31D09NW2008 2.20363 HARVEY 010 ^.20363 Work Assessment Report For Claim # 1 077399 Claim Holder Mike G. Tomlinson (A522196) Do May 19, 2000 45 Day Notice Reply RECEIVED SEP - 8 /O ! oc/fst GEOSCIENCE ASSESSMENT ______OFFICE

Transcript of WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707...

Page 1: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

31D09NW2008 2.20363 HARVEY 010

^.20363

Work Assessment Report For Claim # 1077399 Claim Holder Mike G. Tomlinson (A522196)

Do May 19, 2000 45 Day Notice Reply

RECEIVEDSEP - 8

/O ! oc/fst GEOSCIENCE ASSESSMENT ______OFFICE

Page 2: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

31D09NW2008 2.20363 HARVEY 0 10C

Table Contents

1. Prospecting (Section 9)

2. Physical Work (Section 10)

3. Geological Survey (Section 11)

4. Foot notes

5. Map - Al

6. Map - A2

7. Expense l

8. Expense 2

9. Expense 3

10. Expense 4

11. Geological Survey Map - A3

12. Geological Survey Map - A4

13. Overburden Stripping Map - A5

14. EJ. Williams

15. EJ. Williams

16 Production Potential

17 M.J. Davenport & Associates

Page 3: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Prospecting lot 21 con 6 East Half Assessment Credit Section 9

Description;

Intent:To mark the area that had the best potential for mineral extraction by leaving marker tape at

the point of the four post.

Overburden:The area that was observed was covered with a verity of trees ( White pine, Oak, Junipers,

and Maple.) Minerals that were visual were limestone and red granite. Minimal amounts of topsoil.O"-6"

Wildlife:There was no large game noticed at the time of the prospecting. Some small birds were noted.

Terrain Covered:The walk to reach the area was approx. 2 hours covering 9 kilometers. Walking North on the

Maple lake trail road allowance. At the end of the trial we turned West and walk for 15 minutes through dense brush.

Water:There was a large pond at the north side of the area that was being taped off. It was approx.

500m long and 100m wide

Time A Cost:The amount of time taken to prospect this area was 11.5 hr.@ S17.50 per/hr^ S201.25

Date Preformed:April 20/1998

Person How Preformed Work:Mike G. Tomlinson Lie.A52196 Cli.303482

Page 4: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Physical Work lot 21 con 6 East Half Assessment Credit Section l O

Manual and Mechanical Overburden stripping:

Rocks Si minerals:Once the 100m x 200m area of overburden was removed the mineral that were exposed are

(Limestone).

Volume A Uses:The amount of material in 1077399 is estimated at 600000cubic meters. There has been

Approx. SOOtonne stockpile on site. This material will be used primarily in retaining walls and landscaping.

Testing:A sample of the limestone rock was sent to Davenport Engineering in Peterborough On. For

testing (See report).

Equipment Used: Cost:PC220 Komatsu Excavator @ S100.00 per/hr.D53 Komatsu Dozer @ S 65.00 per/hr200 Canadian Rock @ S 50.00 per/day966 Cat loader @ S 65.00 per/hrRB Mack Dump Track @ S 55.00 per/hr

Operator: Cost:Carry Kelly - PC220 @ S 16.00 per/hr

-D53Robert Baily -200 @ S 12.00 per/hr John Powers - RB @ S 14.00 per/hr John V. Reed -966 @ S 12.00 per/hr

Dates:( See Quarry Project Income Details ( Expense) )

Map:( See Overburden Stripping Map - A5 )

Page 5: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Geological Survey lot 21 con 6 East Half Assessment Credit Section 11

Description:

Rock Types A Formations:The South East Corner of the Claim is Limestone .The Limestone ends approx. 200m north of

post number 2 At this point the Limestone drops off Approx. 100'. Then there is a large pond 500m x 100m The rest of the claim is granite with scattered ponds.

Pond:500m x 100m pond is approx. 20' deep with swamp at both ends. Two Beaver dams are

present one at each end

Ridge:The Limestone ridge runs through the claim from post # 3 in a reasonable straight line to the

200m mark north of post 2. It drops off at a l to l slope.

Date Preformed:June 1/1998

Done by:Davenport Engineering of Peterborough On. EJ. Williams Surveyors-Planners

Maps & Invoices:( See map A3 & A4 )(See Invoices on page 1415)

Page 6: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Foot Notes

Survey Crews:EJ.Williams Surveying Limited ( Ontario Land Surveyors - Planners )

Willam D. Fitzgerald Geological Investigations.

Prospector:Mike G. Tomlinson Lie. A52196 Cli.303482

Engineering:Murray Davenport Engineering. Peterborough On.

This Report Was Done By Mike Tomlinson

Page 7: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

o

^ oo

occ:

Page 8: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

05 '00 15:32 FR 03 1*1

iZOTT

TO 817052926171Ull BK

IOOO le.li..

P.Q3-Q3;

' ' 100,0 A tM

M.H.O. - MINING SIGHTS ONLY

tMO- ~ SURf ACf MIGHTS OMLV

l*.* l. - MINING AMO SUKIiACE ntOHTS

101) W. l

41111*1.1

lUTCt

SEC "35 W-LU-P26W ONT MAY 1 t(98 MtSswuf ACE racHT* RESCTVATION ALWW THE

SHORES V Ait LAKES ANb MVEftS

HARVEYEAST PART

i M.M.M.ADWIHtlTMTtVt DtSTHICt

1 MINDEN

HMtHe DIVUIDN

SOUTHERN ONTARIO LAW Tina/ DiGia PETERBOROUGH

MMrtryof MmunU

Oni*rlo

Mkwrtry ofKljUlJA-^HUt fmnnvfii iand Mm*

G-1293

WMtNCtAL HWH*AV OTHER MAM TRAM

UMEl: ME IMS, ETC.

LOTS, CLAMfc MkNCILS, ETC IMBURVTCCD LMBI:

tor imetMMCEL KUMOAHCB

HMMO CCANMRAILWAY AMD BK9KT Of WAYUTiurr LMBNON-FCMWMML STHEAM FLOOOHEi OM nOOOMO MQHTI MMWKM M COWKMTC PLAM ^^^^^ MCWPMAnOM WWS.9IWWSS TMVEMt MO*MMMT -^ LAND nQiOimON 111

DISPOSITION OF CROWM LAMPS

TYfg Of pqCUMB

l i WnMCC W3MTt^OMLY..-V.,.,-.......ei , numta moftn om.v............,.....ft

LE All, tUAKACCft MMNMZ WUHW....... ...Bk . UWfcCtWOKT* OMLY..............-B* , MHND N0HT* OMLV..,......,.......B

LICCH6I-OF-QCCU*M1OM ............. - -.. T,..............,--....... le

SSL ,.. .MTuni *r fm puwx i- . m a MM, ow. m, "c

REFERENCE:

LAKES AND RIVERS ETC.. f ROM f Oflt INVENTORY SHEtTS Not. 444785E,4^ 443782,445781,446781,446782*

NOTE BOOKS' 444,1281.1262,5 AND J27S

Y a4-l4,Y46-*l,Y50-45 AMD X 19-:

HIGHWAY^ THROUGH CROWN LANO: MINISTRY OPTRANSPORTATIOM Al CATIONS SURVEY PLANS AS NOT

LOT AND CONCESSION LINES SHC AWE PROJECTED FKOM THE BC! AVAItAALE, BUT THEIR TRUE. POGUAKANTCED, ron tee At A HCPUWOSeS CONSULT THE OftlGr PLANS ANO FIELO NOTES OrTHE MI M IST r* OK NATURAL R.TQBOKTOACREAGES SHOWN roft MTtNTlIN ACCORDANCE WITH AREAS C

** TOTftL PfiGE.03 **

Page 9: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Rigbe's Lakeshore LandscapingQuarry Project. Income Detail 01/03/99 to 09/05/00

7

Amount Cumulative

r ''ENSE

5300 Wages05/11/9905/11/9905/11/9903/12/9910/12/9910/12/9910/12/9910/12/9917/12/9917/12/9924/12/9924/12/9931/12/9931/12/9931/12/9931/12/9907/01/0007/01/0007/01/0007/01/0014/01/0014/01/0014/01/0014/01/00

701/00. .701/00

21/01/0021/01/0021/01/0021/01/0028/01/0028/01/0028/01/0028/01/0004/02/0004/02/0004/02/0004/02/0011/02/0018/02/00

Bailey, Robert Kelly, Carry Reid, John V. Reid, John V. Bailey, Robert Kelly, Douglas Kelly, Carry Reid, John V. Bailey, Robert Kelly, Carry Kelly, Douglas Kelly, Carry Kelly, Douglas Kelly, Carry Powers, John Reid, John V. Kelly, Douglas Kelly, Carry Powers, John Reid, John V. Bailey, Robert Kelly, Douglas Kelly, Carry Powers, John Reid, John V. Bailey, Robert Kelly, Douglas Kelly, Carry Powers, John Reid, John V. Bailey, Robert Kelly, Carry Powers, John Reid, John V. Bailey, Robert Kelly, Carry Powers, John Reid, John V. Kelly, Carry Reid, John V.

5310 Ul Expense05/11/99 05/11/99 05/11/99 03/12/99 10/12/99 10/12/99 10/12/99 10/12/99

Bailey, Robert Kelly, Carry Reid, John V. Reid, John V. Bailey, Robert Kelly, Douglas Kelly, Carry Reid, John V.

3623362436263655365836593660366236683670367936803684368536863687368936903691369236953696369736983699370137023703370437053706370737083709371437153716371737193725

36233624362636553658365936603662

J513J514J516J571J588J589J590J592J624J626J649J650J658J659J660J661J678J679J680J681J694J695J696J697J698J703J704J705J706J707J715J716J717J718J736J737J738J739J746J763

J513 J514 J516 J571 J588 J589 J590 J592

131.04465.92378.5647.32

305.76197.60241.28169.00199.68158.0841.6099.84

192.40449.28365.04229.8472.80

490.88331.24304.20249.60202.80515.84236.60419.12624.00343.20823.68500.24648.96449.28665.60385.32473.20692.64

1,056.64608.40507.00166.4081.12

131.04596.96975.52

1,022.841,328.601,526.201,767.481,936.482,136.162,294.242,335.842,435.682,628.083,077.363,442.403,672.243,745.044,235.924,567.164,871.365,120.965,323.765,839.606,076.206,495.327,119.327,462.528,286.208,786.449,435.409,884.68

10,550.2810,935.6011,408.8012,101.4413,158.0813,766.4814,273.4814,439.8814,521.00

14,521.00

4.5015.9912.99

1.6210.496.788.285.80

14,525.5014,541.4914,554.4814,556.1014,566.5914,573.3714,581.6514,587.45

Printed On: 09/05/00

Page 10: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Rigbe's Lakeshore LandscapingQuarry Project. Income Detail 0 1/03/99 to 09/05/00

Page 2

17/12/99 17/12/99

f 12/99 Z4/12/99 31/12/99 31/12/99 31/12/99 31/12/99 07/01/00 07/01/00 07/01/00 07/01/00 14/01/00 14/01/00 14/01/00 14/01/00 14/01/00 21/01/00 21/01/00 21/01/00 21/01/00 21/01/00 28/01/00 28/01/00 28/01/00 28/01/00 04/02/00 04/02/00 14/02/00

'02/00 11/02/00 18/02/00

Bailey, Robert Kelly, Carry Kelly, Douglas Kelly, Garry Kelly, Douglas Kelly, Garry Powers, John Reid, John V. Kelly, Douglas Kelly, Garry Powers, John Reid, John V. Bailey, Robert Kelly, Douglas Kelly, Garry Powers, John Reid, John V. Bailey, Robert Kelly, Douglas Kelly, Garry Powers, John Reid, John V. Bailey, Robert Kelly, Garry Powers, John Reid, John V. Bailey, Robert Kelly, Garry Powers, John Reid, John V. Kelly, Garry Reid, John V.

5320 CPP 05/11/99 05/11/99 05/11/99 03/12/99 10/12/99 10/12/99 10/12/99 10/12/99 17/12/99 17/12/99 24/12/99 24/12/99 31/12/99 31/12/99 31/12/99 31/12/99 07/01/00 07/01/00 07/01/00 07/01/00 " ''01/00

ExpenseBailey, Robert Kelly, Garry Reid, John V. Reid, John V. Bailey, Robert Kelly, Douglas Kelly, Carry Reid, John V. Bailey, Robert Kelly, Garry Kelly, Douglas Kelly, Garry Kelly, Douglas Kelly, Garry Powers, John Reid, John V. Kelly, Douglas Kelly, Garry Powers, John Reid, John V. Bailey, Robert

36683670367936803684368536863687368936903691369236953696369736983699370137023703370437053706370737083709371437153716371737193725

362336243626365536583659366036623668367036793680368436853686368736893690369136923695

J624J626J649J650J658J659J660J661J678J679J680J681J694J695J696J697J698J703J704J705J706J707J715J716J717J718J736J737J738J739J746J763

J513J514J516J571J588J589J590J592J624J626J649J650J658J659J660J661J678J679J680J681J694

Amount6.865.431.433.436.61

15.4312.537.892.51

15.8610.709.838.066.55

16.677.65

13.5420.1611.0926.6216.1720.9614.5221.5012.4515.2822.3734.1319.6616.385.38

_ 2.62

476.72

3.9714.3311.39

1.439.065.417.465.045.804.821.193.044.12

13.609.936.670.09

17.3211.4810.546.74

Cumulative14,594.3114,599.7414,601.1714,604.6014,611.2114,626.6414,639.1714,647.0614,649.5714,665.4314,676.1314,685.9614,694.0214,700.5714,717.2414,724.8914,738.4314,758.5914,769.6814,796.3014,812.4714,833.4314,847.9514,869.4514,881.9014,897.1814,919.5514,953.6814,973.3414,989.7214,995.1014,997.72

15,001.6915,016.0215,027.4115,028.8415,037.9015,043.3115,050.7715,055.8115,061.6115,066.4315,067.6215,070.6615,074.7815,088.3815,098.3115,104.9815,105.0715,122.3915,133.8715,144.4115,151.15

Printed On: 09/05/00

Page 11: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

,3igbe's Lakeshore LandscapingQuarry Project. Income Detail 01/03/99 to 09/05/00

Page3

14/01/00' 1/01/00

.701/0014/01/0021/01/0021/01/0021/01/0021/01/0021/01/0028/01/0028/01/0028/01/0028/01/0004/02/0004/02/0004/02/0004/02/0011/02/0018/02/00

5330 WCB05/11/9905/11/9905/11/9903/12/9910/12/9910/12/99"1/12/99

712/9917/12/9917/12/9924/12/9924/12/9931/12/9931/12/9931/12/9931/12/9907/01/0007/01/0007/01/0007/01/0014/01/0014/01/0014/01/0014/01/0014/01/0021/01/0021/01/0021/01/0021/01/0021/01/0028/01/0028/01/0028/01/00

'01/00

Kelly, DouglasKelly, GarryPowers, JohnReid, John V.Bailey, RobertKelly, DouglasKelly, CarryPowers, JohnReid, John V.Bailey, RobertKelly, GarryPowers, JohnReid, John V.Bailey, RobertKelly, GarryPowers, JohnReid, John V.Kelly, GarryReid, John V.

ExpenseBailey, RobertKelly, CarryReid, John V.Reid, John V.Bailey, RobertKelly, DouglasKelly, GarryReid, John V.Bailey, RobertKelly, GarryKelly, DouglasKelly, GarryKelly, DouglasKelly, GarryPowers, JohnReid, John V.Kelly, DouglasKelly, GarryPowers, JohnReid, John V.Bailey, RobertKelly, DouglasKelly, GarryPowers, JohnReid, John V.Bailey, RobertKelly, DouglasKelly, CarryPowers, JohnReid, John V.Bailey, RobertKelly, GarryPowers, JohnReid, John V.

3696369736983699370137023703370437053706370737083709371437153716371737193725

3623362436263655365836593660366236683670367936803684368536863687368936903691369236953696369736983699370137023703370437053706370737083709

J695 J696 J697 J698 J703 J704 J705 J706 J 707 J715 J716 J717 J718 J736 J737 J738 J739 J746 J763

J513J514J516J571J588J589J590J592J624J626J649J650J658J659J660J661J678J679J680J681J694J695J696J697J698J703J704J705J706J707J715J716J717J718

Amount" 4.98

17.87 7.76

13.97 20.78 10.25 28.48 16.13 21.91 14.49 22.63 12.65 15.58 23.35 37.09 20.19 17.37 5.71

__274

467.36

CumulativeTsTl 56713 15,174.00 15,181.76 15,195.73 15,216.51 15,226.76 15,255.24 15,271.37 15,293.28 15,307.77 15,330.40 15,343.05 15,358.63 15,381.98 15,419.07 15,439.26 15,456.63 15,462.34 15,465.08

9.6134.1827.77

3.4722.4314.5017.7012.4014.6511.603.057.33

14.1232.9626.7816.875.34

36.0224.3022.3218.3114.8837.8417.3630.7545.7825.1860.4336.7047.6132.9648.8428.2734.72

15,474.6915,508.8715,536.6415,540.1115,562.5415,577.0415,594.7415,607.1415,621.7915,633.3915,636.4415,643.7715,657.8915,690.8515,717.6315,734.5015,739.8415,775.8615,800.1615,822.4815,840.7915,855.6715,893.5115,910.8715,941.6215,987.4016,012.5816,073.0116,109.7116,157.3216,190.2816,239.1216,267.3916,302.11

Printed On: 09/05/00

Page 12: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Rigbe's Lakeshore LandscapingQuarry Project. Income Detail 0 1/03/99 to 09/05/00

10 Page 4

04/02/00 ^4/02/00

,/02/OQ U4/02/00 11/02/00 18/02/00

Bailey, Robert Kelly, Carry Powers, John Reid, John V. Kelly, Carry Reid, John V.

371437153716371737193725

J736 J737 J 738 J739 J746 J763

Amount50.82 77.52 44.64 37.19 12.21

__5.95

1,065.36

Cumulative" i6,352.93

16,430.45 16,475.09 16,512.28 16,524.49 16,530.44

TOTAL EXPENSE 16,530.44

Printed On: 09/05/00

Page 13: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

C? f 0i a (3 1 c Q l

15-20m HM WP RO TA WA

Claim , 1077396

—/. — . — . — . -.Unepeneti'Road-Allowan,ee^betwveeiVUot'-2Q l8rL:^t-21 — - — ' 'J"

Page 14: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

33

NotesAll land within 120 metres of this site is Crown Land to which no tenure has been granted.

There are no buildings, or other land uses within 120 metres of this site. The entire area is natural, undeveloped land.

Contour interval: 5 metres (pre-approved by MMR) as per OBM mapping and spot elevations measured during 1998 field surveys

Major tree species

White Pine, WP Black Ash, BAWhite cedar, WC White birch, WB Ground Juniper, GP Red oak, ROScotch Pine, SP Basswood, BHard Maple, HM Ironwood, lGreen Ash, GA Yellow Birch, YBSilver Maple, SM Pincherry, P

Trembling Ash, TA Willows, W White oak, WO Staghorn Sumac, SS American Beech, AB Eastern Hemlock, EH Large Toothed Aspen, LA

The majority of the site is covered with a 10 -15 metre mixed ' and coniferous bush. (Majority species listed on plan.)

There are no significant man made features on or within 120 me site.

There are no existing excavation faces on the site. The test sa has been restored as per MN DM approval requirements.

Page 15: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Con VI Lot 22

15-20m HM WP RO TA WA

Con VI Lot 21

Shorelandetlao'd

Un0t9enetl";RQad tAllowancerbetweenrUot-20'8rL6t-21 — ' —

Page 16: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

vt- V L. V l r t1 o 7 s * i Cii y r

ACCOUMTWITH

ONTARIO LAND SURVEYORS - PLANNERS

To: Mr Prynr,

0/0 "III Flttgoraia

Box 122, 130 AlpineMo

LOK

#733;cd

Dot*-"tei

rjt

" W TV -il \t. M Mi W m ri

isti Remit To,

Huntsville Office '

Ktfc IN FULL FOR PROFESSIONAL SERVICES RENDERED, Including:

* MoDilteation and Demobilization; 6 hours @ J75.007hour...

field WOCK; it) nours @ ^/'S.OO/hour..,

* Pcsl p(oCf.---'-.'-i-r 4 hours @ J60.007hour...

/'ciioCod Cd -uuion; 2 h c-urs (^ ipOO.OO/liuui .

* P/.iii. ;c,if Rental

' Living Expanses...

j; 200 km ® 50.327km...

kl

^\4a'-A \̂. \ ^c*^

^^

Total.

y'% C3ST.

Amount Owing,..

T Kegietration #13576 0171

nx)

)**yrrwiiu

. UN PHI T ci-

r Service Charga Moji, ^ i\v\ 'j Box 420, 35; '(;trio Burk* Fulls. POA1CO (705) 362-23-

Page 17: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

--; l -E: ' RijHp[i C Jan.10 l998

UiiLv ! - v ' ^ v. U.M i T i :-y.ONTARIO LAMD 8URVUYORS ^ PUANMERS

TV. Mr, fc5;y*n Tomlinson oBos 122, "3ft A.'pfnis Or. Moonston*, ON LOK 1NO

irwoica:

Dato:

firtCM.ni

J',ru. r-,

P-" ''t To:

.sviiia Orfica i

FEE IN FULL FOR PROFESSIONAL SERVICES RENDERED, Including:

* Mobilization and Demobilisation; A hours @ S75.0CVhour...

':6 hours ^ ̂ 75"00 -'hour...

eb-Mng: 2 ho:.,"~ @ STjj.DO/ncur...

406km ;o? fcO.^/

TotaJ,

5 300,00

$1 l 200.00

? 150.00

S 450,00

7 0XoOST.

Total Amount

0171 RT'

du*——— -. . | oflnvoloii-- . — -

420, 3: Ourk* Pilli (705) -ifli ;, (Fax) 3BJ-,

yintwrlo Si-- N POA i..

Page 18: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Product potential: 1 6

Ontario's Infistructure has come to a point where there is a demand for new and upgraded Buildings, Highways, Small Roads, Parks. These are all areas where limestone can and will be used in grate abundance. We expect to be involved in the supply of limestone in all the above construction fields.

With the economic growth in Ontario the cities are sprouting new building and with limestone being the main structural material. The demand for this material has been on a steady rise for the last five years and it is projected to stay on this path .

Ontario Highways are under going a massive face lift. With the 407 getting extended and the 401 being refaced and extra lanes add. As well the 400 is under going investigation on how it can be improve.

Know that the townships have started amalgamation they have more money to spend on rural roads. Approx. S5 07o of all rural roads are tar and chip this is a very large market that we would like to get involved with. As well with retaining walls that are used to hold back ditch lines and other areas these are made out of over size limestone.

Ontario has Introduced lots of new parks into service in the passed year and are planning more in the future as well as renovations on old parks. Decorative rocks are one of the most natural ways the spruce up a park area. As well as the addition of new road into and out of the parks.

As the Ontario continue to improve its Infistructure the demand will continue to grow on mineral based products. We will be a large part of this growth.

Page 19: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

09'06 2000 WED 16:41 FAX 7U5 745 7326 M.J, DAVENPORT liCOl

M.J. Davenport Si Associates Ltd.CONSULTING ENGINEERS AND PLANNERS

MUHSAY J. DAVENPOR'iVP-Enj.

September 6, 2000

Edendcrry Aggregatesc/o Bryan Tomlinson Construction470 Robinson Road,R.R.No. l,Ennismore, ONKOL l TO

Attention: Mr. Bryan. Tomlinson

Re: Limestone Sample TestingBuckhorn Quarry No, 1077399 Project No. 96-D-1351

Dear Bryan,

We. hereby, confirm thatM J. Davenport & Associates Ltd. tested limestone samples from the Buckhorn Quarry No. 1077399 during 1998.\ ~~~""X

We are'wailabie to etjscuss this project at your convenience.

Yours tnu

1J, DAVENP'Ojto ASSOCIATES LTD.

Murray J. Daveaporc, P.Eng.

169 LANSDOWNE STRJEaT EAST -SUITE 101-PETERBOROUGH -ONTARIO -K9J 7P7 Telephone (705) 745-6676 -Fax (705) 745-732(5 - E-mail: [email protected]

Page 20: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Ministry ofNorthern Developmentand Mines

Declaration of Assessment Work Performed on Mining LandMining Act, Subsection 65(2) and 66(3), H.S.O. 1990

Transaction Number (office use)

Assessment Files Research Imaging

of subsections 65(2) and 66(3) of the Mining Act. Under section 8 of the' review the assessment work and correspond with the mining land holder.

Recorder, Ministry of Northern Development and Mines, 6lh Floor,

31D09NW2008 2.20363 HARVEY 900

Instructions: - For work performed on Crown Lands before recording a claim, use form 0240.- Please type or print in ink. fc~ O A O /^ O

td c- (O v/ O O O 1. Recorded holder(s) (Attach a list if necessary)Name . . ^^ t

lvl . L "j j -

Address

6X6 *r? 1 1 J -*~ -d tz i der r y LI ne.f

En*MS"*ore O^-h . KOt- 1TOName -

Address

T 1 -J r\ l C7*vj i //7 J ty o

^"t?^n c'epS'y' / *Vi c

fW*r*wc O*t KOLlTO

Client Number

3O3 LI 83-Telephone Number

V^TfFax Number

Client Number30^ 1431

Telephone Number70S- 7 HO - V^//

Fax Number

2. Type of work performed: Check ( v ) and report on only ONE of the following groups for this declaration.

r jxphysical: drilling, stripping, t—l trenchino and associated a

Geotechnical: prospecting, surveys, l—l assays and work under section 18 (regs) trenching and associated assays f~|. Rehabilitation

Work

Q/ O k ft To J QDay Month | Year Day | Month | Year

Office UseCommodity

Total S Value of Work Claimed

. -. , 3 O . ** O l

NTS Reference

Global Positioning System Data (if available) Township/AreaMining Division M

M or G-Plan Resident Geologist District

Please remember to: - obtain a work permit from the Ministry of Natural Resources as requi- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for a- include two copies of your technical report.

3. Pereon or companies who prepared the technical report (Attach a list if necessary)Name Telephone Number

Address Fax Number

NameSac,Address

Telephone Number

rax Number

Name

tr.3\ lOilltflmS Sufoe^iTelephone Number

Address

4- -i-Fax Number-7(95-

4. Certification by Recorded Holder or Agent

l, ' H(f / o** , do hereby certify that l have personal knowledge of the facts seti j i(Print Name)

forth in this Declaration of Assessment Work having caused the work to be performed or witnessed the same during or after its completion and, to the belst of my knowledge, the annexed report is true.Signature of Recorded

Agent's Addr

^70

Date ,

1 1/1*Xgy Telephone Number Numb

Page 21: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

d5/18/2332 7252326171 PAGE 82

S. Work to b* recorded and dlstrlbuled-Jflfttflrttiri only be assigned to claims thai are contiguous (adjoining) to tha rnming land where work was performefTat the time work was performed. A map showing the contiguous link

Mining Claim Number. Or if work was dona on other eligible mining land, show in thin column itw location number Indlceiad on the claim map

•geg99i2

3

4

5

6

7

e9

10

11

12

13

14

15

TB 7627

1234567

1234568

/on^g —foizwe—

/2Z966,i/JL3-73/3

-4^^^-H- —l i ill 1 *5iH-iS/b/23T3n/A3~?3/?2*73)7/25-J330/2.573i/M3-RZ^

-

Number ol Claim Unlli. For other mining land, lin hectarej.

16 ha

12

2

-Ly

{•4T ——— fV;/2.

^2.z.

f

Column Total*

Value of work performed on this claim or other mining land

S26, 825

0

S B. 892

itoHil.Cft e- S

cfo(*-looo

ooo0

0

Ay-teiaL

Value of work applied lo (hit claim.

N/A

424.000

4 4.000

/dOQ.OO

~ /6oo "a •SPoa.crJ

./(•oo w-76. ee^-

1 U. oo 0^/^oo.oo

(^X), oa^CbCQ

/600- odffcoo. 0®

/(oOO oQ/b00 0f)

"

/-S.'rtoO.rf0

Value or workceetgned to other mining claims.

S24.000

0

0

/(e,, Sroo.00Hr-o-OoOO

0oo00

/6,Vto**..

Bank. Value of work to b* dlelribuled at a Mure dalt.

S2.825

0

S4.892

'.2031.99?T"o—— ̂ — o"O

o©oofto

#031 99

, do hereby certify that the above work credits are eligible underl (Prlnl Full Ntmtt

subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application tothe claim whhare th was done.Signature Agent AutNorlzed in Writing .*mv

5/9/3D

6. Instruction* for cutting back credits that are not approved.

Some of Ihe credits claimed in this declaration may be cut back. Please check ( *- ) in the boxes below lo show how

you wish to prioritize the deletion of credits:

D 1. Credits are to be cut back from tha Bank first, followed by option 2 or 3 or 4 as indicated.

G 2. Credits are to be cut back starting with the claims listed last, working backwards; or

[i3 3 . Credits are to be cut back equally over all claims listed in this declaration; or

O 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):

Nole: If you have not indicated how your credits are to be deleted, credits will be cut back from the Bank first, followed by option number 2 If necessary.

For Office Us* OnlyReceived Stomp Deemed Approved Dale Data Nollflcallen Sent

Z . 203 63

MflY 18 '00 12

Dale Approved Total valin ol C redit Approved

Approved tor Recording by Mining Recorder (Signature)

7052926171 PRGE.02

Note: If you have not indicated how your credits are to be deleted, credits will be cut back from the Bank first, followed by option number 2 if necessary.

For

t (02/96)

^ ^j ̂

Deemed Approved Date

Date Approved

Date Notification Sent

Total Value of Credit Approved

Approved for Recording by Mining Recorder (Signature)

Page 22: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Ontario Ministry ofNorthern Developmentand Mines

Statement of Costs for Assessment Credit

Transaction Number (office use)

Personal information collected on this form is obtained under the authority of subsection 6(1) of the Assessment Work Regulation 6/96. Under - section 8 of the Mining Act, the information Is a public record. This information will be used to review the assessment work and correspond with the mining land holder. Questions about this collection should be directed to the Chief Mining Recorder, Ministry of Northern Development and Mines, 6lh Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E 6B5. ^SV C (\ O ^ r\±

" ' ' '

Work TypeUnits of Work

Depending on the type of work, list the number of hours/days worked, metres of drilling, kilo metres of grid line, number of samples, etc.

Cost Per Unit of work

Total Cost

3 Wo. 00 '

Associated Costs (e.g. supplies, mobilization and demobilization).

-10- CO

RECEIVED4^ or

QEOSCICNCC A.G5ESSTransportation Costs OfFICE

Food and Lodging Costs

Total Value of Assessment Work

Calculations of Filing Discounts:

1. Work filed within two years of performance is claimed at lOO'Vh of the above Total Value of Assessment Work.2. If work is filed after two years and up to five years after performance, it can only be claimed at 50Vo of the Total

Value of Assessment Work. If this situation applies to your claims, use the calculation below:TOTAL VALUE OF ASSESSMENT WORK x 0.50 Tola! S value of worked claimed.

Note:- Work older than 5 years is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in this statement of costs within 45 days of a request for verification and/or correction/clarification. If verification and/or correction/clarification is not made, the Minister may reject all or part of the assessment work submitted.

Certification verifying costs:

j___________ , do hereby certify, that the amounts shown are as accurate as may(please print lull name)

reasonably be determined and the costs were incurred while conducting assessment work on the lands indicated on

the accompanying Declaration of Work form as M( fi*

to make this certification.(recorded holder, agent, or state company position with signing authority)

l am authorized

Page 23: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Ministry of Ministere duNorthern Development Developpement du Nordand Mines et des Mines Ontario

Geoscience Assessment Office 933 Ramsey Lake Road

September 27, 2000 6th FloorSudbury, Ontario

MIKE GEORGE TOMLINSON P3E 6B5686 EDENDERRY LINEENNISMORE, ONTARIO Telephone: (888) 415-9845KOL-1TO Fax: (877)670-1555

Visit our website at: www.gov.on.ca/MNDM/MINES/LANDS/mlsmnpge.htm

Dear Sir or Madam: Submission Number: 2.20363

Status Subject: Transaction Number(s): W0090.00044 Approval After Notice

We have reviewed your Assessment Work submission with the above noted Transaction Number(s). The attached summary page(s) indicate the results of the review. WE RECOMMEND YOU READ THIS SUMMARY FOR THE DETAILS PERTAINING TO YOUR ASSESSMENT WORK.

If the status for a transaction is a 45 Day Notice, the summary will outline the reasons for the notice, and any steps you can take to remedy deficiencies. The 90-day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, will no longer be in effect for assessment work which has received a 45 Day Notice. Allowable changes to your credit distribution can be made by contacting the Geoscience Assessment Office within this 45 Day period, otherwise assessment credit will be cut back and distributed as outlined in Section #6 of the Declaration of Assessment work form.

Please note any revisions must be submitted in DUPLICATE to the Geoscience Assessment Office, by the response date on the summary.

If you have any questions regarding this correspondence, please contact LUCILLE JEROME by e-mail at [email protected] or by telephone at (705) 670-5858.

Yours sincerely,

ORIGINAL SIGNED BYSteve B. BeneteauActing Supervisor, Geoscience Assessment OfficeMining Lands Section

Correspondence ID: 15275

Copy for: Assessment Library

Page 24: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Work Report Assessment Results

Submission Number: 2.20363

Date Correspondence Sent: September 27, 2000 Assessor: LUCILLE JEROME

First Claim Number

1077399

Township(s) l Area(s)

HARVEY

Status

Approval After Notice

Approval Date

September 27, 2000

Transaction Number

W0090.00044

Section:12 Geological GEOL 10 Physical PSTRIP

The revisions outlined in the Notice dated August 10, 2000 have not been fully corrected. Costs were incurred to strip, remove and ship the sample to Davenport S Associates. We have not received any sample result from those costs. As a result, a total of 2507o of the physical work costs have been reduced from this submission.

The assessment credit is being reduced by 34,037.00. The TOTAL VALUE of assessment credit that will be allowed, based on the information provided in thissubmission, is S16,394.00.Assessment work credit has been redistributed, as outlined on the attached Distribution of Assessment Work Credit sheet, to better reflect the value of the work.

Correspondence to:

Resident Geologist Tweed, ON

Assessment Files Library Sudbury, ON

Recorded Holder(s) and/or Agent(s):

MIKE GEORGE TOMLINSON ENNISMORE, ONTARIO

BRYAN MICHAEL TOMLINSON ENNISMORE, ON

Page: 1

Correspondence ID: 15275

Page 25: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590

Distribution of Assessment Work Credit

The following credit distribution reflects the value of assessment work performed on the mining land(s).

Date: September 27, 2000

Submission Number: 2 .20363

Transaction Number: W0090.00044

Claim Number Value Of Work Performed

1077399 16,394.00

Total: $ 1 6,394.00

Page: l

Correspondence ID: 1 5275

Page 26: WORK ASSESSMENT RPT FOR CLAIM 1077399€¦ · j694 j695 j696 j697 j698 j703 j704 j705 j706 j707 j715 j716 j717 j718 j736 j737 j738 j739 j746 j763 j513 j514 j516 j571 j588 j589 j590