Work plan of KNU for ATF2
description
Transcript of Work plan of KNU for ATF2
Men power E-S Kim : ATF2 Beam dynamics S-H Shin : Design and fabrication of IP-BPM and S-band BPM H-S Kim : Fabrication of IP-BPM Y-S Hwang : Design and fabrication of IP-BPM electronics (Graduate student) H-J Kim : Design and fabrication of IP-BPM electronics I-M Hwang : Experimental studies in ATF partly (New post-doc from March 2007)
Budgets - KNU has budgets of FY2006 to FY2008 for the R&D of ILC accelerator (~2000MYen/Y). - KNU will also submit proposals for R&D of ILC accelerator to KOSEF and KRF in March 2007. We expect that the budgets in FY2007 will be increased more than the
present and thus we need to consider another R&D items that may be performed after completion of S-Band BPM.
- KNU R&D peoples for ILC accelerator and detector have a R&D meeting in 6th Dec.. After this meeting, we may inform more detailed accelerator R&D plans in FY2007.
Work plan of KNU for ATF2
Work plan of KNU for ATF2 (R&D items)
Beam dynamics R&D Studies of final optics and beam tuning in ATF2 Experimental studies in ATF
Instrumentation R&D IP-BPM - Body : design / fabrication / electrical testing - Electronics : design / fabrication /electrical testing
S-band BPM - Body : design / fabrication / electrical testing
IP-BPM
- body : design (S-H Shin) until Dec. 2006 at KEK
: fabrication (S-H Shin, H-S Kim)
starts in Dec. 2006 at Korea
- Electronics : design (Y-S Hwang ) (5 Jan. -25 Feb. at KEK)
: fabrication (Y-S Hwang, H-J Kim)
starts in March 2007 at Korea
S-band BPM
- body : design (S-H Shin) (1. Feb.~28 Feb. 2007 at KEK)
: fabrication (S-H Shin, H-S Kim)
starts in March 2007 at Korea
Work plan of KNU for ATF2
(Schedule)