Work plan of KNU for ATF2

3
Men power E-S Kim : ATF2 Beam dynamics S-H Shin : Design and fabrication of IP-BPM and S-band BPM H-S Kim : Fabrication of IP-BPM Y-S Hwang : Design and fabrication of IP-BPM electronics (Graduate studen t) H-J Kim : Design and fabrication of IP-BPM electronics I-M Hwang : Experimental studies in ATF partly (New post-doc from March 2007) Budgets - KNU has budgets of FY2006 to FY2008 for the R&D of ILC accelerator (~2000 MYen/Y). - KNU will also submit proposals for R&D of ILC accelerator to KOSEF and KRF in March 2007. We expect that the budgets in FY2007 will be increased mor e than the present and thus we need to consider another R&D items that may be performed after completion of S-Band BPM. - KNU R&D peoples for ILC accelerator and detector have a R&D meeting in 6 th Dec.. After this meeting, we may inform more detailed accelerator R&D plans in F Y2007. Work plan of KNU for ATF2

description

Work plan of KNU for ATF2.  Men power E-S Kim : ATF2 Beam dynamics S-H Shin : Design and fabrication of IP-BPM and S-band BPM H-S Kim : Fabrication of IP-BPM Y-S Hwang : Design and fabrication of IP-BPM electronics (Graduate student) - PowerPoint PPT Presentation

Transcript of Work plan of KNU for ATF2

Page 1: Work plan of KNU for ATF2

Men power E-S Kim : ATF2 Beam dynamics S-H Shin : Design and fabrication of IP-BPM and S-band BPM H-S Kim : Fabrication of IP-BPM Y-S Hwang : Design and fabrication of IP-BPM electronics (Graduate student) H-J Kim : Design and fabrication of IP-BPM electronics I-M Hwang : Experimental studies in ATF partly (New post-doc from March 2007)

Budgets - KNU has budgets of FY2006 to FY2008 for the R&D of ILC accelerator (~2000MYen/Y). - KNU will also submit proposals for R&D of ILC accelerator to KOSEF and KRF in March 2007. We expect that the budgets in FY2007 will be increased more than the

present and thus we need to consider another R&D items that may be performed after completion of S-Band BPM.

- KNU R&D peoples for ILC accelerator and detector have a R&D meeting in 6th Dec.. After this meeting, we may inform more detailed accelerator R&D plans in FY2007.

Work plan of KNU for ATF2

Page 2: Work plan of KNU for ATF2

Work plan of KNU for ATF2 (R&D items)

Beam dynamics R&D Studies of final optics and beam tuning in ATF2 Experimental studies in ATF

Instrumentation R&D IP-BPM - Body : design / fabrication / electrical testing - Electronics : design / fabrication /electrical testing

S-band BPM - Body : design / fabrication / electrical testing

Page 3: Work plan of KNU for ATF2

IP-BPM

- body : design (S-H Shin) until Dec. 2006 at KEK

: fabrication (S-H Shin, H-S Kim)

starts in Dec. 2006 at Korea

- Electronics : design (Y-S Hwang ) (5 Jan. -25 Feb. at KEK)

: fabrication (Y-S Hwang, H-J Kim)

starts in March 2007 at Korea

S-band BPM

- body : design (S-H Shin) (1. Feb.~28 Feb. 2007 at KEK)

: fabrication (S-H Shin, H-S Kim)

starts in March 2007 at Korea

Work plan of KNU for ATF2

(Schedule)