WTE presentation 17 Oct 2011 - Yukon Energy · Microsoft PowerPoint - WTE presentation 17 Oct 2011...
Transcript of WTE presentation 17 Oct 2011 - Yukon Energy · Microsoft PowerPoint - WTE presentation 17 Oct 2011...
18 October 2011
CurbsideCollection; Street b l ll ti
Waste Management Bylaw
barrel collection; Education and Enforcement;
Solid Waste Bylaw Landfill
Waste Management Bylaw Waste Management Facility
Landfill
Compost SiteE‐waste
Waste Management Facility
HHW Recycling/Re‐Use
Scrap Metal TiresScrap Metal Tires
•May 2009 – last revision accommodates City‐wide Cartsy y
•Opportunity to incorporate current waste management practices and to remove redundancyp y
• Environmental liability!! ‐ better control and education on acceptable items being landfilled and compostedon acceptable items being landfilled and composted
•Catalyst ‐ E‐waste•Do not want E‐waste landfilledDo not want E waste landfilled• Tipping fees do not adequately cover costs
C ll ti T t ti Di lCollection Transportation Disposal
Di t d d fDivertedCompostable
Recyclable/Large metal
LandfilledControlled waste
Banned from land filling
Biomedical/HazardousRecyclable/Large metal
Re‐useableResidual waste
Biomedical/Hazardous
Tires
E‐waste
•Draft Bylaw to City Solicitor•Draft Bylaw to City Solicitor
•Draft Bylaw to stakeholders
•Bylaw to Council
• Plastic clogs screen
• Hazardous waste, garbage, recyclables –compromise compost quality
Vanessa BraultVanessa Brault
30
35
15
20
25
01‐Feb‐11
14‐Feb‐11
0
5
1028‐Feb‐11
0Copper
Ridge/LoganArkell/Ingrim Downtown Granger Hillcrest Takhini Porter Creek Riverdale
• Packer Operators recorded # of green carts in each Neighbourhood Contamination
neighbourhood that had obvious contamination
• 116 contaminated carts on average per week
Copper Ridge/Logan 2.1%Arkell/Ingrim 4.1%Downtown 2.7%Granger 2.4%Hillcrest 1 3%
• Recycling (confusion) + Wrong bags (confusion) + Garbage (deliberate/confusion)
Hillcrest 1.3%Takhini 5.2%Porter Creek 1.9%Riverdale 2.4%
• Targeted EducationTargeted Education
• Specific and relevant notices
f• Consequences for non‐compliance
• Partnership ‐ Public Groups, Partnership Public Groups,Bylaw, Public Works, Engineering and Environment
• Packer operators seePacker operators see contamination
• Stop emptying – put a warning sticker on the cart indicating the problem
• Fill incident form: address, Fill incident form: address,contamination, date, time
• Future incidents: not accepted; ti ith Cit iblmeetings with City; possible
fines; possible cancellation of services.
Internal Waste Program
E d ti t ll• Expand source separation to all buildings
• Individual offices responsible for• Individual offices responsible for own wastes
• Possible future separation of all precyclables
25,00025,000
20,00020,000
ar)
10,000
15,000
10,000
15,000
ntities (Ton
nes/yea
C&D
5,0005,000
Ann
ual W
aste Qua
Domestic From Outside
Domestic
Di d
00
A Diverted
‐5,000‐5,0002000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
composted 2 149
C&D 6,219recycled 2,500
2,149
curbside 1,798
ICI 12 968ICI 12,968
• Curb side collection $8 09 per month• Curb side collection ‐ $8.09 per month• Includes disposal and collection
• Tipping Fees• Commercial /MF ‐ $54.25 per tonne
• Outside tipping fees ‐ $100 per tonne
• Revenue offsets annual operating costs• Revenue offsets annual operating costs
• Full cost accounting study by City/YEC
• $1 4 million per year annual operating• $1.4 million per year annual operating• Fixed annual costs
• Gatehouse• Landfill disposal• Recycling• Testingg• Administration
• Per tonne disposal costs varies• Other costs not included in tipping fees• Other costs not included in tipping fees
• Landfill final cover• Leachate collection and treatment• Gas management
• Waste to Energygy
• Special Waste Facility
• Recycling Processors’ StudyRecycling Processors Study
• Improved Composting
• Goals:• Goals: • Zero Waste by 2040• 50% waste diversion 2015
wood 10%
plastic 1%
organics 8%
landfilled 49%metal 4%
plastic 1%
paper 7%
composted 10%
recycled 11%
Landfill Management Plan 2003• Forecast landfill life – 60 to 80 years
2012 Studies• Landfill Management Plan• Solid Waste Action Plan• Solid Waste Action Plan
• Waste to Energygy
• Special Waste Facility
• Recycling Processors’ StudyRecycling Processors Study
• Improved Composting
• 2012 Studies• 2012 Studies• Landfill Management Plan• Solid Waste Action Plan
• Goals: • Zero Waste by 2040• 50% waste diversion 2015• 50% waste diversion 2015
wood 2,295
l ti 205
organics 1,920
landfilled 11,250
metal 1,003
plastic 205
paper 1,527
composted 2,149
recycled 2,500