Work Breakdown Structure (WBS) Extended Table of contents.
-
Upload
abel-wells -
Category
Documents
-
view
226 -
download
0
Transcript of Work Breakdown Structure (WBS) Extended Table of contents.
![Page 1: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/1.jpg)
Work Breakdown Structure (WBS)
Extended Table of contents
![Page 2: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/2.jpg)
IntroductionThe project triangle
Product (result, features, quality)
TimeResources
2
![Page 3: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/3.jpg)
IntroductionThe project triangle
Product (result, features, quality) What:
Time WhenResources Who
3
![Page 4: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/4.jpg)
The project triangleThe relation between product, time and resources
Product
Resources Time
Change in one part – will have consequences for other parts
4
![Page 5: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/5.jpg)
Works Breakdown Structure is:
• A method for organizing tasks for a project• Focuses on tasks and what needs to be done in a hierarchical way –
top down (headlines not importance)• Most of the time - says nothing about time (sequence and time needed)
• From distance the elephant doesn’t look that big – but when it comes closer
• But bite the elephant into smaller pieces
5
![Page 6: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/6.jpg)
WBSWhy breaking the project into tasks?
• Clear plan of the work-sequence towards completion of promised deliverables
• Easier to manage -> plan, execute and control• Easier to decide what kind of skills/resources are needed +
estimate resource (time, manpower and machinery)• Easier to communicate and understand
6Project planning and control
![Page 7: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/7.jpg)
WBS: Ground rules for WBS
• Define the work as independent tasks that can be sequenced, assigned, scheduled and monitored
• Define the tasks at a level of detail appropriate for the length and complexity of the project
• Think parallel tasks, but be aware of dependencies, joint decision and completion points
• Present the hierarchy of tasks in a easy understood format• Verify that the tasks cover the attainment of project goals and objectives
7Project planning and control
![Page 8: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/8.jpg)
IntroductionFrom structure into a plan
• From distance the elephant doesn’t look that big
– but when it comes closer !!! - ???
• ... bite the elephant into smaller pieces
8Project planning and control
![Page 9: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/9.jpg)
Work Breakdown Structure I
Stepwise or gradually planning process.
Structuring according to:
• Physical/geographical location
• Type of work
• Functions
• Systems
• Organisational belonging
![Page 10: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/10.jpg)
Work Breakdown Structure IIUse e.g. your function tree or mind –map to split your project tasks into even smaller tasks.
Determine in which order you will solve the different tasks.
![Page 11: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/11.jpg)
Example of a WBS
![Page 12: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/12.jpg)
• An Extended Table of contents is an Extended Table of contents • Table of contents known from reports and word!• ETOC is used for helping you discuss and structure your project –
before you start writing on your project (probably not now)• Consist typically of:
– Content– Arguments– Literature/method based upon– Number of pages / extent– Responsible
Extended Table of Contents
![Page 13: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/13.jpg)
Extended Table of Contents
•1. Introduction • Background of the car• When and how was it invented• Cars statistics (Number, nations, segments)• Environmental status of the earth (both pollution and energy) -> rationale• Pollution and cars• We need to improve the cars from an environmental point of view -> Interface to purpose
Based upon different UN reports
• Lise is responsible, proposed length = 1 page
2. Purpose
![Page 14: Work Breakdown Structure (WBS) Extended Table of contents.](https://reader036.fdocuments.net/reader036/viewer/2022062408/56649f005503460f94c158e4/html5/thumbnails/14.jpg)
To the next time
• Hand in preliminary project description – October 1rst (to your supervisor and upload to fronter) –
– ALL 7 sections must be included (Planning tools next time)– Approximately 10 pages– Everyone from the group must “deliver” and participate in the work