Working & Height Regulations 2005

37
AA Scottish Branch Working @ Height Seminar 21 st July 2009 Working & Height Regulations 2005 A discussion of the regulations, their practical implementation & possible reason for lack of compliance

Transcript of Working & Height Regulations 2005

Page 1: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 1/37

AA Scottish Branch Working @ Height Seminar 21 st July 2009

Working & Height

Regulations 2005A discussion of the regulations, theirpractical implementation & possible

reason for lack of compliance

Page 2: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 2/37

AA Scottish Branch Working @ Height Seminar 21 st July 2009

Mr Kevin Moore f.Arbor.A; MIfL

Training ManagerBTS ART

Part of the BTSGroup of Companies

Page 3: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 3/37

AA Scottish Branch Working @ Height Seminar 21 st July 2009

WARNING

WORKING AT HEIGHT IS DANGEROUSE,BECAUSE THIS PRESENTATION ISABOUT PROVOKING THOUGHT ANDDISCUSSION SOME IMAGES OF REALACCIDENTS AND ALSO MOCKEDACCIDENTS THAT ARE GRAPHIC HAVE

BEEN USED.

Page 4: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 4/37

AA Scottish Branch Working @ Height Seminar 21 st July 2009

Who Climbed Trees as a Child?

Page 5: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 5/37

AA Scottish Branch Working @ Height Seminar 21 st July 2009

Page 6: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 6/37

AA Scottish Branch Working @ Height Seminar 21 st July 2009

Blurring the Lines

From this to this

At what cost?

Page 7: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 7/37

AA Scottish Branch Working @ Height Seminar 21 st July 2009

The Safety Wave

Time

F r e q u e n c y o

f A c c

i d e n

t sEngineering

Systems

People

Page 8: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 8/37

AA Scottish Branch Working @ Height Seminar 21 st July 2009

Working @ Height

Page 9: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 9/37

AA Scottish Branch Working @ Height Seminar 21 st July 2009

The Regulations1. Citation2. Interpretation3. Application4. Organisation and

planning5. Competence6. Avoiding Risks7. Selection of kit8. Requirements of

particular kit9. Fragile surfaces10.Falling Objects

11.Danger Areas12.Inspecting Equipment13.Inspection of places of

[email protected] of persons at

work15.Exemptions by HSE16.Exemptions for Forces17.Amendments PUWER

18.Repeals of Factories act19.Revocation of

instrumentsSheduels …….

Page 10: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 10/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

The Regulations1. Citation2. Interpretation3. Application4. Organisation and

planning5. Competence6. Avoiding Risks7. Selection of kit8. Requirements of

particular kit9. Fragile surfaces10.Falling Objects

11.Danger Areas12.Inspecting Equipment13.Inspection of places of

[email protected] of persons at

work15.Exemptions by HSE16.Exemptions for Forces17.Amendments PUWER

18.Repeals of Factories act19.Revocation of

instrumentsSchedules …….

Page 11: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 11/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

The Regulations1. Citation2. Interpretation3. Application4. Organisation and

planning 5. Competence 6. Avoiding Risks7. Selection of kit8. Requirements of

particular kit9. Fragile surfaces10. Falling Objects

11. Danger Areas12.Inspecting Equipment13.Inspection of places of

W@H14. Duties of persons at

work15.Exemptions by HSE16.Exemptions for Forces17.Amendments PUWER

18.Repeals of Factories act19.Revocation of

instrumentsSchedules …….

Page 12: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 12/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Schedules

1. Requirement forexisting places ofwork

2. Requirements forguard rails etc

3. Requirements forWorking platforms

4. Requirements forcollective safeguards

5. Requirements PFPSinc. fall arrest, workpositioning, rope

access & workrestraint6. Requirements Ladders7. Inspection particulars8. Revocation of

instruments

Page 13: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 13/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Schedules

1. Requirement forexisting places ofwork

2. Requirements forguard rails etc

3. Requirements forWorking platforms

4. Requirements forcollective safeguards

5. Requirements PFPSinc. fall arrest, workpositioning, rope

access & workrestraint 6. Requirements Ladders7. Inspection particulars8. Revocation of

instruments

Page 14: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 14/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Schedule 5 Requirements forPFPS

• Pt1 All PFPS• Pt2 Additional

requirements for

work positioningsystems

• Pt3 Additionalrequirements forrope access

• Pt4 Additionalrequirement forfall arrest systems

• Pt5 Additionalrequirements forwork restraintsystems

Page 15: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 15/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Schedule 5 Requirements forPFPS

• Pt1 All PFPS• Pt2 Additional

requirements for

work positioningsystems

• Pt3 Additionalrequirements forrope access

• Pt4 Additionalrequirement forfall arrest systems

• Pt5 Additionalrequirements forwork restraintsystems

Page 16: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 16/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Schedule 5 Part 2 AdditionalWork Positioning Systems

• Includes a suitablebackup for preventingor arresting a fall

• If line backup the useris attached• Where it is not

reasonably

practicable measurestaken to ensuresystem does not fail.

Page 17: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 17/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Schedule 5 Part 3 Additional RopeAccess & Positioning

• At least 2 separateanchored lines, working &safety

• Suitable Harnessconnected to both lines

• Working line safe meansof assent & decent &locking

• Connected mobile PFPSon backup that followsuser

• RA to account, duration,ergonomic constraintsmay need seat.

• System may comprise asingle rope where-RA demonstrates use ofsecond line entails higherrisk, and; -Appropriate measureshave been taken toensure safety.

Page 18: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 18/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

High Compliance

Page 19: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 19/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Normal Compliance

• Training tends to reflect “ look for when 2 ropes will work”

• Most climbers tend to „supplement‟ their singleline working NOT true backup/safety

• MEWP‟s not utilised with poor justification

Page 20: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 20/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Limited or No Compliance

Page 21: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 21/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

„I have But One Vice……

…….And that is that I give in to them.”

Oscar wilde

Why The Variance?

Page 22: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 22/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

All we Do Has a Trigger

• Rules and Regulations are not truetriggers

• Consequences are an example of triggersDelayed SoonUncertain Certain

Negative PositiveIf Slow Uncomfortable or Inconvenient its

tempting not to do it

Page 23: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 23/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

The Tree et al ..• The tree is a 3

dimensional structure• Mother nature makes

then all different• All climbers take a

different approach• Perceptions &

realities• Taking it apart and

removing anchors

Page 24: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 24/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

For W@H Regulations to TrulyWork

• They need to be understood & explained toall affected by them including customers.• Affective education from top management

down.

• Management must have 100% adherence totheir requirements

• Affective enforcement to ALL• Positive information about their advantages• Equipment made so that it is not slow,

uncomfortable or inconvenient to utilise.

Page 25: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 25/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

For Twin Roping to Truly beAccepted in Arb. we Must Make it

• SOON

• CERTAIN• POSERTIVE

• Quick• Comfortable• Convenient

Page 26: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 26/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Just to Demonstrate

Page 27: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 27/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Thank You

Kevin Moore

BTS Training

Page 28: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 28/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Regulation 4Organisation & Planning

1. Planned & supervisedfrom start to finish

2. Selection of equipment3. Plan for emergencies4. Only when weather

does not jeopardiseH&S

5. Exempts „Police, Fire,Ambulance or otheremergency services‟from 4.

Page 29: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 29/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Regulation 5Competence

Are you competent?„knowledge, skills,experience, behaviour ,communicate‟

• Organising• Planning• Supervising• Using work equipment• Trainees under supervision

of comp. person.

Page 30: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 30/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Regulation 9Fragile Surfaces

• No person at work willSFARP

-pass, across,

near-works on, from ornear

• Signage or information• Emergency services

exemption

Page 31: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 31/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Regulation 10Falling Objects

Where necessary toprevent injury to anyperson…..

• Prevent falling objects

SFRP• Take SS steps to prevent

struck by‟s… • Systems to prevent thrown

objects that will injure• Storage of objects.

Page 32: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 32/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Regulation 11Danger Areas

• If a risk of beingstruck by a fallingobject or falling from

height exists wherepersonal injury likelySFRP – means to prevent

unauthorised accessprovided

– Clearly indicate area

Page 33: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 33/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Regulation 14Duties of Person @ Work

• Report to supervisorany dangerousactivity

• Use Equip as trainedor instructed to do

• Use safety devices astrained or instructedto do

Page 34: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 34/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Work Positioning & Rope Access

•Tree Climbing Level or Below main anchor

•Use of Load Bearing Supplementary anchors toprevent fall or swing

•Maximum slack in system 500mm (250mm in eachside of system)

•Harness must have leg loops & may require „seat‟

•Affords Full or Partial Support

•In rope access the line does not usually move withthe climber

Page 35: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 35/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Work Restraint

(Travel Restriction Systems) Restrict the user‟s travelso that access is not possible to zones where the risk ofa fall from a height exists.

Page 36: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 36/37

AA Scottish Branch Working @ Height Seminar 21st

July 2009

Fall Arrest

•Allows for climbing above main anchor point

•Slack in system >500mmm

•Use of full body harness incorporating energyabsorber

•Thoracic or dorsal attachment points

Page 37: Working & Height Regulations 2005

8/2/2019 Working & Height Regulations 2005

http://slidepdf.com/reader/full/working-height-regulations-2005 37/37

AA S tti h B h W ki @ H i ht S i 21st

J l 2009