DATE : 14 JULY 2011 SI CLIENT CONT NO. STATUS WORKS DONE 1 Proscape on Sunday meeting Not done 2 PTL solar Rafik-E6614722 3 TAMAS Baker 4 AIS Puhal 5 BMTS Renish 6 ACECO Hameed-E7902443 7 GISCO Payas / madhu 8 SEIDCO 9 ADEEB Peer 10 Sun insurance kavitha 563 9901 11 Al SABBAH Noel 12 DRAKE & SCULL Qablavi 13 AIS Puhal 14 FEDERAL Majid (Johnson@Proscapegroup .com) week we will get reply under approval stage. approval stage, client will call us during finalisation approval to end client, he will call me during finalisation Authorisation sign not done 60days credit & total order value is less Quote given - 6400Dhs Client need urgent work on MN & delivery Client saying that Our name is not in the vendor list. We ve to prepare Prequalification dossier to bring this order he told that DB standard as per FEWA but it should be as per DMW

Transcript of Work Schedule Daily

Page 1: Work Schedule Daily

DATE : 14 JULY 2011

SI CLIENT CONT NO. STATUS Dtd:15.07.11

1 Proscape on Sunday meeting Not done MON 18

2PTL solar

Rafik-E6614722

3TAMAS

Baker

4AIS

Puhal

5

BMTS

Renish

6

ACECO

Hameed-E7902443

7 GISCO Payas / madhu

8SEIDCO

9 ADEEB Peer

10Sun insurance

kavitha 563 9901

11Al SABBAH

Noel

12

DRAKE & SCULL

Qablavi

13AIS

Puhal

14

FEDERAL

Majid

WORKS DONE

D 3006454 ([email protected])

he told in One week we will get reply

2 projects are under approval stage.

Submittal under approval stage, client will call us during finalisation

Sameway went for approval to end client, he will call me during finalisation

Authorisation sign not done

client asking for 60days credit & total order value is less

Quote given - 6400Dhs

Client need urgent work on MN & delivery

Client saying that Our name is not in the vendor list. We ve to prepare Prequalification dossier

One week will take to bring this order

he told that DB standard as per FEWA but it should be as per DMW

Page 2: Work Schedule Daily

SI CLIENT CONT NO. STATUS Dtd:16.07.11

1ADEEB

Order Request

2FEDERAL

Issue?

3DRAKE & SCULL

Qablaavi

4

Proscape

Not done

5 GISCO Payas / madhu

6 CODE Cheque collection tomorrow

7DRAKE & SCULL

Meet Tahani

8TARGET ENGG

FEROZ

9AIS

Puhal

10DRAKE & SCULL

Kablavi -

11HILALCO

Selvin

12VOLTAS

ansar / tawhid

13 Sohaib will call me

14

15

WORKS DONE

D 3006454 ([email protected])

on Sunday meeting - al raha beach

Appointment on 17th

Authorisation sign not done

Appointment on 17th

Appointment on 17th

Appointment on 17th

Appointment on 17th

Appointment on 17th

Appointment on 17th

Appointment on 17th

Appointment on 17th

ADVANCED TECH. SERVICES

Page 3: Work Schedule Daily

SI CLIENT CONT NO. STATUS Dtd:17.07.11

1 Proscape

Al raha beach Not done

2 GISCO Payas / Alex - purchase

3 CODEChako

4 DRAKE & SCULLMeet Tahani

5 TARGET ENGGFEROZ

6 AISPuhal

7 DRAKE & SCULLKablavi -

8 HILALCOSelvin

9 VOLTASansar / tawhid

10Sohaib's client

1102 6727333 From Copri - jassir

12 DAMASAVAL

13

SAYEM/JHONG 02-6432804

14

WORKS DONE

D 3006454 ([email protected])

Authorisation sign not done / also Alex

Cheque collection tomorrow

ADVANCED TECH. SERVICES

AL BERAK ELECTRICAL

PROFESSIONAL ELECTRICAL

they don’t have anything - enquiry

bengali, philipiny

AL NASER ELEC. CONSTRUCTION

Page 4: Work Schedule Daily

15 THARBAN DOSS

16

17

18

19

20 SEG emiratesFax: +971 1 26770007

21 MECS JAYADEEP - 050 8151 579 DUBAI

22they are not doing DUBAI

told to call on 20th

Grand Platform General Contracting

Office # M1, Mezzanine Floor, Saeed Al Mansouri Building, Muroor Road (East Road)Al Nahyan, Abu DhabiLandmark: Near Emirates College of TechnologyP.O.Box: 60764, Abu DhabiTel: +971 2 6433119 Fax: +971 2 6433117

Exxon International Contracting LLC

Office # 202, 2nd Floor, Saeed Juma Al Huwaidi BuildingDeira, DubaiLandmark: Opposite Hyatt Regency HotelP.O.Box: 120208, DubaiTel: +971 4 2549313 Fax: +971 4 2549314

Contest Engineering Contracting Est

Office # M1, Mezzanine Floor, Mohd Fareshi Qubaisi Building, Zayed 1st Street (Electra Road)Al Khalidiya, Abu DhabiLandmark: Near Dana PlazaP.O.Box: 5441, Abu DhabiTel: +971 2 6676940 Fax: +971 2 6676941

Amana Contracting & Steel Buildings Co

Al Falah Street (Old Passport Road)Madinat Zayed (Main City), Abu Dhabi;Landmark: Near Abu Dhabi MunicipalityP.O.Box: 5643, Abu DhabiTel: +971 2 6428383 Fax: +971 2 6428644

KCC - KUWAIT CONTROL

ENGR.SUMANT - E 7361 248

Page 5: Work Schedule Daily

SI CLIENT CONT NO. STATUS Dtd:17.07.11

1 DRAKE & SCULLKablavi -

2 SAHULCheck with him

3 MECS JAYADEEP - 050 8151 579 DUBAI

4

6 AL KHALIZ SUGARSahul

7 PETROFAC

8

9

10

11

12

13

14

15

WORKS DONE

CONDOR ELEC.MECH

Page 6: Work Schedule Daily

Sl#QTN. # QTN.DT. ENQ.#Item / Material DescriptionCompany Name

1 7/10/2011 E0539 MDB, SMDB, DB SEIDCO

605 7/12/2011 E0546 MDB TSSCClient – Job in hand for TSSC – Went for approval – By Month end we’ll get approval

601 7/10/2011 E0540 LT Panel CODE ContractingTender –

602 7/11/2011 E0544 DB, Photocell Gulf TurretsWe will get this Order

598 7/6/2011 E0512 SDP, FDP, EFDB, DP ACECOClient – IN meeting – E 790 2443 – Call again

597 7/10/2011 E0528 ATS Panel CODE ContractingClient – Ranjith – Client told – he will call during finalization of this Order

589 7/4/2011 E0532SWB-ST1, SWB-HU44, ATS PanelGulf TurretsTender

588 7/4/2011 E0527 MDB / DB CODE ContractingJob in hand – Ahmed shestavy – we will get this Order

586 7/9/2011 E0525 MDB, SMDB, DB Al Sabbah

584 7/9/2011 E0523 MDB, SMDB, DB Al Sabbah

582 7/2/2011 E0526 DMW Gulf TurretsYasin maki – Went with existing supplier

581 7/2/2011 E0524Water Pump Starter Control Panel Al SabbahYasin maki – Went with existing supplier – Price also less with the old supplier

573 6/29/2011 E0521 MDB / SMDB / MTS CAEApproval under process – with end client

567 6/25/2011 E0472 MDB / SMDB / CAP.BANK Condor ContractingJob in hand – But this project is.

443-11-Rev.01Client asking – 200,000Dhs à Payment terms – 60days Credit – if we accept for both – we can get order

448-11

444-11

445-11

442-11

441-11-Rev.01

435-11

434-11-Rev.01

433-11-Rev.01Ibrahim fahad – Under approval from end client – sure they will come back  

432-11-Rev.01Ibrahim fahad – Under approval from end client – sure they will come back  

431-11

430-11

424-11

421-11

Page 7: Work Schedule Daily

Project Al Bateen ###

Fire Water Back Up Pipe line At Mot Fujairah36,790.00

CMW-09003-C-001###

Al Maqta 5,945.00

UAE World Desert92,850.00

Packing Unit Building at Al Wathba Farms###

Huwaila 34,570.00

Proposed19,680.00

Al Salaah Batching Plants – Oman###

DB’s Unibetton - Qatar###

DMW 11,520.00

Unibeton @ Salalah, Oman78,140.00

ASAB New Camp89,210.00

Pacific Cloud Data Center###

QTN.VALUE

Payment terms – 60days Credit – if we accept for both – we can get order

Page 8: Work Schedule Daily

Sl# QTN. # QTN.DT. ENQ.# Company Name Project QTN.VALUE QTN.BY

1 04/01/2011 E005DB

E.T.A PCS 72,720.00 Siraj

2 05/01/2011 E0549Control Panel

Citiscape 91,880.00 Abdullah

3 05/01/2011 E006LCP

8,480.00 Siraj

4 05/01/2011 E010SMDB & Isolator

Al Sabbah Al Bateen School Siraj

5 06/01/2011 E003Control Panel

Citiscape Garden Villa 56,690.00 Abdullah

6 30/01/2011 E003Control Panel

Citiscape Garden Villa 72,736.00 Abdullah

7 07/02/2011 E003Control Panel

Citiscape Garden Villa 69,736.00 Abdullah

8 06/01/2011 E014Socket Panel

GISCO 7,350.00 Mohamed

9 10/01/2011 E014Socket Panel

GISCO 7,500.00 Mohamed

10 06/01/2011 E018SMDB & DB

Voltas Nil 168,210.00 Siraj

11 08/01/2011 MailDB & Breaker

Nil 6,550.00 Siraj

12 08/01/2011 Mail

DB & Breaker

Nil 5,975.00 Siraj

13 09/01/2011 MailLV - Panel

Spectrum 1,466,742.00 Abdullah

14 08/01/2011 E013LCP

8,370.00 Siraj

15 08/01/2011 E017Consumer Unit

Extra co Nil Kalandar

Item / Material Description

001-11CAPITAL CENTRO

HOTEL

002-11

Development of Beach Hotel and Resort – Plot No.(SB-06) SAADIYAT

ISLAND

003-11CODE

Contracting

CONSTRUCTION OF BOUNDRY WALL FOR

HH SH.SAEED BIN MOHD AL NAHYAN AT

ABU DHABI004-11

005-11

005-11-Rev.01

005-11-Rev.02

006-11Radar Station Elec

Works

006-11-Rev.01Radar Station Elec

Works

007-11

008-11Buvan suresh Rajiv's

brother

008-11-Rev.01Buvan suresh Rajiv's

brother

009-11

010-11CODE

ContractingRuwais Housing

complex expansion

011-11Option1:

27,730 Option 2: 29,710

Page 9: Work Schedule Daily

16 09/01/2011 E015DB

Al Ryum 9,650.00 Abdullah

17 17/01/2011 E015DB

Al Ryum 9,100.00 Abdullah

18 20/01/2011 E015DB

Al Ryum 9,000.00 Abdullah

19 09/01/2011 E023Sub Station

MW – RG – 118 - 2009 Abdullah

20 17/01/2011 E023Sub Station

MW – RG – 118 - 2009 590,485.00 Abdullah

21 17/01/2011 E023Sub Station

MW – RG – 118 - 2009 538,350.00 Abdullah

22 09/01/2011 E019CT Meters

64,435.00 Siraj

23 18/01/2011 E019CT Meters

69,115.00 Siraj

24 09/01/2011 NILKWH Meter with C.T

GISCO Nil 1,470.00 Siraj

25 18/01/2011 NILKWH Meter with C.T

GISCO Nil 1,975.00 Siraj

26 09/01/2011 E020Capacitor Bank

CCIC 236,250.00 M.D

27 09/01/2011 E027MDB / SMDB / DB

Gulf Turrets Nil 56,614.00 Abdullah

28 10/01/2011 E027MDB / SMDB / DB

Gulf Turrets Nil 51,265.00 Abdullah

29 10/01/2011 E027MDB / SMDB / DB

Gulf Turrets Nil 48,702.00 Abdullah

30 11/01/2011 E027MDB / SMDB / DB

Gulf Turrets Nil 42,000.00 Abdullah

31 11/01/2011 E027MDB / SMDB / DB

Gulf Turrets Nil 37,440.00 Abdullah

32 09/01/2011 E026SMDB & DB

Kharafi national Zayed sports city 11,450.00 Siraj

012-11Pump Room for 1m

Gallon Water Tank in Muhayar Farm, Al Ain

012-11-Rev.01Pump Room for 1m

Gallon Water Tank in Muhayar Farm, Al Ain

012-11-Rev.02

Pump Room for 1m Gallon Water Tank in Muhayar Farm, Al Ain

013-11

Al Bader Contracting

Option 1: 195810 /= Option 2: 210550 /=

013-11-Rev.01

Al Bader Contracting

013-11-Rev.02

Al Bader Contracting

014-11

ALEC ( Al Jaber Group)

50 Private Villas , Khalifa City

014-11-Rev.01

ALEC ( Al Jaber Group)

50 Private Villas , Khalifa City

015-11

015-11-Rev.01

016-11

SHAH SULPHUR STATION & PIPELINES

PROJECT

017-11

017-11-Rev.01

017-Rev.02

017-Rev.03

017-Rev.04

018-11

Page 10: Work Schedule Daily

33 22/01/2011 E026SMDB & DB

Kharafi national Zayed sports city 10,980.00 Siraj

34 10/01/2011 E009 MASCO 2,540,080.00 Rasool

35 10/01/2011 E021Power Climber Panel

Nil 4,115.00 Abdul Kader

36 13/01/2011 E021Power Climber Panel

Nil 2,150.00 M.D

37 16/01/2011 E021Power Climber Panel

Nil 1,900.00 M.D

38 10/01/2011DB

Al Sabbah 3,600.00 Siraj

39 10/01/2011 E0534MDB,SMDB,FP,ATS,CP

Al Ryum Al Daher Park 137,500.00 Kalandar

40 10/01/2011 E0537DB

Al Ryum Al Daher Park 11,040.00 Kalandar

41 11/01/2011 E029 Sharjah Project 10,060.00 Siraj

42 11/01/2011 E032Feeder Pillar

U.A.E Armed Force 24,890.00 Siraj

43 26/01/2011 E032Feeder Pillar

U.A.E Armed Force 39,638.00 Abdullah

44 12/01/2011 E004LV Panels

Al Fikri Al Sahama Palace 629,300.00 Abdullah

45 18/01/2011 E004LV Panels

Al Fikri Al Sahama Palace 317,470.00 Abdullah

46 12/01/2011 E030Control Panel

Al Sabbah 35,000.00 Siraj

47 12/01/2011 E037LV Panels

Lindenberg Nil 650,000.00 Abdullah

48 12/01/2011 E037LV Panels

Lindenberg Nil 650,000.00 Abdullah

49 12/01/2011 E036SMDB / DB

Al Sabbah 6,770.00 Siraj

018-11-Rev.01

019-11MDB SMDB, DB, ATS, MCC

PANEL

Ruwais Recreation Center

020-11

Emirates Contracting

020-11-Rev.01

Emirates Contracting

020-11-Rev.02

Emirates Contracting

021-11

Habshan KN Accommadation

022-11

023-11

024-11MDB / METER CABINET /

CAP.BANK

Muscat Electrical

025-11

Al Bader Contracting

025-11-Rev.01

Al Bader Contracting

026-11

026-11-Rev.1

027-11

BEACH ROTANA HOTEL

028-11

028-11-Rev.01

029-11

POLICE MAINTENANCE AT AL AIN

Page 11: Work Schedule Daily

50 13/01/2011 E033ACB / CT

Corodex Delma 121,924.00 Abdullah

51 13/01/2011 E033ACB / CT

Corodex Delma 121,924.00 Abdullah

52 13/01/2011 E042LV Panels

MASCO Commercial Building 211,890.00 Abdullah

53 13/01/2011 E043MDB / Capacitor Bank

GISCO Nil 44,625.00 Siraj

54 18/01/2011 E043MDB / Capacitor Bank

GISCO Nil 54,445.00 Siraj

55 13/01/2011 E047SMDB

Kharafi national Nil 7,530.00 Siraj

56 13/01/2011 E008Control panel

98,870.00 Siraj

57 15/01/2011 E016LV Panels

769,815.00 Abdullah

58 17/01/2011 E016LV Panels

703,790.00 Abdullah

59 19/01/2011 E016LV Panels

690,790.00 Abdullah

60 20/01/2011 E016LV Panels

680,000.00 Abdullah

61 12/05/2011 E016LV Panels

157,097.00 Abdullah

62 16/05/2011 E016LV Panels

157,097.00 Abdullah

63 22/05/2011 E016LV Panels

157,383.00 Abdullah

64 16/01/2011 E049DB

Al Sabbah 1,980.00 Siraj

65 17/01/2011 E045DB

Corodex Delma Island 2,410.00 Abdullah

66 17/01/2011 E050Contactor

Techno Power Nil 123,660.00 Siraj

030-11

030-11-Rev.01

031-11

032-11

032-11-Rev.01

033-11

034-11

Emirates National

Abu dhabi general police head quarters

035-11

Al Bader Contracting

Directorate of Military Works

035-11-Rev.01

Al Bader Contracting

Directorate of Military Works

035-11-Rev.02

Al Bader Contracting

Directorate of Military Works

035-11-Rev.03

Al Bader Contracting

Directorate of Military Works

035-11-Rev-04

Al Bader Contracting

Directorate of Military Works

035-11-Rev.05

Al Bader Contracting

Directorate of Military Works

035-11-Rev.06

Al Bader Contracting

Directorate of Military Works

036-11

AL AIN INDUSTRIAL CITY

037-11

038-11

Page 12: Work Schedule Daily

67 17/01/2011 E054Accessries

Al Sabbah Al Bateen School 0.00 Siraj

68 18/01/2011 E057SMDB / DB

ARCO CNIA 19,134.00 Abdullah

69 19/01/2011 E057SMDB / DB

ARCO CNIA 19,729.00 Abdullah

70 19/01/2011 E057SMDB / DB

ARCO CNIA 18,742.00 Abdullah

71 22/01/2011 E057SMDB / DB

ARCO CNIA 22,645.00 Abdullah

72 24/01/2011 E057SMDB / DB

ARCO CNIA 21,870.00 Abdullah

73 18/01/2011 E040Control Panel

ARCO DMW - MALIHA 142,660.00 Siraj

74 19/01/2011 E040Control Panel

ARCO DMW - MALIHA 142,660.00 Siraj

75 19/01/2011 E040Control Panel

ARCO DMW - MALIHA 122,465.00 Siraj

76 22/02/2011 E040Control Panel

ARCO DMW - MALIHA 99,890.00 Mohamed

77 19/01/2011 NILC.T

GISCO Nil 380.00 Siraj

78 19/01/2011 E031 Drake & Skull 191,030.00 Abdullah

79 22/01/2011 E031 Drake & Skull 191,030.00 Abdullah

80 26/01/2011 E031 Drake & Skull 347,640.00 Abdullah

81 19/01/2011 E059DB / SMDB

Al Ryum Al Maqama Palace 13,480.00 Abdullah

82 20/01/2011 E059DB / SMDB

Al Ryum Al Maqama Palace 12,480.00 Abdullah

83 20/01/2011 VerbalDB / Componnets

TSSC Nil 73,800.00 Siraj

039-11

040-11

040-11-Rev.01

040-11-Rev.02

040-11-Rev.03

040-11-Rev.04

041-11

041-11-Rev.01

041-11-Rev.02

041-11-Rev.03

042-11

043-11 MCC – 1C, MCC – 3C, MCC – 9A

AD Court House Complex

043-11-Rev.01 MCC – 1C, MCC – 3C, MCC – 9A

AD Court House Complex

043-11-Rev.02 MCC – 1C, MCC – 3C, MCC – 9A

AD Court House Complex

044-11

044-11-Rev.01

045-11

Page 13: Work Schedule Daily

84 23/01/2011 VerbalDB / Componnets

TSSC Nil 73,000.00 Siraj

85 20/01/2011 E039LV Panels

Elmec Dubai Marina 5,078,990 Abdullah

86 22/01/2011 E063DB & Components

Site Technology Nil 60,000.00 Siraj

87 22/01/2011 E042MDB/ LCP / CAP.BANK

Musaffah gardens 270,010.00 Abdullah

88 04/05/2011 E042MDB/ LCP / CAP.BANK

Musaffah gardens 20,977.00 Abdullah

89 05/05/2011 E042MDB/ LCP / CAP.BANK

Musaffah gardens 20,977.00 Abdullah

90 10/05/2011 E042MDB/ LCP / CAP.BANK

Musaffah gardens 20,000.00 Abdullah

91 11/05/2011 E042MDB/ LCP / CAP.BANK

Musaffah gardens 22,360.00 Abdullah

92 23/01/2011 E055isolators

MASCO Commercial Building 49,965.00 Siraj

93 23/01/2011 E068DB / SMDB

Al Ryum 17,864.00 Abdullah

94 24/01/2011 E068DB / SMDB

Al Ryum 17,864.00 Abdullah

95 25/01/2011 E068DB / SMDB

Al Ryum 17,083.00 Abdullah

96 26/01/2011 E068DB / SMDB

Al Ryum 16,307.00 Abdullah

97 23/01/2011 E067Capacitor Bank

Fajr Al Hind Nil 38,110.00 Siraj

98 23/01/2011 E056Lighting Control Cabinet

Al Ryum 55,750.00 Abdullah

99 23/01/2011 E070MCB

Kharafi national Nil 3,630.00 Siraj

100 23/01/2011 E069DB

Al Sabbah External Site Plan 39,130.00 Siraj

045-11-Rev.01

046-11

047-11

048-11Damas

Contracting

048-11-Rev.01Damas

Contracting

048-11-Rev.02Damas

Contracting

048-11-Rev.03Damas

Contracting

048-11-Rev.04Damas

Contracting

049-11

050-11COMMAND OF

MILITARY WORKS

050-11-Rev.01COMMAND OF

MILITARY WORKS

050-11-Rev.02COMMAND OF

MILITARY WORKS

050-11-Rev.03COMMAND OF

MILITARY WORKS

051-11

052-11CROWN PRINCE

COURT

053-11

054-11

Page 14: Work Schedule Daily

101 03/03/2011 E069DB

Al Sabbah External Site Plan 59,945.00 Siraj

102 24/01/2011 E053LV Panels

Sterlin Wilson 1,800,600.00 Abdullah

103 25/01/2011 E071Isolator – IP-65

ARCO 3,807.00 Siraj

104 25/01/2011 E076DB

Al Sabbah 1,850.00 Siraj

105 25/01/2011 E061LV Panels

415,167.00 Abdullah

106 26/01/2011 E074MDB, DB, Meter Cabinet

Al Jaber 37410 / 34920 Abdullah

107 26/01/2011 E047 Al Ashwaq Tecom Tower 886,490.00 Siraj

108 26/01/2011 E077DB

Extra co 13,800.00 Siraj

109 26/01/2011 E079Synchronising Panel

Nil 234,630.00 M.D

110 27/01/2011 E075DB / Enclosure

Al Jaber Nil 9,480.00 Abdullah

29/01/2011 E083 ACDB TSSC Nil 11,705.00 Abdullah

111 30/01/2011 E087SMDB

Al Sabbah Nil 9,733.00 Abdullah

112 03/02/2011 E087SMDB

Al Sabbah Nil 8,964.00

113 30/01/2011 E089DB

Fuqiang Nil 3,925.00 M.D

114 31/01/2011 E090DB

Fuqiang DB-MOT 89,600.00 Abdullah

115 31/01/2011 E065LV panel

Al Ryum Qatar Embassy 360,220.00 Abdullah

116 31/01/2011 E044LV Panel

GECO Sheik Zayed Mosque 587,660.00 Abdullah

117 31/01/2011 E091Control Panel

Citiscape Zaina 50,750.00 Abdullah

054-11-Rev.01A

055-11IRIS AMBER CULTURAL

VILLAGE

056-11ZAYED MILITARY CITY

– CNIA

057-11 AL AIN INDUS CITY

058-11Al Bader

Contracting

Technical Administration Office

Building @ RAK

059-11 GF + 1st + Roof Villa

060-11 LV PANEL, SMDB, DB, CAP BANK

061-11SAHIL & SHALH FULL FILE DEVELOPMENT

062-11Muscat

Electrical

063-11

064-11

065-11

065-11-Rev.01

066-11

067-11

068-11

069-11

070-11

Page 15: Work Schedule Daily

119 01/02/2011 E091Control Panel

Citiscape Zaina 41,750.00 Abdullah

120 07/02/2011 E091Control Panel

Citiscape Zaina 39,275.00 Abdullah

121 06/02/2011 E091Control Panel

Citiscape Zaina 39,275.00 Abdullah

122 06/02/2011 E091Control Panel

Citiscape Zaina 33,950.00 Abdullah

123 01/02/2011 E058ATS

GISCO Bur Duai / Military area 14,750.00 Abdullah

124 03/02/2011 E080Feeder Pillar

Kharafi national 35,820.00 Abdullah

125 03/02/2011 E080Feeder Pillar

Kharafi national 35,820.00 Abdullah

126 03/02/2011 E086DB

GISCO Nil 3,550.00 Abdullah

127 03/02/2011 E100Lighting Transformer

Galfar Nil 19,122.00 Abdullah

128 03/02/2011 E101DB

Galfar Nil 7,065.00 Abdullah

129 05/02/2011 E064Battery Circuit Breaker

Site Technology Nil 15,398.00 Abdullah

130 03/02/2011 E034Control Panel

Torishma Nil 322,635.00 Abdullah

131 05/02/2011 E103DB

GISCO Nil 3,891.00 Abdullah

132 08/02/2011 E103DB

GISCO Nil 4,164.00 Abdullah

133 05/02/2011 E110MDB

GISCO Nil 9,845.00 Abdullah

134 05/02/2011 E098ATS

Gulf Turrets Nil 26,820.00 Sohaib

135 05/02/2011 E111DB

Al Ryum CNIA 5,480.00 Abdullah

136 06/02/2011 E113MTS

Al Bahar Nil 2,525.00 Abdullah

137 06/02/2011 E109DB

TSSC Nil 4,422.00 Abdullah

138 06/02/2011 E114Feeder Pillar

Shams Nil 10,109.00 Sohaib

139 07/02/2011 E114Feeder Pillar

Shams Nil 7,225.00 Sohaib

070-11-Rev.01

070-11-Rev.02

070-11-03

070-11-Rev.04

071-11

072-11Habshan Camp 2 Commercial offer

072-11Habshan Camp 2 Technical offer

073-11

074-11

075-11

076-11

077-11

078-11

078-11-Rev.01

079-11

080-11

081-11

082-11

083-11

084-11

084-11-Rev.01

Page 16: Work Schedule Daily

140 08/02/2011 E114Feeder Pillar

Shams Nil 8,725.00 Abdullah

141 06/02/2011 E115Lighting Contactor

Kharafi national Nil 453.00 Abdullah

142 07/02/2011 E121Starter panel - Star Delta

Nil 12,000.00 Sohaib

143 08/02/2011 E116MTC DB

TSSC Nil 6,621.00 Sohaib

144 08/02/2011 E107LCP

Citiscape Khalidia Complex 7,500.00 Sohaib

145 08/02/2011 E119Isolator

Nil 65,220.00 Sohaib

146 08/02/2011 E122Cutout Box

Nil 1,800.00 Sohaib

147 08/02/2011 E123 Al Darmaky LS 584 Swaihan 14,643.00 Sohaib

148 08/02/2011 E117DB

Al Sabbah 2,626.00 Abdullah

149 08/02/2011 E120Control Panel

BMTS Manipal University 145,495.00 Sohaib

150 09/02/2011 E118Isolator

Kharafi national Nil 24,825.00 Sohaib

151 09/02/2011 E124ATS Panel

Drake & Skull 28,206.00 Sohaib

152 09/02/2011 E085Control Panel

Torishma PME00087_ RFQ 25,475.00 Abdullah

153 09/02/2011 E102HVAC Control Panel

BMTS HVAC 284,911.00 Abdullah

154 13/02/2011 E102HVAC Control Panel

BMTS HVAC 295,247.00 Sohaib

155 15/06/2011 E102HVAC Control Panel

BMTS HVAC 305,745.00 Sohaib

156 15/06/2011 E102HVAC Control Panel

BMTS HVAC 287,750.00 Abdullah

157 09/02/2011 E125DB

Extra co ADCO 12,900.00 Sohaib

158 09/02/2011 E126Consumer Unit

Extra co 32,185.00 Abdullah

159 09/02/2011 E131FP – SMDB – S /S – 2 - 04

Kharafi national Habshan Labor Camp 9,142.00 Abdullah

160 10/02/2011 E112Control Panel

Torishma Nil 21,358.00 Abdullah

084-11-Rev.02

085-11

086-11CODE

Contracting

087-11

088-11

089-11Kharafi National

090-11Kharafi National

091-11Pumping Station

Components

092-11Habshan KN

Accommadation

093-11

094-11

095-11Heart of Doha -

Dohaland

096-11

097-11

097-11-Rev.01

097-11-Rev.03

097-11-Rev.04

098-11

099-11JUNIOR STAFF

ACCOMMODATION

100-11

101-11

Page 17: Work Schedule Daily

161 12/02/2011 E095LV Panel

Al Ashwaq G+1 Residential Villa 27,230.00 Abdullah

162 12/02/2011 E095LV Panel

Al Ashwaq G+1 Residential Villa 23,340.00 Sohaib

163 12/02/2011 E139DB

Al Ryum Nil 1,875.00 Abdullah

164 13/02/2011 E104MDB / SMDB

Nael Energy 166,880.00 Abdullah

165 13/02/2011 E132SMDB

Nael Energy 3 Block Apartments 26,569.00 Abdullah

166 13/02/2011 E140DB

ARCO Nil 1,702.00 Abdullah

167 13/02/2011 E134DB

Extra co Nil 29,736.00 Abdullah

168 13/02/2011 E134DB

Extra co Nil 8,260.00 Abdullah

169 14/02/2011 E088MDB, SMDB, DB

Federal 59,170.00 Abdullah

170 14/02/2011 E132FAHU / AHU PANELS

Nael Energy MEZAYED SCHOOL 339,283.00 Abdullah

171 16/02/2011 E132FAHU / AHU PANELS

Nael Energy MEZAYED SCHOOL 339,283.00 Abdullah

172 03/03/2011 E132FAHU / AHU PANELS

Nael Energy MEZAYED SCHOOL 166,415.00 Abdullah

173 14/02/2011 E147ATS

16,742.00 Abdullah

174 15/02/2011 E081 Al Guzlan Nil 61,070.00 Abdullah

175 15/02/2011 E146DB

Extra co Consultant Site Office 2,632.00 Abdullah

176 15/02/2011 Nil Site Technology Nil 3,940.00 Abdullah

177 15/02/2011 E105LCP

Corodex Nil 234,052.00 Abdullah

178 15/02/2011 E145DB

Nil 1,150.00 Sohaib

179 21/02/2011 E145DB

Nil 1,835.00 Abdullah

180 16/02/2011 E143AHU and FCU Controller

BMTS Nil 78,642.00 Abdullah

181 16/02/2011 E133Control Panel

Citiscape 51,981.00 Abdullah

102-11

102-11-Rev.01

103-11

104-113 Block Apartments for

Shaikh Sultan Bin Thahnoun,

105-11

106-11

107-11

107-11-Rev.01

108-11INTERNET CAFÉ AND

RESTAURANT OF ARMY FORCE

109-11

109-11-Rev.01

109-11-Rev03

110-11Emirates National

Data Center for Zayed Military Hospital

111-11MDB, SMDB, DB, Capacitor

Bank

112-11

113-11New Mounting Plate with

additional breaker

114-11

115-11Stout

Gen.Maint.

115-11-Rev.01Stout

Gen.Maint.

116-11

117-11Development of Beach

Hotel and Resort

Page 18: Work Schedule Daily

182 20/02/2011 E151Feeder Pillar

ESS Nil 24,705.00 Abdullah

183 20/02/2011 E150FAHU / AHU PANELS

11,570.00 Sohaib

184 21/02/2011 E149SMDB

GISCO Nil 4,900.00 Sohaib

185 21/02/2011 E157 2,800.00 Mohamed

186 21/02/2011 E128 AIS 100,610.00 Sohaib

187 23/05/2011 E128 AIS 335,632.00 Abdullah

188 122-11-Rev.02 25/05/2011 E128 AIS 301,206.00 Abdullah

189 24/5/11 E128 AIS 330,632.00 Abdullah

190 26/06/2011 E128 AIS 330,632.00 Abdullah

191 21/02/2011 E154MDB

Kharafi national 66,600.00 Sohaib

192 21/02/2011 E141LV PANEL

Al Ryum MW-OU-099-2010 314,460.00 Mohamed

193 21/02/2011 E135Electric Switch board

AIS Nil 100,610.00 Sohaib

194 22/02/2011 E155SMDB

Kharafi national 54,800.00 Rasool

195 01/03/2011 E155SMDB

Kharafi national 183,760.00 Rasool

22/02/2011 E138DB

Voltas Nil 40,770.00 M.D

196 22/02/2011 E144AHU Control Panel

BMTS Nil 34,310.00 Sohaib

22/02/2011 E165Cutout Box

ARCO Nil 17,500.00 Mohamed

197 22/02/2011 NilATS Panel

Emesa FZE Nil 40,190.00 Sohaib

198 22/02/2011 E159LCP

ESS Nil 11,890.00 Sohaib

199 23/02/2011 E162ATS Panel

Al Bahar Nil 9,800.00 Sohaib

200 23/02/2011 E162ATS Panel

Tamas Nil 41,190.00 Sohaib

118-11

119-11CODE

ContractingTABREED COOLING

PLANT

120-11

121-11Control panel for Extract

FansCODE

Contracting

EREC BUILDING NO.16 FOR MINISTRY OF

CULTURE, YOUTH & SOCIETY

DEVELOPMENT122-11Electrical Transformer

panelTOTAL ABU AL BUKHOOSH

122-11-Rev.01Electrical Transformer

panelTOTAL ABU AL BUKHOOSH

Electrical Transformer panel

TOTAL ABU AL BUKHOOSH

122-11-Rev.03Electrical Transformer

panelTOTAL ABU AL BUKHOOSH

122-11-Rev.04Electrical Transformer

panelTOTAL ABU AL BUKHOOSH

123-11HABSHAN 5- PROCESS

PLANT

124-11

125-11

126-11HABSHAN 5- PROCESS

PLANT

126-11-Rev.01HABSHAN 5- PROCESS

PLANT

127-11

128-11

129-11

130-11

131-11

132-11

133-11

Page 19: Work Schedule Daily

201 24/02/2011 E092LV Panel / Cap. Bank

Al Khanezi 190,850.00 Kalandar

202 24/02/2011 E164LV Panel Modification

GISCO Nil 53,490.00 Sohaib

203 135-11-Rev.01 28/02/2011 E164LV Panel Modification

GISCO Nil 79,040.00 Sohaib

204 24/02/2011 E173MDB/SMDB/DB

54,340.00 Sohaib

24/02/2011 E169 SMDB Kharafi national ABJ 5,500.00 Sohaib

205 26/02/2011 E167SMDB/DB

Voltas Nil 6,680.00 Sohaib

205 27/02/2011 E163LT Panel, ATS, Cap.bank

Citiscape 145,430.00 Kalandar

205 27/02/2011 E163MCC PANEL

ROGERS 314,576.00 Sohaib

206 04/05/2011 E163LT Panel, ATS, Cap.bank

Citiscape 31,550.00

207 27/02/2011 E175SMDB

Kharafi national ABJ Workshop 3,810.00 Sohaib

208 27/02/2011 E160LV Panel

Sensaire Club House 173,790.00 Sohaib

209 27/02/2011 E176DB Panel

Nil 5,800.00 Sohaib

209 27/02/2011 E168UPS Output Panels

Site Technology Cleave land Clinic 153,490.00 Sohaib

210 28/02/2011 E183Outdoor DB

ARCO C12 - Al Ain 4,500.00 Sohaib

212 28/02/2011 E1826 Way SMDB

ARCO CNIA 6,306.00 Sohaib

213 28/02/2011E177,78,79SOCKET,ACCESSORIES

Kharafi national MR 3428, 3464,271 Mohamed

214 28/02/2011 E171MDB

Citiscape 69,900.00 Sohaib

215 28/02/2011 E184MDB

Capriole MW-AF-043-2009 79,870.00 Sohaib

05/03/2011 E184MDB

Capriole MW-AF-043-2009 87,710.00 Sohaib

05/03/2011 E184MDB

Capriole MW-AF-043-2009 Sohaib

216 05/03/2011 E184MDB

Capriole MW-AF-043-2009 70,700.00 Sohaib

134-11Civil defense in Al

Daher Al Ain

135-11

136-11Damas

Contracting

TEMPORARY CONNECTION OF WATANI VILLAS

(PHASE 2)137-11

138-11

139-11Al Wathba Irrigation

Forms

139-11

139-11-Rev.02Al Wathba Irrigation

Forms

140-11

141-11

142-11Al Bahar

Caterpillar

143-11

144-11

145-11

146-11

147-11Al Jawaher – Saadiyaat

Island

148-11

148-11-Rev.01

148-11-Rev.02

148-11-Rev.03

Page 20: Work Schedule Daily

217 01/03/2011 E185MDB and DB

568,530.00 Abdullah

218 05/04/2011 E185MDB and DB

360,010.00 Abdullah

219 10/04/2011 E185MDB and DB

438,820.00 Abdullah

01/03/2011 E180SMDB and DB

Voltas 58,740.00 Abdullah

220 02/03/2011 E193ATS Panel

Gulf Turrets Nil 32,360.00 Abdullah

221 08/03/2011 E193ATS Panel

Gulf Turrets Nil 43,859.00 Abdullah

222 14/03/2011 E193 ATS Panel Gulf Turrets Nil 41,952.00

03/03/2011 E190 MDB / Isolator GISCO Tawazun ammunitions 74,560.00 Abdullah

223 03/03/2011 E190MDB / Isolator

GISCO Tawazun ammunitions 86,019.00 Abdullah

224 03/03/2011 E196Consumer Unit

Extra co Prefab 890.00 Abdullah

225 05/03/2011 E060Site Work

GISCO Al Dhafra Air Base 24,688.00 Abdullah

226 05/03/2011 E201DB

ARCO CNIA 3,550.00 Abdullah

05/03/2011 E202Capacitor Bank

Nil 34,500.00 Abdullah

227 05/03/2011 E202Capacitor Bank

Nil 36,420.00 Abdullah

228 05/03/2011 E202Capacitor Bank

Nil 30,780.00 Abdullah

229 09/04/2011 E202Capacitor Bank

Nil 30,700.00

230 05/03/2011 E172 River Light 2 Private Villas 57,370.00 Abdullah

231 05/03/2011 E197DB

ARCO CNIA 63,960.00 Abdullah

231 05/03/2011 E192 Al Barakka 261,840.00 Abdullah

232 05/03/2011 E153DB, LCP and MCC Panels

Al Ryum Nil 313,110.00 Abdullah

149-11Damas

Contracting Steel Factory in Abu Dhabi Industrial City

149-11-Rev.01Damas

Contracting Steel Factory in Abu Dhabi Industrial City

149-11-Rev.02Damas

Contracting Steel Factory in Abu Dhabi Industrial City

150-11 Ethihad Tower Projects

151-11

151-11-Rev.01

151-11-Rev.02

152-11

152-11-Rev.01

153-11

154-11

155-11

156-11Damas

Contracting

156-Rev-01Damas

Contracting

156-Rev-02Damas

Contracting

156-Rev.03Damas

Contracting

157-11MDB, SMDB, DB, Capacitor

Bank

158-11

159-11SMDB, DB and Pump

Control PanelsBawabat Al Sharq

Phase-2 Villas

160-11

Page 21: Work Schedule Daily

233 05/03/2011 E153DB, LCP and MCC Panels

Al Ryum CPC 323,440.00 Abdullah

234 160-11-Rev.03 19/04/2011 E153DB, LCP and MCC Panels

Al Ryum CPC 235,425.00 Abdullah

235 E153DB, LCP and MCC Panels

Al Ryum CPC

235 06/03/2011 E174 Park Residence Hotel 649,750.00 Abdullah

236 06/03/2011 E200630A ATS Panel

GISCO Nil 31,767.00 Abdullah

237 06/03/2011 E203SMDB, DB

ARCO 48,700.00 Abdullah

238 06/03/2011 E203SMDB, DB

ARCO Abdullah

239 07/03/2011 E211 GISCO 58,500.00 Mohamed

240 07/03/2011 E210for LV Panel, SMDB

Nil 131,910.00 Abdullah

241 07/03/2011 E204DB

Extra co Nil 6,852.00 Abdullah

242 07/03/2011 E195MDB, SMDB, DB

Gulf Turrets Nil 49,510.00 Abdullah

243 14/03/2011 E195MDB, SMDB, DB

Gulf Turrets Nil 47,520.00 Abdullah

244 07/03/2011 E189SMDB, DB

Al Sabbah 7,408.00 Abdullah

245 07/03/2011 E198MDB, SMDB

BMTS 1,689,270 Abdullah

246 08/03/2011 E208DB1, DB2, DB3, DB4

Site Technology 14,020.00 Abdullah

247 08/03/2011 E205SMDB

Kharafi national Habshan 695,520.00 Siraj

248 09/03/2011 E206MDB

Kharafi national MR 3542 332,800.00 Siraj

249 09/03/2011 E206MDB

Kharafi national MR 3542 293,600.00 Siraj

250 09/03/2011 E0082MDB,CAPACITOR BANK

DYNAMO 357,920.00 Siraj

251 09/03/2011 E0213SMDB

PLUTO DMW - MALIHA 9,167.00 Siraj

252 09/03/2011 E0191LV PANELS

GECO Ambulatory HC Centre 527,490.00 Siraj

160-Rev-01

160-11-rev.04

161-11MDB, SMDB, DB, Capacitor

Bank, ATS PanelDamas

Contracting

162-11

163-11Maintenance &

Renovation for C.N.I.A Camp in Zone -1

163-Rev-01Maintenance &

Renovation for C.N.I.A Camp in Zone -1

164-11

LT PANEL MODIFICATION(RAFFY

KOYA)ZAYED MILITARY-AL

AIN

164-11Nasa

Electromechanical

165-11

166-11

166-Rev-01

167-11Police maintenance works in Abu Dhabi

168-11

Contractors Camp, Company Camp Accommodation,

Office Area169-11

Installation of CCTV System for Takreer in

Ruwais refinary

170-11

171-11

171-11-REV 1

172-112B + G + 5 Offices + 10 Residential Floors

173-11

174-11

Page 22: Work Schedule Daily

253 09/03/2011 E0217ISOLATORS

Kharafi national 167,910.00 Siraj

254 09/03/2011 E0217ISOLATORS

Kharafi national 160,950.00 Siraj

255 09/03/2011 E0220CONTROL PANELS

RATHAN TECH NOT MENTIONED 1,220.00 Siraj

256 09/03/2011 E0209TRANSFORMER

Kharafi national MR#3565 377,300.00 Siraj

257 09/03/2011 E0222Starter panel - Star Delta

RATHAN TECH NOT MENTIONED 7,200.00 Siraj

258 10/03/2011 E218MDB

Citiscape 69,900.00 Abdullah

259 10/03/2011 E219 Citiscape Beach Hotel & Resort 14,367.00

260 12/03/2011 E223LCP

HBT DMW - AUH 33,065.00

261 12/03/2011 E226Isolator Panel

FM Of The Souk 2,380.00

262 12/03/2011 E225DB

BSS Tech NIL 30,510.00

263 12/03/2011 E228DB

MW-OU-101-2009 2,310.00

264 13/03/2011 E229SMDB

Al Ryum 4,585.00

265 13/03/2011 E199MDB

MW-AF-026-2010 95,480.00

266 13/03/2011 E230SMDB

Musco Lighting 17,290.00

267 14/03/2011 E161 MDB/SMDB CCIC Iraq Fabrication Shop 847,900.00

268 15/03/2011 E236DB

MW-GS-419-2007 2,616.00

269 15/03/2011 E233Socket Panel

GISCO 2,950.00

270 15/03/2011 E224Isolators

GECO 66,310.00

271 15/03/2011 E235DB

Al Badr 2,665.00

272 15/03/2011 E215Feeder Pillar

PLUTO 8,579.00

273 16/03/2011 E232Pump Start Panel

GISCO 3,590.00

175-11Habshan 5 Process

Plant

175-11-REV 01Habshan 5 Process

Plant

176-11

177-11

178-11

179-11Al Jawaher – Saadiyaat

Island

180-11Presidential pool Motor

Control Panel

181-11

182-11Kharafi National

183-11

184-11CODE

Contracting

185-11CROWN PRINCE

COURT

186-11CODE

Contracting

187-11External Lighting for

AUH Golf Club188-11

189-11CODE

Contracting

190-11

191-11Ambulatory HC Centre,

Sahana & Shamkha

192-11

193-11

194-11

Page 23: Work Schedule Daily

274 16/03/2011 E0181SMDB&DB

Voltas 30,440.00

275 16/03/2011 E0240Site Work

Zayed Military City 5,100.00

276 16/03/2011 E0197 LV Panel Modification ARAB TECH 202,790.00

277 1703/2011 E0234PLC PANEL

ABB 3,200.00

278 1703/2011 E0212LV PANELS

Al Sabbah Yas Mall 9,174,010.00

279 20/03/2011 E0207AHU & FAHU Panel

BMTS 83,453.00

280 19/03/2011 E0242VFD Panel

Khoory 47,922.00

281 19/03/2011 E0242VFD Panel

Khoory 23,728.00

282 20/03/2011 E0241MDB,MCC,DB

Gulf Turrets 55,390.00

283 20/03/2011 E0237MCC PANEL

Eram Engg 233,800.00

284 20/03/2011 E0246DB

Gulf Turrets 2,450.00

285 22/03/2011 E0238MDB/SMDB

Commodore 173,098.00

286 21/03/2011 E0244MDB/DB

ESS 19,680.00

287 21/03/2011 E0227Soft Starter

Tabreed 217,113.00

288 21/03/2011 E0245Starter panel

ARCO 3,650.00

289 21/03/2011 E0248ATS Panel

GISCO 15,000.00

290 10/04/2011 E0248ATS Panel

GISCO 22,000.00

291 22/03/2011 E0187Battery Breaker

Site Technology 166,400.00

292 22/03/2011 E0246Fan Control Panel

MEPCO Al Nabooda Project 8,384.00

293 22/03/2011 E0251DB

Al Sabbah Al Fara’a SSF@ Al Ain 6,400.00

294 22/03/2011 E0213Control Panel

RATHAN TECH 6,000.00

195-11

196-11CODE

Contracting

197-11

198-11

199-11

200-11Imperial College London Diabetes

Center201-11

201-Rev01-11

202-11Multi Story Building

car parking in Manama

203-11

LV Switch Gear – Magulube LLC

Project, Dubai - LUBE OIL PLANT

204-11

205-11

206-11

207-11

208-11

209-11

209-11-Rev.01

210-11

211-11

212-11

213-11

Page 24: Work Schedule Daily

295 23/03/2011FP- SMDB

Kharafi national 9,142.00

296 23/03/2011ATS

AT Generators 96,540.00

297 23/03/2011Site Work

Kharafi national Site Work 2,250.00

APRIL 23/03/2011 E0187 DB Site Technology 2,480.00

298 23/03/2011 E0249DB

METITO 105,000.00

299 24/03/2011 E0243LV PANEL

Federal SERINA RESIDENCE 456,570.00

300 26/03/2011 E0254Feeder Pillar

Al Ryum YAS ISLAND DEVPMNT 9,480.00

301 26/03/2011 E0255DB

Al Sabbah 6,400.00

302 26/03/2011 E0262Jacuzzi Control Panel

TerraVerde Villa 88, Palm Jumeirah 25,780.00

303 27/03/2011 E0263DB

Al Sabbah AL Bateen School 11,750.00

304 27/03/2011 E0264DB

Al Sabbah AL Bateen School 41,340.00

305 27/03/2011 E0214LV PANEL

PLUTO Dubai Sports City 1,278,160.00

306 27/03/2011 E0214LV PANEL

PLUTO Dubai Sports City 2,029,680.00

308 30/03/2011 E0251LV PANEL

WELLS AREA -MOUADAB 15,800.00

309 30/03/2011 E0265Starter Panel

Al Sabbah 6,300.00

310 30/03/2011 E0257DPP Panel

Corodex 37,010.00

311 31/03/2011 E0274DB

TerraVerde 2,090.00

312 31/03/2011 E0258MDB/SMDB/ Cap Bank

Nivitrex 255,400.00

313 02/04/2011 E0281DB Enclosure

Panjab General Trading 31,250.00

314 03/04/2011 E0273LT Panel Modification

Tawazun 135,000.00

315 232-11-Rev.01 05/04/2011 E0273LT Panel Modification

Tawazun 125,000.00

214-11

215-11

216-11

217-11

218-11

219-11

220-11

221-11STEEL STRUCTURE- AL

AIN

222-11

223-11

224-11

225-11

225-11

226-11UAQ

MUNICIPALITY

227-11Steel Structure Work Shop and Office at Al

Ain

228-11Al Bararri

Development

229-11Villa 88 Frond A, Palm

Jumeirah

230-11

231-11

232-11

Page 25: Work Schedule Daily

316 04/04/2011 E0285GRP JUNCTION BOX

Site Technology 6,620.00 Mohamed

317 234 04/04/2011 E0287Consumer Unit

Extra co 1,430.00

318 235 04/05/2011 E0213 PLUTO DMW - MALIHA 7,978.00

319 236 07/04/2011 E0293DB

Extra co Nil 68,400.00 Abdullah

320 237 07/04/2011 E0297DB with Locking

Extra co Nil 133,475.00 Abdullah

233-11

Lighting Control Panel with Double walled

Aluminium Enclosure

Page 26: Work Schedule Daily

321 09/04/2011 E0297DB without Locking

Extra co Nil 102,450.00 Abdullah

322 238 07/04/2011 E0295DB with Locking

Extra co Nil 193,300.00 Abdullah

323 239 09/04/2011 E0290Pump Control panel

Musaffah Workforce Community14,760.00 Abdullah

324 20/04/2011 E0290Pump Control panel

Musaffah Workforce Community17,660.00 Abdullah

310 22/05/2011 E0290Pump Control panel

Musaffah Workforce Community14,000.00 Abdullah

325 23/05/2011 E0290Pump Control panel

Musaffah Workforce Community16,680.00 Abdullah

326 06/06/2011 E0290Pump Control panel

Musaffah Workforce Community17,500.00 Abdullah

327 240 09/04/2011 E0239LV Panel

Emirates CODE Nil1,878,170.00

Abdullah

328 241 09/04/2011 E0266DB / LCP

GISCO Gayathi Underground Camp 18,740.00 Abdullah

329 242 09/04/2011 E0280LV Panel

Al Naser Commercial Building 1,144,913.00 Abdullah

330 243 10/04/2011 E0305LV Panel

Nil 141,450.00 Abdullah

331 244 11/04/2011 E0289MCC PANEL

Corodex Brakich Water Reverse Osmosis21,600.00 Abdullah

332 245 11/04/2011 E0302LV Panel

ABUDHABI RUWAIS 4TH NGL TRAIN 335,610.00 Abdullah

333 24/05/2011 E0302LV Panel

ABUDHABI RUWAIS 4TH NGL TRAIN 403,830.00 Abdullah

334 246 11/04/2011 E0301 BSS Tech NIL 87,850.00 Abdullah

335 246-Rev.01 14/04/2011 E0301 BSS Tech NIL 17,109.00 Abdullah

336 247 12/04/2011 E0308Local Ctrl. Station

NIL 1,095.00 Sohaib

337 248 12/04/2011 E0276DB

Site Technology NIL 14,196.00 Sohaib

338 249 12/04/2011 E0311ATS Panel

Al Ryum NIL 7,555.00 Mohamed

339 250 16/04/2011 E0306DB / SMDB

ACME NIL 11,700.00 Abdullah

340 16/04/2011 E0306DB / SMDB

ACME NIL 9,630.00 Abdullah

237-Rev.01

CODE Contracting

239-11-Rev.01CODE

Contracting

239-11-Rev.02CODE

Contracting

239-11-Rev.04CODE

Contracting

239-11-Rev.05CODE

Contracting

Damas Contracting

Advance Tech.service

245-11Advance

Tech.service

Testing & Commissioning - MDB

Testing & Commissioning - MDB

Rose System technik

250-11-Rev.01

Page 27: Work Schedule Daily

341 250-11-Rev.02 20/04/2011 E0306DB / SMDB

ACME NIL 3,715.00 Abdullah

342 25/04/2011 E0306DB / SMDB

ACME NIL 4,715.00 Abdullah

343 E0290Pump Control panel

Musaffah Workforce Community14,000.00 Abdullah

344 251 17/04/2011 E0316LCP

Zayed Military City 7,667.00 Abdullah

345 251-11-Rev.01 21/04/2011 E0316LCP

Zayed Military City 7,667.00 Abdullah

346 252 17/04/2011 E0312ATS

GISCO Jabel Jaber 65,370.00 Abdullah

347 253 17/04/2011 E0323Selector Switch

NIL 6,750.00 Abdullah

348 03/05/2011 E0323Selector Switch

NIL 8,175.00 Abdullah

349 254 18/04/2011 E0296Control Panel

ESS NIL 52,600.00 Abdullah

350 255 18/04/2011 E0300LV Panel

MECS NIL 633,110.00 Abdullah

351 29/03/2011 E131SMDB

Kharafi national Habshan Labour Camp 82,705.00 Abdullah

352 29/03/2011 E0271Breaker & Busbar

Showroom- Inventory 2,245.00 Abdullah

353 29/03/2011 E0272KWH Meter Panel

Citiscape 2,245.00 Abdullah

354 29/03/2011 E0267Isolators

Gulf Turrets 9,847.00 Abdullah

355 31/03/2011 E0269Control Panel

ACME Nil 5,750.00 Abdullah

356 260-11-Rev.01 20/04/2011 E0269Control Panel

ACME Nil 5,000.00 Abdullah

357 02/04/2011 E0277SMDB, DB

ESS Nil 15,410.00 Abdullah

358 04/04/2011 E0275MDB / SMDB / CAP.BANK

ACME Nil 40,030.00 Abdullah

359 04/04/2011 E0275MDB / SMDB / CAP.BANK

ACME Nil 37,960.00 Abdullah

360 09/04/2011 E0275MDB / SMDB / CAP.BANK

ACME Nil 73,990.00 Abdullah

361 09/04/2011 E0298Soft Starter

Energy Intl. NIL 305,150.00 Abdullah

250-11-Rev.03

239-11-Rev.02CODE

Contracting

CODE Contracting

CODE Contracting

Rose System technik

253-11-Rev.01Rose System

technik

256-11

257-11Panjab General

Trading

258-11Al Jawaher – Saadiyaat

Island

259-11

260-11

261-11

262-11

262-11-REV01

262-11-ReV02

263-11

Page 28: Work Schedule Daily

362 263-11-Rev.01 21/04/2011 E0298Soft Starter

Energy Intl. NIL 320,780.00 Abdullah

363 09/04/2011 E0299LCC Panel

Al Ryum NIL 14,190.00 Abdullah

364 04/05/2011 E0299LCC Panel

Al Ryum NIL Abdullah

365 09/04/2011 E0288Motor Control Panel

Citiscape 5,500.00 Abdullah

366 09/04/2011 E0291MDB / MCC

Eram Engg maglube LLC Project 95,300.00 Abdullah

367 18/04/2011 E0325Panel Modification work

Legend Bragon NIL 0.00 M.D

368 19/04/2011 E0314Assembly of Syn.panel

Electric House J836 Camp 72,800.00 Masthan

369 19/04/2011 E0324PVC Box

BMTS Nil 21,300.00 Masthan

370 19/04/2011 E0326DOL Starter

CODE Contracting 20,070.00 Mohamed

371 19/04/2011 E0327SMDB / DB

ESS DMW 1,319,790.00 Abdullah

372 20/04/2011 E0333JUNCTION BOX

Al Sabbah Nil 37,250.00 Mohamed

373 20/04/2011 E0329DB

GISCO Nil 1,250.00 Abdullah

374 21/04/2011 E0310DB

Target Engineering 636,540.00 Abdullah

375 21/04/2011 E323 SMDB

Damas Contracting Nil 1,570.00 Mohamed

376 24/04/2011 E0330MDB / DB

Mohafiz G+ 1 Al Khwaneej 7,080.00 Sohaib

377 24/04/2011 E0339MDB / DB

Mohafiz G + 1 Al Warqa 7,830.00 Sohaib

378 24/04/2011 E0331MDB / DB

Mohafiz G+ 1 Oud Al Mateena 5,557.00 Sohaib

379 24/04/2011 E0334CONTROL PANEL

AL RYUM ABB CONTROL 26,500.00 Kalandar

380 24/04/2011 E0315LV Panel

Bin Darwish OAD AL TOUBA 833,080.00 Abdullah

381 24/04/2011 E0335MDB / SMDB

Al Sabbah SKMC ADH 31,780.00 Abdullah

382 24/04/2011 E338DBs

ACECO 22,410.00 Mohamed

264-11

264-11-Rev.01

265-11Al Jawaher – Saadiyaat

Island

266-11

267-11

268-11

269-11

270-11Ruwais Housing

complex expansion

271-11

272-11

273-11

274-11Shah Gas

Development

275-11

276-11

277-11

278-11

279-11

280-11

281-11

282-11MINISTRY OF

PRESIDENTIAL AFFARIS

Page 29: Work Schedule Daily

383 25/04/2011 E343DB

GISCO Nil 1,930.00 Mohamed

384 26/04/2011 E0334SMDB

Al Ryum Shooting Club 6,490.00 Abdullah

385 26/04/2011 E0351MDB

Gulf Turrets KHALEEL VILLA 11,430.00 Abdullah

386 03/05/2011 E0351MDB

Gulf Turrets KHALEEL VILLA 9,600.00 Abdullah

387 27/04/2011 E0340DB

Citiscape Nil 204,600.00 Abdullah

388 27/04/2011 E342630A ATS Panel

DYNAMO Nil 16,080.00 Abdullah

389 30/04/2011 E342630A ATS Panel

DYNAMO Nil 13,060.00 Sohaib

390 27/04/2011 E0354VFD Panel

Khoory Nil 111,237.00 Abdullah

391 26/06/2011 E0354VFD Panel

Khoory Nil 97,040.00 Abdullah

392 28/06/2011 E0354VFD Panel

Khoory Nil 100,830.00 Abdullah

393 28/04/2011 E0350industrial Socket Pin

Steelman Nil 234.00 Sohaib

394 30/04/2011 E0356DB

ARCO CNIA 5,170.00 Mohamed

395 30/04/2011 E0337Control Panel

Spectrum 69,320.00 Abdullah

396 01/05/2011 E0357Socket Panel

Schneider Electric Nil 1,287,750.00 Abdullah

397 03/05/2011 E0360Motor Control Panel

Corodex Nil 1,250.00 Abdullah

398 03/05/2011 E0361DB

Al Badr Nil 10,933.00 Abdullah

399 04/05/2011 E0362DB

ACME Nil 5,295.00 Sohaib

400 04/05/2011 E0366LCP

Al Ryum Nil 42,720.00 Mohamed

401 05/05/2011 E0370DB

Citiscape Nil 15,210.00 Abdullah

402 05/05/2011 E0369Mobile DB

Al Sabbah Cleave land Clinic 96,800.00 Mohamed

403 07/05/2011 E0318MDB / SMDB

Imeco Saipem 750,920.00 Abdullah

283-11

284-11

285-11

285-11-Rev.01

286-11

287-11

287-11-Rev.01

288-11

288-11-Rev.01

288-11-Rev.02

289-11

290-11

291-11Higher College of

technology

292-11

293-11

294-11

295-11

296-11

297-11

298-11

299-11

Page 30: Work Schedule Daily

404 08/05/2011 E0371Remote Control Panel

ACME Nil 2,500.00 Abdullah

405 08/05/2011 E0375Capacitor Bank

Citiscape Nil 5,460.00 Abdullah

406 08/05/2011 E0376DB Kit

Al Badr Nil 5,820.00 Abdullah

407 09/05/2011 E0348MCC Panel, Capacitor Bank

HilalcoDesert islands, Sir Baniyas Project507,100.00 Abdullah

408 09/05/2011 E0365Feeder Pillar and DB

CODE Contracting Zayed Military City 14,660.00 Abdullah

409 11/05/2011 E0365Feeder Pillar and DB

CODE Contracting Zayed Military City 12,660.00 Abdullah

410 09/05/2011 E0344LV Panel

ESS Nil 101,800.00 Abdullah

411 09/05/2011 E0347SMDB,DB

ATS Nil 44,520.00 Abdullah

412 10/05/2011 E0378MDB & Meter Cabinet

Aboom Contracting Nil 15,320.00 Abdullah

413 10/05/2011 E0378MDB & Meter Cabinet

Aboom Contracting Nil 9,280.00 Abdullah

414 10/05/2011 E0368LT panel

GISCO Commander of Military Works1,262,790.00 Abdullah

415 10/05/2011 E0364LT panel

AIS Mubarraz Island 223,700.00 Abdullah

416 17/05/2011 E0364LT panel

AIS Mubarraz Island 233,700.00 Abdullah

417 06/02/2011 E0364LT panel

AIS Mubarraz Island 342,100.00 Abdullah

418 26/06/2011 E0364LT panel

AIS Mubarraz Island 227,370.00 Abdullah

419 10/05/2011 E0367Meter Cabinet panel

Tamas Projects Du Shelter 16,090.00 Abdullah

420 11/05/2011 E0387DB

ARCO Nil 1,600.00 Abdullah

421 11/05/2011 E0382DB

ARCO C.N.I.A Camps 1,905.00 Masthan

422 11/05/2011 E0383MCCB / Ispolator

ARCO C.N.I.A Camps 975.00 Masthan

423 11/05/2011 E0384Emergency Push Button

ARCO C.N.I.A Camps 572.00 Masthan

424 11/05/2011 E0388Panel Modification work

GISCO Al Dhafra Air Base 845,921.00 Abdullah

300-11

301-11

302-11

303-11

304-11

304-11-Rev.01

305-11

306-11

307-11

307-11-Rev.01

308-11

309-11

309-11-Rev.01

309-11_Rev.03

309-11-Rev.04

310-11

311-11

312-11

313-11

314-11

315-11

Page 31: Work Schedule Daily

425 11/05/2011 E0386LCP / Feeder Pillar

ARCO Zayed Military City 287,105.80 Masthan

426 11/05/2011 E0363LCP

Al Dhafra Al Yaher Park, Al Ain 15,930.00 Abdullah

427 11/05/2011 E0372 Adeeb Electrical Al Foah Mall 48,790.00 Abdullah

428 12/05/2011 E0372 Adeeb Electrical Al Foah Mall 40,220.00 Abdullah

429 18/05/2011 E0372 Adeeb Electrical Al Foah Mall 36,960.00 Abdullah

430 12/05/2011 E0374Power DB / 8 Way DB

TSSC Nil 10,086.00 Abdullah

431 12/05/2011 E0385DB

UB Emirates Taji Power Plant Project 27,780.00 Abdullah

432 12/05/2011 E0309LV

Al Geemi PartnersPermanent and Fireman Accommodation project1,716,980.00 Abdullah

433 14/05/2011 E0390MDB, KWH meter cabinet

Al Ryum Nil 13,870.00 Abdullah

434 14/05/2011 E0381Lighting Control Panel

Al Ryum Abu Dhabi Shooting Club 3,300.00 Abdullah

323-11-Rev.01 21/05/2011 E0381Lighting Control Panel

Al Ryum Abu Dhabi Shooting Club 3,220.00 Abdullah

435 14/05/2011 E0377DB / SMDB / MDB

Venture 29,840.00 Abdullah

436 15/05/2011 E0379LV Panel

Electromen Contracting Nil 2,534,900.00 Sabur

437 15/05/2011 E0394SMDB

Kharafi national 105,750.00 Abdullah

316-11

317-11

318-11SMDB / DB / Capacitor

Bank

318-11-Rev.01SMDB / DB / Capacitor

Bank

318-11-Rev.02SMDB / DB / Capacitor

Bank

319-11

320-11

321-11

322-11

323-11

324-11Al Jazeera Marine

Services

325-11

326-11Habshan 5 Process

Plant