseful if you select a large number of objects repeatedly according to the
same selectionconditions (for example, orders for printing shop papers, for collective release, or
forcreating order valuations). Transaction : Menu Path : IMG – Production – Shop Floor Control –
Master Data – BS42 Order – Define selection profilesTo view the Selection conditions screen, select the
SelProf you want and click SelectionconditionsThis is the Selection conditions screen where you
configure the pre-define Status.@ www.sap-img.com Page 35 of 79 SAP Version 4.6c
36. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsWhere-is the Selection
Profile used? Transaction : SAP Menu Path : Logistics – Production – Production Control – COOIS
Information System – Order Information SystemLook at the field name “Selection profile status”.@
www.sap-img.com Page 36 of 79 SAP Version 4.6c
37. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine the Production
Operations Control keyInitial IMG Action : Usually Not requiredUsing the control key of the operation you
determine • which business functions you want to carry out • how an operation should be dealt withThe
most important functions are: SchedulingWith this indicator you control whether the operation is
scheduled Det. Capacity planningWith this indicator you control whether capacity requirements records
are written for theoperation Inspection characteristics requiredWith this indicator you control whether
inspection characteristics have to be maintainedfor the operation Automatic goods receiptWith this
indicator you determine that the yield quantity is posted to the warehouseautomatically when the
operation is confirmed Printing time ticketsYou can use indicators to control whether time tickets or
completion confirmation slips(referring to shop floor paper) should be printed for an operation CostWith
this indicator you control whether the operation is to be taken into account in costing. Sched. external op
/ External ProcessingWith this indicator you control whether the operation is to be processed externally.
ConfirmationsWith this indicator you control • whether the confirmation of an operation is allowed,
possible or required • whether the operation is to be marked as a partial completion confirmation
Transaction : Menu Path : IMG – Production – Shop Floor Control – Master Data – OPJ8 Routing Data –
Define control keyDouble click on the Control key to configure the settings.@ www.sap-img.com Page 37
of 79 SAP Version 4.6c
38. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsWhere-is the Control key
used?Transaction : SAP Menu Path : Logistics – Production – Master Data – Work CenterCR03 – Work
Center – Display - DefaultsThe Control key will be automatically copy when user create the Routing.
TheRouting will be copy when user create the Production Order.@ www.sap-img.com Page 38 of 79
SAP Version 4.6c
39. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine formula parameters
for Work CenterInitial IMG Action : RequiredIn the PRT management you need formula parameters to
define: • formulas that are used to calculate the required total quantity and the total usage value of a
production resource/tool • formula constants in PRT master records of the category "Other"You also
need formula parameters for work center maintenance to • describe standard values • define
formulasThese formulas are used to calculate the capacity requirements, the lead times and thecosts in
capacity planning, scheduling and (general). Transaction : Menu Path : IMG – Production – Shop Floor
Control – Master Data – OPKL Production Resources/Tools – Formulas – Define Formula
parametersClick the New entries button to create a new Formula Parameters.@ www.sap-img.com
Page 39 of 79 SAP Version 4.6c
40. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsTransaction : Menu Path :
IMG – Production – Shop Floor Control – Master Data –OPKM Production Resources/Tools – Formulas
– Define Formula@ www.sap-img.com Page 40 of 79 SAP Version 4.6c
41. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsType in the Formula that you
want. Refer to the Formula Parameters (Tcode OPKL)for the Fields Name.@ www.sap-img.com Page
41 of 79 SAP Version 4.6c
42. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsWhere-is the Work Center
Formula Used? Transaction : SAP Menu Path : Logistics – Production – Master Data – Work Center
CR02 – Work Center – Change - CostingTo check the Formula, park your cursor at the Activity type and
click Extras – FormulaDisplay.The Work Center formula will be copied to the Production Order during
order creation(CO01).Define the Production Scheduling ProfileInitial IMG Action : Usually Not
requiredHere, you can create the production scheduling profiles for specific plants.In a production
scheduling profile, you can • specify that in a production order or process order particular business
transactions are carried out in parallel • order auto release on order creation • generation of document
link from material master on order creation • generation of document link from BOM on order creation •
auto printing of shop floor papers on order release • scheduling on order release@ www.sap-img.com
Page 42 of 79 SAP Version 4.6c
43. A Step-by-Step Guide to the SAP PP Shop Floor Control Configurations • generation of document
link from material master on order release • generation of document link from BOM on order release •
specify that only partial quantities are to be confirmed in an availability check • specify that automatic
goods receipt should take place • enter an overall profile for capacity leveling • specify how the capacity
requirements of operations should go into the basic load • specify when finite scheduling is carried out in
the capacity availability check • specify that for the confirmation • no deficit quantities are updated • no
surplus quantities are updated • neither deficit nor surplus quantities are updated • an adjustment of the
operation and component quantities to the actual values takes place • make various specifications in the
area of batch management: • automatic batch creation on order creation • branch to batch classification
on changing a batch • extended batch classification via Customer Function Call • specify that only
transport requirements are created if transport requirements can be generated for all components in the
operation • specify that when transport requirements are generated either the committed quantity or the
required quantity are taken into account • specify that the creation of transport requirements takes place
automatically • specify which order type is proposed depending on the business process (make- to-
stock, make-to-order, engineer-to-order, order without material)You can assign a production scheduling
profile to a • material (work scheduling view in material master – Tcode MM01/MM02) • production
scheduler (Customizing – Tcode OPJ9)The assignment to the material has a higher priority.The
production scheduling profile is copied to the production order or processorder on order creation.
Transaction : Menu Path : IMG – Production – Shop Floor Control – Master Data – OPKP Trigger Point –
Define production scheduling profileDouble click the Plant to configure the detail settings.@ www.sap-
img.com Page 43 of 79 SAP Version 4.6c
44. A Step-by-Step Guide to the SAP PP Shop Floor Control Configurations@ www.sap-img.com Page
44 of 79 SAP Version 4.6c
45. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Production
SchedulerInitial IMG Action : RequiredIn this step, you define the production schedulers for your plants.
In addition to this, youcan assign a control profile to each production scheduler.By assigning production
schedulers to materials within the application, you can defineresponsibilities for a materials within
production activity control. Transaction : Menu Path : IMG – Production – Shop Floor Control – Master
Data – OPJ9 Trigger Point – Define production schedulerWhere-is the Production Scheduling Profile and
Production SchedulerUsed?Create (MM01) or Change (MM02) Material Master (Work scheduling
View)@ www.sap-img.com Page 45 of 79 SAP Version 4.6c
46. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine User Exits
SelectionInitial IMG Action : Not requiredMost companies will choose not to implement any additional
ABAP routines for selectinga routing or alternative routing unless really necessary.In this menu option,
you can permit the user to select task lists.You can define separate ABAP/4 routines for each of the
following parameters: • Task list application • Task list type • Selection IDThese parameters are then
automatically used to select a routing or a routing alternative. Menu Path : IMG – Production – Shop
Floor Control – Operations – Task List Selection – Define User SelectionDouble click on the Application
to configure the user-exits.@ www.sap-img.com Page 46 of 79 SAP Version 4.6c
47. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsSelect Routing
AutomaticallyInitial IMG Action : Usually Not requiredIn this menu option, you determine the selection
criteria for the automatic plannedselection of alternatives using the selection ID.You can define several
selection priorities for every selection ID. You allocate theselection criteria to these priorities in each
case.An alternative routing is searched for during the automatic planned selection ofalternatives that
corresponds to the selection criteria.Selection criteria are, for example: • Routing type • Task list usage •
Routing statusIf no alternative routing can be calculated, the SAP System continues searching with
theselection criteria of the next lowest selection priority.The selection ID is determined by the order type
within the production activitycontrol.Define the following for every selection ID: • Selection priority •
Routing type • Task list usage • Routing status Transaction : Menu Path : IMG – Production – Shop Floor
Control – Operations – OPJF Task List Selection – Select Automatically@ www.sap-img.com Page 47 of
79 SAP Version 4.6c
48. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsWhere do you define the
Usage and Status?You define Usage and Status when you create the Routing in transaction “CA01”.
TheTask List Type will be default as “N”.Define Default Values If No Routing ExistsInitial IMG Action :
Usually Not requiredIn certain company, routing might not required as BOM is only required for the
ProductionOrder. For this kind of requirement, you will configure this settings in which you specifywhich
data is contained in an operation that is automatically created during ordercreation.Within order creation,
you can determine that an operation is created automatically if norouting exists for the material to be
produced or no routing can be selected.The automatically created operation should contain the following
data, for example: • control keyThe control key specifies how an operation is processed (for example,
whether it isscheduled, costed, etc.) • operation number • operation short text • material group (only for
external processing) • work center where the operation is carried out@ www.sap-img.com Page 48 of 79
SAP Version 4.6c
49. A Step-by-Step Guide to the SAP PP Shop Floor Control Configurations Transaction : Menu Path :
IMG – Production – Shop Floor Control – Operations – OPJG Task List Selection – Define Default
ValuesSpecify the data for operations automatically created by the system.@ www.sap-img.com Page
49 of 79 SAP Version 4.6c
50. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Priorities for BOM
UsagesInitial IMG Action : Usually Not requiredHere, you can specify different sequences of priorities of
BOM usages.Every process relating to automatic alternative determination is represented via
anapplication. Among other things, a selection ID is calculated via this application. Theselection ID
conceals a certain sequence of priorities of BOM usages.When specifying the selection ID, you must
know the required applications.If you use only one BOM usage, you must define a selection ID with
priority 1. Transaction : Menu Path : IMG – Production – Shop Floor Control – Operations – Bill OPJI of
Material Selection – Define Priorities for BOM UsagesSpecify different sequences of priorities of BOM
usages according to your requirements.Define Applications for BOM ExplodeInitial IMG Action : Usually
Not requiredHere, you define the processes relating to automatic alternative determination.Every
process is represented via an application. You need this application in order toexplode a BOM during
order creation.The alternative determination is controlled both by the application and the settings in
thematerial master.In the material master, you can specify in the field "Alternative selection" whether
youwant an alternative to be selected according to one of the following parameters: • order quantity •
date • production versionVia the application, you specify the following criteria: • priority sequence for
BOM usage (selection ID)@ www.sap-img.com Page 50 of 79 SAP Version 4.6c
51. A Step-by-Step Guide to the SAP PP Shop Floor Control Configurations • priority of a certain
alternative for a special multiple BOM dependent on dateYou can specify per application whether the
settings should be taken into account for thealternative selection for multiple BOMs. These settings are
only taken into account if youselected the alternative selection according to date in the corresponding
material master. • take production version into accountIf you selected the alternative selection according
to production version in the materialmaster, you can specify here for every application whether this
setting should be takeninto account. If this setting is not to be taken into account, the alternative
selection iscarried out for the corresponding material and application according to order quantity. •
Indicator of the BOM statusDuring alternative determination, only those bills of material are taken into
account whosestatus at least contains the indicators specified here.During order creation, the application
is determined on the basis of order type.RequirementsYou must have processed the menu option
"Alternative selection for multiple BOMs"(Transaction OS32).Define the applications according to your
requirements. Double click on theApplications to configure the detail settings.@ www.sap-img.com Page
51 of 79 SAP Version 4.6c
52. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Alternative
Determination for ProductionInitial IMG Action : Usually Not requiredIn this menu option, you define how
automatic alternative determination is to run from thepoint of view of production.First process menu
option "Define applications" (Transaction OPJM). Menu Path : IMG – Production – Shop Floor Control –
Operations – Bill of Material Selection – Define Alternative Determination for ProductionEnter an
application depending on plant and order type.@ www.sap-img.com Page 52 of 79 SAP Version 4.6c
53. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Checking GroupInitial
IMG Action : Usually Not requiredHere, you define the checking groups. You must allocate each material
you want tochecked for availability to a checking group. You can allocate the material in thematerial
master.The checking group groups together materials checked according to the same criteria.Materials
can be grouped according to material type and/or MRP type, for example.You can also use the checking
group to control whether • the quantities confirmed in the availability check are to be locked • during the
check the normal ATP quantity or the cumulated ATP quantity is to be used.You allocate the checking
group to the material in the material master under theavailability check field in the MRP data screen.If
you have not maintained a checking group for a material, the material will not bechecked for availability.
Transaction : Menu Path : IMG – Production – Shop Floor Control – Operations – OVZ2 Availability
Check – Define Checking GroupDefine the necessary checking rules.@ www.sap-img.com Page 53 of
79 SAP Version 4.6c
54. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Checking RuleInitial
IMG Action : Usually Not requiredHere, you can define checking rules for the following applications:
Sales and distribution MRP Production order processing Maintenance order processing Inventory
managementYou can thus carry out various application-related checks for a material. Menu Path : IMG
– Production – Shop Floor Control – Operations – Availability Check – Define Checking RuleFor the
company, define whether there is a need to check on a differentiated basis foreach application.Define
Scope of CheckInitial IMG Action : Usually Not requiredHere, you define the check scope. Checking
group and checking rule together specify thescope of the check.You can specify the following: • which
elements relevant to MRP (inward goods movements/outward goods movements) are taken into
account (for example, purchase requisition, purchase order, planned order) • which stock categories are
taken into account • whether replenishment lead time is checkedSpecify • which inward goods
movements and which outward goods movements are to be included in the availability check • which
stocks are to be included in the availability check • whether the check should take into account the
replenishment lead time • whether the availability should always be checked at plant level.@ www.sap-
img.com Page 54 of 79 SAP Version 4.6c
55. A Step-by-Step Guide to the SAP PP Shop Floor Control Configurations Transaction : Menu Path :
IMG – Production – Shop Floor Control – Operations – OPJJ Availability Check – Define Scope of
CheckDouble click the Checking rule to configure the detail settings.@ www.sap-img.com Page 55 of 79
SAP Version 4.6c
56. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Checking Rule for
Backorder ProcessingInitial IMG Action : Usually Not requiredHere, you can determine a checking rule
per plant for backorder handling. The checkingrule determines the scope of check for backorder
handling.It is recommended that you use the same checking rule for backorder handling as you dofor
availability checks.Menu Path : IMG – Production – Shop Floor Control – Operations – Availability Check
–Define Checking Rule for Backorder ProcessingDefine the necessary checking rules.@ www.sap-
img.com Page 56 of 79 SAP Version 4.6c
57. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsSpecify Scheduling
TypeInitial IMG Action : Not requiredHere, you define the scheduling type, which determines how the
SAP System shouldcarry out scheduling. There are the following options: Forwards Backwards No
scheduling "Today" scheduling Basic dates with times (only for process orders)You can save the
scheduling type in the control data for scheduling depending on theorder type. It is then proposed by the
SAP system when an order is created.Scheduling types are predefined in the SAP standard package. It
is recommended thatyou work with these predefined scheduling types. Transaction : Menu Path : IMG –
Production – Shop Floor Control – Operations – OPJN Scheduling – Specify Scheduling Type@
www.sap-img.com Page 57 of 79 SAP Version 4.6c
58. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Standard Value
KeysInitial IMG Action : RequiredHere, you can maintain the standard value keys. The standard value
key determines themeaning of the standard values. It is used to assign parameter IDs to the six
standardvalues of operations and the work in network activities.These parameter keys determine the
following: • the key word displayed for the standard value on the screen, for example, setup, machine,
labor, tear down • the dimension (for example, time, quantity, volume) of the standard valueAt the same
time, the parameter IDs are the names used for the standard values for thecalculation of: • execution
time • capacity requirements • costsA parameter which is to be used in a standard value key must have
the origin "2". Transaction : Menu Path : IMG – Production – Shop Floor Control – Operations – OPJQ
Scheduling – Define Standard Values Keys1. Define the parameter IDs for the standard standard
values.2. Define the standard value key.Double click on Standard values to configure the detail
settings.@ www.sap-img.com Page 58 of 79 SAP Version 4.6c
59. A Step-by-Step Guide to the SAP PP Shop Floor Control Configurations@ www.sap-img.com Page
59 of 79 SAP Version 4.6c
60. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsWhere-is the Standard Value
Key used?The user define the Standard Value Key when they create the Work Center – tabstripsBasic
data (transaction CR01).Define Scheduling Margin KeyInitial IMG Action : Not requiredThe system will
calculate a longer Start and Finish period when the user create theProduction Order if addition buffer
days are configured.In this menu option, you specify time floats for scheduling as well as the release
periodfor order release.The following floats are defined: float before productionThis is the time between
the order start date and the scheduled start date. float after productionThis is the time between the
order finish date and the scheduled finish date.@ www.sap-img.com Page 60 of 79 SAP Version 4.6c
61. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsThe release date is
calculated by adding the release period. The order release is carriedout on this date.Via the release
period key you can specify the following for each material: • float before production • float after
production • release periodThe following parameters are always defined in days: • float before
production • float after production • release period Menu Path : IMG – Production – Shop Floor Control –
Operations – Scheduling – Define Scheduling Margin KeyDefine the release period key for the
material.Define Capacity CategoriesInitial IMG Action : RequiredYou can assign several capacities of
different capacity categories to a work center.Capacity categories can be, for example: • Machine •
Personnel • Setup personnel • EmissionsYou have to define the availability for every capacity of the work
center (for example,work start, work finish, calendar, etc.). You can create these values as default
values foreach plant and capacity category.@ www.sap-img.com Page 61 of 79 SAP Version 4.6c
62. A Step-by-Step Guide to the SAP PP Shop Floor Control Configurations Menu Path : IMG –
Production – Shop Floor Control – Operations – Capacity Requirements Planning – Define Capacity
Categories1. Define the possible capacity categories.2. Define the default values for the capacity
categories.Where-is Capacity Categories used?The user assigned the Capacity category when they
create the Work Center –tabstrips Capacities (transaction CR01).@ www.sap-img.com Page 62 of 79
SAP Version 4.6c
63. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Single Screen Entry
for Time Ticket ConfirmationsInitial IMG Action : Usually Not requiredIn this step you define the
confirmation profile for single screen entry of time ticketconfirmations and also for reprocessing time
ticket confirmations containing errors.You can define the layout of the entry screen. When you do this,
you define which inputand output fields are displayed and in which order. These definitions are saved
inprofiles. A profile is assigned to an individual user in the user parameter CORUPROF(transaction
SU01 – Click Changed button – Parameters tabstrips – Enter ParametersCORUPROF and Value Profile
Name.ReprocessingThe reprocessing indicator defines whether the profile is to be used for single
screenentry or for the reprocessing of time ticket confirmations with errors. Under one profilename, you
can have a definition for each application situation.Standard profileWith the Standard prof. indicator, you
can define that the profile is to be used as thestandard profile. Only one profile each can be defined as
the standard profile for singlescreen entry and reprocessing of time ticket confirmations with errors. The
standardprofile is then used if no profile has been assigned to the user in the user
parameterCORUPROF or if the profile that has been assigned does not exist.Area selectionIn the
header area you can define which data is to identify the operation to be confirmed.Here, for example,
you can define whether only the confirmation number and/or order,sequence, operation can be
entered.In the detail areas, you define which information can be entered for the operation to
beconfirmed and in which order the fields in question are displayed. You can select up toseven detail
areas, each containing one group of possible entry fields. Note that everyinput and output field can only
be issued once. When you save, the system automaticallychecks whether this rule has been adhered to.
To carry out this check beforehand,choose the pushbutton Check area selection.Titles can be assigned
to the detail areas, which are reproduced on the pushbuttonsabove the corresponding area. You can
use these pushbuttons to open and close theareas. This means that the number of fields on the screen
can be kept to a minimum.With the "Closed" indicator you define that the area is to be closed when the
function isfirst called up.You can display a preview of the individual area and also of the entire entry
screen. To dothis, choose the corresponding pushbutton (Header area preview, Detail area preview,List
screen preview )Defaults • Confirmation function@ www.sap-img.com Page 63 of 79 SAP Version 4.6c
64. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsYou define whether a partial
confirmation, final confirmation or a final confirmation withposting of open reservations is to be
proposed. • Default valueYou can define the time of default determination for quantities and/or activities:
• no proposal • immediate proposal • proposal when savingFor default determination • the quantity that
is still to be confirmed is calculated • the activities are calculated in proportion to the quantities •
Activities/forecastFor both the activities and forecast values, you can define 6 texts that are
displayedduring confirmation entry. These texts are overwritten with the texts from the standardvalue
key in the work center after you have chosen ENTER. If you want to prevent thisfrom happening, set the
indicator "Fix text". You can hide activities or forecast values forwhich you do not want to enter a
confirmation by setting the indicator "Hidden".Maintain language-dependent textsThe texts entered for
the pushbuttons in the detail areas, as well as for the activities andforecast values, are saved in the
logon language. If you want to process the texts inseveral languages, use the IMG activity "Maintain
Language-Dependent Texts".Profile assignmentThe confirmation profile assigned to a user depends on
the application and theCORUPROF parameter entry in the user parameters: • Single screen entryA
profile is used that agress with the CORUPROF parameter entry and in which thePostprocessing
indicator has not been set. • PostprocessingA profile is used that agress with the CORUPROF parameter
entry and in which thePostprocessing indicator has been set.If the user has not been assigned a
confirmation profile in the CORUPROF userparameter or the assigned profile does not exist, then the
standard profile for theapplication is used. If there is not a standard profile, a firmly defined user
interface ispresented. Transaction : Menu Path : IMG – Production – Shop Floor Control – Operations –
OPK0 Confirmation – Single Screen Entry – Define Single Screen Entry1. Define the confirmation
profile.2. Display the preview of each profile and check the profiles.3. Enter the texts for the profile in
other languages, if necessary (IMG activity Maintain Language-Dependent Texts).4. In the user
parameter CORUPROF, assign confirmation profiles to the individual users.For the detail areas, there
are also 3 screens available whose layout you can defineyourself. The definitions required for this are
made via the user exit CONFPP07.@ www.sap-img.com Page 64 of 79 SAP Version 4.6c
65. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDouble click on the Confirm
profile to change the screen setting for “CO11N”.Tick the Standard Profile if you want the settings to be
default whenever CO11N is used.After the changes, click the Preview button to check the screen
layout.Area selection Tabstrips@ www.sap-img.com Page 65 of 79 SAP Version 4.6c
66. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefault TabstripsMaintain
Language-Dependent TextsInitial IMG Action : Not requiredThis configuration are for those with a
multiple language environment.In this step, you can maintain the texts in the profile for single screen
entry ofconfirmations in several languages: • Push button text in the header area • Push button texts in
the detail areas • Activity texts • Forecast texts Transaction : Menu Path : IMG – Production – Shop Floor
Control – Operations – OPK0T Confirmation – Single Screen Entry – Maintain Language-Dependent
TextsMaintain the confirmation profile texts in the languages required.@ www.sap-img.com Page 66 of
79 SAP Version 4.6c
67. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsDefine Reasons for
Variances for Production ScrapInitial IMG Action : RequiredIn this menu option, you define the causes of
variances. You thus define the reasons thatcan be given if a variance occurs, in order to document this
variance.Variances might be: • scrap on a quantity basis • excess consumption of activities •
longerexecution time • other resource, etc. Transaction : Menu Path : IMG – Production – Shop Floor
Control – Operations – OPK5 Confirmation – Single Screen Entry – Define Reasons for VariancesDefine
the possible causes of variances that could occur in your company.@ www.sap-img.com Page 67 of 79
SAP Version 4.6c
68. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsWhere-is the Production
Reason Code used?The Reason Code is used when the user enter a Scrap quantity during the
ProductionOrder confirmations. Every Scrap quantity must have a reason attached to it.Define Print
Control for Shop Floor PapersInitial IMG Action : RequiredIn this step you make the settings necessary
for printing shop floor papers (transactionCO04N) or directly from the production order (menu –
Functions – Print).If you do not want to use the standard shop floor papers then you first have to design
anew layout set (ABAP effort will be required).Use a standard layout set as a reference (for example
PSFC_STD_LAYOUT) to write anew print report.Use as a reference a print program that belongs to the
standard layout set (for example,PSFCCONF) Transaction : Menu Path : IMG – Production – Shop Floor
Control – Operations – OPK8 Confirmation – Define Print Control@ www.sap-img.com Page 68 of 79
SAP Version 4.6c
69. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsTo define the print control,
proceed as follows: 1. Maintain the list names. 2. Define the spool parameters for the user. 3. Maintain
the reference order types. 4. Maintain the layout sets and maintain the relevant parameters for them. 5.
Maintain the print programs for each list. 6. Specify the transactions from which you can print and
maintain the relevant parameters for them. (list control for transactions). 7. Maintain the printer
specification. 8. Specify the spool parameters for the print procedure. 9. If necessary define the table
accesses for the individual fields in the lists.Click Spool parameters for user to reach this screenDouble
click on the User Name to the Print List and Printer Name for each user.The control are Plant and User
Login name.Listed in the Spool parameters for user are all the user names that are allowed to printthe
shop papers.Double click on the user name that are allowed to print the shop papers.Here you tick on
the Print column the Print Shop Paper Layout that will be used. Youcan specify the default printer if you
want. To print immediately, just tick the Immed.column.@ www.sap-img.com Page 69 of 79 SAP Version
4.6c
70. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsClick Reference order types
to configure the RefOrdType for the Production Order.Click Forms to configure any new SAPscripts that
you may have.Click on Print programs to configure any new Report name you may have.Click on Printer
Specification and configure how you want to control the Output device.@ www.sap-img.com Page 70 of
79 SAP Version 4.6c
71. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsClick on Flow control for
transactions to configure how you want to process theprinting.@ www.sap-img.com Page 71 of 79 SAP
Version 4.6c
72. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsPreparing the Initial
Implementation of the PP Shop Floor Control ModuleBefore the live-implementation of the SAP system,
there will be a cut-off day to turn-onfrom the OLD to the NEW SAP system. The PP Shop Floor Control
module is one of themost important module although it belongs to the last process flow because
theProduction Floor will based on the Production Order Generated to produce the FinishedGoods for the
Customer.As a PP consultant, you have to inform the users that they have to get those CRITICALdata
into the system before going live. Work Center Master Bills of Materials Master Routing
MasterRemember that when the user create a new Production Order, the system will READfrom the
BOM and Routing Master.Take note that the Master data can be input into the SAP system even
BEFORE goinglive as long as there are no transaction postings such as Production Confirmation
whichwill impact the Financial figures.Normally, in an on-going business, there will be existing OPEN
non-SAP ProductionOrder. You must let the EVERYONE know that as the days come nearer to
theimplementation date, they must try to keep the OPEN non-SAP Production Order quantityjust enough
to be CLOSE before going live. For e.g. if the ACTUAL production quantityis 10,000 and they estimate
that they can only complete 3,000 by the time of theImplementation, they should only CREATE the
production order to produce 3,000 only.The other 7,000 should only be created AFTER going live on the
NEW SAP system.How about those Process Incomplete Production Order?In a manufacturing
environment, Division of Labor means Jobs are separated in stagesas to achieve maximum Productivity.
There are certain cases of Incomplete ProductionProcess where 3,000 was completed in Process 1.
When it reaches Process 2, only1,000 can be completed. In this case, the user still have to close the
non-SAP ProductionOrder and RE-OPEN a new SAP Production Order for the remaining 2,000 for
Process 2.They have to take note of the difference either on the non-SAP Production Order or as aText
note on the SAP Production Order.Production Floor users are also recommended to return all those
additional raw materialsto the Inventory Stores. This will aid in the accuracy of the Physical Stock count.
Theycan then re-draw the raw materials after going-live.@ www.sap-img.com Page 72 of 79 SAP
Version 4.6c
73. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsStatic versus dynamic data
conversionIn general, data could be classified as begin either static or dynamic data.Static data includes
items that are relatively stable such as vendor master, materialmaster, BOM, routing, work centers,
customer master, price agreement, material group,activity prices, cost centers etc.Dynamic data
includes items such as inventory balances, A/R balances, A/P balances,GL balances, Open Production
Orders, Open Sales Orders, Open Purchase Orders andPlanned Independent Requirements.In general,
we will have lots of time to convert the static data but insufficient time to rushthe dynamic data into the
system. This is because dynamic data must be converted witha clear cut-off date. This means that the
balances must be that of the same point intime in order to ensure the integrity of data.Where the volume
of data in relation to the number of end users is high, we will considerautomating the conversion,
provided that data is available from the old system.If the volume is low or if data is not available from the
present system, users should keythe data directly into SAP. This approach has an added and important
benefit oftraining the end users in the operation of the SAP system.A Sample Note to users regarding
the Uncompleted Production OrdersThis is the most complex area for conversion. We must take the
following step tominimize the number of uncompleted production orders. Three weeks before the cut-
over date, all un-started and newly created production orders will be marked with a special color code. A
bold instruction “Do not record component issue and labor cost until completion” will be stamped on
these production orders. We will withhold the recording of material issues and production activities in the
Old System and related systems if the production orders are color coded. If the production orders are
completed and need to be received into stores before the cut-over date, we will then enter the
component issue and labor activity to the production orders before the goods receipts of the finished
product. If the production orders are not completed before the cut-over date, we will manually create the
production orders in SAP and enter the confirmation in SAP. Material issue will be performed in the SAP
after the cut-over date. If stock take of raw material take place on the cut-over date, we must take care
to add back the raw materials which issue has been withheld. For the purpose of general ledger, we will
manually compute an accrual and reversal entry to ensure that proper cut-off are observed for
accounting purposes. The entry to put through to FY19XX in the old GL system prior to its conversion is
to Dr WIP, Cr Raw Material (for the material component) and to Dr WIP Cr Manufacturing cost for the
labor component. The reversal entry for FY19YY should be Dr Raw Material Cr WIP (for the raw material
component) and Dr WIP Change account Cr WIP for the labor component.@ www.sap-img.com Page 73
of 79 SAP Version 4.6c
74. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsAppendix A: The Production
Order Status Business Process FlowThe Production Order Status refer to the business process flow of
the current ProductionOrder. This is a way for the system to control the different activities of the user on
theProduction Order.An example of a Production Order Business Process Flow:1. A Planner User
convert the Plan Order to a Production Order, the initial status will be CRTD. The status CRTD means
that this order is not firm for Production.2. The Production User will not be able to Print Out the
Production Order until the Planner User Release it which will change the status to REL.3. The Planner
User Release the Production Order (CO02 – Functions – Release) and the Production User will be able
to print out the Production Order (CO04N) for actual Production. After printing the Shop Floor Paper, the
order will include the status PRT to inform the user that this order have been printed.4. Actual
Production started and upon completion the Production User will input the Production information which
they have collected and written on the Shop Floor Paper into the SAP system. This is called Production
Confirmation (CO11). An Order which is partially completed, will include the status PCNF. Once it is Fully
completed, the status will change to CNF.5. A fully completed production order means that the materials
has turned into a Finished Product which is really to be ship to the Customer. The Delivery User will
receive the fully completed Production Order (which is the Finished Product - MB31) into his warehouse
and he can then delivered it to the customer. Finally, the status will include DLV which means that the
whole Production Order process have been completed.6. In cases where the Production Order was
stopped due to the Customer Order Cancellation, the Production User can closed the Order by setting
the status to TECH (CO02 – Functions – Restrict Processing – Technically Complete).@ www.sap-
img.com Page 74 of 79 SAP Version 4.6c
75. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsA Sample of the SAP
Production Order Screen – CO01/CO02@ www.sap-img.com Page 75 of 79 SAP Version 4.6c
76. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsAppendix B: How to make
enquiry on Open Production Orders?Transaction : SAP Menu Path : Logistics – Production – Production
Control –COOIS Information System - Production Order Information SystemThe default enquiry is by
Order Headers. You can make enquiry by Operations if youwant to by changing the List Profile. To list
the Open Production Orders, make used ofthe System Status and exclude all status with CNF
(Confirmed) and DLV (Delivered).@ www.sap-img.com Page 76 of 79 SAP Version 4.6c
77. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsAppendix C: What is
Backflushing and Where is the Indicator Set?In SAP context, Backflushing means to consumed those
Materials that have been usedduring the course of the Manufacturing Process. To produce something,
raw materialsmay be required. With reference to the Bill of Materials, the Purchaser will buy
thosematerials based on the requirement prompt by the SAP MRP system. Upon finishing
theManufacturing Process, raw materials will be used up to produced the Finished Goods forthe
Customer.The Planner will determined at which Production Operation will this components beconsumed
and set the Backflushing indicator accordingly.To set the Backflushed Indicator: Transaction : SAP Menu
Path : Logistics – Production – Master Data – Routings – CA01/CA02 Routings – Standard Routings –
Create/ChangeAssuming that you have built the BOM and input the Work Center for each
Operations.This is the first screen when you enter CA02. Now, click the CompAlloc button.At the
CompAlloc screen, you will see the Backflushing Indicator. A tick will indicate thatthe Components will be
deducted when the Production User do the ProductionConfirmation. If the Backflushed Indicator is grey,
this mean that Backflushing havenot been assigned. To assigned it, click the New assignment button.A
New assignment screen will pop-up. Just input the Operations that you want theComponents to be
Backflushed. When the Planner create a Production Order, thesystem will read the Routing Master data
and copied all this information to the ProductionOrder.@ www.sap-img.com Page 77 of 79 SAP Version
4.6c
78. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsUltimately, it still the
Production Order will decide which Operation will the Componentsbe Backflushed.At the First Screen in
CO01/CO02 – Production Order Create/Change, click theComponents Overview button.The Backflushed
Indicator will be copied from the Routing but the Planner still canchanged it in the Production Order.@
www.sap-img.com Page 78 of 79 SAP Version 4.6c
79. A Step-by-Step Guide to the SAP PP Shop Floor Control ConfigurationsChecking the Backflushing
Goods MovementWhenever the user post a confirmation with CO11N, the backflushing components
goodsmovement will be tied to the production order. You can check them with TcodeCO02/CO03 by
clicking the menu Goto – Documented goods movements.@ www.sap-img.com Page 79 of 79 SAP
Version 4.6c
SAP Production PlanningRupesh Brahmankar
299,151 views
SAP PP End User DocumentY. Z. MERCAN
12,834 views
SAP PP Case study by Murali Krishna Nookellamuralikrishnanookella
15,193 views
SAP PP PI Dairy ConfigurationNikhil Belpande
4,501 views
SAP PP - Production Planning - Coursealfilmanagement
772 views
Production Planning and Control
Recommended
Swatanu Satpathy
57,841 views
Production planning and controlLaxmikant Deshmukh
49,796 views
Pp interview questionssuryanarayana tata
2,986 views
Sap production planningSourav Dass
2,907 views
Production planning & controlamirthakarthi
29,476 views
Sap configuration-guideGovind Vikram Aggarwal
41,732 views
PP 01 (Maintain PP Master Data) V1.0pimporn
10,163 views
Production planning and controlNumero Uno
8,488 views
Variant Configurition in SAP: Beginners Guide | www.sapdocs.infoY. Z. MERCAN
17,231 views
Production planning & control(ppc)Abu Bashar
13,265 views
English Espanol Portugues Français Deutsche
About Blog Terms Privacy Copyright
LinkedIn Corporation © 2015