SOUTHERN RAILWAY
PLANNING BRANCH
G.275/WSSR-221718/2017-18
STUDIED BY
WORK STUDY TEAM
OF
PLANNING BRANCH
SEPTEMBER 2017
.
WORK STUDY TO REVIEW THE
STAFF STRENGTH AT
SSE/C&W/KCVL -
TVC DIVISION
I N D E X
SERIAL
NUMBER
CONTENTS PAGE
NUMBER
(i) ACKNOWLEDGEMENT
1 (ii) TERMS OF REFERENCE
(iii) METHODOLOGY
(iv) SUMMARY OF RECOMMENDATIONS 2
CHAPTERS
I INTRODUCTION 3 - 4
II PRESENT SCENARIO 5-21
III CRITICAL ANALYSIS 22-30
IV PLANNING BRANCH’S REMARKS ON CO-RDINATING
OFFICER’S VIEWS 31
V FINANCIAL SAVINGS 32
ANNEXURES
I SANCTION, ACTUAL, VACANCY & EXCESS
STATEMENT OF SSE/C&W/KCVL
33
II RAILWAY BOARD’S LETTER 2000/M(C)/143/5 DATED
24.12.2001.
34-36
III RAILWAY BOARD LETTER NO.95/M(C)/141/1 DATED
31.01.2007 37-38
IV VACANCY STATEMENT ISSUED BY Sr. DPO/TVC 38-39
V CO-ORDINATING OFFICER’S VIEWS 40-45
.
1
(i)
ACKNOWLEDGEMENT
The work study team acknowledges the valuable guidance and
co-operation rendered by Sr.DME/TVC, ADME/KCVL (Co-ordinating
Officer), SSE/C&W/KCVL (Co-ordinating Supervisor) and other
Supervisors of KCVL in completing the study in time.
(ii)
AUTHORITY
Annual programme of work studies for the year 2017-18 approved
by SDGM.
(iii)
TERMS OF REFERENCE
To review the staff strength at SSE/C&W/KCVL-Thiruvananthapuram
Division.
(iv)
METHODOLOGY
The following methodology has been adopted while conducting the study.
1. Collection of data.
2. Observation of activities at KCVL Depot.
3. Application of relevant yardsticks on ground realities.
4. Effect of modern technologies, likely changes in the near
future in the quantum of activities and improvements.
.
2
(v)
SUMMARY OF RECOMMENDATIONS
REVISED RECOMMENDATION
The vacant posts mentioned below are found excess to the
requirement, the same may be surrendered and credited to the
vacancy Bank.
(Total – 7 Posts)
Category Grade Pay Surplus
Junior Engineer
4200/- 2
Helper 1800/- 4
Carpenter 1800/- 1
TOTAL 7
3
CHAPTER – I
1.0 INTRODUCTION
1.1 Thiruvananthapuram, formerly known as Trivandrum is the capital city of
Kerala, located on the West coast of India. It was a trading port for Spices,
sandalwood and Ivory. The city gets its name from Thiru-anantha-puram
meaning the “city of Lord Anantha” derived from the deity of the Sri
Padmanabhaswamy temple.
1.2 The TVC division was formed on 2nd October 1979, carved out of the portions
of Madurai and Olavakkod (presently Palakkad) divisions. It is a passenger
oriented division situated at a distance of 910 Kms from Southern Railway
Headquarters. Approximately 60 Express/Mail trains and nearly 60 passenger
trains are being operated on an average by this division.
1.3 Thiruvananthapuram division is one of the six divisions of Southern Railway
having a route klometrage of 625 Kms with 896 running Track kilometres.
Southern Railway network serves the states of Tamilnadu, Kerala, Puducherry
and parts of Karnataka and Andhra Pradesh.. The total Kilometres aggregate
to 7194 Kms, of which 5080 is route kilometres with 4770 Kms as BG and
380 Km as MG out of which 2792 Kms are electrified.
1.4 Mechanical Branch plays a vital role in the transportation system of
Railways connected with the production, maintenance and repairs
of the Rolling Stock – viz., Locos, Carriages and Wagons. The C&W
Wing is mainly responsible for maintenance and repair of rolling
stock which is carried out under prescribed schedules and
procedure. Standardisation and inspection is also an important
aspect for smooth functioning of the system. Timely supply of
Quality Stores is another important factor.
4
1.5 The improvements in the rolling stock, the latest being CBC
Coupling has not only resulted in higher speeds and safety but
also easy maintenance. The role of Electrical Branch is increasing
after electrification, introduction of EMUS / MEMUs and computer
applications in loco as well as in maintenance practices. The
outsourcing of some activities is also a factor while reviewing the
staff strength. The overall productivity is to be achieved not only
by more production but also by qualitative training and effective
man power utilisation through rightsizing.
1.6 In order to implant a sense of belonging and better care in maintenance, the
coaches of a particular base division are to run only by rakes primarily
maintained by the Division. As per the revised policy circular No. 4 of 2007,
maintenance pattern for coaching trains is broadly classified into 5 groups, in
which it stipulates the schedule of maintenance for various categories of
trains. Accordingly, Primary maintenance is to be carried out after a run of
3500 Kms in respect of Mail/Exp, whereas En-route attention be carried out
after every 250 to 350 Kms. The details of work is broadly classified as
✓ Preventive maintenance at Pit line.
✓ Under gear examination and brake system
✓ Internal cleaning, Passenger amenities and watering
✓ External washing.
✓ Continuity check and Brake power check.
1.7 Out of 18 Coaching depots of Southern Railway, Trivandrum division has 5
to its credit viz., TVC, KCVL, ALLP, ERS and NCJ, of which the study pertains
to C&W depot/KCVL. Needless to say that TVC division is the highest coach
Holding in Southern Railway with 1773 coaches.
1.8 An attempt has been made to arrive at the manpower requirement based on
not only the yardstick but also the salient features of various modern
technologies.
5
CHAPTER-II
2.0 PRESENT SCENARIO
2.1 The C&W Depot/KCVL is situated at 5 Kms from
Thiruvananthapuram central which is 910 Kms away from Southern
Railway headquarters. The KCVL depot started functioning from
30.03.2005. It is surrounded by the famous tourist place Veli Lake,
International Airport and major IT centres of Kerala viz., Techno
Park and Techno City. Apart from these, KCVL is surrounded by
Vikram Sarabhai Space Centre (VSSC), Liquid Propulsion Systems
Centre, National Centre of Earth Science Studies,
Travancore Titanium Products and Indian Institute of Science
and Research (IISR). Beside this, Kochuveli is a satellite
Passenger Rail Terminal station.
2.2 The core activities of the depot are
➢ Pit line Maintenance
➢ Sick line Maintenance
➢ Platform Maintenance
Ancillary activities
➢ Stores
➢ M&P Section
➢ IMS Monitoring
➢ Relief & Rescue
Outsourced Activities.
➢ Interior and Exterior Washing of Coaches.
➢ Watering of coaches.
➢ Pest and Rodent Control.
➢ Linen Management.
➢ On Board House Keeping Management (OBHS)
➢ Buffing of stainless steel parts of the Coaches.
➢ Annual Maintenance operation of Bio toilets.
➢ Annual Maintenance of Fire extinguishers.
6
2.3 Presently the coach holding of the depot is 287 including Special
trains. The salient features of the depot are appended below.
✓ CAMTECH design pit lines having a capacity of 24 coaches.
✓ RCD commissioned on 30.04.2008 with a capacity of 20000
litres.
✓ Sick line shed started functioning from 05th November 2012.
✓ BOOT laundry started functioning from Ist April 2015 with a
capacity of 3 tonnes per shift and having an average load of
7.5 tonnes per day.
✓ Bio Toilet Effluent Testing Lab started functioning from 22nd
June 2015.
✓ IOH activity started from 29th March 2016 and for LHB
coaches from 14.04.2017.
✓ OBHS started from 14.04.2017.
✓ Number of Pit lines ---- 3 (each 650 mts)
Number of Sick lines ---- 3 (60-70 mts)
2.4 Coach holding of SF/MAIL/EXP/Passenger trains at C&W
/KCVL Depot.
T.No ACCW ACCN WCB SCN GS SLR TOTAL
12625 12 30 6 72 12 12 144
16316 2 6 0 28 6 4 46
22659 1 3 0 8 6 3 21
GHY
SPL
0 0 0 12 6 2 20
MAJN
SPL
0 1 0 8 8 2 19
TOTAL 15 40 6 128 38 23 250
Apart from these, the train No. 16312 with 22 coaches (LHB coach)
& the train No.12202 with 15 coaches (Garibrath) is also
maintained at this shed amounting to 287 coaches.
7
2.5 For convenience of the administration, the coaching stock is
classified into two categories. One is Passenger coaching vehicles
(PCV), mainly used for carrying passengers and the second one is
Other coaching vehicles (OCV) which includes Inspection carriage,
Saloons, Pantry cars, Military car and composite luggage cum brake
van etc.
2.6 Coaching stock is periodically overhauled in the workshops at
prescribed intervals according to their service and usage. For PCVs,
the periodicity for POH is 18 months, whereas it is 24 months for
OCVs. In respect of IOH, the periodicity is 9 months.
2.7 The organisation set up of this unit:
Sr.DMETVC
DME/TVC
ADME/KCVL
SSE/C&W/KCVL
2.8 THE STAFF STRENGTH AT SSE/C&W/KCVL
The details of staff strength is given in the scale check is also
placed as Annexure-I. The sanctioned strength is 194 whereas
the actual is 166 leaving behind a vacancy of 28.
Sl. No.
Category Sanction Actual Vacancy
1. SSE 8 6 2
2. JE 10 6 4
3. Ch.OS 0 1 -1
4. Sr.Technician 12 10 2
5. Technician-I 29 20 9
6. Technician-II 23 21 2
8
7. Technician-III 35 34 1
8. Helper 69 65 4
9. Welder 2 2 0
10. Trimmer 1 1 0
11. Carpenter 3 0 3
12. Painter 2 0 2
TOTAL 194 166 28
2.9 BRIEF OUTLINE OF ACTIVITIES
❖ Primary maintenance
❖ Secondary maintenance
❖ Sick line activities
❖ IOH activities
❖ Store activities
❖ Bio lab, Bio maintenance
❖ Coaching cell/complaints
❖ OBHS
❖ BOOT Laundry
❖ M&P maintenance
❖ Contract activities
2.10 PRESENT ENGAGEMENT OF STAFF – PRIMARY MAINTENANCE OF COACHES.
Primary Maintenance is to be undertaken on all running coaches at
Primary Depot and shall include periodical schedules as also trip
schedules.
Periodical Schedules are:
Schedule A : Every month (grace period 3 days).
Schedule B : Every three months (grace period 7 days)
IOH : Every nine months (grace period 30 days)
POH : 18 months
9
22 activities are listed under Schedule A including trip schedule,
cleaning washing, testing, checking, oiling, lubrication, inspection
etc. This can be done without detaching the coaches. Nine
activities are listed under Schedule-B apart from all the activities
under Schedule-A, for which no detachment is required in normal
course.
2.11 Trip Schedule
Nine activities are listed under this head with many activities
having sub-activities. All the coaches of long distance trains having
3500 kms run and Mail/Exp trains are given trip schedule at the
end of the trip.
2.12 Washing and Cleaning of Coaches :
Detailed instructions are given in Appendix – E (Rule 3.8.1) for
a) External cleaning and washing
b) Cleaning of buffers and screw coupling
c) Interior cleaning of 1st class, AC coaches, second class coaches.
d) Interior cleaning of parcel, luggage and brake vans
e) Cleaning of lavatories
f) New and existing trains
2.13 Deployment of staff for various activities:
Sl. No.
Activity Sr. Tech Tech Helper
1 Gang I 1 10 6
2 Gang 2 1 13 3
3 Gang 3 1 12 3
4 Gang 4 2 8 5
5 Sick Line 1 12 13
6 Platform 4 6 4
7 Contract billing 0 0 2
10
8 OBHS 0 0 1
9 Bio maintenance 0 1 2
10 Pest control 0 1 1
11 Bio Lab
0 1 0
12 Store collection 0 0 4
13 Special gang 0 3 4
14 RCD 0 1 0
15 Coaching cell
0 2 2
16 Time section /
Pass / Misc
0 1 2
17 Laundry 0 1 4
18 Control/Driver 0 2 3
19 Store 0 1 2
20 Welder 0 2 0
21 Trimmer 0 1 0
22 Resigned but still
on Roll
0 0 4
TOTAL 10 78 65
2.14 Activities involved in Platform Maintenance:
1. Rolling in examination
2. Visual Inspection of hanging parts, unusual sound.
3. Axle box feeling.
4. Pulling of DV release valve.
5. Cleaning, watering and certification of PFTR trains.
6. Continuity check.
7. Rolling out examination.
11
Details of PFTR Trains :
Sl.
No
Train No. From To No. of
coaches
Days of turn
round/
week
Daily aver
age
1 12257/12258 KCVL/YPR YPR/KCVL 18 Thrice 8
2 12777/12778 KCVL/UBL UBL/KCVL 14 Once
2
3 16561/16562 KCVL/YPR YPR/KCVL 16 Once
12
4 16315/16316 KCVL/SBC SBC/KCVL 23 Twice
7
5 22113/22114 LTT/KCVL KCVL/LTT 18 Twice
5
6 07115/07116 HYB/KCVL KCVL/HYB 15 Once
4
Total - Avg / day 38
2.15 Details of Pass through trains :
• Two trains are shown as pass through trains at KCVL.
• Train No. 56308/56307-QLN Passenger; Daily service with 15
coaches.
• Train No. 56318/56317- NCJ-KCVL Passenger; Daily service with 15
coaches.
2.16 Platform Attention activities :
a) Pass through trains – Rolling in and rolling out examination,
axle box feeling and carriage watering.
b) Starting trains
Air-continuity test, spraying of deodorant, issue of BPC and
rolling out examination.
c) Terminating trains :
Rolling in examination, axle box feeling, releasing of brakes,
safety check, interior check for amenities, carpentry, water
service, repair attention, dry sweeping, lavatory cleaning and
closing of doors and shutters.
12
2.17 Details of Primary Maintenance Trains :
Sl.
No
Train No. Train Name No. of
coaches
Days of turn
round/ week
Daily
average
1 12626/25 TVC-NDLS Kerala Exp 24 Six 21
2 16315/16 KCVL-SBC Exp 23 Twice
7
3 16311/12 KCVL-BKN Exp 21 Once
3
4 22660/59 KCVL-DDN Exp 21 Once
3
5 12201/02 KCVL-LTT Garibrath 15 Once
2
6 06335/36 KCVL-GHY Spl 20 Once
3
7 06065/64 KCVL-MAJN Spl 19 Once
3
Average / day 42
2.18 Details of Secondary Maintenance Trains
Sl. No
Train No. Train Name No. of coaches
Days of turn
round/week
Daily average
1 12218/12217 Sampark Kranthi (CDG)
21 Twice 7
2 12483/12484 ASR Exp – KCVL-ASR 23 Once 3
3 19260/19259 KCVL-BVC Exp 19 Once 3
4 19262/19261 KCVL- PBR Exp 18 Once 3
5 19331/19332 KCVL-INDB Exp 18 Once 3
Average / day 19
2.19. Machinery and Plants:
Sl.
No.
Description Qty. Location
1 Distributor Valve Test Bench 1No Sick line
2 Hand operated shearing Machine Heavy
Duty 1No Gents Rest
Room
13
3 Welding Plant Mini with accessories 6
KV 1No Sick line
4 Single Car Test Rig 2 Nos Pit line &
Sick line
5 Rake Test Rig 2 Nos Pit line
6 AirCompressor Portable Pneumatic CPS 160
1 No Pit line
7 Welding plant 300 Amps Thyristorised welding Rectifier
2 Nos. Sick line
8 High pressure Jet cleaning system 10
Hp
1 No Pit line
9 Drainage Pump heavy duty 5 Hp 3 Phase AC
1No Pit line
10 Fork Lift Truck 3 Tonne capacity 1 No Sick line
11 Air compressor with electric motor 3 Hp
200 litre tank capacity
1 No Sick line
12 Air compressor with 120 CFM with air
drier
1 No Pit line
13 Electronic flow scrubber 2 No Near
Coaching cell
14 Welding plant, converted to A & C Plant 1 No Pit line
15 Multi scrubber E 700 1 No Sick line
16 Jamalpur Jack 15 tonne capacity 8 No Sick line
17 Jamalpur jack 15 ton capacity 5 no Sick line
18 Platform truck :battery with charger,
capacity 2000 kg
2 no Sick line
19 Electric hoist .5 tonnes 1 no Sick line
20 EOT 10/3 capacity 1 no Sick line
21 Mud pump 2 hp 1 no Near
compressor
room
22 Hydro jet cleaning system 1 no Near
compressor
room
14
2.20 Intermediate overhauling activities (IOH)
1. Initial and final measurements including wheel and tyre on
arrival and after IOH recording of Roller bearing details and
register maintenance as per ISO and tool room management
instructions.
2. coach positioning, jack setting, coach lifting, placement of
trustles shifting of bogie to dismantling bay, bogie
dissembling, bolster dismantling, cleaning of bogie and
components with high pressure jet, reassembly and lowering.
3. Brake gear components examination, dismantling, cleaning,
renewal of damaged components and refitting.
4. Centre pivot cleaning, examination, dye penetrant testing
equalising stays and anchor links dismantling and refitting.
5. Axle box safety strap removal and refitting, dashpot assembly
and side bearers examination and attention crown clearance
adjustment to wheel dia.
23 High pressure cleaning system 10 hp 1 no Pit line
24 Welding plant 400 tonnes 1 no Pit line
25 Single car test rig 1 no Sick line
26 Rake test rig 1 no Pit line
27 Welding plant 400 amps 1 no Sick line
28 Electric operated sewing machine with
clutch hand electric motor ¼ hp
1 no Platform
office
29 Coach floor scrubber 1 no Pit line
30 Pallet truck 1 no Stores
31 Spray paint machine with 24 litre
capacity air compressor with one pint
paint sprayer gun, 25 mtr 8 mm braced
hoist
1 no Night store
15
6. Deflecting testing of coil springs, grouping and colour coding
and painting of the same, dye penetration test, grouping and
examination of BSS hanger blocks and pins.
7. Buffer gear dismantling, adjustment of buffer projection and
plunger stroke, examination of shock absorber; draw gear,
replacement and painting.
8. Air brake testing, painting, dirt collector cleaning, single car
testing, ICV testing and replacement
9. Bogie scraping, dusting, cleaning and painting with primer
and bituminous, painting of foot board.
10. Under frame examination for corrosion, scratching, dusting
and painting with red oxide and then with bituminous black.
11. Re-examination, cleaning and ultrasonic testing of roller
bearing of 4 wheels, cleaning of axle box with high power jet,
dye penetrant testing, regressing and assembling, painting of
axle, axle box, re-profiling of wheels.
12. Intensive cleaning of IOH coach and exterior washing
13. Hoist and whiting jack operators.
14. Welding and cutting works in bogie frame, underframe pipe
lines etc
15. Carpentry attention, if any
16. Minor painting works, stencilling application of putty etc
17. Minor turning of axle box front cover, plate cutting with
shearing machine.,
18. Blacksmithy works as required
19. IOH shed cleaning and upkeeping
20. Material collection and jurisdiction works.
16
2.21. Registers kept at IOH Depot:
1. IOH dimensional check register
2. Check list for bogie details
3. Check list for Buffing gear, draw gears, and underframe
register
4. Checklist for Air brake Register
5. Single check Register
6. Amenities / Check Register
7. Ultrasonic testing of Axle Register
8. Roller bearing related registers
9. Daily released coaches register
10. Daily road occupation register
11. Job distribution register
12. 17 hours position register
13. Calibration history register
14. Customer complaint register
15. Corrective action register
2.22 Sick line attendance from the past three years
MONTH 2014-15 2015-16 2016-17
APR 67 35 50
MAY 29 53 37
JUNE 34 63 41
JULY 61 43 52
AUG 65 56 64
SEP 46 42 60
17
OCT 47 45 61
NOV 42 31 52
DEC 36 42 42
JAN 70 49 27
FEB 52 31 18
MAR 52 46 35
TOTAL 601 536 539
SICK PER MONTH 50 44.6 44.9
SICK PER DAY 1.66 1.48 1.50
2.23 Pitline maintenance Register :
1. Duty diary register – RS-17/A
2. Trip schedule maintenance
3. “A” schedule maintenance
4. “B” schedule maintenance
5. Air Brake Testing
6. Fire Extinguisher
7. Disinfection
8. Bacon Treatment
9. Intensive coach cleaning
10. Coach attendance
11. DRS Card Register - RS 59
18
2.24 Platform Register :
1. TXR diary - RS 7
2. TXR handbook – RS 5
3. Axle box feeling register
4. Staff sign ON and OFF
5. Platform message register
6. SLR Equipment Register
7. Component failure
8. Spare coach register
9. Incoming LP remarks RS-5
10. Brake power certificate RS-6 Goods & Coaching
11. Theft Report Register - RS-18
12. Sick memo - Rs-16
13. Fit Memo - Rs.17
14. Memo Book
15. Thermal Hunter
16. Inspection Light
17. Goods yard attention.
2.25 Miscellaneous activities:
i) BIO- TOILETS:
Bio toilet Effluent Testing Lab started functioning from 22nd June
2015. This depot caters the needs of whole division.
(a) Inspection
(b) Co ordination of AMOC activities
(c) Bio toilet schedules
(d) Bio toilet testing
(e) Maintenance of registers
19
Performance parameters of bio toilets:
➢ PH – 6 to 9
➢ Total solids (TS) – 750 mg
➢ Total volatile solids – 500 mg
➢ Total dissolved solids – 350 mg
Apparatus used in bio-lab:
➢ Crucible
➢ Weighing machine
➢ Desiccator
➢ Hot air oven
➢ Muffle furnace
Measuring of PH value and TDS are electronic metres
whereas TS & TVS are machines.
2.26 OBHS: (ON BOARD HOUSE KEEPING SYSTEM)
OBHS started functioning in Train no 22659/60 (KCVL-DDN) Exp
from 14th April 2017.
Activities involved in this section:
(a) Distribution of OBHS materials, ensuring attendance of OBHS
staff.
(b) Maintenance of registers.
(c) Ensuring availability of OBHS stickers
(d) Preparing monthly summary for billing purpose.
2.27 BOOT- LAUNDRY:
It started functioning from 1st of April 2015 with a capacity of 3
tonnes per shift and an average load of 7.5 tonnes per day. This
mechanical laundry caters the needs of whole division and is
working in 2 shifts i.e., 6 to 14 hrs & 14 to 22 hrs.
20
➢ The average requirement of bed sheets per day: 13050 Nos.
➢ Average tonnage per day with blankets: 7.496 tonnes
➢ Average blanket washing per day: 400 Nos
There are 3 types of machines namely,
1. Washing machines- 5Nos. (each washing machine washes
250 sheets in 45 minutes )
2. Drying machines- 2 Nos (each machine dries 250 sheets in
45 minutes)
3. Ironing cum folding machines- 4 Nos (each machine can iron
and fold 20 sheets per minute )
Schedule of washing:
The bed sheets, pillow cover and face towel are washed on daily
basis except that of blanket which is washed once in a month.
Codal Life 0f Materials:
➢ Bed sheets – One year
➢ Pillow cover - 9 months
➢ Face towel - 9 months
➢ Blanket - 4 years.
➢ Pillow - 2 years.
2.28 PEST & RODENT CONTROL:
The activities involved are fumigation, pest application in trains,
boric mixture application etc., apart from maintenance of the
related registers.
21
2.29 STORES:
In addition to 288 stock items, 185 items are shown in the non-
stock items. Collection of materials, receipt, stacking and issue
are maintained by this section.
2.30 WORKING HOURS
The working hours of maintenance sheds including IOH shed is
09.00 to 17.00 hours and 22.00 to 06.00 hours. The staff at the
station for rolling in and rolling out etc are working round the
clock.
2.31 The C&W/KCVL depot, under the guidance of Sr.DME/TVC,
ADME/KCVL and the able supervision of SSE/JEs is really making
rapid improvement in service and is in the advanced stage of
preparation in getting ISO Certification.
.
22
CHAPTER – III
3.0 CRITICAL ANALYSIS
3.1 The periodical maintenance of coaching stock is a very important
requirement for ensuring safety, punctuality and customer service.
The regular attendance at platform and at the end of rake link at
the base stations, secondary depots and at notified junction
stations in the rake link is also of paramount importance.
Watering, cleaning, attendance of amenities is also part of these
activities.
3.2 There are some additional factors to be taken into consideration
while arriving at the right size of man power required for each
activity. They are late running trains, detention on account of other
departments, different timings during monsoon trains, running of
special trains, extra coaches, weather related issues etc. The
timely supply of stores, running of departmental and freight trains,
the obligation under inter change quotas with other division / zone,
disasters etc also affect the coaching operations.
3.3 However there is a dire need to minimise the utilisation of
manpower because it is the main factor in arriving at productivity.
The overall shortage of earnings from expenditure, operating ratio,
and performance efficiency index (PEI) of Southern Railway calls for
prudent steps in this direction.
3.4 An all out effort is required to achieve Rs. 12 lakhs / employee
productivity to be on par with IR average. The SR figure is around
6 lakhs per annum at present.
23
3.5 The following improvements have an impact on the efforts required
for maintenance activities.
a) Improved fittings like couplings, springs, break blocks, braking
system, bearings etc.
b) All steel bodied, anti telescopic, anti climbing coaches
c) Reduction in attachment / detachments, slip coaches and
shunting operations.
d) Advanced technology and equipments for inspection, checking,
maintenance, attendance etc.
e) Better training facilities and induction of technically better
qualified staff for ART, SPART, MRV, Cranes there of etc.
f) Outsourcing activities like watering, cleaning etc.
g) Computerisation for records maintenance, stores works etc
h) Possibilities for multi skilling under changed pattern of working
i) The requirement for each activity is calculated based on the
inputs from SSE/C&W, yardsticks and ground realities.
3.6 As per Railway Board’s norms, staff provision for coach maintenance (for
Primary & Secondary maintenance) is listed as under (Board’s letter
2000/M/143/5 dated 24.12.2001)
Maintenance SF/LD Trains Express Trains Passenger Trains
Primary 1.1Men / Coach 0.9 Men / Coach 0.75 Men / Coach
Secondary 0.55Men/ Coach 0.45 Men / Coach 0.38 Men / Coach
Sick line & IOH 0.14 Men per coach inclusive of RG & LR
24
3.7 PRIMARY MAINTENANCE:-
Sl.
No
Train No. Train
type
No. of
Coaches
Service Total
coaches
per
week
PM
coaches
/ per
day
Express trains
1 16315/16316 EX 23 Twice a week 46 6-57
2 06065/06064 EX 19 Once in a
week
19 2.71
Total 65 9.28
As per the RB norms the man power Requirement is 0.9 / per coach
Hence actual requirement for Primary maintenance of Express Trains
9.28 x 0.9
8.35
say 9
Super Fast/ Long Distance Trains
1 12626/12625 SF 24 6 days a week 144 20.57
2 16311/16312 LD 22 Once in a week 22 3.14
3 22660/22659 SF 21 Once in a week 21 3.00
4 12201/12202 SF 15 Once in a week 15 2.14
5 06335/06336 LD 20 Once in a week 20 2.85
Total 222 31.70
As per the RB norms the man power Required is 1.1 / per coach
Hence actual requirement for Primary maintenance of SF/LD Trains
31.70 x 1.1
34.87
say
35
25
3.8 SECONDARY MAINTENANCE:-
There are 5 nominated trains for which Secondary maintenance has to be
done. All the 5 trains are of SF/LD type. The details of the trains are as
appended below..
Sl.
No
Train No. Train
Type
No. of
Coaches
Service Total
coaches
per
week
PM
coaches/
per day
1 12218/12217 SF 21 Twice a
week
42 6.00
2 12483/12484 SF 23 Once in a
week
23 3.28
3 19260/19259 LD 19 Once in a
week
19 2.71
4 19262/19261 LD 16 Once in a
week
16 2.28
5 19331/19332 LD 16 Once in a
week
16 2.28
104 16.55
As per the Prevalent norms, the man power required is 0.55 /
per coach. Hence actual requirement for Secondary
maintenance of SF/LD trains 16.55 x 0.55
9.10 say
10
Requirement of manpower for Primary/Secondary Maintenance
Minimum requirement of staff for Primary/Secondary Maintenance ---- 54
Add LR @ 12.5% ---- 7
Total ---- 61
26
3.9 INTERMEDIATE OVERHAULING (IOH) & SICK LINE
Intermediate overhauling is done after 9 months of POH. The
present utilisation is shown as 26 working posts excluding LR.
Since IOH shed is not working on Sundays and NH Days, there is no
need for RG.
Certain activities will definitely need a team of 4 or more persons
to work in tandem. But after that they have a lot of idle time to be
utilised for supplementary activities.
The measurement at all stages is to be done by SSE/JE with the
help of an assistant.
3.10. The services of MV Driver, Welders, Fork lift operator, Hoist /
Whiting jack operations, carpentry, trimming, etc. is not exclusive
for IOH but can be used for primary, PFTR etc. also.
The number of coaches attended in the sick line is shown as 268.
As per the Railway Board norms the yardstick is 0.14 men /coach.
Accordingly, the requirement of staff for IOH & Sick line is as
follows.
Number of coaches attended in a year - 268
As per yardstick @ 0.14 men/coach - 37 staff [
3.11 ENROUTE TRAIN PASSING /PFTR / OTHER END ATTENTION:
This is round the clock activity at station which includes loco
change, loco turn round, platform turn round and pass through
trains.
At present, 14 staff are deputed for this purpose in each of the
three shifts excluding supervisor.
27
KCVL station is located just parallel to the pit line which is exclusively used
for receiving and despatching of the trains pertaining to destinating and
originating of KCVL terminus. There is another platform in the Main line is
located in the Main line. No staff is required for this main line platform since
only very few passenger trains are dealt. The KCVL Terminus platform
dealt an average of Two trains for reception and Two number of trains for
despatch in a shift and only two trains are required Pass through attention in
a day.
On Need base, the work study permitted three staff in a shift round the
clock. The total requirement is 11 including RG.
There are six trains required platform Turn round attention at KCVL terminus
platform to the average of 1.4 trains per day for which a contract is on live
for the PFTR cleaning activities. Hence Supervision only is required, the study
team allowed 4 staff including RG. The total staff requirement at PFTR & PF
is 15.
3.12 Pest Control
One staff utilised for this purpose may be maintained as such.
3.13 Store Activities:
The present utilisation is 7 staff. Three are for material handling in
depot and four for outstation collection. This is more than enough
and the existing system can be continued.
3.14 Requirement of staff other than supervisors including LR @
12.5% wherever applicable.
Primary/Secondary maintenance 61
IOH/Sickline 37
Platform maintenance/PFTR 15
Special gang 7
28
Stores/Collection 7
BOOT Laundry 5
OBHS 1
Bio maintenance/Lab 4
Pest control 2
RCD 1
Welder 2
Trimmer 1
Painter 2
Carpenter 2
Coaching cell 4
Control/driver 5
Time section/Pass/Misc 3
Contract billing 2
Ministerial staff 2*
163
* Even though no Ministerial staff is sanctioned, the study team
recommends two posts in this category on Need base,
considering the works related to maintaining the employees
personal data, stores, contract management etc as is being done
in other C&W depots.
3.15 Requirement of Supervisors
Sl. No
Activity
Design. No. of posts
1 Depot incharge SSE 1
2 Rake maintenance SSE/JE 5
3 IOH & SL SSE/JE 2
4 BOOT Laundry SSE 1
29
5 Platform maintenance SSE/JE 3
6 Contract works JE 1
7 TOTAL 12
The total requirement of staff including supervisors is
arrived at 175.
3.16 Sanction vs Requirement
Sl.
No
Designation Sanction Actual Requirement Surplus
1 SSE 8 6 12 6
2 JE 10 6
3 Ch.OS/OS 0 1 2 -2
4 Sr.Technician 12 10 154 14
5 Technician Gr.I 29 20
6 Technician Gr.II 23 21
7 Technician Gr.III 35 34
12 Helper 69 65
8 Welder 2 2 2 0
9 Trimmer 1 1 1 0
10 Carpenter 3 0 2 1
11 Painter 2 0 2 0
TOTAL 194 166 175 21*
* The total requirement is 175 and the study team recommends to
surrender 21 posts in various categories and also requests the
division to initiate two posts of Ministerial staff while
considering the necessity of the present workload.
30
Recommendation No.1:
Two vacant posts of SSE in GP Rs.4600/- is found excess to
requirement, the same may be surrendered and credited to
vacancy bank. (2 posts)
Recommendation No.2:
Four vacant posts of JE in GP Rs.4200/- is found excess to
requirement, the same may be surrendered and credited to
vacancy bank. (4 posts)
Recommendation No.3:
Two vacant posts of Senior Technician in GP Rs.4200/- is found
excess to requirement, the same may be surrendered and credited
to vacancy bank. (2 posts)
Recommendation No.4:
Seven posts of Technician Gr. III in GP Rs.1900/- is found excess to
requirement, the same may be surrendered and credited to
vacancy bank. (7 posts)
Recommendation No.5:
Five posts of Helpers in GP Rs.1800/- is found excess to
requirement, the same may be surrendered and credited to
vacancy bank. (5 posts)
Recommendation No.6:
One vacant post of carpenter in GP Rs.1800/- is found excess to
requirement, the same may be surrendered and credited to
vacancy bank. (1 post)
[Total – 21 posts]
31
CHAPTER – IV
4.0 PLANNING BRANCH’S REMARKS ON CO-ORDINATING
OFFICER’S VIEWS
Co-ordinating Officer’s views were received vide Sr.DME/TVC’s letter No.
V/M.225/Staff/Work study/KCVL dt. 01.09.2017 and the remarks of the
Planning Branch on the co-ordinating officer’s views are given below.
4.1 Co-ordinating Officer`s views/comments( Para 2.17):
Corrections in the details of primary maintenance trains.
1. 12626/25 – Kerala Express 7 days a week instead of 6 days a week.
2. 16315 KCVL-SBC Express- 4 days a week instead of 2 days a week
3. 12201/02 – KCVL-LTT – Twice a week instead of once in a week.
Planning Branch Remarks:
Noted, the same is incorporated in the subsequent paras under the
revised calculations.
4.2 Co-ordinating Officer`s views/comments (Para 2.26):
OBHS is now functional for Train No. 22659/60, 16315/16 & 16311/12.
Planning Branch Remarks:
Noted.
4.3 Co-ordinating Officer`s views/comments (Primary & Secondary) -
(Para 3.7 & 3.8) :
Sl. No
Train
No. Type
No. of
coaches
Days of turn
round/ week
Total No of
Coaches
Daily
average
1 16315/16 Ex 23 4 times a week 92 13.14
2 06065/04 Ex 19 Once in a week 19 2.71
Total man according to RB norms will be 15.85 x 0.9 = 14.2 = 15
15.85
32
Sl. No
Train
No. Type
No. of
coaches
Days of turn
round/ week
Total No of
Coaches
Daily
average
1 12626/25 SF 24 7 days a week
168 24
2 12201/02 SF 15 Twice a week 30 4.28
Total man according to RB norms will be 37.25 x 1.1 = 41.0 = 41 men
37.28
Requirement of manpower for Primary & Secondary maintenance will change.
Minimum requirement of staff for PM & SM per day = 66
LR @ 12.5% = 8.25
Total = 74.25 (75 staff)
Planning Branch Remarks:
Noted and the corrections are incorporated as follows:
Sl. No
Train No. Train type
No. of Coaches
Service Total
coaches per week
PM coaches/ per day
Express trains
1 16315/16316 EX 23 Four days a
week
92 13.14
2 06065/06064 EX 19 Once in a
week
19 2.71
Total 111 15.85
As per the RB norms, the man power Requirement is 0.9 men / per coach Hence actual requirement for Primary maintenance of Express Trains 15.85 x 0.9
14.26
say
14
33
Super Fast/ Long Distance Trains
1 12626/12625 SF 24 7 days a week 168 24.00
2 16311/16312 LD 22 Once in a week 22 3.14
3 22660/22659 SF 21 Once in a week 21 3.00
4 12201/12202 SF 15 Twice a week 30 4.28
5 06335/06336 LD 20 Once in a week 20 2.85
Total 271 37.27
As per the RB norms the man power Required is 1.1 Men / per coach Hence actual requirement for Primary maintenance of SF/LD Trains 37.27 x 1.1
40.99
say
41
Secondary Maintenance:
Sl.
No Train No.
Train
Type
No. of
Coaches Service
Total
coaches
per
week
PM
coaches/
per day
1 12218/12217 SF 21 Twice a week 42 6.00
2 12483/12484 SF 23 Once in a week 23 3.28
3 19260/19259 LD 19 Once in a week 19 2.71
4 19262/19261 LD 16 Once in a week 16 2.28
5 19331/19332 LD 16 Once in a week 16 2.28
104 16.55
As per the Prevalent norms, the man power required is 0.55 men / per coach. Hence actual requirement for Secondary maintenance of SF/LD trains 16.55 x 0.55
9.10
say 10
Requirement of manpower for Primary/Secondary Maintenance
Minimum requirement of staff for Primary/Secondary Maintenance ---- 65
Add LR @ 12.5% ---- 8
Total ---- 73
34
4.4 Co-ordinating Officer`s views/comments: (IOH & SL)-(Para 3.9 &
3.10)
IOH shed is working on all the 7 days & National Holidays instead of 6 days
as mentioned in the Draft work study report.
Number of coaches in a year ---- 268
Yardstick @ 0.14/coach ---- 37
LR & RG to be added because IOH is functioning for 7 days and NH
Yardstick ---- 37
LR @ 12.5% ---- 4.6
RG @ 16.66% ---- 6.14
Total ----- 47.74 (48 staff)
Planning Branch Remarks:
Though the IOH shed functions for all the 7 days, the study team allowed
37 staff in lieu of the utilised strength of 26 staff. If RG @ 16.66% is added,
the requirement will become 31 i.e., 6 staff more than that of 31.
4.5 Co-ordinating Officer`s views/comments (PFTR)-(Para 3.11)
According to norms for PFTR
LR to be provided in excess of Bench mark
Total staff --- 15
LR @ 12.5% --- 1.8
---16.8 (17 men)
Planning Branch Remarks:
Agreed to Co-ordinating Officer`s views.
4.6 Co-ordinating Officer`s views/comments (Para 3.12):
Pest control
Right now only 1 staff is used for day and night monitoring of contract
work.
Comments : One more staff to be given for RG & LR for efficient
monitoring of pest control as it is done by contract.
35
Planning Branch Remarks:
Agreed to the views of Co-ordinating Officer.
4.7 Co-ordinating Officer`s views/comments –(Para 3.13):
Store activities:
Presently there is 7 staff for store.
Comments: LR @ 12.5 % = 0.87
RG @ 16.66% = 1.16
= 2 staff more to be given
Planning Branch Remarks:
Not agreed to. Sufficient number of staff is provided for both collection and
issue of materials. Moreover provision of separate RG & LR for each and
every activity is not reasonable and it may be judiciously planned.
4.8 Co-ordinating Officer`s views/comments – (Para 3.14):
Requirement of staff other than supervisors including LR @ 12.5% wherever
applicable.
Final calculation:
Primary/secondary maintenance - 75
IOH - 48
PFTR - 17
Stores - 9
OBHS - 3
Bio-toilet/Maintenance - 4
Bio Lab - 3
Pest & Rodent control - 3
RCD (Currently day & night duty done by 1 staff only) - 2 Welder - 5 (for each shift + Sick line)
Trimmer - 5 (for each shift +Sick line)
(We are having 5 gangs for maintenance of amenities and Under gear)
Contract billing:
36
Currently 2 staff are doing billing, maintenance of records and sending bills to
division HQ. One more can be given.
Extra one person required for IMS, as we have started IMS for
maintaining 134 registers.
Mill Wright:
For maintenance of M&P (Crane, Jack and tools)
Accompany staff for LHB - 2, as we have to send 2 staff for every trip of LHB
rake i.e., 2 men daily.
Planning Branch Remarks:
Based on the above remarks, the revised calculation as follows activity-wise :-
Primary/Secondary maintenance 73
IOH/Sickline 37
Platform maintenance/PFTR 17
Special gang 7
Stores/Collection 7
BOOT Laundry 5
OBHS 1
Bio maintenance/Lab 4
Pest control 2
RCD 1
Welder 2
Trimmer 1
Painter 2
Carpenter 2
Coaching cell 3
Control/driver 3
Time section/Pass/Misc 2
Contract billing 2
Ministerial staff 2
Total Man power : 173
37
4.9 Co-ordinating Officer`s views/comments – (Para 3.15) :
Requirement of Supervisors:
Depot in- charge - 1
Store activities - 1
Sick line/ IOH - 1
Rake Maintenance - 6
Platform - 4
Bio toilet, Bio lab & OBHS - 1
Contract works - 1
BOOT Laundry - 2
Coaching Cell/IMS - 1
Total requirement - 18
Planning Branch Remarks:
Sl. No
Activity
Design. No. of posts
1 Depot incharge SSE 1
2 Rake maintenance SSE/JE 6
3 IOH & SL SSE/JE 1
4 BOOT Laundry SSE/JE 1
5 Platform maintenance SSE/JE 3
6 Contract works (Bio toilet, OBHS & Pest
control)
SSE/JE 1
7 Stores/M & P SSE/JE 1
TOTAL 14
LR @ 12.5% 2
Grand Total 16
The request of one additional post for Linen Management and one separate
SSE for IMS is not accepted and the study is of the opinion that all SSE/JEs
may be conversant with all activities of the depot.
4.10 Co-ordinating Officer`s views/comments – (Para 3.16):
38
Sanction vs Requirement
Sl. No.
Designation/Section Sanction Actual Require
ment Shortage
1 SSE 8 6 8 7 2 JE 10 5 10
3 Sr. Technician 12 9
191 42
4 Tech Gr. I 29 21
5 Tech Gr. II 23 21
6 Tech Gr. III 35 34
7 Helper 69 64
8 Welder 2 2 5 3
9 Trimmer 1 1 5 4
10 Carpenter 3 0 2 2
11 Mill Wright 0 0 2 2
12 Painter 2 0 2 2
13 IMS 0 0 1 1
14 Accompany staff for LHB
0 0 2 2
15 Ministerial staff 0 1 2 1
TOTAL 194 164 230 66
Total requirement = 230
Shortage = 66
Extra comments:
Considering staff retiring within 3 years
Upto December 2018 - 4 staff
Upto Decmber 2019 - 10 staff
Upto December 2020 - 16 staff
16 persons to be replaced on retirement account.
39
Planning Branch Remarks:
Out of 28 vacancies, the study team recommends only 7 posts i.e., 25 % of
the total vacant posts. Still 21 vacancies are left over.
Revised summary of sanction Vs Requirement :
Sl.
No Designation Sanction Actual Requirement Surplus
1 SSE 8 6 16 2 2 JE 10 6
3 Ch.OS/OS 0 1 2 -2*
4 Sr.Technician 12 10
164 4
5 Technician Gr.I 29 20
6 Technician Gr.II 23 21
7 Technician Gr.III 35 34
8 Helper 69 65
9 Welder 2 2 2 0
10 Trimmer 1 1 1 0
11 Carpenter 3 0 2 1
12 Painter 2 0 2 0
TOTAL 194 166 189 7
*The division may initiate to create 2 posts.
The total requirement is 189 and the study team recommends
surrendering of 7 posts in various categories. Considering the
present workload of Ministerial staff, the Planning Branch suggests
that the Executive Department may initiate for creation of two
posts of Ministerial staff on matching surrender as per extant
norms.
The division`s calculation of 230 staff i.e, 36 posts more than that
of the sanctioned strength of 194 is not accepted and it is requested
to surrender the 7 posts identified as Surplus.
40
CHAPTER– V
5.0 FINANCIAL SAVINGS
5.1 If the recommendations made in the study report are implemented,
the annual recurring financial savings will be as under:
Sl.
No.
Category Grade
pay/
Level
No.
of
posts
Money
value
Annual
financial
savings
1. JE 4200/6 2 75378 1809072
2. Helper 1800/1 4 38948 1869504
3. Carpenter 1800/1 1 38948 467376
TOTAL 7 41,45,952
.
41
ANNEXURE – I
‘S.A.V.E.’ STATEMENT OF SSE / C&W / KCVL
Sl.
No.
Category Sanction Actual Vacancy Excess
1. SSE 8 6 2 0
2. JE 10 6 4 0
3. Ch.OS 0 1 0 1
4. Sr.Technician 12 10 2 0
5. Technician-I 29 20 9 0
6. Technician-II 23 21 2 0
7. Technician-III 35 34 1 0
8. Helper 69 65 4 0
9. Welder 2 2 0 0
10. Trimmer 1 1 0 0
11. Carpenter 3 0 3 0
12. Painter 2 0 2 0
TOTAL 194 166 29 1
42
ANNEXURE – II
Sheet – 1
BENCHMARKING NORMS FOR MAINTENANCE STAFF PROVISIONS FOR
COACHING MAINTENANCE
ANNEXURE TO BOARD’S LETTER 2000/M©/143/5, dated 24.12.2001
Sl.
No. Activity
Prevalent Norms
Unit/men
Benchmarking Norms
Unit/men
1 Primary Maintenance
Primary Men / Coach /
Day
Super Fast / Long
distance Trains – 1.2
Mail / Express – 1
Pass. Trains – 0.8
Men / Primary Coach
handled per day
Superfast / Long
distance trains: 1.1
Mail / Express – 0.9
Pass. Trains – 0.75
2 Secondary
Maintenance
50% of Primary
Men / coach examined
/ day
Superfast / long
distance trains – 0.55
Mail / Express
Trains – 0.45
Pass. Trains – 0.36
3
Enroute Train
Passing.
Turn round attention.
Terminating /
originating (Inclusive
of cleaning and
examination of
Platform but
excluding interior dry
cleaning of turn
round trains
As per local practice
Men / coach examined
per day (up and down pair of trains to be
counted as one rake)
Superfast / Long
distance trains – 0.26
Main / Express Trains –
0.23
Pass. Trains – 0.18
43
ANNEXURE – II
Sheet – 2
Sl.
No. Activity Prevalent Norms
Unit/men Benchmarking Norms
Unit/men
4 Sick Line Attention 0.15 / coach held 0.14 / coach
5
Cleaning & complete
washing
0.7 / coach
maintained daily
including primary and
secondary trains
0.55 coach maintained
daily including primary
and secondary trains.
6 Only for dry cleaning 0.5 / coach cleaned 0.45 / coach cleaned
7 Watering Not covered
A committee is
separately examining
the area. For the
present requirement
may be based on local
conditions.
8 Material storage /
accounting 32 men
26 men for each
coaching depot holding
150 or more coaches
9 Linen management 0.27 men / AC coach 0.22 / AC coach holding
10 Inspection carriage 2.2 / insp. Carriage 1.76 / insp. Carriage
11 Train escorting staff
As per Boards letters
99 / TGV /12/2, dated
13.03.99
No Change
12 Statistical Work
10 men 8 men only for depots holding 150 or more
coaches
13 Outstation / Line
Attention
7 men NIL
14 Pest Control Already Outsourced No Change
44
ANNEXURE – II
Sheet – 3
Sl.
No. Activity
Prevalent Norms
Unit/men
Benchmarking Norms
Unit/men
15
Waste disposal
Pit line sweeping &
drain cleaning
Security and locking of
rakes
Already Outsourced
Already Outsourced
Already Outsourced
No Change
Railways where yardstick provides
for staff for these
items of work may work towards
outsourcing based on
local condition
16 Staff Training
requirement of trainers Not covered
Not covered by
benchmarking norms
to be provided on
Need basis
17
ART and accident relief
Mill wright, W. measures and ancilliary
staff
Not covered
Not covered by
benchmarking norms
to be provided based
on existing norms for
accident relief trains
of different types
and on need basis
for other tasks
1. The above norms (other than sick line) are inclusive of rest giver
allowance (RG), but Leave Reserves (LR) may be provided as
applicable. For sick line, both LR & RG are included.
2. The Norms do not cover ministerial staff and divisional control
staff which may be provided according to local practices.
...