Workshop for development of Plans and Estimates for works under MGNREGS
-
Upload
dibyendu-sarkar-ias -
Category
Education
-
view
2.778 -
download
1
description
Transcript of Workshop for development of Plans and Estimates for works under MGNREGS
![Page 1: Workshop for development of Plans and Estimates for works under MGNREGS](https://reader036.fdocuments.net/reader036/viewer/2022082807/554bed89b4c9055a368b5083/html5/thumbnails/1.jpg)
Workshop on MODEL
PLAN &ESTIMSTES
for works under
MGNREGS24-27 March 2014
SIPRD, Kalyani
![Page 2: Workshop for development of Plans and Estimates for works under MGNREGS](https://reader036.fdocuments.net/reader036/viewer/2022082807/554bed89b4c9055a368b5083/html5/thumbnails/2.jpg)
Expectations• Listing all possible works under 4
major categories
• Identifying scope of convergence against each identified work• With which programme/department• In what fashion
• Identifying women specific components of works, apart from the common component
![Page 3: Workshop for development of Plans and Estimates for works under MGNREGS](https://reader036.fdocuments.net/reader036/viewer/2022082807/554bed89b4c9055a368b5083/html5/thumbnails/3.jpg)
Expectations
• Preparing Plan for each identified work• Plan specifying physical and
financial outlays, physical output and outcome
• Plan giving the specifics of the location (lat-long) and other details
![Page 4: Workshop for development of Plans and Estimates for works under MGNREGS](https://reader036.fdocuments.net/reader036/viewer/2022082807/554bed89b4c9055a368b5083/html5/thumbnails/4.jpg)
Expectations
• Preparing Estimates for each of the identified works• Estimates with regional
variation, if required• Estimates in easy to replicate
‘excel’ format
![Page 5: Workshop for development of Plans and Estimates for works under MGNREGS](https://reader036.fdocuments.net/reader036/viewer/2022082807/554bed89b4c9055a368b5083/html5/thumbnails/5.jpg)
Expectations
• Preparing Designs for each of the identified works• Standard designs• More focus on visualization so
that the design, if painted on the ‘info-board’ at worksite can be understood by the villagers
![Page 6: Workshop for development of Plans and Estimates for works under MGNREGS](https://reader036.fdocuments.net/reader036/viewer/2022082807/554bed89b4c9055a368b5083/html5/thumbnails/6.jpg)
Expectations
• Exploring the scope of using alternative technology for the assets under MGNREGS• Cost-effective• Environment friendly• Labor intensive• Disaster proof
![Page 7: Workshop for development of Plans and Estimates for works under MGNREGS](https://reader036.fdocuments.net/reader036/viewer/2022082807/554bed89b4c9055a368b5083/html5/thumbnails/7.jpg)
Priorities
• Habitation-based planning with community, not individuals at the core• (IBS will be there, rather in a larger
scale- but IBS will be identified by the community and not by individuals)
• Wage-seekers as stakeholders and not as labourers or beneficiaries
• Focus on land, water and plants
![Page 8: Workshop for development of Plans and Estimates for works under MGNREGS](https://reader036.fdocuments.net/reader036/viewer/2022082807/554bed89b4c9055a368b5083/html5/thumbnails/8.jpg)
Priorities• Focus on convergence
• Intra-departmental• Inter-departmental
• Involving women SHG at all level from planning, through implementation to monitoring and supervision
• Plan for individual works to align to the outcome for the habitation and impact on the community
![Page 9: Workshop for development of Plans and Estimates for works under MGNREGS](https://reader036.fdocuments.net/reader036/viewer/2022082807/554bed89b4c9055a368b5083/html5/thumbnails/9.jpg)
Grouping of participants
• Land group (Watershed, agriculture…)
• Water group (Irrigation, WRID…)
• Plantation group (Forest, Horticulture…)
• Animal group (ARD, Fisheries…)
• Sanitation group (NBA, NGO…)
• IBS group
• Infrastructure and Alternative technology group (DRR…)