worldwide leader in the foundation engineering field KNAPP AG Bauunternehmung GRANIT Gesellschaft m.b.H. 03/2018 - 05/2018 Graz, Austria TECHNISCHE REFERENZ - TECHNICAL REFERENCE Bauherr : Owner : Auftraggeber : Main Contractor : Bauzeit : Duration of works: Innovationszentrum Innovation center Schneckenbohrpfähle Continuous Flight Auger Piles KNAPP AG

Transcript of worldwide leader in the foundation engineering field...The warehouse logistics company KNAPP AG is...

Page 1: worldwide leader in the foundation engineering field...The warehouse logistics company KNAPP AG is building a new office complex (six storeys on 1.800 m²) in its head - quarters.

worldwide leader in the foundation engineering field

KNAPP AG

Bauunternehmung GRANIT Gesellschaft m.b.H.

03/2018 - 05/2018

Graz, Austria

TECHNISCHE REFERENZ - TECHNICAL REFERENCE

Bauherr : Owner :

Auftraggeber : Main Contractor :

Bauzeit : Duration of works:

InnovationszentrumInnovation center

Schneckenbohrpfähle

Continuous Flight Auger Piles

KNAPP AG

Page 2: worldwide leader in the foundation engineering field...The warehouse logistics company KNAPP AG is building a new office complex (six storeys on 1.800 m²) in its head - quarters.

ProjektbeschreibungDas Logistikunternehmen KNAPP AG errichtet am Hauptsitz in Hart bei Graz ein Bürogebäude mit sechs Geschoßen auf 1.800 m².TREVI Geotechnik GmbH stellte die Tiefgründung mit Schneckenbohrpfählen (System Trelicon) mit 900 mm Durchmesser unter beengten Platzverhältnissen von zwei unterschiedlichen Ebenen her.

Project descriptionThe warehouse logistics company KNAPP AG is building a new office complex (six storeys on 1.800 m²) in its head-quarters. The building will be located in the Hart munici-pality, near the city of Graz.TREVI Geotechnik GmbH carried out the deep foundation works by means of Continuous Flight Auger Piles (CFA, Trelicon System) with a 900 mm diameter. Piles were drilled in a confined working space at two different levels.

Durchgeführte Arbeiten:• Schneckenbohrpfähle (System Trelicon)

- Durchmesser 900 mm- Längen bis 18 m

Performed works:• Continuous Flight Auger Piles (CFA, Trelicon System)

- Diameter 900 mm- Length up to 18 m