Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET...
Transcript of Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET...
![Page 1: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/1.jpg)
Wrap-Up Meeting of thepilot project on SIGMET Coordination in
South East Asia(MetMalaysia, MSS & BMKG)
Singapore27-29 March 2017
Agenda Item 4 (NMHS experiences and recommendations)
Hamray Bin Muhammad YazitMetMalaysia
1
![Page 2: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/2.jpg)
OUTLINES
INTRODUCTION
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
▪ Staff awareness and training
▪ Review of local procedures
▪ Installation of technical resources
LOCAL ACTIVITIES DURING TO OPERATIONAL PHASE
▪ Ongoing staff awareness and training
▪ Update of local procedures
▪ Completion of logbooks
▪ Resolution of technical difficulties
POSITIVE EXPERIENCES
AREAS FOR IMPROVEMENT
RECOMMENDATIONS
TRANSITION
OTHER ISSUES2
![Page 3: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/3.jpg)
INTRODUCTION
Two FIR involved:
o Kuala Lumpur (KL); and
o Kota Kinabalu (KK)
Meteorological Watch Office (MWO):
o Kuala Lumpur FIR – National Aviation Meteorological Centre(NAMC) at KLIA.
o Kota Kinabalu FIR – Sabah Meteorological Office (SMO) at KKIA.
Number of Meteorological Officer involved:
o NAMC – 10 (5 senior MO’s and 5 junior MO’s/ Shift/ 24 x 7)
o SMO - 10 (5 senior MO’s and 5 junior MO’s/ Shift/ 24 x 7)
3
![Page 4: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/4.jpg)
4
NAMC
Sabah Meteorological Office
![Page 5: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/5.jpg)
5
Forecaster’s Workstation Meteorological Data Processing System (MDPS)
SATAID and JMA web tool STAID, MDPS and ABT (Aviation Briefing Terminal)
NAMC
![Page 6: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/6.jpg)
6
DISPLAY SYSTEM AT NAMC
![Page 7: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/7.jpg)
7
SABAH METEOROLOGICAL OFFICE
HKO Web Tools and Meteorological Processing System
Forecaster’s Workstation
![Page 8: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/8.jpg)
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Staff awareness
Responsibility of MWO to prepare the SIGMET based on;
▪ International Standards and Recommended Practices (SARPs), Annex 3.
▪ Technical Regulations (WMO-No. 49), Volume II: Meteorological Service for International Air Navigation.
▪ ASIA/PACIFIC Regional SIGMET Guide.
The issues on SIGMET;
▪ Phenomena involve more than one FIR.
▪ No specific tools especially to locate the coordinate of phenomena.
▪ The accuracy of SIGMET (Movements, Intensity and Position of phenomena).
8
![Page 9: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/9.jpg)
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Training
The qualifications and competencies required of personnel involved in the provision of aeronautical meteorological services.
▪ Qualifications - Aeronautical Meteorological Forecaster (AMF) has successfully completed the Basic Instruction Package for Meteorologists;
▪ Competencies for AMF is implemented.
Familiarization on the use of Web Tool
▪ Refer to the manual of Web Tools.
▪ Using the Web Tools in daily SIGMET operation.
▪ Refer to JMA/HKO for any problems on Web Tools.
9
![Page 10: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/10.jpg)
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Training
Adoption the new SIGMET coordination procedures into actual operation.
▪ Use of web applications
▪ The completion of Log Book
▪ Coordinates the web applications and existing Meteorological Processing System in the dissemination of SIGMET.
Harmonization of SIGMET procedures;
▪ SIGMET coordination procedures
▪ Latest ASIA/PACIFIC Regional SIGMET Guide (5th Edition)
▪ Local Procedures
10
![Page 11: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/11.jpg)
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Training
Attended “Asia Pacific SIGMET WORKSHOP TOKYO 2016”
▪ Training conducted to other forecaster; and
▪ Materials used from workshop.
Study on Himawari Satellite products continuously.
▪ JMA Website
▪ MetMalaysia Himawari Satellite Processing System Manual
11
![Page 12: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/12.jpg)
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Review of Local Procedures
The new processes to be included in the local procedures;
▪ use of Web Tools for the weather monitoring;
▪ coordination with other MWO for phenomena involving more than one FIR;
▪ Use of Web Tools to generate the coordinate (latitude/longitude) of the SIGMET phenomenon;
▪ transfer the SIGMET which is generated from Web Tools to the existing processing system for the dissemination of SIGMET;
▪ monitoring of the SIGMET (ABT, SkyVector, AWC, JMA Web Tools); and
▪ record the coordination in Log Book; and
▪ Document references
12
![Page 13: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/13.jpg)
Previous SOP New SOP 13
![Page 14: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/14.jpg)
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Review of Local Procedures
Updates the references documents (manual/guidelines):
▪ Local Procedures;
▪ SIGMET coordination procedures; and
▪ ASIA/PACIFIC Regional SIGMET Guide.
Updates the use of the system/tools:
▪ Web Tools (Monitoring and Generating); and
▪ Meteorological Data Processing System (Monitoring,
Analysis/Forecasting and Dissemination)
14
![Page 15: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/15.jpg)
LOCAL ACTIVITIES PRIOR TO OPERATIONAL PHASE
Installation of technical or other sources
Installation of Web Tools:
▪ Refer to manual (JMA and HKO);
▪ Used existing workstation; and
▪ No upgrading on the network.
Satellite data (Himawari 8) and Composite Radar Network:
▪ Enhanced Infrared Satellite Image data updates every 10 Minutes into
SATAID and Meteorological Processing System; and
▪ Composite CAPPI (2 km) data updates every 10 minutes into
Meteorological Processing System.15
![Page 16: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/16.jpg)
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Ongoing staff awareness
Frequent discussion on the procedures:
▪ SIGMET coordination procedures;
▪ ASIA/PACIFIC Regional SIGMET Guide; and
▪ Local Procedures.
Attending the coordination monthly meeting:
▪ updates on new issues;
▪ new instructions/amendments of procedures; and
▪ Opportunities to share the knowledge.16
![Page 17: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/17.jpg)
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Ongoing staff training
All forecasters are involved in the discussion of any issues :
▪ during coordination (monitoring and analysis of weather); and
▪ actively involved in the case study (preparation).
Training on the system
▪ hands on training on the updated features available via Web Tools;
and
▪ other MetMalaysia Meteorological Systems (radar, satellite and WAFS
products) which is available for the purposes of monitoring and
analysis.17
![Page 18: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/18.jpg)
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Update of local procedures
Update accordingly from the monthly meeting highlights:
▪ Processes (Methodologies);
▪ Web Tools new features (JMA and HKO);
▪ local meteorological system (overlay radar data and satellite); and
▪ Add new document references (WMO, ICAO, etc)
18
![Page 19: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/19.jpg)
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Completion of logbooks
Number of SIGMET
19
![Page 20: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/20.jpg)
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Completion of logbooks
Number of SIGMET Coordination
20
![Page 21: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/21.jpg)
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Completion of logbooks
SIGMET Coordination Logbook
21
![Page 22: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/22.jpg)
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Completion of logbooks
Significant elements to be recorded in the logbook includes:
▪ Date of consultation;
▪ Consultation start and end time;
▪ Local MWO;
▪ Consulted by or consultation with neighbouring MWO;
▪ SIGMET sequence number;
▪ Phenomenon;
▪ Observed or forecast;
▪ Geographic area affected;
▪ Brief description of the consultation (reach consensus and/or nonconsensus);
▪ Full SIGMET message issued by the originating MWO; and
▪ Suggestions for improvement.
22
![Page 23: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/23.jpg)
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Completion of logbooks
Criteria for logbook completion:
▪ For any coordinated SIGMETs; and
▪ Recorded after the issuance of coordinated SIGMET.
Review logbook to identify any issues for further discussion (monthly
meeting as a case study).
Retain logbook (softcopy)
23
![Page 24: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/24.jpg)
LOCAL ACTIVITIES DURING OPERATIONAL PHASE
Resolution of the technical difficulties
Web Tools
▪ Call the front line maintenance team (24 x 7) for any problem
encountered on workstation and network;
▪ Report to WEB TOOL ADMINISTRATOR (JMA via BBS chatroom/email
and HKO (via HKO chatroom); and
▪ Call the Satellite Division for any problem on the SATAID Satellite
Images.
Other Meteorological Systems as a back-up for the SIGMET coordination.
▪ Corrective and preventive maintenance which is support by
maintenance team (office/Headquarters)24
![Page 25: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/25.jpg)
POSITIVE EXPERIENCES
Increase the knowledge and confident among forecasters through:
▪ Discussion with other MWO;
▪ Discussion on any issues encountered (case studies) in the monthly
meeting;
▪ Improve local SOP
▪ Cooperation at international level for development of SIGMET
Coordination Procedures and Guidelines; and
▪ Technologies (web tools) used for monitoring and generating of
phenomenon coordinate and SIGMET messages.25
![Page 26: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/26.jpg)
AREA FOR IMPROVEMENT
Methodologies used for the movement of phenomenon;
26
![Page 27: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/27.jpg)
AREA FOR IMPROVEMENT
Need to have a proper procedure to be included in the SIG-CoordGuidelines on determining the SIGMET consistency (to reachconsensus) {E.g: cloud top reference, movement & intensity}
27
![Page 28: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/28.jpg)
AREA FOR IMPROVEMENT
Usage of other satellite images. Eg. Cloud Type, etc.;
To include cloud type or other types of satellite images in web tools
Himawari 8 – Cloud Type 28
![Page 29: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/29.jpg)
AREA FOR IMPROVEMENT
Use of WAFC (graphic) for the monitoring of SIGMET
29
Graphic SIGMET
![Page 30: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/30.jpg)
AREA FOR IMPROVEMENT
Use of actual upper wind chart (0000UTC and 1200UTC);
30
Upper Wind Chart(1,000ft, 3,000ft, 5,000ft, 7,000ft, 10,000ft, 14,000ft, 19,000ft, 25,000ft, 32,000ft, 36,000ft and 41,000ft)
![Page 31: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/31.jpg)
AREA FOR IMPROVEMENT
31
FY2E ASEAN IR, 0000UTC, 23/02/17 HIMAWARI 8 ASEAN IR, 0020 UTC, 23/02/17
Verification on Infra-Red Satellite (position of phenomenon).
![Page 32: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/32.jpg)
AREA FOR IMPROVEMENT
32
Overlay IR Himawari satellite images with Radar CAPPI
(2km) Composite images, 0000UTC
IR satellite images, JMA Web Tools, 0100UTC, 23/2/2017
Verification on Infra-Red Satellite (position of phenomenon).
![Page 33: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/33.jpg)
RECOMMENDATIONS
WMO or JMA expert provide training on the application of satellite
images.
Involves other adjacent FIR
▪ Other adjacent FIR to Kuala Lumpur FIR : Bangkok, Yangon and
Chennai
▪ Other adjacent FIR to Kota Kinabalu FIR : Manila
33
![Page 34: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/34.jpg)
34
Kuala Lumpur , Kota Kinabalu and adjacent FIR
![Page 35: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/35.jpg)
TRANSITION TO FULL OPERATIONAL SIG-Coord
Commencement on 1st May 2017 at 0000UTC.
Support required
▪ JMA and HKO for web tools
▪ Training
35
![Page 36: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/36.jpg)
OTHER ITEMS/ISSUES
WMO and ICAO future plan
To disseminate Graphical SIGMET locally
To practice the usage of NWP products to forecast phenomena in the
issuance of SIGMET
36
![Page 37: Wrap-Up Meeting of the pilot project on SIGMET ... 4.2_Malaysia.pdf · pilot project on SIGMET Coordination in South East Asia (MetMalaysia, MSS & BMKG) ... o NAMC –10 (5 senior](https://reader034.fdocuments.net/reader034/viewer/2022051320/5aa331847f8b9aa0108e3e20/html5/thumbnails/37.jpg)