WP 3.2.1 – Closure of Open Issues
Status review
Date: 10th March 2010
Place:GMV-Skysoft, Lisbon
GNSS for INnovative Road Applications
GNSS for Innovative road Applications
Company’s
logo19/04/23 Page 2PRESENTATION TITLE VERDANA (9)
Parties involved
GNSS for Innovative road Applications
Company’s
logo
Contents
1. Overall objectives of WP3.2.1
2. Delivered items
3. Remaining issues
4. Completed Actions
5. Technical focus – Geo-Objects
6. Technical focus – Pre-trials
7. Exhaustive Trials Plan
8. End-to-End Trials Plan
9. Questions
19/04/23 Page 3PRESENTATION TITLE VERDANA (9)
GNSS for Innovative road Applications
Company’s
logo19/04/23 Page 4PRESENTATION TITLE VERDANA (9)
Definition of:
Exhaustive Performance Trials:• Definition of routes and Geo-Objects• Detailed trial objectives and procedures to reach them (GNSS Performance
evaluation, distance measurement performance, performance of GEO objects identification and charging performance)
• Detailed trials execution• Procedures for performance evaluation• Description of OBU and configurations
End-to-end Performance Trials:• Definition of additional Geo-Objects• Detailed trial objectives and procedures to reach them (overall assessment
of the capabilities of the system and performance analysis without a reference system)
• Detailed execution• Procedures for performance evaluation• Description of OBU configurations
Overall objectives of WP3.2.1
GNSS for Innovative road Applications
Company’s
logo19/04/23 Page 5PRESENTATION TITLE VERDANA (9)
Deliverable D3.1 GINA Trials Plan Revised document incorporating GMV feedback (V1.0) Revised document following GSA feedback (from Sverker
Almqvist) D3.1 included the following items:
– Defined Test Routes– Defined Exhaustive Geo-Objects– Defined Day Plans– Agreed OBU configuration – Defined Trial Requirements– Aenor Trial
Delivered Items
GNSS for Innovative road Applications
Company’s
logo19/04/23 Page 6PRESENTATION TITLE VERDANA (9)
Following Progress Meeting #3:
1. End-to-End Geo Object definition Closed
2. All Geo-Objects in shapefile format Closed
3. Calibration between GMV and Navteq reference systems Closed1. Pre-trials
4. Maximising benefits offered by Navteq vehicle Closed1. Providing Geo-Object data to Navteq2. Knowledge of Navteq vehicle trajectories during exhaustive trials
Remaining Issues
GNSS for Innovative road Applications
Company’s
logo
Completed Actions
19/04/23 Page 7PRESENTATION TITLE VERDANA (9)
GMV and ARVAL have provided a full list of End-to-End trial participants– TRL defined additional Geo-Objects based on this information
All Geo-Objects defined so far (Exhaustive and End-to-End) converted to shapefile format and delivered to Avego
Pre-trials for vehicles taking part in the Exhaustive trials set up by GMV– Calibration of Navteq and GMV reference systems
A suitable approach on the use of Navteq vehicle discussed with Navteq
GNSS for Innovative road Applications
Company’s
logo
47 Geo-objects over 3 routes
2 Charging areas
19/04/23 Page 8PRESENTATION TITLE VERDANA (9)
Technical Focus: Geo Objects (Exhaustive)
GNSS for Innovative road Applications
Company’s
logo19/04/23 Page 9PRESENTATION TITLE VERDANA (9)
Technical Focus: Geo Objects (Exhaustive - Navteq)
Conversation held with Navteq regarding the planned trajectories of the Navteq vehicle
Navteq supplied a list of municipalities Areas which overlap with GINA routes include:
– Rotterdam– Den Haag
If required, further Geo-Objects could be defined specifically for Navteq vehicle
GNSS for Innovative road Applications
Company’s
logo19/04/23 Page 10PRESENTATION TITLE VERDANA (9)
Technical Focus: Geo Objects (End-to-End)
17 Geo-Objects in addition to Exhaustive
GNSS for Innovative road Applications
Company’s
logo
2 or 3 days have been allocated for Exhaustive pre-trials commencing 2nd March.
Pre-trials will encompass:– Equipping of Navteq vehicle with GMV OBU– Testing the functionality of GMV OBU in both vehicles– Enforcement trials– Calibration of Navteq and GMV reference equipment to:
• Ensure similar output format• Synchronisation of output time stamps• Understanding of levels of accuracy of the two reference systems• Attempt to calibrate accuracy performance via the HUB
– Test method for data transfer from both vehicles to Avego– Provide Avego with first “real” set of data from both vehicles
19/04/23 Page 11PRESENTATION TITLE VERDANA (9)
Technical Focus: Pre-trials
GNSS for Innovative road Applications
Company’s
logo
Pre-trial installation of OBUs, testing and enforcement trials will be held in Veldhoven, Navteq base
Pre-trial calibration run will be carried out on part of Route 3 (Rotterdam)– 7 Geo-Objects per loop
GMV and Navteq vehicle travel in convoy
Reference system performances analysed over each route/whole day/each Geo-Object
19/04/23 Page 12PRESENTATION TITLE VERDANA (9)
Technical Focus: Pre-trials
GNSS for Innovative road Applications
Company’s
logo
Trials commence following the completion of pre-trial phase– Currently expected to be ~ 8th March 2010
Total duration of 4 weeks– 3 weeks of following defined routes and schedules– 1 week for repeating missed/incomplete routes
3 Routes– 20 repetitions of each route
Navteq vehicle is not following defined GINA routes but will be travelling in and around Rotterdam and Den Haag as part of its standard operations
19/04/23 Page 13PRESENTATION TITLE VERDANA (9)
Exhaustive Trials Plan – Overview
GNSS for Innovative road Applications
Company’s
logo
Exhaustive Trials Plan - Routes
Route 1 (Amsterdam)
19/04/23 Page 14PRESENTATION TITLE VERDANA (9)
Route 1 features: Simulated Cold Start
from an underground car park
Simulated charging zones around Amsterdam and Hoofddorp
Coen and Ij tunnels Dense urban
environments Motorway sections
GNSS for Innovative road Applications
Company’s
logo
Exhaustive Trials Plan - Routes
Route 2 (The Hague)
19/04/23 Page 15PRESENTATION TITLE VERDANA (9)
Route 2 features: Three tunnels in a
row Tunnel with an
underground junction Dense urban areas Tall buildings
GNSS for Innovative road Applications
Company’s
logo
Exhaustive Trials Plan - Routes
Route 3 (Rotterdam)
19/04/23 Page 16PRESENTATION TITLE VERDANA (9)
Route 3 features: Stretch of road
parallel to a motorway
Maas Tunnel Erasmus Bridge Dense Urban and
industrial environment
Tall buildings Narrow Roads Motorway sections
GNSS for Innovative road Applications
Company’s
logo
EXAMPLE DAILY TIME TABLE
09:00-09:30 Vehicle inspection and paperwork check
09:30-10:00 Arrive at the start of Route x
10:00-11:30 Undertake driving of Route x
11:30-13:00 Undertake driving of Route x
13:00-14:00 Lunch Break
14:00-15:30 Undertake driving of Route x
15:30-17:00 Undertake driving of Route x (last drive of the day)
17:00-17:15 Break
17:15-17:45 Travel back to the Hotel
17:45-18:15 Finish Vehicle checks, refuelling and data transfer
End
19/04/23 Page 17PRESENTATION TITLE VERDANA (9)
Exhaustive Trials Plan: Daily Time Table
GNSS for Innovative road Applications
Company’s
logo
One OBU per vehicle Exhaustive trials: OBU will produce four data streams simulating
four OBU configurations:– raw GPS data only,– raw GPS data enhanced by CANBUS (GMV vehicle only)– raw GPS data enhanced by SISNET (EGNOS)– raw GPS data enhanced by both CANBUS and SISNET (GMV vehicle
only) End-to-End trials:
– raw GPS data only– raw GPS data enhanced by SISNET (EGNOS).
19/04/23 Page 18PRESENTATION TITLE VERDANA (9)
Exhaustive Trials Plan: OBU Configuration
GNSS for Innovative road Applications
Company’s
logo
Data output format has been agreed and the following templates are proposed:
In addition, Geo-Object identifier flags for reference data will be included for comparison with OBU determined flags. This will be done in post-processing by GMV.
19/04/23 Page 19PRESENTATION TITLE VERDANA (9)
Exhaustive Trials Plan: Exhaustive Data output
GNSS for Innovative road Applications
Company’s
logo
Important information for drivers of the GMV vehicle is enclosed with D3.1, this includes:– Route scripts (directions)– Trials equipment checklist– Trials briefing sheet– Instructions for carrying out Time to
First Fix (TTFF) tests– Vehicle safety checklist– Driver declaration form
Drivers should aim to keep the same line during each drive
Data from the GMV vehicle is expected to be downloaded to the GMV ftp server on a daily basis to minimise the risk of data loss
19/04/23 Page 20PRESENTATION TITLE VERDANA (9)
Exhaustive Trials Plan: General Information
GNSS for Innovative road Applications
Company’s
logo
Trials are expected to last for 6 months 100 participants have been selected Additional Geo-Objects have been defined Data is expected to be automatically uploaded from the OBUs
19/04/23 Page 21PRESENTATION TITLE VERDANA (9)
End-to-End Trials Plan:
GNSS for Innovative road Applications
Company’s
logo
Data output format has been agreed and the following templates are proposed:
End-to-End (for each OBU)
19/04/23 Page 22PRESENTATION TITLE VERDANA (9)
End-to-End Trials Plan: End-to-End Data output
GNSS for Innovative road Applications
Company’s
logo
Data output format has been agreed and the following templates are proposed:
End-to-End (for each Geo-Object)
19/04/23 Page 23PRESENTATION TITLE VERDANA (9)
End-to-End Trials Plan: End-to-End Data output
Any Questions?
Placeholder for a nice picture