Work Measurement of ANSOS Project Report

44
Work Measurement of ANSOS Project Report The University of Michigan Hospitals Management Systems Department April 16, 1990 Submitted By: Eileen Lel Darya Lin Scott Severance

Transcript of Work Measurement of ANSOS Project Report

Page 1: Work Measurement of ANSOS Project Report

Work Measurement of ANSOSProject Report

The University of Michigan HospitalsManagement Systems Department

April 16, 1990

Submitted By:

Eileen LelDarya Lin

Scott Severance

Page 2: Work Measurement of ANSOS Project Report

Work Measurement of ANSOSProject Report

The University of Michigan HospitalsManagement Systems Department

April 16, 1990

Submitted By:

Eileen LeiDarya Lin

Scott Severance

fOE 481 - Hospital SystemsInstructor: Richard CoffeyCoordinator: John Gialanetla

tMVFiflYMfljM)CflG CENTIERMANAGEMENT SYSTEMS

Page 3: Work Measurement of ANSOS Project Report

Ljjjjjj

M1SJ

I

0’

•.•

Page 4: Work Measurement of ANSOS Project Report

TABLE OF CONTENTS:

• Executive summary.2

• Background 3

• Purpose 4

• Introduction 4

• Project participants 7

• Project plan, approach, and methodology 7

• Conclusions and recommendations 22

• Outcome and related impact 35

• References 36

• Appendix 37

1CENfERMANAGEMENT SYSTEMS

Page 5: Work Measurement of ANSOS Project Report

LIST OF TABLES:

• Table 1. Time Study Data for ANSOS Modules 14

• Table 2. Annualized Activities Using the ANSOS Modules 15

• Table 3. Number of New Hires, Personnel, and Units Per Hospital . . . 17

• Table 4. Number of Annual Schedule Changes 1 8

• TabLe 5. Annualized Activity Volumes 20

• Table 6. Annualized Earned Hours 21

• Table 7. Number of Full Time Equivalents (FTE’s) Required 25

C

r, MD1CALMICHlG4CENIERMANAGEMENT SYSTEMS

Page 6: Work Measurement of ANSOS Project Report

LIST OF FIGURES:

• Figure 1. Sample Controller Screen.8

• Figure 2. Sample Scheduler Screen 10

• Figure 3. Estimated Annual Time Requirements to PerformStudied ANSOS Module Activities 23

• Figure 4. Flow Chart for Producing Plan Sheets 27

• Figure 5. Flow Chart for Scheduling Requests 29

• Figure 6. Flow Chart for Staffer Module (Present Approach) 30

• Figure 7. Flow Chart for Staffer Module (Alternative A) 31

O Figure 8. Flow Chart for Staffer Module (Alternative B) 32

0

(

MICHIGAN CENTERMANAGEMENT SYSTEMS

Page 7: Work Measurement of ANSOS Project Report

ACKNOWLEDGEMENTS:

We would like to express our sincere thanks to the following people forhelping us complete this project:

John Gialanella, our Coordinator, for all of his help, support, guidance, time,and effort throughout this project.

Gail Benjamin and Ann Kaiser, our clients, for providing us with thenecessary information we needed to complete a successful project.

Michelle Hebersold and Karen Ruhlig, our time study participants, for takingtheir time to participate in our time study of ANSOS.

Richard Coffey, our instructor, for his guidance in organizing this project.

And all others who contributed to this project.

MICH1GA LA4 CE’TERMANNEMENT SYSTEMS

Page 8: Work Measurement of ANSOS Project Report

Work Measurement of AN SOSProject Report

EXECUTIVE SUMMARY:

Since December of 1989, most patient care units of the

University Hospital, Pediatric/Perinatal/Psychiatric (P/PIP) Hospitals,

University of Michigan Hospitals Operating Rooms (OR), and Ambulatory

Care Service (ACS) have been using the Automated Nurse Staffing Office

System (ANSOS). The nurse managers use ANSOS to create and change work

schedules, produce unit reports, and maintain payroll data. ANSOS was

- designed for central use but is currently used decentrally, hence the nurse

managers spend extensive time on the system performing simple activities.

In addition to the inconvenient wait times for ANSOS to serve multiple

users, many of the nurse managers do not have the time nor training to fully

utilize ANSOS’ capabilities.

The purpose of this project was to quantify the amount of time

required to perform scheduling and payroll tasks using ANSOS. It was

determined that this could be accomplished by the centralization of most of

the ANSOS related activities, such as the printing of various reports and

time cards. Once these ANSOS related activities are centralized, they can

be delegated to someone other than a nurse manager, such as a clerk, to

perform. This will, in effect, alleviate a substantial amount of valuable

time, which the nurse managers could use much more effectively.

‘MDTCALMICH((iN CEr,TER

2MANAGEMENT SYSTEMS

Page 9: Work Measurement of ANSOS Project Report

LNlMDICALMK1fWN CENYERMANAGEMENT SYSTEMS

A time study was performed of the ANSOS related activities,

and then the annualized activity volumes for these tasks were estimated

using various sources of information. It was determined that a total of

12.9 full time equivalents would be required to perform these ANSOS

clerical duties, for all the University of Michigan Hospitals. Centralizing

this function would conservatively reduce the nurse managers’ time by a

minimum of 24,000 hours annually.

BACKGROUND:

Since December of 1989, most patient care units of the

University Hospital, Pediatric/Perinatal/Psychiatric (P/P/P) Hospitals,

University of Michigan Hospitals Operating Rooms (OR), and Ambulatory

Care Services (ACS) have been using the Automated Nurse Staffing Office

System (ANSOS). The nurse managers use ANSOS to create and change work

schedules, produce unit reports, and maintain payroll data. The demanding

responsibilities of these managers, however, are not effectively supported

by this system.

In order to use ANSOS, the nurse managers need to be familiar

with computers, typing, and the various commands used in running the

ANSOS system and in differentiating the shift, hours, and payroll symbols.

Many of the nurse managers do not have enough time to commit to

completely familiarizing themselves with the system. Some also lack the

typing and computer skills needed to use ANSOS efficiently. Besides these

skills mentioned, which are vital in using ANSOS, the nurse managers are

3

Page 10: Work Measurement of ANSOS Project Report

also required to invest extra time in order to actually utilize the system

functions. The ANS’DS system user guide is a 210 page manual, and does not

lend itself to easy learning fo nontechnical users. in addition, since

ANSC)S was designed to be used centrally and is currently used decentrally

at some 70 to 80 locations, the system takes a long time for loading,

assembling, and printing any needed information. In short, the use of

ANSOS is a time consuming process which requires much attention and time

commitment from the nurse managers in addition to their already

demanding patient care unit management responsibilities.

PU P DOSE:

C The purpose of this report was to determine the time

commitment required by the nurse managers at the University of Michigan

Hospitals to perform all of their ANSOS-related tasks. The annual time

requirements to perform ANSOS activities were estimated, and then the

resource conditions needed to perform these ANSOS related tasks, for all of

the hospitals’ units, were determined. Several recommendations will also

be discussed.

INTRODUCTION:

As of March 12, 1990, tnere was a total of 79 units comprising

of 2600 individual employees on ANSOS. Each of the 79 nurse managers

using ANSOS have to perform at least several activities on a weekly or

UM9P rvEDICALMtCWCN L4A CENUER

4 MANAGEMENT SYSTEMS

Page 11: Work Measurement of ANSOS Project Report

biweekly basis. These activities can be categorized by five different ANSOS

modules: the Controller, the Report Writer, the Scheduler, the Staffer and

the Staffer Reporter. The modules are listed below with brief descriptions

about each of their functions:

1) The Controller is used to:

- Create or delete budget positions

- Maintain and view an employee’s personnel data (name, skill level, etc.)

- View an entire unit’s personnel data

- After personnel data

- Transfer an employee to another position

- Terminate an employee

- Alter master schedules

- Print a position report for each unit -

- Print a list of vacant:positions

- Print a fist of employees markedw for termination

- Print a wage report

- Print a scheduling plan sheet

2) The Report Writer is used to

- Create and save custom reports using controller data fields

- Modify reports created

3) The Scheduler is used to

- Enter special requests for a scheduling period

C - Create schedules

5 MANAGEMENT SYSTEMS

Page 12: Work Measurement of ANSOS Project Report

- Print schedules for evaluation and/or posting

- Alter schedules if necessary

- Print a house coverage report

- Print individua’ schedule labels

4) The Staffer is used to:

- Perform daily staffing functions

- Input acuity information and determine target staffing, or input targetstaffing directly

- Print the staffing worksheet for each shift

- View/alter a nurse’s staffing duty

- View or print a unit’s staffing for a given day

- Quickly look up nurses by skill, qualification, code, unit preference,

shift, etc.-

5) The Staffer Reporter is used to:

- Produce end-of-the-period management reports on the activity of the

previous period, as well as provide year-to-date information.

Each of the modules have their own passwords and functions,

which the nurse managers must know in order to use ANSOS.

To assess the resources needed to work with ANSOS, an activity

breakdown for using ANSOS was obtained from the nurse managers. A time

study was then performed to estimate the amount of time required to

perform these ANSOS related tasks for the University of Michigan

Hospitals.

I’49PM3DICALMCHI(iN .CE?’TEI{

6MANAGEMENT SYSTEMS

Page 13: Work Measurement of ANSOS Project Report

PROJECT PARTICIPANTS:

This project involved the cooperation, communication, and

understanding between the following three parties:

1. The student engineers: Eileen Lei; Darya Lin; and Scott Severance.

2. The coordinator: John Gialanella, Senior Clinical Systems Analyst.

3. The clients: Gail Benjamin, Nursing Systems Planner, and Ann Kaiser,

Nursing Support Services Manager.

The student engineers followed the guidance of the coordinator

in communicating with the clients and in preparing and completing a

successful project.

QPROJECT PLAN, APPROACH, AND METHODOLOGY:

In estimating the amount of resources needed to work with

ANSOS, the following items were determined:

Activity breakdown-

A breakdown of all ANSOS related tasks performed by the nurse managers

was obtained The data entries and tasks are listed below for each module

A. Using 1jj Controller module:

- Entering Personnel Information

(See left side of sample screen in Figure 1)

1VE1Sj MDTCALMICHKAN CENFER

7 MANAGEMENT SYSTEMS

Page 14: Work Measurement of ANSOS Project Report

C

UPOS’UNIT(SKILL)’SE$RcH E1U11

FIGURE 1. SAMPLE CONTROLLER SCREEN

8llYr MDICLM1CHft CENTER

NaMe£.plogee HuNberTelephoneSkill Le*.ielCareer Ladder

JOHHSON, JANETI4389a7558

£35?4Gt

Jage RateFit StatusQualifications

Daily Ouert1e StartUeekly4iuekly Overtiie StartDaily DoubletiMe StartUeeklyBiL.leekly Doublrti,ie StartHon Duty Shift Length (Minutes) Itax Uorkstretch, by shift -(123)

Hire DateCu..ulatIve Hour:BDAILICEX?LICEHCPREXPCotuilDECREE

I 348i.eIEFJD. ....

I3l1Z8t3984

‘all

186953121498QUflLBSH;

Rotate Unit.:

____

UNIT PR!? CODE (lURK

Znd Tour:

___

1st Tour: 1I

3rdTour

__

4th Tour:

____

Master Schedule (V40 ? H

HOTELHOTE3

Skeleton(unit)

SMTUTFSSMTUTFSStITUTFSSflTUTFS

HOTEZHOTE4

MANAGEMENT SYSTEMS

Page 15: Work Measurement of ANSOS Project Report

- Entering Scheduling Information

(See right side of sample screen in Figure 1)

- Creating and Printing Plan Sheets

- Userfields data entry

- Position Reports

B. Using Ijji Scheduler module:

- Creating initial schedules

- Entering schedule requests

(See Figure 2 for sample Scheduler screen.)

C. Using 1h Staffer module:

- Entering schedule changes

D. Using theStaffer Reporter and Report Writer modules to create,

assemble and print:

- Individual Activity Reports

- Non productive Time Report

- Productivity Reports

- New-hires Reports

- Employee transfer Reports

- Employee termination Reports

- Weekly Rosters

- Daily Rosters

- Straight day Reports

- Straight evening/night Reports

‘NEDICALMINh.4CENI’ER

9 MANAGEMENT SYSTEMS

Page 16: Work Measurement of ANSOS Project Report

Unit 4l £D4EDULIKG UPRtH PRTERS

FIGURE 2. SAMPLE SCHEDULER SCREEN

tlVE1 MDiG\LMICHIGANI14CENTER

uw ffARD4 C0(ThOL auShift order for initialfin ur&erco.qr to considerfin SCore to coiii4srfax sinuteg to search

OVERE LJEICHTSskill... RLflU

Under Coverage

____

ar coveraje

____

tinder cus verage

sww HEDLfl1 UEIHtSSingle da onSingle dasi elfExceeding sax u.rkstrotchExcredlng target rotationSingle da rotationRotation before daj offSplit usekendtoubl ebackSeni.rtt9 factor

UTFSlet Shift’D9Znd -4 Pri.r1t3rd

______

CS neutral’)

—ww PARIETERSNL vnttsPULL skillsHin pull (his per shi

I3K

Reset to Default CopjtrosUnitI

10 MANAGEMENT S’STEMS

Page 17: Work Measurement of ANSOS Project Report

Overappointment time Reports

Weekend Reports

E. Using I1iTimecard module to

- Run Timecards

- Correct Tim ecards

Time Study

A time study was performed on the actual times it took nurse

managers who are well familiarized with ANSOS to perform the required

tasks.

A. Time Study Participants:

The students timed two nurse managers who were chosen by the

clients, Ann Kaiser and Gail Benjamin. The clients felt that the two nurse

managers chosen were proficient in performing ANSOS related tasks and

therefore were given performance ratings of 100%. In other words, the

clients felt that the study participants’ performance using ANSOS was at a

level compatible to a person adeptly trained in using ANSOS. The study

participants (operators) timed were:

Operator A:

Name: Karen Ruhlig

Title: Nursing Services, Survival Flight

Experience: 18 months using ANSOS, UMH Trainer for ANSOS

MICHIGAN4CENTER11 MANAGEMENT SYSTEMS

Page 18: Work Measurement of ANSOS Project Report

Operator B:

Name: Michelle Hebersold

Tit[e: Clinical Nurse Supervisor, Neurology/Neurosurgery

Experience: 8 months using ANSOS

B. Time Study Equipment:

An Advance Quartz Digital (Sports Timer) Stopwatch was used

to take the times throughout the time study. The raw data was recorded on

No. 100 time study forms of the Industrial and Operations Engineering

Department at the University of Michigan, Ann Arbor.

C. Time Study Experiment Conditions:

The time study took place at the University of Michigan

Hospitals, on February 28, 1990 from 2:00 pm to 5:00 pm in a room equipped

with two ANSOS connected computer terminals. The atmospheric and

lighting conditions were comfortable and adequate. The noise level in the

room was also at a minimal level. The entire time study took place in the

presence of the coordinator, John Gialanella.

D. Time Study Data:

Michelle Hebersold and Karen Ruhlig were asked to simulate

several tasks using ANSOS. Activities in the following modules were

timed:

1) The Controller

2) The Scheduler

iNIWiMDICALMICH!WN 4CENTER

1 2 MANAGEMENT SYSTEMS

Page 19: Work Measurement of ANSOS Project Report

C3) The Staffer

4) The Report Writer

5) The Staffer Reporter

It should be noted that in several cases, the subjects entered their own

personnel information into the module. Therefore, in some instances, the

actual times should be longer, since the operator would be entering

information from a data sheet. The raw data collected during the time

study was analyzed and Table 1 was created.

Activity frequency

Table 2 shows the frequency per unit of time for each of the

activities listed in Table 1. The data in Table 2 was obtained from the

following sources:

- The activity breakdowns were obtained from the clients

- The normal times ...junit .Qjactivity were timed during the time study.

Since there were two operators timed, for the ANSOS related

activity times, the students chose the shorter times when creating Table 2.

For example, to enter personnel data, Operator A had a time of 2:02 while

Operator B had a time of 2:58. In Table 2, 2:02 was chosen (2:02 equals

2.03 minutes) on the assumption that when a professional data entry clerk

is doing the job, they would be efficient in their performance. Also, they

won’t have to compete for access time with others to get on ANSOS, since

not as many personnel will be using the system. In cases where there was

only one time recorded, that time was used. The numbers from Table 1

were converted from minutes and seconds to decimal minutes for Table 2.

. MEDICALMICHIGAN CENTER

13

Page 20: Work Measurement of ANSOS Project Report

TABLE 1. TIME STUDY DATA FOR ANSOS MODULES

CUMULATIVE TIMEANSOS MODULE ACTIVITY (MINUTES : SECONDS)

OPER.A OPER.B

CONTROLLER ENTERING PERSONNELMAIN SCREEN 0:00 0:00FUNCTION MENU 0:21 0:48

VIEW UNIT 0:34 1 :27VIEW INDIVIDUAL 0:41 1 :36

FINISH TYPING 2:02 2:58

PLAN SHEETSMAIN SCREEN 0:00 0:00FUNCTION MENU 0:22 0:34

VIEW UNIT 0:26 0:44SEE PLAN SHEET 5:41 7:45

STAFFER SCHEDULE CHANGES BY PERSONMAIN SCREEN 0:00 0:00FUNCTION MENU 1:39 2:25

VIEW UNIT 2:03 2:38VIEW INDIVIDUAL 2:08 2:45

FINISH TYPING CHANGES 3:00 3:33

SCHEDI.LE CHANGES BY DAYFUNCTION MENU 0:00 0:00CHANGEDAY 1:19 1:49VIEWUNIT 1:29 2:07

WEEKLY STAFFERMAIN SCREEN 0:00 0:00FUNCTION MENU 0:34 0:23VIEW ATTENDANCE MODULE 0:40 0:33DONE READING UNITS 6:57 16:10SEE REPORTFILE 7:09 16:23

STAFFER REPORTER TO GO TO REPORTERMAIN SCREEN 0:00FUNCTION MENU 0:40REPORTER MENU 1 9:03

SCHEDULER ENTERING REQUESTSMAIN SCREEN 0:00 0:00FUNCTION MENU 0:31 0:46

VIEW UNIT 0:51 0:56VIEW INDIVIDUAL 1 :12 1 :42

FINISH TYPING CHANGES 1:20 1:51

REPORT WRITER GETTING REPORT READY TO PRINTMAIN SCREEN 0:00FUNCTION MENU 1:38

CHOOSE YOUR REPORT 2:42ASSEMBLE REPORT TO PRINT 4:36

14

1Nl r,. MDTC1’1LM1CHKiN LA CENTER

MANEMENT SYSTEMS

Page 21: Work Measurement of ANSOS Project Report

TAB

LE2.

AN

NU

ALI

ZED

AC

TIV

ITIE

SU

SIN

GTH

EA

NSO

SM

OD

ULE

S

AN

SOS

MO

DU

LEN

OR

MA

LST

AN

DA

RD

STA

ND

AR

DU

NIT

AN

NU

ALI

ZED

AC

TIV

ITY

TIM

ETI

ME

TIM

EO

FA

CT

IVIT

YIN

ININ

AC

TIV

ITY

MIN

.M

IN.

HO

UR

SC

ON

TRO

LLER

NEW

HIR

ES2.

032.

330.

04N

EWH

IRE

393.

38N

EWH

IRES

/YEA

RC

HA

NG

EPE

RSO

NN

ELD

ATA

1.03

1.18

0.02

T.A

.D.

0.79

87/

PER

SON

SCH

EDU

LER

PLA

NSH

EE

TS

5.68

6.53

0.11

PLA

NSH

EET

13/

UN

ITST

AFF

ER

SCH

EDU

LEC

HA

NG

ES3

0.00

0.00

CHA

NG

E71

.92

/PE

RSO

N(B

YPE

RSO

N)

PRIN

TT

IME

CA

RD

S7.

150.

000.

00TI

MEC

AR

D26

/PE

RS

ON

STA

FFE

RR

EPO

RT

ER

IND

IVID

UA

LA

CTI

VIT

YR

EPO

RT

19.0

521

.91

0.37

REP

OR

T13

/U

NIT

WEE

KLY

RO

STER

19.0

521

.91

0.37

REP

OR

T52

/U

NIT

DA

ILY

RO

STE

R19

.05

21.9

10.

37R

EPO

RT

260

/U

NIT

PRO

DU

CTI

VIT

YR

EPO

RT

19.0

521

.91

0.37

REP

OR

T13

/U

NIT

NO

N-P

RO

DU

CTI

VET

IME

REP

OR

T19

.05

21.9

10.

37R

EPO

RT

13/

UN

ITN

EWH

IRES

REP

OR

T19

.05

21.9

10.

37R

EPO

RT

13/

UN

ITTR

AN

SFER

RE

POR

TS

19.0

521

.91

0.37

REPO

RT13

/U

NIT

TER

MIN

ATI

ON

REP

OR

T19

.05

21.9

10.

37R

EPO

RT

13/

UN

ITST

RA

IGH

TDA

YR

EPO

RT

19.0

521

.91

0.37

REP

OR

T13

/U

NIT

STR

AIG

HT

EVEN

ING

/NIG

HT

RE

POR

19.0

521

.91

0.37

REP

OR

T13

/U

NIT

WEE

KEN

DR

EPO

RT

19.0

521

.91

0.37

REP

OR

T13

/U

NIT

OV

ERA

PPO

INTM

ENT

REP

OR

T19

.05

21.9

10.

37R

EPO

RT

13/

UN

IT

RE

POR

TW

RIT

ERPO

SFTI

ON

REP

OR

T4.

605.

290.

09R

EPO

RT

13/

UN

IT

Page 22: Work Measurement of ANSOS Project Report

For example, 5:41 is equivalent to 5.68 minutes.

- The standard times .pu nit .Qjactivity were obtained by multiplying

the normal times by the allowance factor of 1.15, made for personal,

fatigue and delay allowances for the job. In other words, an allowance of

15% was made (see the APPENDIX for further information).

- Annualized activity data was obtained from the nurse managers. This

data is shown in Table 3 and described below:

1. Number of New i-fires:

For the Annual number of new hires, data was obtained for each of the 5

hospitals for one year; starting March 1989 and ending February 1990. This

Ci number was then used as the volume of new hires per hospital.

2. Number of Personnel data changes per person:

In estimating the number of changes in personnel data, Turn Around

Documents (TAD’s) were used. The TAD’s for the week of March 19, 1990

through March 23, 1990 were : 11 for the Perinatal/Pediatric/Psychiatric

units and 23 for the University Hospital units. Therefore, giving a total of

34 TAD’s for 2213 employees. Dividing these two numbers by each other

gives : 0.7375 TAD’s per person annually.

3. Number of Schedule changes per person:

The number of schedule changes were obtained by averaging the number

of changes and the total number of staff for several of the hospital units.

Table 4, shows the raw data used to estimate the number of changes made

LMVERS1jF NEDICALMICIflCS CENTERMANAGEMENT SYSTEMS16

Page 23: Work Measurement of ANSOS Project Report

iAB

LE

3.N

UM

BE

RO

FN

EW

HIR

ES,

PER

SON

NE

L,

AN

DU

NIT

SPE

RH

OSP

ITA

L.

HO

SP

ITA

L

M/W

/HPS

YC

HUH

AC

S

NU

MB

ER

OFN

EW

HIR

ES

93.6

26

.426.6

32

16

.75

30

(3/8

9-

2/90

)

NU

MB

ER

OFP

ER

SON

NE

L6

06

12

61

82

1481

256

AS

OF

FEB

RU

AR

Y19

90

NU

MB

ERO

FUN

ITS

125

624

22

11

Page 24: Work Measurement of ANSOS Project Report

cx

TAB

LE4.

NU

MB

ERO

FA

NN

UA

LSC

HE

DU

LE

CH

AN

GE

S.

UN

ITN

UM

BER

OF

NU

MB

ERO

FTO

TAL

NU

MB

ERC

HA

NG

ESC

HA

NG

ESO

FEM

PLO

YEE

SB

IWEE

KLY

AN

NU

ALL

Y4B

133

3458

47

4DC

70

1820

44

6A23

16006

606C

136

353

637

7B204

530

435

7C189

4914

65

K2

66

1716

31PI

CU

10

82808

90

HO

LDEN

244

634

4114

6255

66

30

64

L&D

79

2054

33

TOTA

L1

71

54

45

90

620

Page 25: Work Measurement of ANSOS Project Report

per person annually. The total number of changes annually was 44590, and

the total staff was 620, giving an estimate of 71.92 changes per person

annually.

4. Number of plan sheets, time cards and various reports:

The number of plan sheets, time cards and all the reports was obtained

from the clients

Table 5 shows the volume of the annualized activities The

numbers in Table 5 were obtained by multiplying the annualized activity

volume by either:

1) The number of units per hospital.

2) The number of employees per hospital.

For example, for preparing plan sheets:

The annualized activity volume = 13 per unit

Number of ambulatory. care units = 22

Therefore, the annualized activity volume for the ambulatory care units is:

13 plan sheets annually/unit X 22 units = 286 plan sheets annually.

Table 6 incorporates data from Tables 2 and 5 and shows the

time spent annually on the ANSOS related activities timed. The times per

hospital were obtained by multiplying the annualized activity volume (found

in Table 5) by the time per unit of activity (found in Table 2).

For example, for peparing plan sheets for the ambulatory care units:

The annualized activity volume = 286 plan sheets annually.

The time per plan sheet preparation = 0.11 hours.

Therefore:

The annualized activity time = 286 X 0.11 = 31.46 hours.

tN1VE19 1EDIGLMCH1GAN4CENTER

1 MANAGEMENT SYSTEMS

Page 26: Work Measurement of ANSOS Project Report

n(T

hC)

TAB

LE5.

AN

NU

ALI

ZED

AC

TIV

ITY

VO

LUM

ES

AN

SOS

MO

DU

LEA

NN

UA

LIZE

DV

OLU

ME

PER

HO

SPIT

AL

AC

TIV

ITY

AC

TIV

ITY

VO

LUM

EM

/W/H

PSY

CHO

LHA

CS

TOTA

LC

ON

TRO

LLER

NEW

HIR

ES39

3.38

NE

WH

IRE

S93

.626

.426

.621

6.8

3039

3.4

CH

AN

GEP

ERSO

NN

ELD

ATA

0.79

87/P

ER

SO

N44

6.9

92.9

134.

211

9618

8.9

2058

.9PL

AN

SHE

ET

S13

/U

NIT

168.

9570

.396

84.4

7533

7.89

930

9.74

971.

46

STA

FFE

RSC

HED

ULE

CH

AN

GES

71.9

2/P

ER

SO

N4

35

83

.590

61.9

1308

9.4

1065

13.5

1841

1.5

1906

59.8

(BY

PER

SON

)PR

INT

TIM

EC

AR

DS

26/P

ER

SO

N24

33.6

686.

469

2.4

5635

.578

010

227.

9ST

AFF

ER

RE

POR

TE

RIN

DIV

IDU

AL

AC

TIV

ITY

RE

POR

T13/U

NIT

156

6578

312

286

741

WEE

KLY

RO

STER

52

/UN

IT62

426

031

212

4811

4431

20DA

ILY

RO

STER

260

IU

NIT

3120

1300

1560

6240

5720

1544

4PR

OD

UC

TIV

ITY

REP

OR

T13

/U

NIT

156

6578

312

286

897

NO

N-P

RO

DU

CTI

VET

IME

REP

OR

T13

/U

NIT

=15

665

7831

228

689

7N

EW

HIR

ESR

EPO

RT

13/U

NIT

156

6578

312

286

897

TR

AN

SFE

RR

EPO

RT

S13

/U

NIT

156

6578

312

286

897

TERM

INA

TIO

NR

EPO

RT

13/

UN

IT15

665

7831

228

689

7ST

RA

IGH

TDA

YR

EPO

RT

13/U

NIT

156

6578

312

286

897

STR

AIG

HTE

VEN

ING

/NIG

HTR

EPO

R13

/UN

IT15

665

7831

228

689

7W

EEK

END

REP

OR

T13

/UN

IT15

665

7831

228

689

7O

VER

APP

OIN

TMEN

TREP

OR

T13

/UN

IT15

665

7831

228

689

7R

EPO

RT

WR

ITER

POST

ION

REP

OR

T13

IU

NIT

156

—65

7831

228

674

1

0

Page 27: Work Measurement of ANSOS Project Report

TAB

LE6.

AN

NU

ALI

ZED

EAR

NED

HO

UR

S

AN

SOS

MO

DU

LEA

CTI

VIT

YA

NN

UA

LN

OR

MA

LTI

ME

PER

HO

SPIT

AL

(INH

OU

RS)

M/W

/HPS

YCH

ORLH

AC

STO

TAL

CO

NTR

OLL

ERN

EWH

IRES

3.74

1.06

1.06

8.67

1.20

15.7

3C

HA

NG

EPER

SON

NEL

DA

TA9.

682.

012.

9025

.91

4.09

44.5

9

SCH

EDU

LER

PLA

NSH

EE

TS

17,1

67.

158.

5834

.32

31.4

698

.67

STA

FFE

RSC

HED

ULE

CH

AN

GES

2615

.01

543.

7178

5.36

6390

.81

1104

.69

1143

9.59

(BY

PER

SON

)PR

INT

TIM

EC

AR

DS

340.

7096

.10

96.9

478

8.97

109.

2014

31.9

0ST

AFF

ER

RE

POR

TE

RIN

DIV

IDU

AL

AC

TIV

ITY

RE

POR

T57

.72

24,0

528

.86

115.

4410

5.82

331.

89W

EEK

LYR

OST

ER23

0.88

96.2

011

5.44

461.

7642

3.28

1327

.56

DA

ILY

RO

STER

1154

.40

481.

0057

7.20

2308

.80

2116

.40

6637

.80

PRO

DU

CTI

VIT

YR

EPO

RT

57.7

224

.05

28.8

611

5.44

105.

8233

1.89

NO

N.P

RO

DU

CT

IVE

TIM

ER

EPO

RT

57.7

224

.05

28.8

611

5.44

105.

8233

1.89

NE

WH

IRE

SRE

POR

T57

.72

24.0

528

.86

115.

4410

5.82

331.

89T

RA

NSF

ER

RE

POR

TS

57.7

224

.05

28.8

611

5.44

105.

82331.8

9TE

RM

INA

TIO

NR

EPO

RT

57.7

224

.05

28.8

611

5.44

105.

8233

1.89

STR

AIG

HT

DA

YR

EPO

RT

57.7

224

.05

28.8

611

5.44

105.

8233

1.89

STR

AIG

HT

EV

EN

ING

/NIG

HT

RE

POR

57.7

224

.05

28.8

611

5.44

105.

8233

1.89

WEE

KEN

DR

EPO

RT

57.7

224

.05

28.8

611

5.44

105.

82331.8

9O

VER

APP

OIN

TMEN

TREP

OR

T57

.72

24.0

528

.86

115.

4410

5.82

331.

89R

EPO

RT

WR

ITER

-

POSI

TIO

NR

EPO

RT

14.0

45.

857.

0228

.08

25.7

480

.73

TO

TA

L4962.8

11473.5

81883.1

011201.7

24874.2

624395.4

7

Page 28: Work Measurement of ANSOS Project Report

Finally, Figure 3 summarizes the data in Table 6 It shows the

estimated annual time requirements to perform the studied ANSOS module

activities.

CONCLUSIONS AND RECOMMENDATIONS:

In determining the necessary resource requirements to perform

all ANSOS related activities, the students considered the following:

Thedata collected during the time study, shown in Table 1.

- Tables 2, 5, and 6 which were created by considering information such

as the number of units and the number of employees per unit at the

University of Michigan hospitals (the raw data is shown in Tables 3

C and4).

- The opinions and suggestions on the improvement of the current system

by the clients and several other nurse managers.

- The coordinator’s advice.

The students also obtained information from a recent nurse managers

meeting (week ending March 16, 1990). At this meeting, the following

tasks were identified by the head nurses as tasks they could delegate:

1. Using the Controller to

A. Update personnel information

B. Print Plan sheets

2. Using the Report Writer to print position reports.

3. Using the Staffer to print time cards.

-

,M1JICALMIHKiS CENrERMANAGEMENT SYSTEMS

Page 29: Work Measurement of ANSOS Project Report

HO

UR

S

j

PSY

CH

iATR

IC

OPE

R4T

ING

RQ

o

UN

IVER

SITY

HO

SPIT

AL

AM

3U

TQ

Ry

CA

F

0

-11

Og

C TC

)

- —m

zz

Cr,

(or-

.

01120172

cm

I73

mm 0

0 (i)

4.c

,)

o 0

C)

-.

-

80

08

0 0

4962

.81

1473

.58

1883

.1

j4874.

0 C’)

-1 I-

Page 30: Work Measurement of ANSOS Project Report

C’4. Using the Staffer Reporter to print:

A. Individual activity reports.

B. Daily rosters.

C. Weekly rosters.

D. Penalties paid reports.

In addition to the tasks mentioned, the students feel that the task of using

the Staffer to make schedule changes by person or by day, can also be

delegated to someone other than a nurse manager to complete. These

activities would be performed at a central location for all the units of the

University of Michigan hospitals.

Delegating all the responsibilities mentioned above, would save

the nurse managers at the University of Michigan hospitals nearly 24,000

hours annually. This estimate is extremely conservative as it is based on

the time required by an efficient data terminal operator experienced in the

use of ANSOS. In order to delegate this responsibility, the following

resources are required:

1) Number of full time equivalents (FTE’s) needed:

24,000 hours of clerical work annually would require 12.9 full time

clerks (this number takes into account personal and fatigue delays and

benefit days taken off. The number of full time equivalents (FTE’s) needed

for each hospital, is shown in Table 7.

The data in Table 7 was obtained using the annualized earned hours,

LNIVE9TMEDICALMiCHIGAN .A4CEN1ER

24 MANAGEMENT TEMS

Page 31: Work Measurement of ANSOS Project Report

TAB

LE7.

NU

MB

ER

OF

FULL

TIM

EE

QU

IVA

LE

NT

S(F

TE’S

)R

EQ

UIR

ED

.

HO

SPIT

AL

M/W

/HPS

YC

Hw

AC

S

AN

NU

AL

EA

RN

ED

HO

UR

S4962.8

1473.6

1883

.111202

4874.3

AN

NU

AL

HO

UR

SPE

RFT

E2080

2080

2080

‘2080

2080

NU

MB

ER

OFP

RO

DU

CT

IVE

2.39

0.71

0.91

5.39

2.34

FTE’

S

FT

E’S

RE

QU

IRE

D2.6

20.7

81.0

05.9

22.5

8

TO

TA

LFT

E’S

RE

QU

IRE

D

12.9

0

Page 32: Work Measurement of ANSOS Project Report

which were calculated in Table 6.

The annual hours rFTE is 2080 hours for every full time equivalent.

This number was obtained in the following manner:

The number of hours a FTE works per week = 40

The number of weeks per year = 52

Thus, annual hours per FTL = 40 X 52 = 2080 hours.

The number.Qj productive FTE’s was obtained by dividing the Annual

earned hours by the Annual hours per FTE. For example, for the number of

productive FTE’s required at Mott/Women/Holden:

Annual Earned Hours = 4962.81

Annual Hours per FTE = 2080

Therefore, the number of productive FTE’s required = 4962.81 I 2080 = 2.39.

To determine the number.QI FrEs required. an additional 10% allowance

for vacation, holiday, and sick leaves (VHS) was made. For further

information regarding the 10% allowance see the APPENDIX. Therefore, the

number of productive FTE’s was multiplied by the allowance factor of 1.10.

For example, for the number of FTE’s required at MottlWomenlHolden:

Number of productive FTE’s = 2.39

Allowance Factor for VHS = 1.10

Therefore, the number of FTE’s required is 2.39 X 1.10 = 2.62.

2) Centralization of most of the ANSOS related tasks:

All the ANSOS related tasks such as the using the Scheduler to print

plan sheets (see Figure 4), using the Staffer Reporter to print all reports,

‘MDICALMCH1GAN LA CEr%TERMANAGEMENT SYSTEMS

Page 33: Work Measurement of ANSOS Project Report

FIGURE 4 FLOW CHART FOR PRODUCING PLAN SHEETS.

tNWEI9r,. ‘ MDTCLMICWGAS i;:CENTERMANM3EMENT SYSTEMS

NO

I.1

27

Page 34: Work Measurement of ANSOS Project Report

and using the Controller to enter personnel information, should be done

centrally. The only task which should remain decentralized is using the

Scheduler to enter requests and create a finalized schedule. As seen in the

flow chart of Figure 5, the Scheduler activities are rather complicated and

defy delegation, in that they require double checking and making sure that

the staffing is appropriate in quantitative and qualitative terms, before

granting any requests. Clinical Nurse Managers (CNM) in each unit would be

better familiar with their unit’s employees, their working relationships

• and most importantly, their unit’s staffing requirements. Therefore it is

best that schedule finalization requests remain decentralized.

Regarding the centralization of time keeping activities using the

Staffer module, there are two possible alternatives (see Figure 6 for the

C present method): Alternative A (Figure 7) would be to have every unit

enter their own time card data decentrally, and to centralize the printinQ of

the time cards. This would support a quicker process since in each unit, the

CNM can immediately check and see if the actual time that the employee

worked is equivalent to their scheduled time. However, this alternative

requires every user to have consistent knowledge of contract and payroll

interpretation.

A second alternative, Alternative B (Figure 8) would be to cross train

the centralized ANSOS data terminal operators with payroll processing

expertise. This would reduce CNM activity to verification that an employee

worked specific hours on a specific date. The timesheet on which this

would be recorded would be forwarded to nursing payroll/ANSOS where the

proper pay code would be assigned each employee and entered to ANSOS

C’ Investigation as to the feasibility of electronically transferring this data

r,. MD1CALMICHIGAN L.4 CENTER

28 MANNEMENT SYSTEMS

Page 35: Work Measurement of ANSOS Project Report

FIGURE 5. FLOW CHART FOR SCHEDULING REQUESTS.

1 MD1CL29 MI(11lC CENfER

MANAGEMENT SYSTEMS

REVIEW STAFFINGOF EACH DAY OFSCHEDULE

ASSIGN STAFF TOMATCH NEED

INtTIATE SUPPPLEMENTALSTAFFING STRATEGIES

Page 36: Work Measurement of ANSOS Project Report

..FIOURE6. FLOWCHART FOR STAFFER MODULE (PRESENT APPROACH).

tNIrMDTGLMICHIGAN L_4 CENTERMANWEMENT SYSTEMS

EMPLOYEE WORKS

I SCHEDULED/REQUESTED ISHIFTS AND RECORDS

TIME WORKED.

I— RE VISE EMPLOYEE”SCHEDULE TO

I REFLECT ACTUAL I1ThiE1iiE\ORKED * J

(DOES ACTUAL TIMEWORKED =

LSCHEDUJIED TIME?

Ys

PR I NTTIMECARD

j

*NOTE:

TO ENTER EVERYTHINGDECENTRALLY, WILL REQUIREEVERY USER TO HAVECONSISTENT KNOWLEDGE INCONTRACT AND PAYROLLINTERPRETATION.

I FORWARD TIMECARDSTO NURSING

PAYROLhJ

30

Page 37: Work Measurement of ANSOS Project Report

EMPLOYEE WORKSSCHEDULED! REQUESTEDSHIFTS AND RECORDSTHIE WORKED.

YES

PR I NTTIMECARDSCENTRALLY.

FORWARD TIMECARDSTO NURSING PAYROLL

FIGURE 7. FLOW CHART FOR STAFFER MODULE (ALTERNATIVE A).

M’QE9PMEDICALMCHKikN i4CENTERMANJEMENT SYSTEMS

C I(DOES ACTUAL TIME

I WORKED =

(SCHEDULED TIME?

C

}— 1RE VISE EMPLOYEENNO SCHEDULE TO I

I REFLECT ACTUAL Ilj1EVO RKEciJ

D*NOTE:TO ENTER EVERYTHINGDECENTRALLY, WILL REQUIREEVERY USER TO HAVECONSISTENT KNOWLEDGE INCONTRACT AND PAYROLLINTERPRETATION.

31

Page 38: Work Measurement of ANSOS Project Report

CEMPLOYEE WORKSSCHEDULED/REQUESTEDSHIFTS AND RECORDSTIME WORKED.L I

( CNM VERIFIES ACCURACYOF TIME WORKED.

TIME SHEET FORWARDED TOPAYROLL/ANSOS.

DTO WITH PAYROLL EXPERTISE

I ENTERS PROPER PAY CODESINTO ANSOS.

FORWARD TIMECARDSTO NURSING PAYROLLFUTUR EELECTRONICALLYTRANSFER TOUNI VERSITY PAYROLL.

C DDTO/ANSOS SUPERVISES(UALI TY CONTROL

F(GURE 8. FLOW CHART FOR STAFFER MODULE (ALTERNATIVE B).

32 LUfl WDICLCENTER

MANAGEMENT SYSTEMS

Page 39: Work Measurement of ANSOS Project Report

to University Payroll should be conducted.

Further explanations of the resource requirements follow:

1) Clerical duties:

The clerks that would take over the ANSOS related tasks are required to

be:

1) Efficient data terminal operators.

2) Familiar with the ANSOS modules.

3) Knowledgeable of Michigan Nurses Association (MNA) and the

American Federation of State, County and Municipal

Employees (AFSCME) contract interpretation

In order to ensure these requirements, it is important to

provide the necessary training The clerks however, must be fluent typists

otherwise they will not beable to use ANSOS efficiently. The nurse

managers that are well familiar with ANSOS can be of assistance in

training the clerks. Extensive training in ANSOS may take a few weeks.

Once the clerks are ready to use ANSOS, a central location should be chosen

for the clerks to perform their ANSOS related activities. ANSOS file

servers and printers should also be located at this office, If relocating the

servers is not possible, the clerks should be positioned as close (in

distance) to the servers as possible. If a number of line printers are

available, it would be best if they were placed in a room nearby to where\

the clerks are stationed. This is because line printers tend to be noisy, and

since the clerks would be printing up large number of reports, the noise

level would become disturbing.

MVE1S NEDICLMICH1G.N L.4 CENTERMANFIe4T SVSTEMS

Page 40: Work Measurement of ANSOS Project Report

Once the rooms have been assigned, an effective method of

distributing the plan sheets, reports, etc. to each of the ANSOS users must

be installed to provide delivery on a regular orderly basis. The clerks will

first need to classify each units information, perhaps by installing large

filing shelves. These shelves would have slots for each of the users. Any

time reports are printed, the clerks can periodically classify them. At the

end of each work day these reports can be transferred to each unit’s

mailbox by a messenger, or a table can be designated such that each nurse

manager can come to pick up the necessary reports.

The nurse managers can also be notified of personnel changes or

new hires via the E-Mail system. The clerks could report daily any new hire

information, schedule changes or personnel data changes that they made

that day to the appropriate nurse managers using E-Mail.

2) Centralization of tasks:

The advantages that the centralization of the various ANSOS

related tasks will have are numerous. First of all, the ANSOS system will

be used as it was originally designed. (ANSOS was designed for central

use). This means that the system will be functioning in its most efficient

configuration. This will considerably shorten computer wait times. At

present, access to the different modules is a function of the number of

users on the system. The larger the number of users, the longer the wait

time. This has significant effects on the actual time spent producing anc

printing reports. In addition, the time for assembling reports will be

shortened significantly, because ANSOS reads in all the data from all the

units before producing any one specific report. Assembling reports can

1MVE9‘MEDICALMKI1iGAN CbNTERMANMiEMENT S’STEMS

Page 41: Work Measurement of ANSOS Project Report

take up to 20 minutes at times. Once all the reports are centrally

assembled and printed, the wait time will be shortened because all the

reports can be printed out at one time in a systematic manner. It will no

longer be necessary for each user to wait while ANSOS reads in all the

units individually every single time a report needs to be accessed or

printed. More importantly, however, is the fact that in total the current

ANSOS users will save a conservative minimum of 24,000 hours yearly.

OUTCOME AND RELATED IMPACT:

As previously described, the aim of this project was the

determination of the resources needed to perform ANSOS related activities

at the University of Michigan Hospitals. Having done so, the student

engineers met their clients’ request. In conclusion, the student engineers4

hope to have provided the clients and nurse managers with information they

need to reduce the amount of their valuable time performing tasks using

ANSOS.

35

MICHl(iN L4 CENTERMANAGEMENT SYSTEMS

Page 42: Work Measurement of ANSOS Project Report

REFERENCES:

ANSOSII Users Manual. Version 9.0, Atwork Corporation, Chapel HiM, NC,1988, pp. 1-210.

ANSOS Conversion Workbook. Version 10.0, Atwork Corporation, Chapel HillNC, 1989, pp. 1-56.

Benjamin, Gail, “ANSOS Related Tasks Performed by Managers”, Universityof Michigan Hospitals, Ann Arbor, Ml, February 8, 1990.

Kaiser, Ann, “Head Nurses ANSOS Requests”, University of MichiganHospitals, Ann Arbor, Ml, March 15, 1990.

Kaiser, Ann, of Schedule Changes on Staffer (biweekly)”,University of Michigan Hospitals, Ann Arbor, Ml, March 12, 1990.

“Monthly LPN/AIDE employment Statistics”, Human Resources EmploymentLog, The University of Michigan Medical Center, March 1989through February 1990.

“Monthly RN employment Statistics”, Human Resources Employment Log,The University of Michigan Medical Center, March 1989through February 1990.

Niebel, Benjamin W., Motion and Time Study. Richard D. Irwin, Inc.,Homewood, IL,1988, pp. 1-11, 408-427.

“Nurse Staffing Activity Report by Unit/Department”, The University ofMichigan, Medical Campus Personnel Office, February 1990.

36

t•1PM1JICALMlCHIC CENTERMANU3EMENT SYSTEMS

Page 43: Work Measurement of ANSOS Project Report

APPENDIX:

Calculations for the allowance factors are made in this section:

1. To calculate the 15% allowance for personal, fatigue and delay, data was

obtained from Table 16-3, of the text: Motion .j.Time Study by Niebel.

The following allowances were then made accordingly:

- A. Constant Allowances

1. Personal Allowance 5

2. Basic Fatigue Allowance 4

B. Variable Allowances

1. Close attention for fine-

- or extracting work 2

2. Mental Strain for a fairly

complex process 1

3. Medium Monotony .

4. Tedious Work

Therefore, the total allowance is 5 + 4 + 2 + 1 + 1 + 2 = 15%, and the

allowance factor will be 1.15.

2. To calculate the 10% allowance for vacation, holiday, and sick leaves

(VHS):

The number of work days per year are 260 (365 days minus weekends).

Subtracting off 11 days for holidays, 1 0 vacation days and 5 sick days,

L%1’E MD1CALMICHIGAN CENTERMANAGEMENT SYSTEMS

1

2

37

Page 44: Work Measurement of ANSOS Project Report

gives you 239 actual work days. And:

239 I 260 = 0.90 = 90%

Therefore, the actual number of work days is 90%. Thus, the allowance will

be 10% and the allowance factor will be 1.10.

()

.

..-., . . ..

r4,MEDIC.L4.4 CENUER

MANAGEMENT SYSTEMS38