Wonder World Equipment Manufacturer 350-1421 · Wonder World Pre-Consumer Recycled Content (lbs)...
Transcript of Wonder World Equipment Manufacturer 350-1421 · Wonder World Pre-Consumer Recycled Content (lbs)...
Equipment Manufacturer
350-1421
Wonder World
Equipment Manufacturer
350-1421
Wonder World
05' 10'
DATE:
SCALE:PROJECT NO:
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
6,53M x 4,29M x 2,26M
10,37M x 8,08M
64,29 SqM. 29,87M
1,04M
11
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
05' 10'
DATE:
SCALE:PROJECT NO:
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
6,53M x 4,29M x 2,26M
10,37M x 8,08M
64,29 SqM. 29,87M
1,04M
11
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
DATE:
SCALE:
DRAWN BY:
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
(112"
(144"
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
1
2
4
"
1
2
4
"
1
2
4
"
1
2
4
"
1
2
4
"
1
2
4
"
1
2
4
"
1
2
4
"
36"
36"
36"
48"
72" 36"36"
16"
21"
7"
17"
37"
137"
32"
41"
16"
25"
51"
5"
19"
16"
58"
29"
7"
6"
2"
35"
123"
8"
47"
TRANSFER
STATION
W/ STEP
RIBBON
CLIMBER
90°
GLIDE
SLIDE
ARCH
BRIDGE
DEEP RUNG
ARCH CLIMBER
NUVO
36" (915mm)
DOUBLE SLIDE
145"
135"
130"
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
FOOTING LEGEND
1
1
2
"
1
8
5
0
Z
Z
C
H
1
4
4
"
G
Z
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
WO
ND
ER W
OR
LDC
AT
AL
OG
P
RE
-D
ES
IG
N
350-1421C 1/4"=1'-0"
M. MERTZ
04-OCT-16
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
Posts
ZZCH0018 81 3.5in OD x 124in STEEL POST W/RIVETED CAP
Decks & Kick Plates
ZZCH0616 12 SQUARE COATED DECK ASSEMBLY
ZZCH0636 13 DOUBLE SLIDE COATED DECK ASSEMBLY
ADA Items
ZZCH2007 14 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
ZZUN2019 15 APPROACH STEP FOR TRANSFER STATION
Slides
ZZCH3129 16 90 DEGREE GLIDE SLIDE (36in DECK)
ZZCH3538 17 NUVO 36in DOUBLE SLIDE
Activity Panels
ZZCH4290 18 POST MOUNTED STEERING WHEEL
ZZCH4399 19 ACCESSIBLE PLANE PANEL
ZZCH4446 110 SLIDE-N-LEARN PANEL
Climbers
ZZCH7400 111 DEEP RUNG ARCH CLIMBER (36in DECK)
ZZCH8289 112 RIBBON CLIMBER (36in DECK)
Bridges
ZZCH6595 113 6ft ARCH BRIDGE
Additional Tool & Maintenance Kits
ZZCHGUID 114 CHALLENGER GUIDELINES
ZZUN9910 115 SURFACING WARNING LABEL KIT
ZZUN9930 116 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
Part No. Description
Design Number: 350-1421C - Bill Of Material
Wonder World
Ref.No. Quantity
Tuesday, October 04, 2016 Page of1 1 Playworld.com
CertifiedZZCH00181 3.5in OD x 124in STEEL POST W/RIVETED CAP
8 311.28 430 0 8.00 1.00 0
CertifiedZZCH06162 SQUARE COATED DECK ASSEMBLY 1 54.86 174 3 1.00 0.00 0
CertifiedZZCH06363 DOUBLE SLIDE COATED DECK ASSEMBLY1 63.86 185 3 1.00 0.00 0
CertifiedZZCH20074 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
1 148.40 310 2 2.00 0.09 0
CertifiedZZUN20195 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0
CertifiedZZCH31296 90 DEGREE GLIDE SLIDE (36in DECK)1 96.73 418 2 2.00 0.03 1
CertifiedZZCH35387 NUVO 36in DOUBLE SLIDE 1 157.29 683 2 2.00 0.06 1
CertifiedZZCH42908 POST MOUNTED STEERING WHEEL 1 7.83 44 1 0.25 0.00 1
CertifiedZZCH43999 ACCESSIBLE PLANE PANEL 1 22.67 212 1 0.50 0.00 1
CertifiedZZCH444610 SLIDE-N-LEARN PANEL 1 57.80 516 1 1.00 0.00 1
CertifiedZZCH740011 DEEP RUNG ARCH CLIMBER (36in DECK)1 76.46 170 2 2.00 0.06 1
CertifiedZZCH828912 RIBBON CLIMBER (36in DECK)1 35.02 101 2 1.50 0.06 1
CertifiedZZCH659513 6ft ARCH BRIDGE 1 183.35 415 2 1.50 0.00 1
N/AZZCHGUID14 CHALLENGER GUIDELINES 1 0.00 1 0 0.25 0.00 0
CertifiedZZUN991015 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993016 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 90
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1421C - Compliance and Technical Data
Wonder World
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
172 334 3,820 22 24.25 1.341,251.43 8Totals:
4 Metric Tons150 Kg77 Kg563.14 Kg 1.02 m3
Tuesday, October 04, 2016 Page of1 2 Playworld.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1421C - Compliance and Technical Data
Wonder World
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 350-1421C, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Tuesday, October 04, 2016 Page of2 2 Playworld.com