Wurster studio608 portfolio
-
Upload
maxwurster -
Category
Documents
-
view
224 -
download
2
description
Transcript of Wurster studio608 portfolio
Max Wurster - Studio 608 Portfolio - Fall 2014
`
8th
STR
EET
RED
EVLO
PMEN
T
8th East
Continued from phase two the 8th Street Redevelopment seeks to integrated required program into the downtown fabric of Lawrence Kansas. The site, located between Massachusetts and Vermont Street along the new pedestrian zoned 8th Street, is in a high traffic area. The problem statement left open 3000 sqft to be assigned as seen fit. The 8th Street Redevelopment contains a ‘Maker’s Space’ as the open program. This program compliments the 9th Street Corridor Project currently under development and also supports the Warehouse Arts district of Lawrence. The main idea of the proposal is to incorporate passive and active ‘green’ strategies, provide a conditioned exterior space, and to create a dialogue between the adjacent buildings mainly the revamped Fire Station.
1 | Wurster
Axis Plaza Two Story Bar
PRECEDENTS
WMS BOATHOUSE
USINA DEL ARTE
BOMBAY SAPPHIRE
SITE PLAN
AXIS GENESIS AXIS DEVELOPMENT TRAFFIC CALMING
Wurster | 2
Office Axis Conditioned Space
FIRST FLOORTHIRD FLOOR OF 123 W. 8TH
SECOND FLOOR
SPLIT FORM
SAWTOOTH GENERATION
FOLDED SAWTOOTH
3 | Wurster
8TH STREET ELEVATION
AXIS ELEVATION - SOUTH
VERMONT ELEVATION
Wurster | 4EXPLODED AXON - LOBBY CORNER
5 | Wurster
STEEL FRAME
Wurster | 6
PASSIVE AND ACTIVE ‘GREEN’ SYSTEMSGEOTHERMALSOLAR PANELS & LOUVERS
7 | Wurster
EAST WEST SECTION - SOUTH
NORTH SOUTH SECTION - WEST
NORTH SOUTH SECTION - EAST
Wurster | 8Maker’s Space
9 | Wurster
PHASE II - 8TH STREET CORRIDOR
Wurster | 10
PHASE III - CLOSE UP OF BUILDING
11 | Wurster
PHASE III - GREEN SPACE
Wurster | 12
PHASE III - OVERALL
13 | Wurster
PHASE III - SECTION MODEL
Wurster | 14
13 | Wurster
Wurster | 14
`
Phase II was completed by Allison Wilke and Max Wurster. The design was a combined effort of both parties. We divided the production on the final work such that Allison created the board layout and the content with help by Max. The model was generated, laser cut, and assembled by Max with help by Allison.LA
WR
ENC
E M
AST
ER P
LAN
NIN
G
PHASE II - FIRE STATION REVAMP
PHASE II - CASE STUDY
`
PHASE II - CASE STUDY
PHASE II - RESEARCH
`
PHASE II - PLAN
PHASE II - 8TH STREET
`
PHASE II - RENDERINGS
`
`