MetroPlan OrlandoCitizens’ Advisory Committee
Refined North/South Corridor Update - September 28, 2011
![Page 2: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/2.jpg)
Purpose of Today’s Update Provide study progress to date Review status of East/West and
the Parramore BRT corridors Present refined North/South
Corridor alternatives Present summary of public input Review study schedule
www.lymmostudy.com
![Page 3: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/3.jpg)
Study Progress To Date
www.lymmostudy.com
Since March 2010 – Evaluated possible expansion of LYMMO based on technical analysis and public input East/West Corridor Parramore Corridor North/South Corridor System Analysis
![Page 4: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/4.jpg)
Current Status
www.lymmostudy.com
Initial Alternatives
Analysis
Refined Alternatives
Analysis
Locally Preferred
Alternative
Agency/Jurisdiction
Approval
Environmental Study
Design/ Build
Funding Application
East/West Corridor
Parramore Corridor
North/South Corridor
We Are Here
System Analysis Model
Development Underway
Not Currently Funded
System AA Report
![Page 5: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/5.jpg)
LYMMO East/West and Parramore CorridorsLocally Preferred Alternatives
www.lymmostudy.com
![Page 6: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/6.jpg)
Initial North/South Corridor Alternatives
www.lymmostudy.com
North South
![Page 7: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/7.jpg)
Corridor Screening Process
Subarea OptionsEast/WestParramoreNorthSouth
Subarea OptionsEast/WestParramoreNorthSouth
Refined Option(s)
Refined Option(s)
Base Build Alternatives
Base Build Alternatives
Refined Alternatives
Refined Alternatives
www.lymmostudy.com
Screening evaluation based on the six goals:1. Improve Mobility and Transit Accessibility
2. Assure Equitable Transportation Options
3. Enhance the Quality of the Environment
4. Enhance the Social Integrity of the Community
5. Develop Transportation Options that are Financially Viable
6. Promote Economic Development
![Page 8: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/8.jpg)
Public Input
www.lymmostudy.com
Meetings/events were held to solicit public input on the North/South Corridor College Park Neighborhood Association – February 7
Downtown South Main Street (Board of Directors) – February 10
Lake Formosa Neighborhood Association – July 19
Park Lake Highland Neighborhood Association – July 21
Mills50 Main Street (Design Committee)– August 2
Wadeview Park Neighborhood Association – August 8
Ivanhoe Village Main Street (Board of Directors) – August 10
Ivanhoe Village Main Street (Merchant Mixer) – August 15
South Corridor Neighborhood Update – August 29
![Page 9: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/9.jpg)
North CorridorProposed Refined Alternatives
www.lymmostudy.com
1. Alden Rd./Hospital 2. Orange Ave./Hospital/College Park
![Page 10: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/10.jpg)
North CorridorProposed Refined Alternatives
www.lymmostudy.com
4. Orange Ave./Hospital/College Park/Mills Park via Rollins St./Princeton St. (Two Routes)
3. Orange Ave./Hospital/Mills Park via Rollins St.
![Page 11: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/11.jpg)
North CorridorProposed Refined Alternatives
www.lymmostudy.com
5. Orange Ave./Hospital/Mills Park via Princeton St./Virginia Dr.
![Page 12: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/12.jpg)
North CorridorPublic Comments
www.lymmostudy.com
• Majority preferred Alternative 4 with some combinations:
Alternative 4 with a loop on Virginia Drive Alternative 4 and 5 (most preferred) Alternative 5 with connection to College Park Alternative 2 and 5
Alternative 4 Alternative 5Alternative 2
![Page 13: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/13.jpg)
North CorridorPublic Comments
www.lymmostudy.com
• Other alternatives (provided by Ivanhoe Village)
Connect to Baldwin Park Further north/south on Edgewater Drive Further south on Mills Avenue
![Page 14: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/14.jpg)
South CorridorProposed Refined Alternatives
(South St. to Miller Ave.)
www.lymmostudy.com
1. Lucerne Ter./Sligh Blvd. 2. Orange Ave./Gore St./Sligh Blvd. 3. Orange Ave./Columbia St./Sligh Blvd.
![Page 15: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/15.jpg)
South CorridorPublic Comments
www.lymmostudy.com
• Majority preferred Alternative 3 with a combination of either Alternative 2 or 3
Alternative 3Alternative 2
![Page 16: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/16.jpg)
South CorridorProposed Refined Alternatives
Southern End Options (Miller Ave. to Michigan St.)
www.lymmostudy.com
1. Stop at Sodo via Orange Ave. 2. 2-Way on Orange Ave. 3. Orange Ave./Delaney Ave./Miller Ave. Loop
![Page 17: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/17.jpg)
South Corridor (Southern End Options)
Public Comments
www.lymmostudy.com
• Majority preferred Alternative 2 and 3with some combinations:
Alternative 1 and 2 without entering Sodo Alternative 2 and 3 without entering Sodo Phase in Alternative 1, 2 and 3 Access Sodo in front of Target via Crystal Lake Street Alternative 1 and 2 - Alternative 2 could be phased in once
development occurs near Michigan Street
Alternative 2 Alternative 3Alternative 1
![Page 18: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/18.jpg)
Study Schedule July to October 2011 - LYMMO North/
South Corridor refined alternatives analysis (including Trunk Corridor)
November to December 2011 – Added public outreach and identify Locally Preferred Alternative (LPA)
January to February 2012 – Complete System AA
North/South Corridor LPA evaluation Connections to East/West and Parramore
BRT System implementation strategy
www.lymmostudy.com
![Page 19: Www.lymmostudy.com MetroPlan Orlando Citizens’ Advisory Committee Refined North/South Corridor Update - September 28, 2011.](https://reader035.fdocuments.net/reader035/viewer/2022062713/56649ceb5503460f949b6420/html5/thumbnails/19.jpg)
Contact Information
Alan DanaherProject ManagerPB Americas, [email protected]
Ginger CorlessPublic Outreach CoordinatorHHI Design407.838.2559 (office)407.616.5500 (cell)[email protected]