Wolverhampton Canalside Quarter
Transcript of Wolverhampton Canalside Quarter
Wolverhampton Canalside Quarter
December 2000
Contents Page
1.0 Introduction 1
2.0 Background 3
3.0 Vision for the Quarter 7
4.0 Proposals 10
5.0 Implementation 19
6.0 Delivery Mechanisms and Funding 33
7.0 Sustainability 39
Appendices (bound separately) Appendix A: Baseline Information Report and Emerging Options Summary
Appendix B: Infrastructure and Environment Projects
Appendix C: Development Opportunities
Appendix D: Sustainability Audit
List of Plans after page
Sub-area Plan 8
Overall Masterplan 10
Highway Improvements 12
Pedestrian/Cyclist Realm 13
and Public Spaces
Canal Corridor 16
Conservation Area and Listed Buildings 18
Development Opportunities 18
Wolverhampton Canalside Quarter
December 2000
Appendix B:
Project Costing Schedule Project Control Forms
4.0 Proposals 4.1 This section of the report describes and explains key features of the overall
Implementation Masterplan, linking the Vision with the Implementation Programme
and the priorities for action.
Land Use 4.2 The pattern of land use envisaged is shown on Plan (x) and represents a long-term
prospect for the Canalside Quarter as a whole. These proposals set out a significant
change of direction in land use terms from the area’s predominantly industrial past,
introducing a new mix of residential, leisure and commercial activities in the area as a
whole. However this does not imply a mix of uses within all development
opportunities throughout the area – the various Character Areas have different mixes
of proposals and we have identified the potential principal land uses whilst welcoming
ancillary supporting uses appropriate to their particular situation.
4.3 In broad terms the proposed mix of uses is as follows:
4.3.1 Northern Area:
• commercial main road frontage uses fronting Stafford Street / Ring Road
• residential led redevelopment of Carvers’ site with ancillary commercial / leisure uses
4.3.2 Eastern Area:
• residential-led mixed-use redevelopment and refurbishment of Springfield Brewery and
adjoining land
• a mix of business / industry / leisure immediately north of Wednesfield Road
• a new leisure pool and associated leisure uses on the former Low Level Station site,
• OR a mix of small scale commercial / leisure proposals
(note, further discussion is needed to determine the choice of direction on this site)
• an opportunity to consolidate Royal Mail transport operations south of Sun Street
4.3.3 Southern Area:
• a new mix of residential, business, leisure and commercial uses alongside the canal
between Corn Hill and Union Mill Street
• business frontage to Horseley Fields
• small scale industry / workspace, at Limekiln Wharf and Minerva Wharf and alongside the
canal east of Albion Mill, including canal-related uses
4.3.4 Station Area
• a range of commercial, leisure and retail uses focussing on a new Station forecourt and
the canal
4.4 In devising this mix of uses the following have also been considered and rejected:
Major food / non-food retail. - This would be contrary to the wider town centre and
retail policy of the Council, and whilst it would bring significant investment to specific
locations there are alternative opportunities in and adjoining the town centre which
better meet the relevant policy criteria.
4.5 Large-scale heritage led leisure proposal. – Whilst aspirations have been expressed
for such a scheme, no market has been identified and the capital and revenue
implications for public funding support would be excessive. The prospect of a
scheme cross-funded from a high value retail development faces the policy problems
noted above.
4.6 Large-scale commercial leisure – The recent experience of market failure for a major
commercial leisure proposal on the Low Level Station site indicates that such a
scheme would not currently be achievable.
4.7 Quite clearly the Council will need to look flexibly at viable development proposals
where these come forward. Uses such as factory outlet shopping do not readily fit
traditional concepts of retail development and such use may run contrary to the
interpretation of policy to date. Indeed there will need to be a full and thorough
assessment of these ideas before the Council can commit to accept such use. The
additional regeneration benefits that may arise will be a factor in their positive
consideration.
Movement and Linkages
4.8 Canalside Quarter currently suffers from much that is negative in terms of
transportation and movement, despite its location alongside the town centre, Ring
Road and radial routes and the presence of the station. These key components of
the town’s transportation infrastructure sever the area and take people through and
past it rather than contributing to its life and regeneration. Nonetheless they provide
the potential for significant improvement. The proposals address these problems with
a comprehensive approach and programme of action.
Eastern Area
Implementation Approach 5.18 The Eastern Area requires early commitment to a comprehensive regeneration
framework for phased implementation of its two principal development opportunities,
Low Level Station and Springfield Brewery. There is a clear need to enhance market
perception particularly in relation to Springfield Brewery, and to radically improve
linkages within and into the area.
5.19 Therefore whilst there are two priorities for development opportunities, there will need
to be catalytic action on linkages and environment to assist these in coming forward.
5.20 A private sector residential – led mixed-use programme for Springfield Brewery needs
the confidence of comprehensive access and environmental improvements and land-
use restructuring between the Brewery and Wednesfield Road. This entails
relocation of the Council Depot, realignment of Culwell Street from an improved
junction with Wednesfield Road, and relocation of the cash and carry warehouse site
to permit residential / business redevelopment. New leisure / business opportunities
will also emerge close to Wednesfield Road and as part of Springfield Brewery
through this initiative.
5.21 Enhanced pedestrian linkages with the canal, the adjoining Springfield area and the
town centre via Lock Street are essential. Whilst the former two can emerge in due
course from development proposals, the link to Lock Street is an essential
prerequisite to promote development, and may require firm action to secure the
necessary alignment.
5.22 The future use of Low Level Station site remains undetermined. Options have been
identified. Its redevelopment will depend on a firm commitment from all parties to
whatever direction is pursued. Central to whatever option is followed is the need to
enhance the links to the town centre via the station underpass, Wednesfield Road,
and Corn Hill, and to secure sensitive refurbishment and re-use of the historic
buildings. The range of implementation actions will then depend on the direction
chosen. However it is clear that whilst linkages to the High Level Station will be very
important for this development they will not of themselves secure the regeneration of
this site.
Development Opportunities
5.29 The principal development opportunities are:
• Low Level Station site – currently two broad options
• Springfield Brewery and adjoining lands – residential led mixed-use refurbishment
and redevelopment ( with some leisure / business elements)
• Springfield Cash and Carry site – residential / business redevelopment
• Railway cutting north of Wednesfield Road – reclamation for leisure / commercial /
business development
• Council Depot site – clearance and redevelopment for leisure / commercial business
development
5.30 In phasing terms successful redevelopment of the railway cutting and council depot
sites would complement the infrastructure works in promoting the major
redevelopment and refurbishment of the Springfield Brewery.
5.31 Redevelopment of land to the east of Cambridge Street currently occupied by a
building contractor and petrol filling station would provide an opportunity for
comprehensive new housing development to link the Brewery site with the adjoining
residential area. This would need business relocations and would be a later phase of
the regeneration programme, linked with enhancement of public space on Cambridge
Street.
5.32 Independent of the above an opportunity exists south of Sun Street to consolidate
Royal Mail vehicle operations in conjunction with regeneration initiatives in the
Southern area off Horseley Fields.
Northern Area
Implementation Approach
5.33 This Character Area does not require the early direct intervention needed elsewhere
in the Quarter, but useful benefits can ensue from selective action in the medium term
and a commitment to fundamental change in the longer term. The approach to
regeneration seeks to deliver higher quality frontage commercial redevelopment on
the Stafford Street and Ring Road frontages, an opportunity for improved public
transport links to the town centre from the north and enhanced pedestrian / cycle
linkages to the Springfield area.
3 Vision for Eastside Quarter
The Vision The indicative Masterplan presents the framework of a vision for the Eastside Quarter designed to promote the comprehensive economic and physical regeneration of this important area. The regeneration of Eastside Quarter can provide an enhanced strategic function for this sector of the town and can heal the severance between the town centre and the adjoining communities to the east. The overall vision is of an area with: • A new economic role in relation to the town centre embracing business, residential and
leisure activity in a series of linked but distinct character areas • A wider range of land uses and attractive development opportunities • An attractive canal and canalside environment as an integral part of the economy and life
of the town • An enhanced strategic role for the Station • Sensitively restored historic buildings in economic use • Good quality new development • An improved public realm environment with a strong and positive sense of place and
identity • Improved linkages both into and through the area especially for cyclists and pedestrians • Opportunities for future change and improvement This vision is the basis for the range of projects and priorities that form the Implementation Programme that complements the Masterplan. It is a vision of what might be achieved in the long term, recognising that not all its elements will be delivered at the outset, but that there needs to be a strong commitment to the overall direction from the outset.
Structure of the Quarter An understanding of the structure of the area is fundamental to securing its regeneration. The Canalside Quarter is not a homogenous area of uniform character. Whilst there are significant problems, issues and opportunities to be addressed across the area as a whole and in relation to the wider town centre, it is also necessary and helpful to highlight its different character areas as a basis for the practical regeneration proposals which are set out in this report. The Canalside Quarter can be subdivided into four principal Character Areas, each with a unique identity. These provide areas of manageable scale and complexity, substantially defined by the strong physical barriers that are a feature within the Quarter. The four Character Areas, shown on plan (x) are: Northern Area Southern Area Eastern Area Station Area At present these areas are distinctly separate in their location, function and interaction. A fundamental objective of the masterplan and implementation programme is to strengthen the linkages between the areas whilst enhancing both their individual identities and the identity of
the Quarter as a whole. This will lead to redefinition of spatial relationships within the area, most notably in relation to the Station and its surroundings. In addition the canal is a linking theme running through the Quarter’s four Character Areas, with differing relationships to its surroundings along its whole length. The masterplan and implementation programme will enhance its operational, development and environmental roles as an integral part of the area’s regeneration.
Wider Relationships The future of this area is not seen solely in terms of how the Character Areas are each developed, but more broadly in terms of how the Canalside Quarter relates to the town centre as a whole and the communities to the east. To this end the vision is set within a wider framework of policies for Wolverhampton. These policies are themselves under review and it is intended that this study will inform this wider review as appropriate.
Character Area Futures The long-term futures envisaged for the four Character Areas can be summarised as follows: Northern Area: A prestigious northern gateway for the town centre with high quality commercial main road frontage developments, and a mix of residential and leisure uses creating an new relationship with the canal. Southern Area An area of mixed-use activity, combining small-scale residential, leisure and employment uses in a restored fine grained historic environment centred on the canal. Eastern Area A newly formed residential and commercial area combining large-scale redevelopment and re-use of historic buildings with a framework which links it into both the town centre and the adjoining residential community. Station Area A redesigned major integrated public transport hub with new linkages into adjoining areas and new opportunities for commercial development. These broad objectives, and the steps needed to achieve them, are described and amplified in the sections that follow.
WOLVERHAMPTON CANALSIDE QUARTER
Implementation Plan
December 2000 Document no: 1654/03 Taylor Young Urban DesignCompiled by: PS The StudioApproved by: SG 51 Brookfield RdDate: 20/12/00
Cheadle
Cheshire SK8 1DQ
Tel: 0161 428 0616
Fax: 0161 491 0972
E mail: [email protected]
Wolverhampton Canalside Quarter Section 1.0 Introduction
December 2000 1
1.0 Introduction
The Brief
1.1 In April 1999 a consultancy team of Taylor Young Urban Design, GVA Grimley, and
Mott MacDonald was appointed to prepare an Implementation Plan and Programme
for the Wolverhampton Canalside Quarter. The client team for this study comprises
Wolverhampton Metropolitan Borough Council, Advantage West Midlands, and British
Waterways.
1.2 The brief set out the requirement for a plan and programme for the Canalside Quarter
“which will encourage a wide mix of sustainable uses, particularly housing and
including leisure attractions and business, secure improvements to the environment
and appropriate infrastructure, and achieve high quality urban design architecture and
environment.” The client team wished to recognise the importance of the canal
corridor as a regeneration mechanism for Wolverhampton.
1.3 To this end key elements of the consultants’ work were identified as follows:
• To identify of those development, infrastructure and environment projects
essential to the creation of the quarter
• To prioritise, cost and provide a programme of key projects, with further
information on such areas as land assembly, constraints, and potential funding
sources
• To provide a planning and development framework to guide both the initial priority
projects and subsequent schemes
• To make recommendations as to the most appropriate form of delivery vehicle to
ensure programme implementation
The Structure of this Report
1.4 Following this introduction the report is divided into a further six sections.
• Section 2 provides background context
• Section 3 introduces a coherent Vision for the area as a whole and for its
individual Character Areas
• Section 4 describes the principal proposals in relation to the Vision and overall
masterplan.
Wolverhampton Canalside Quarter Section 1.0 Introduction
December 2000 2
• Section 5 sets out the Implementation Programme, including key priorities and
actions
• Section 6 reviews and recommends possible delivery mechanisms and funding
• Section 7 addresses issues of sustainability
• The appendices provide additional information in relation to
• the Baseline analysis (Appendix A)
• infrastructure and environment projects (Appendix B)
• development opportunities (Appendix C)
• sustainability matrix (Appendix D)
Wolverhampton Canalside Quarter Section 2.0 Background
December 2000 3
2.0 Background
The Quarter at present
2.1 The Canalside Quarter covers an area of approximately 40 hectares immediately
outside the Ring Road to the north east of the town centre. It is dominated by
transport infrastructure, the present railway line and station, a former rail station (Low
Level Station), the canal traversing its length and a number of major roads. Together
these elements represent strong physical barriers both to movement within the area
and to the development of a coherent character for the area as a whole.
2.2 It is an area of considerable potential with opportunities for a wide range of
regeneration initiatives, building on its historic industrial and transportation character
and infrastructure and its location on the edge of the town centre. However at
present it suffers badly from a spiral of economic decline, with a lack of investment,
site and building dereliction, poor environmental quality and inadequate linkages both
within and into the area. The perception of the area is poor in terms of investment,
environment, and safety.
2.3 The Canalside Quarter is characterised by diversity, and it is useful to consider it not
solely as a single area but also through its distinct sub-areas. These are shown on
Plan 1 and are addressed at various stages through the report.
2.4 The canal, running through the entire length of the quarter is a valuable asset. The
northern section is at present well maintained and pleasantly landscaped, whilst the
southern half appears somewhat run down reflecting the run-down industrial nature of
the surrounding land uses. The canal offers the potential to be developed as a green
heart to the Quarter, offering leisure and recreation opportunities and attraction for
other land uses such as residential/small business developments. The canal and
towpath, for much of its course is poorly connected to the rest of the Quarter but it
does have the potential to promote movement through the Quarter. Steps are
recommended within this report for both the improvement of existing linkages and the
creation of new linkages.
2.5 The present railway station has an important national and commuter role within the
railway network. It lacks the physical and ancillary facilities that might be expected
with a station of this significance, and is very poorly connected with the remainder of
the Quarter. The physical connection with the town centre is direct and good in parts,
but overall in qualitative terms it fails to provide a gateway setting.
Wolverhampton Canalside Quarter Section 2.0 Background
December 2000 4
2.6 In the east of the area there are two substantial vacant sites with landmark buildings,
Low Level Station and Springfield Brewery. Both have significant disused listed
buildings and new development opportunities for which the challenge is to find viable
modern day uses which are compatible with the preservation of their architectural
merit.
2.7 In the southern section of the Quarter, the fine-grained Victorian industrial heritage of
the area can also be seen. Economic decline and change has led to high levels of
dereliction within the area, together with a generally poor and hostile environment
with reduced levels of economic activity.
2.8 The northern part of the area is the most successful economically, with the potential
for improvements and developments to form a prestigious northern gateway to the
town centre.
2.9 There is also a range of issues that relate to the Quarter as a whole. These have
been reviewed in preparing the background to this report and are covered the
Baseline assessment in Appendix (A) which is bound separately.
Policy Context
2.10 The Canalside Quarter cannot be considered in isolation but within the context of
wider issues within the town centre and beyond, integrating with existing national and
local policy.
2.11 At the national level the agenda is now being set by the Urban Task Force Report,
‘Towards an Urban Renaissance’ which recommends a series of best practice
guidelines for securing and sustaining regeneration, including the fields of:
• Managing land supply
• Designing the urban environment
• Managing the urban environment
• Delivery of urban regeneration
• Sustainable movement patterns
• Recycling land and buildings
• Investing in skills and innovation
2.12 Whilst these recommendations are not yet formally government policy they reflect
current trends in regeneration thinking and are of direct relevance to the Canalside
Quarter Implementation Plan.
Wolverhampton Canalside Quarter Section 2.0 Background
December 2000 5
2.13 Wolverhampton Borough Council’s policies of principal relevance to the area are
found in:
• Unitary Development Plan
• Town Centre Action Plan,
• St John’s Urban Village,
• LA21 sustainability strategy
2.14 Also of importance are the emerging Local Transport Plan, the investment strategy of
Advantage West Midlands, the Regional Development Agency, and Wolverhampton
MBC’s Economic Development Plan, each of which will have considerable impact on
resource allocation.
2.15 One of the most significant components of relevant planning policies concerns the
mix of uses that will be acceptable within the Quarter, and the area’s role with the
Town Centre as a whole. Wolverhampton MBC is currently reviewing its Town
Centre Action Plan, which includes the Canalside Quarter, with particular attention
being given to retail opportunities and pressures in and around the Town Centre.
That exercise has indicated a strong commitment to meet retail pressures (both food
and non-food) on sites elsewhere in the Town Centre and not in the Canalside
Quarter.
2.16 The Union Mill Conservation Area is designated in recognition of the historic industrial
significance of the area. It is currently the subject of a Heritage Economic
Regeneration Scheme (HERS), following a successful bid for funding in 1999. This
report integrates the aims of this HERS submissions with a recognition that a
reassessment of the role and boundaries of the Conservation Area may be required
so as to maximise conservation opportunities.
2.17 St John’s Urban Village is a recently established commitment to housing led
regeneration in the southern part of the town centre within the Ring Road. Whilst this
does not have direct planning policy implications for Canalside Quarter it may impact
upon the market and resources for certain housing developments.
2.18 The Local Transport Plan replaces the previous West Midlands TPP, and further
endorses the priority shift in policy and resources towards public transport provision
and enhancement. It contains important commitments to improve public transport
corridors through this part of the town, and also to strengthen the integration of public
transport and pedestrian movements at the edge of the town centre.
Wolverhampton Canalside Quarter Section 2.0 Background
December 2000 6
2.19 Wolverhampton MBC and the former English Partnerships have established the
Wolverhampton Investment Strategy which seeks to identify priorities for regeneration
investment in the Borough as a whole. This document highlights Springfield Brewery,
Steam Mill / Corn Hill and Low Level Station site as local priorities for public sector
investment. This document will in due course be superseded by strategies developed
as part of the establishment by Advantage West Midlands of the North Black Country
and south Staffordshire Regeneration Zone, which includes the Canalside Quarter
area.
Wolverhampton Canalside Quarter Section 3.0 Vision for the Quarter
December 2000 7
3.0 Vision for the Quarter
The Vision
3.1 The indicative masterplan presents the framework of a vision for the Canalside
Quarter designed to promote the comprehensive economic and physical regeneration
of this important area. The regeneration of the Canalside Quarter can provide an
enhanced strategic function for this sector of the town and can heal the severance
between the town centre and the adjoining communities to the east.
3.2 The overall vision is of an area with:
• A new economic role in relation to the town centre embracing business,
residential and leisure activity in a series of linked but distinct character areas
• A wider range of land uses and attractive development opportunities
• An attractive canal and canalside environment as a focus for development and an
integral part of the economy and life of the town
• An enhanced strategic role for the High Level Station
• Sensitively restored historic buildings in economic use
• Good quality new development
• An improved public realm environment with a strong and positive sense of place
and identity
• Improved linkages both into and through the area especially for cyclists and
pedestrians
• Opportunities for future change and improvement
3.3 This vision is the basis for the range of projects and priorities that form the
Implementation Programme that complements the masterplan. It is a vision of what
might be achieved in the long term, recognising that not all its elements will be
delivered in the short term, but that there needs to be a strong commitment to the
overall direction from the outset. It has been produced after extensive examination of
development options and market testing.
Structure of the Quarter
3.4 An understanding of the structure of the area is fundamental to securing its
regeneration.
Wolverhampton Canalside Quarter Section 3.0 Vision for the Quarter
December 2000 8
3.5 The Canalside Quarter is not a homogenous area of uniform character. Whilst there
are significant problems, issues and opportunities to be addressed across the area as
a whole and in relation to the wider town centre, it is also necessary and helpful to
highlight its different character areas as a basis for the practical regeneration
proposals which are set out in this report.
3.6 The Canalside Quarter can be subdivided into four principal Character Areas, each
with a unique identity. These provide areas of manageable scale and complexity,
substantially defined by the strong physical barriers that are a feature within the
Quarter.
The four Character Areas, shown on Plan 1 are:
Northern Area
Southern Area
Eastern Area
Station Area
3.7 At present these areas are distinctly separate in their location, function and
interaction. A fundamental objective of the masterplan and implementation
programme is to strengthen the linkages between the areas whilst enhancing both
their individual identities and the identity of the Quarter as a whole. This will lead to
redefinition of spatial relationships within the area, most notably in relation to the
Station and its surroundings.
3.8 In addition the canal is a linking theme running through the Quarter’s four Character
Areas, with differing relationships to its surroundings along its whole length. The
masterplan and implementation programme will protect and enhance its operational,
development and environmental roles as an integral part of the area’s regeneration.
The canal has an important strategic role and can act as a catalyst for redevelopment
and social change.
Wider Relationships
3.9 The future of this area is not seen solely in terms of how the Character Areas are
each developed, but more broadly in terms of how the Canalside Quarter relates to
the town centre as a whole and the communities to the east. To this end the vision is
set within a wider framework of policies for Wolverhampton. These policies are
themselves under review and it is intended that this study will inform this wider review
as appropriate.
Ring Road
Cam
brid
ge
Stre
et
Cannock Road
Sta
fford
Stre
et
Wednesfield Road
Gre
atW
este
rnS
treet
Cam
brid
ge
Stre
et
nock Road
Wednesfield Road
teet
0 50 100 150 200 250 metres
N
Existing Trees
Proposed Trees
Proposed Commercial/Business
Proposed leisure
Proposed parking
Proposed housing
Industry/workshop
Canal
Public open space
Existing hard-standing
Shading over colour indicates existing buildingof use colour noted in key above
Railway
Wolverhampton Canalside Quarter AreaPlan
drawn by: djb/lbdate: September 1999
Development opportunitesSub Area One
KEY:
TAYLOR YOUNG51 Brookfield Road
CheadleCheshire SK8 1DQ
t. 0161 428 0616f. 0161 491 0972
Notes:
1. Taylor Young Ltd copyright.2. All dimensions are indicative only. Do not scale this drawing.3. Reproduced from the Ordnance Survey Map with the permission ofthe Controller of Her Majesty's Stationary Office.Licence No 164 194(AR) Crown Copyright Reserved.4. Drawing illustrates indicative elevations only.
Drawing storage reference:
rev: description, name and date
Revisions:
Wolverhampton Canalside Quarter Section 3.0 Vision for the Quarter
December 2000 9
Character Area Futures
3.10 The long-term futures envisaged for the four Character Areas can be summarised as
follows:
3.11 Northern Area:
A prestigious northern gateway for the town centre with high quality commercial main
road frontage developments, and a mix of residential and leisure uses creating a new
relationship with the canal.
3.12 Southern Area
An area of mixed-use activity, combining small-scale residential, leisure and
employment uses in a restored fine grained historic environment centred on the
canal.
3.13 Eastern Area
A newly formed residential and commercial area combining large-scale
redevelopment and re-use of historic buildings with a framework which links it into
both the town centre and the adjoining residential community.
3.14 Station Area
A redesigned major integrated public transport hub with new linkages into adjoining
areas and new opportunities for commercial development.
3.15 These broad objectives, and the steps needed to achieve them, are described and
amplified in the sections that follow.
Wolverhampton Canalside Quarter Section 4.0 Proposals
December 2000 10
4.0 Proposals
4.1 This section of the report describes and explains key features of the overall
Implementation Masterplan, linking the Vision with the Implementation Programme
and the priorities for action.
Land Use
4.2 The pattern of land use envisaged is shown on Plan 2 and represents a long-term
prospect for the Canalside Quarter as a whole. These proposals set out a significant
change of direction in land use terms from the area’s predominantly industrial past,
introducing a new mix of residential, leisure and commercial activities in the area as a
whole. However this does not imply a mix of uses within all development
opportunities throughout the area – the various Character Areas have different mixes
of proposals and we have identified the potential principal land uses whilst welcoming
ancillary supporting uses appropriate to their particular situation.
4.3 In broad terms the proposed mix of uses is as follows:
4.3.1 Northern Area:
• commercial main road frontage uses fronting Stafford Street / Ring Road
• residential led redevelopment of Carvers’ site with ancillary commercial / leisure
uses if the business ceased to function or sought relocation at some point in the
future
4.3.2 Eastern Area:
• residential-led mixed-use redevelopment and refurbishment of Springfield
Brewery and adjoining land
• a mix of business / industry / leisure immediately north of Wednesfield Road
• commercial leisure proposals which may include a new leisure pool and
associated leisure uses on the former Low Level Station site
• an opportunity to develop unused land off Sun Street, owned by Royal Mail for
industry / workshop uses.
4.3.3 Southern Area:
• a new mix of residential, business, leisure and commercial uses alongside the
canal between Corn Hill and Union Mill Street
• business frontage to Horseley Fields
N
Ring Road
Rin
gR
oad
Corn
Hill
Horseley Fields
Albion Street
Cam
brid
ge
Stre
et
Cannock Road
Sta
fford
Stre
et
Wednesfield Road
Sun
Stre
et
Railway Drive
Broad Street
Gre
atW
este
rnS
treet
Existing landscaping/trees
Proposed landscaping/trees
Proposed Commercial/Business
Proposed leisure
Proposed parking
Proposed housing
Industry/workshop
Canal
Public open space
Existing service areas
Retail
Station
Shading over colour indicates existing buildingof use colour noted in key above
Railway
Wolverhampton Canalside QuarterArea Plan
drawn by: djb/lb scale: 1:2500@A1 date: December 2000
Overall Masterplan
KEY:
PLAN 2
0 250 500 metres
TAYLOR YOUNG51 Brookfield Road
CheadleCheshire SK8 1DQ
t. 0161 428 0616f. 0161 491 0972
Notes:
1. Taylor Young Ltd copyright.2. All dimensions are indicative only. Do not scale this drawing.3. Reproduced from the Ordnance Survey Map with the permission of theController of Her Majesty's Stationary Office.Licence No 164 194(AR) Crown Copyright Reserved.4. Drawing illustrates indicative elevations only.
Drawing storage reference: M/Jobs/1654/Draw/032
Revisions:
Wolverhampton Canalside Quarter Section 4.0 Proposals
December 2000 11
• small scale industry / workspace, at Limekiln Wharf and Minerva Wharf and
alongside the canal east of Albion Mill, including canal-related uses
4.3.4 Station Area
• a range of commercial, leisure and retail uses focussing on a new Station
forecourt and the canal
4.4 In devising this mix of uses the following have also been considered and rejected:
Major food / non-food retail. - This would be contrary to the wider town centre and
retail policy of the Council, and whilst it would bring significant investment to specific
locations there are alternative opportunities in and adjoining the town centre which
better meet the relevant policy criteria.
4.5 Large-scale heritage led leisure proposal. – Whilst aspirations have been expressed
for such a scheme, no market has been identified and the capital and revenue
implications for public funding support would be excessive. The prospect of a
scheme cross-funded from a high value retail development faces the policy problems
noted above.
4.6 Quite clearly the Council will need to look flexibly at viable development proposals
where these come forward, particularly where a mix of uses is involved. The
additional regeneration benefits that may arise through mixed use proposals will be a
factor in their appraisal, alongside existing planning policy considerations.
Movement and Linkages
4.7 The Canalside Quarter currently suffers from much that is negative in terms of
transportation and movement, despite its location alongside the town centre, Ring
Road and radial routes and the presence of the station. These key components of
the town’s transportation infrastructure sever the area and take people through and
past it rather than contributing to its life and regeneration. Nonetheless they provide
the potential for significant improvement. The proposals address these problems with
a comprehensive approach and programme of action.
Existing Highway Improvement Lines
4.8 The major road improvement lines on Great Western Street and Horseley Fields
should be formally abandoned. Their implementation is no longer supported by
Wolverhampton Canalside Quarter Section 4.0 Proposals
December 2000 12
transportation policy, funding for implementation will not be forthcoming and they act
as blight on the regeneration of the Canalside Quarter.
4.9 The improvement line on Wednesfield Road should be retained and reviewed, as
improvements to highway and footways along this length would benefit both the
Canalside Quarter and wider public transportation objectives. This is dealt with in
further detail below.
Proposed Highway Improvements
4.10 A range of selective highway improvements is proposed which are necessary for the
redevelopment of the area and the improvement of conditions for both new and
retained activities. Certain of these improvements will also contribute directly towards
wider public transport objectives in the town as a whole. Plan 3 identifies a set of
proposals:
• Wednesfield Road / Culwell Street junction redesign and widening with bus lane
• Replacement of Wednesfield Road bridge over former railway line with a lowered
widened road and retaining walls
• Realignment of Culwell Street to serve Springfield Brewery
• New access to industrial units off Culwell Street
• Minor realignment of Cambridge Street / Cannock Road junction on the petrol
filling station side
• New access to Great Western Street via redesigned Stafford Street / Cannock
Road junction to serve new development
• Traffic restrictions in Great Western Street to restrict through traffic to buses only
• New vehicular access to High Level Station and car park from Corn Hill
• Redesign of Railway Drive approach to station to provide enhanced pedestrian
and public transport linkage
• Union Mill Street converted to two way access
• Albion Street subject to traffic calming to restrict through access
• Corn Hill and Albion Street subject to environmental enhancements
• New access from Horseley Fields
These improvements are detailed further in the project schedules in appendix (B).
NN
2m offset
3m offset
Bus lane
Bus and cyclelane
Junction Re-alignment
Improved Junction& Widened Bridge
New Access
Road Re-alignment
Road Closure
Improved Accessto Station
Quality of RoadImproved
Possible New Link
Improved Access
Improved Access
New Access andLink Road
1-way RoadChanged to 2-way
Traffic Calming
Wolverhampton Canalside QuarterArea Plan
drawn by: djb/lb scale: 1:2500@A1 date: December 2000
Highway Improvements
Improved Junction
Bus only link
New roundaboutaccess
PLAN 3
Ring Road
Rin
gR
oad
Corn
Hill
Horseley Fields
Albion Street
Cam
brid
ge
Stre
et
Cannock Road
Sta
fford
Stre
et
Wednesfield Road
Sun
Stre
et
Railway Drive
Broad Street
Gre
atW
este
rnS
treet
0 250 500 metres
TAYLOR YOUNG51 Brookfield Road
CheadleCheshire SK8 1DQ
t. 0161 428 0616f. 0161 491 0972
Notes:
1. Taylor Young Ltd copyright.2. All dimensions are indicative only. Do not scale this drawing.3. Reproduced from the Ordnance Survey Map with the permission of theController of Her Majesty's Stationary Office.Licence No 164 194(AR) Crown Copyright Reserved.4. Drawing illustrates indicative elevations only.
Drawing storage reference: M/Jobs/1654/Draw/032
Revisions:
Wolverhampton Canalside Quarter Section 4.0 Proposals
December 2000 13
Pedestrian and Cycle Routes 4.11 The poor quality of pedestrian and cycle linkages in general is a key feature of the
Canalside Quarter. Not only are key links missing, but many existing routes are
wholly inadequate in terms of safety, environmental quality and convenience.
Overcoming these problems is a key prerequisite for successful redevelopment.
4.12 The canal towpath forms part of the Sustrans Millennium Cycle Network. Progress
has already been made with the improvement of the canal towpath to the north and
(to a lesser degree) to the south-east. However a more comprehensive approach is
needed to establish an attractive, safe and legible network of pedestrian and cycle
routes with public spaces throughout the Quarter and linking into the town centre.
This is required to open up areas for development, improve linkages between sub-
areas and provide user-friendly routes for adjoining communities.
4.13 Plan 4 identifies a set of proposals:
• Further enhancement of the canal towpath including lighting
• New linkages from the station to Corn Hill
• New access to the canal from Corn Hill
• New access to Wyrley & Essington canal from Qualcast Road bridge
• New access to the canal in the vicinity of the station
• Enhancement of the station underpass and colonnades
• A new link across the canal from Union Mill Street and north to Sun Street
• Upgrading of the footpath from Broad Street junction via Lock Street to
Springfield area
• New links from Cambridge Street to existing Springfield housing area and to
canal
• New opportunities for enhanced links to the town centre
• A network of public spaces formed through enhancement of existing spaces and
design of new ones as part of the redevelopment of the area
These new and improved linkages are detailed further in the project schedules.
Public Transport
4.14 In strategic terms Wolverhampton is a key station on the West Coast Main Line. At
the local level, public transport currently passes through the Canalside Quarter en-
route from the town centre to surrounding communities along key transportation
corridors, which are highlighted in the emerging Local Transport Plan. However, with
NN
New/Improved pedestrain/cycle link
Improved public open space
Wolverhampton Canalside QuarterArea Plan
drawn by: djb/lb scale: 1:2500@A1 date: December 2000
Pedestrian/Cyclist Realmand Public Spaces
KEY:
PLAN 4
Improved footpath
Enhancement of stationunderpass / colonnades
New footbridgeover canal
New access to Canal
New access to Canal
New links fromStation to Corn Hill
Enhancement andlighting of canal towpath
Enhanced links totown centre
Improved pedestrian links
Improved pedestrian link
Ring Road
Rin
gR
oad
Corn
Hill
Horseley Fields
Albion Street
Cam
brid
ge
Stre
et
Cannock Road
Sta
fford
Stre
et
Wednesfield Road
Sun
Stre
et
Railway Drive
Broad Street
Gre
atW
este
rnS
treet
0 250 500 metres
TAYLOR YOUNG51 Brookfield Road
CheadleCheshire SK8 1DQ
t. 0161 428 0616f. 0161 491 0972
Notes:
1. Taylor Young Ltd copyright.2. All dimensions are indicative only. Do not scale this drawing.3. Reproduced from the Ordnance Survey Map with the permission of theController of Her Majesty's Stationary Office.Licence No 164 194(AR) Crown Copyright Reserved.4. Drawing illustrates indicative elevations only.
Drawing storage reference: M/Jobs/1654/Draw/032
Revisions:
Wolverhampton Canalside Quarter Section 4.0 Proposals
December 2000 14
the exception of the station, low levels of activity within the area in recent years have
generated relatively little demand for public transport in the area per-se and there has
been little provision specifically to serve the Quarter.
4.15 The public transport proposals are therefore designed to fulfil both strategic and local
functions in two principal ways
• To promote and facilitate the wider public transportation objectives of the town,
• To enhance the public transport provision for the Canalside Quarter itself.
4.16 The future of the Station is a key strategic issue for Wolverhampton. The proposals
set out the potential to review the whole relationship of the station with its
surroundings, overcome its isolation and enhance its quality. This could include:
• A new vehicular access from Corn Hill including revised access to the multi-
storey car park and a new passenger drop-off area
• Redesign of station forecourt to introduce a local bus facility, possible metro
terminus, improved pedestrian environment, and commercial development
opportunities
• Review of multi-storey car park linked with comprehensive redesign of station, its
forecourt and access
• An improved entrance from the Low Level Station side.
4.17 Enhancement of bus routes is already in hand with the Bus Showcase schemes for
Wednesfield Road and Cannock Road corridors. Proposals in the Canalside Quarter
will complement these. The Implementation Plan envisages:
• Implementation of Culwell Street junction improvement to provide a bus priority
lane in conjunction with replacement of the bridge over the former railway line
with a widened road on an embankment.
• Provision for new bus route link from Cannock Road via Great Western Street to
town centre.
• Opportunities for local circular routes.
• Opportunities for improved bus stops etc on all main corridors.
4.18 In the longer term if the need for further improved public transport provision remains
in the Wednesfield Road corridor this will add to the case for widening of the bridge
under the main line railway. At present it is a traffic bottleneck necessitating the
severance of the cycle lane and providing very poor pedestrian environment.
Retaining the existing highway improvement line on this section of Wednesfield Road
would reserve an alignment for this as well for enhancement of other modes of travel.
Wolverhampton Canalside Quarter Section 4.0 Proposals
December 2000 15
Environment
4.19 The theme of comprehensive environmental enhancement runs through the whole
range of masterplan proposals. It is central to the regeneration of the Canalside
Quarter and should be seen as a key dimension of all projects.
4.20 The underlying aim is to create and maintain an environment that supports and
encourages investment, activity and enjoyment of the Canalside Quarter. This will
require:
• an initial impetus for change
• overcoming environmental impediments to development
• high standards of development and restoration for both public and private spaces
and buildings
• a commitment to maintaining high standards of environmental maintenance
4.21 The implementation programme will include specific environmental improvement
projects, particularly as part of early initiatives in the public realm, to change the
image and perception of the area. However, in the longer term impacts will come
through the restoration of quality buildings and through new developments.
4.22 Recognising the nature of the area’s industrial past, there will be specific
requirements for demolition and clearance of buildings, land reclamation and
remediation, and preparation of sites for new development.
4.23 The proposals identify a wide range of opportunities for environmental reclamation
and enhancement, including:
• Site reclamation
• Minor highway schemes
• Improved footpath / cycle routes, railway underpasses and canal towpaths
• A network of public spaces
• Restoration of key historic buildings
• New build development opportunities
• Canal restoration including water quality
• Public art
Wolverhampton Canalside Quarter Section 4.0 Proposals
December 2000 16
The Canal Corridor
4.24 As a linking theme running through the area the canal provides an important context
for regeneration (Plan 5). It is central to the objectives for the Quarter as a whole,
providing a unique dimension which the area can capture as an asset, but its
relationships vary in different parts of the area, and this will influence the nature of its
relevance to particular projects.
4.25 A central objective is to increase the use of both the canal and its towpath. For those
coming by boat this requires new secure moorings and attractions for visiting this
section of the waterways, identifiable reasons for visitors to stop in Wolverhampton,
and enhanced perceptions of security and safety as well as environmental
improvements. For local users of the towpath this also calls for significantly improved
access, and linkages to the surrounding areas.
4.26 Existing business has tended to turn its back on the canal. A fundamental re-
orientation is needed and is promoted through the masterplan. Similarly the access
opportunities south of Broad Street Basin are totally inadequate for current
requirements, and measures to address this will bring benefits for the redevelopment
of the area itself.
4.27 The Canal Corridor is a designated wildlife corridor in the Black Country Nature
Conservation Strategy, and provides an important ecological dimension to this heavily
urbanised area. In recognition of this significance an initial Environmental Appraisal
was carried out in May 2000by British Waterways Environmental and Scientific
Services, in the form of an ecological assessment. This demonstrates that the canal
has areas of ecological value which should be retained and where possible enhanced
through regeneration projects. It concludes that the canal provides “an important
green wildlife corridor through Wolverhampton”. Any proposals “should ensure the
existing ecological value of the canal corridor, and its potential for ecological
enhancement, is recognised and that any decrease in that value is avoided”. Copies
of the Appraisal are available from British Waterways.
4.28 The masterplan recognises that the canal corridor has been significantly improved
north of the Town Centre, both environmentally and in terms of its amenity for use by
boats, pedestrians and cyclists. Nonetheless there are significant opportunities to
improve the corridor through new relationships between adjoining developments and
the canal itself. Key development opportunities must address the canal, for example
in the event of redevelopment of the Carvers’ site at some point in the future, and
land adjacent to Springfield Brewery. In this respect developers of sites adjacent to
N
oad
Rin
gR
oad
Corn
Hill
Horseley Fields
Albion Street
Cam
brid
ge
Stre
et
Cannock Road
Wednesfield Road
Sun
Stre
et
Railway Drive
d Street
Gre
atW
este
rnS
treet
N
51 Brookfield RoadCheadle
Cheshire SK8 1DQ
t. 0161 428 0616f. 0161 491 0972
1. Taylor Young Ltd copyright.2. All dimensions are indicative only. Do not scale this drawing.3. Reproduced from the Ordnance Survey Map with the permController of Her Majesty's Stationary Office.Licence No 164 194(AR) Crown Copyright Reserved.4. Drawing illustrates indicative elevations only.
Drawing storage reference: M/Jobs/1654/canalcorridor
Revisions:
TAYLOR YOUNG
0 250 500 metres
Wolverhampton Canalside QArea Plan
drawn by: djb/lb scale:nts date: Decembe
Canal Corridor
New canalside spaces
Housing overlooking canal
Bridge refurbishment
Redesign of landscaping
New pedestrian link to Station
New commercial or leisure use
Bridge facelift
Housing addressingcanal
Restored Albion Mill
Long term redevelopmentof Crane Foundry
Open spacealongside canal
Pub / restaurantwith terrace
Frontagefacelifted
Landscaped newfootpath and cycle link
Business / industry withnew canal frontage
Newfrontage
New pedestrianaccess
New businessuse
Restored Basins
CanalBasin
New Footbridge
Bridge andwalls facelift
Wolverhampton Canalside Quarter Section 4.0 Proposals
December 2000 17
the Canal must liaise with British Waterways when preparing detailed schemes for
these sites.
4.29 To the south and east however, whilst some improvements to the towpath have
already been made, the canal and its surroundings require comprehensive upgrading.
Proposals therefore include:
• Water quality improvements
• New access points and bridge
• Improvements to retained buildings alongside the canal
• Ecological enhancements
• Housing and business units relating to the canal
• Leisure use alongside the canal
• Opening up or enhancing the tunnel
• Opportunities for canal-related businesses
• Improved visibility
• Public Art
4.30 In seeking to achieve these, however it is vital that the intrinsic characteristics of the
canalside environment are retained and enhanced, including some notable buildings,
the sense of enclosure and the strongly urban feel of the corridor between Corn Hill
and Minerva Wharf. In contrast, the Wyrley and Essington Branch has a wholly
different atmosphere, its surroundings are greener and more open and provide an
opportunity for a more natural ecological theme.
4.31 It is important that the canal is seen as having an economic role and not just as an
environmental feature. Within the Canalside Quarter there are already several small
businesses, including boatbuilding and a chandlery which have direct links with the
canal. These should be encouraged and further opportunities sought, particularly in
the southern Character Area. Elsewhere there are various opportunities for new
developments to benefit in both economic and operational terms through uses and
designs that explicitly recognise their canalside location.
Building Refurbishments
4.32 The Canalside Quarter contains important historic buildings and structures that reflect
the town’s economic and social background. Many of these have suffered in recent
years through economic and physical decline. Nonetheless, together with the
character and identity of the area as a whole they remain a key asset and should be
an integral part of the regeneration of the Canalside Quarter.
Wolverhampton Canalside Quarter Section 4.0 Proposals
December 2000 18
4.33 The potential has been demonstrated through the refurbishment of the Great Western
Public House and the buildings that form the Canal Club and Waterways Depot.
4.34 The masterplan proposes retention and refurbishment of significant historic buildings
within the overall framework of enhancing each of the Character Areas. In most
cases these buildings do not stand alone but are in groups or at key locations with the
potential to be landmarks around which sensitive new development will be required.
They provide specific investment and after-use opportunities which may be best
approached through mixed-use development / refurbishment packages.
4.35 The principal refurbishment opportunities are identified on Plan 6
• Parts of Springfield Brewery
• Low Level Station buildings
• Steam Mill and annexe
• Albion Mill
• Group of buildings between Union Mill Street and the canal
• GTRM railway depot building
• Edward Vaughan Stampings building
• Minerva Wharf group
4.36 The high level station also provides a particular opportunity for a combination of
redevelopment and refurbishment which is dealt with separately elsewhere in this
report.
Development Opportunities
1. 4.37 Plan 7 identifies the full range of development opportunities which might arise
in the Canalside Quarter. This shows the considerable extent of the possibilities for
both new build and refurbishment across the area within the framework of the
Implementation Plan as a whole. The plan should be read in conjunction with
Appendix (C) which provides a schedule of each principal development opportunity.
Priorities for these development opportunities are addressed in Section 5 below.
Infrastructure and Environmental Projects
4.38 Appendix (B) draws together the principal environmental and infrastructure projects
into a schedule with project forms for each project. Section 5 below identifies the key
priorities for physical projects within each Character Area.
N
KEY:
Wolverhampton Canalside QuarterArea Plan
drawn by: djb/lb scale: 1:2500@A1 date: December 2000
drawing number: rev:1654.038
Conservation Areas andListed Buildings
Union Mill Conservation Area
Canal Locks Conservation Area
4
7
9
11
15
1
3
2
1013
12
Springfield Brewery
Former Low Level Station
Great Western Public House
The Old Steam Mill
Albion Mill
Cheese and Butter Warehouse
Pedestrian Arcade and RetainingWall
Mill Street Railway and Goods Depot
Lock Street Railway Bridge andRetaining Wall
Canal Footbridge, Entrance to BroadStreet Basin
Littles Lane Bridge
Wednesfield Road Bridge
Railway Retaining Wall
16A Union Mill Street
Broad Street Warehouse
Canal Locks and Top Lock Cottages
Listed Buildings
Conservation Areas
4
5
6
7
8
9
11
12
13
14
15
16
1
3
2
10
146
8
16
5
PLAN 6
Ring Road
Rin
gR
oad
Corn
Hill
Horseley Fields
Albion Street
Cam
brid
ge
Stre
et
Cannock Road
Sta
fford
Stre
et
Wednesfield Road
Sun
Stre
et
Railway Drive
Broad Street
Gre
atW
este
rnS
treet
0 250 500 metres
TAYLOR YOUNG51 Brookfield Road
CheadleCheshire SK8 1DQ
t. 0161 428 0616f. 0161 491 0972
Notes:
1. Taylor Young Ltd copyright.2. All dimensions are indicative only. Do not scale this drawing.3. Reproduced from the Ordnance Survey Map with the permission of theController of Her Majesty's Stationary Office.Licence No 164 194(AR) Crown Copyright Reserved.4. Drawing illustrates indicative elevations only.
Drawing storage reference: M/Jobs/1654/Draw/032
Revisions:
NN
Wolverhampton Canalside QuarterArea Plan
drawn by: djb/lb scale: 1:2500@A1 date: December 2000
drawing number: rev:1654.039
Development Opportunities
N1
N2
N3
N4
E2
E7
S4
S1
S3
S5
S6
S2
S8
S9
S11
S12
S10
Station
E5
E6
E4
E3
E1
N1
N2
N3
N4
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
S11
S12
E1
E2
E3
E4
E5
E6
E7
Station
S7
Kwik Fit and Car Parks
Stafford Street Frontages South
Stafford Street Frontages North
Carvers Site
Corn Hill Frontage Site
Steam Mill Annexe
Corn Hill Canal Frontage Site
Mill Street Railway and Goods Depot
Royal Mail Building
Ex Hills Foundry and Horseley Fields Frontage Site
Albion Mill
Union Mill and Adjacent Land
Crane Foundry
Horseley Fields
Limekiln Wharf
Minerva Wharf
Business Units off Cambridge Street
Springfield Brewery and Adjoining Land
Springfield Cash and Carry (part)
WMBC Culwell Street Depot (part)
Ex Railway Land
Low Level Station
Royal Mail Site, Sun Street
High Level Station
PLAN 7
Ring Road
Rin
gR
oad
Corn
Hill
Horseley Fields
Albion Street
Cam
brid
ge
Stre
et
Cannock Road
Sta
fford
Stre
et
Wednesfield Road
Sun
Stre
et
Railway Drive
Broad Street
Gre
atW
este
rnS
treet
0 250 500 metres
TAYLOR YOUNG51 Brookfield Road
CheadleCheshire SK8 1DQ
t. 0161 428 0616f. 0161 491 0972
Notes:
1. Taylor Young Ltd copyright.2. All dimensions are indicative only. Do not scale this drawing.3. Reproduced from the Ordnance Survey Map with the permission of theController of Her Majesty's Stationary Office.Licence No 164 194(AR) Crown Copyright Reserved.4. Drawing illustrates indicative elevations only.
Drawing storage reference: M/Jobs/1654/Draw/032
Revisions:
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 19
5.0 Implementation
Approach
5.1 The masterplan proposals provide a framework and guide for the long-term
regeneration for the Canalside Quarter. The following sections introduce an
implementation strategy and programme for each Character Area, with priorities and
phasing for the range of initiatives identified.
5.2 We have identified three guiding principles for the approach to the physical and
economic regeneration of this area:
• Recognise and build upon the four character areas within Canalside Quarter
• Enhance the linkages between the character areas including the canal
• Integrate the Quarter more closely with the rest of the town
5.3 These principles build on the Quarter’s strengths and bring forward programmes and
projects addressing issues relevant to the area as a whole, but also address issues
pertinent to the scale and circumstances of different parts of the area.
5.4 There is a fundamental requirement to transform the market perception of this area
and address key environmental and infrastructure problems that are an impediment
to confidence and investment. This is a prerequisite to securing private sector
investment, which will support and deliver the ongoing regeneration of the area, and
needs to be demonstrated through an up-front partnership commitment to instigate
catalytic action at the outset. The alternative for the Canalside Quarter would be
either no investment at all or piecemeal low levels of investment in self contained
schemes that would do nothing to break the spiral of decline in the area.
5.5 Regeneration can be pursued on several fronts to secure significant and positive
progress. Together with action to address both internal and external linkages, actions
can be taken in each of the Character Areas according to their particular
requirements. However, there are a number of key regeneration focus areas and
issues that should be addressed as priorities from the outset, these are:
• Enhancement of key linkages and Canal
• High Level Station and Corn Hill area
• Low Level Station to Springfield Brewery
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 20
It is recognised that resources, both in financial and human resource terms, will be
limited. These priorities should therefore guide the principal regeneration efforts of
the partner organisations and provide the framework for channelling public sector
investment. At the same time there may be individual opportunities arising elsewhere
which can be pursued if appropriate.
5.6 Wolverhampton Council’s first priority is to seek the redevelopment of derelict or
underused sites / buildings in the Canalside Quarter. It recognises that there are
some long established businesses and activities in the Canalside Quarter and would
support their continued operation. Should however businesses themselves cease to
function or seek to relocate or engage in a comprehensive development proposal that
comes forward, it would wish to work closely with the landowners and developers to
bring about the proper development of the land.
5.7 Subject to the necessary financial resources the Council does have power to make
Compulsory Purchase Orders in respect of property but prefers to negotiate with
landowners where possible.
5.8 The following sections review each Character Area in terms of,
• Implementation Approach
• Implementation Priorities
• Land Acquisition and Preparation
• Infrastructure and Environment Projects
• Development Opportunities (Plan 7)
The report then highlights the short term Specific Delivery Actions required to pursue
the key priorities identified in para.5.5 above.
Southern Area
Implementation Approach
5.9 The focus of regeneration should begin in the Corn Hill area. At the outset it requires
an integrated programme of infrastructure and environmental works designed to
support existing initiatives such as the Steam Mill refurbishment and to generate
confidence for further private sector schemes. This should be linked with selective
land assembly and reclamation to create sites for new land uses including residential,
leisure, and small-scale businesses.
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 21
5.10 Key early development / refurbishment opportunities include land and buildings on
Corn Hill, the former John Hills Foundry site, Albion Mill and the complex of older
canalside buildings in Union Mill Street. Enhanced linkages to the Station, town
centre, and the canal, will be essential from the outset, as will be a co-ordinated
package of improvements for the canal itself to create a new focus for development
and movement.
5.11 Further progress east of Union Mill Street will be longer term. Land assembly
between Horseley Fields and the canal will be necessary, including BT and Royal
Mail sites, together with the relocation of some existing uses to create new industrial
and business development sites. New access from Horseley Fields and a link to
Union Mill Street will be required, possibly as part of a development package.
5.12 Minerva Wharf provides opportunities for small-scale business development ideally
related to the canal, and would be enhanced by the relocation of the coal yard.
Limekiln Wharf provides similar small-scale business opportunities requiring selective
land assembly and clearance, plus improved access, but could benefit in the short
term from basic environmental treatments related to the canal
5.13 Crane Foundry will influence the attractiveness of the areas immediately adjoining.
Its future is presently uncertain. If the business ceased to function or sought
relocation the site would be suitable for redevelopment for business / workspace use.
In the short term a programme of environmental improvements should be
investigated.
Implementation Priorities
5.14 A package of acquisitions, infrastructure / environmental projects and development
projects is recommended to secure regeneration of the Southern Area. In each
category the early phase key projects are identified together with longer-term
opportunities.
Land Acquisition and Preparation
5.15 Four principal acquisitions are necessary at the start of the implementation
programme:
• Former John Hills Foundry site,
• Land at junction of Albion Street / Corn Hill,
• Land adjacent to the canal north of Corn Hill Bridge
• Derelict warehouses between GRTM depot and Crane Foundry
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 22
5.16 Later phases may require acquisitions in the following areas:
• Land between Horseley Fields and the canal east of Union Mill Street
• Land at Limekiln Wharf
Infrastructure and Environment Projects 5.17 Key early phase projects are:
• A new vehicular and pedestrian link to the High Level Station from Corn Hill
• Traffic calming and environmental improvements to Corn Hill including
carriageway, footways, lighting, walls and frontages
• Conversion of Union Mill Street to two way access with Horseley Fields
• Traffic calming and environmental improvements to Albion Street
• A comprehensive canal corridor enhancement scheme
• New landscaped access to canal north of Corn Hill Bridge
• Environmental improvements to Crane Foundry
5.18 Later phase projects include:
• New access road from Horseley Fields and link to Albion Street
• Footbridge link over canal, public space, and new pedestrian route from Union
Mill Street to Sun Street
• New access to Wyrley and Essington Canal from Qualcast Road bridge
Development Opportunities
5.19 Early priority development projects are:
• Steam Mill – secure implementation of workspace proposals or explore
opportunity for residential development
• Steam Mill Annexe – commercial leisure linked with new access to canal and
open space
• Hills Foundry site – comprehensive reclamation for mixed-use scheme including
residential and business.
• Albion Mill – refurbishment for residential or workspace
• Union Mill complex – programme of refurbishment for workspace / business or
residential uses
• Ex Royal Mail Depot – re-use or secure demolition and new commercial
development possibly linked to station
• Land between Albion Mill and Union Mill Street – mix of residential / workspace/
business use
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 23
5.20 Later phase opportunities include:
• Land between Horseley Fields and the canal east of Union Mill Street – business
/ industry following land assembly / reclamation
• Minerva Wharf – small scale business possibly related to canal
• Limekiln Wharf – small scale industry / business possibly related to canal
• Crane Foundry – industry / business if foundry relocates
• GTRM depot – refurbishment / re-use for business / workspace
Eastern Area
Implementation Approach 5.21 The Eastern Area requires early commitment to a comprehensive regeneration
framework for phased implementation of its two principal development opportunities,
Low Level Station and Springfield Brewery. There is a clear need to enhance market
perception particularly in relation to Springfield Brewery, and to radically improve
linkages within and into the area.
5.22 Therefore whilst there are two priorities for development opportunities, there will need
to be catalytic action on linkages and environment to assist these in coming forward.
5.23 A private sector residential – led mixed-use programme for Springfield Brewery needs
the confidence of comprehensive access and environmental improvements and land-
use restructuring between the Brewery and Wednesfield Road. This entails
relocation of the Council Depot, realignment of Culwell Street from an improved
junction with Wednesfield Road, and relocation of the cash and carry warehouse site
to permit residential / business redevelopment. New leisure / business opportunities
will also emerge close to Wednesfield Road and as part of Springfield Brewery
through this initiative.
5.24 Enhanced pedestrian linkages with the canal, the adjoining Springfield area and the
town centre via Lock Street are essential. Whilst the former two can emerge in due
course from development proposals, the link to Lock Street is an essential
prerequisite to promote development, and may require firm action to secure the
necessary alignment.
5.25 The future use of Low Level Station site remains undetermined. Various options
have been identified and there is currently a proposal for a tennis / fitness centre. Its
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 24
redevelopment will depend on a firm commitment from all parties to whatever
direction is pursued. Central to whatever option is followed is the need to enhance
the links to the town centre via the station underpass, Wednesfield Road, and Corn
Hill, and to secure sensitive refurbishment and re-use of the historic buildings. The
range of implementation actions will then depend on the direction chosen. However it
is clear that whilst linkages to the High Level Station will be very important for this
development they will not of themselves secure the regeneration of this site.
Implementation Priorities
5.26 A package of land assembly and key infrastructure works is required for the
intervening areas, together with the establishment of partnership arrangements for
the two major development opportunities.
Land Acquisition and Preparation
5.27 Land assembly is required north of Wednesfield Road at the outset of the
regeneration programme. Acquisition of two sites by the public sector may be
required to facilitate this in conjunction with the council’s own land holding:
• Former railway land immediately north of Wednesfield Road
• Site of Springfield Cash & Carry
5.28 However, discussions should first seek to secure land assembly through agreements
between private landowners with the Council contributing its ownership to the
package.
5.29 Acquisition of Low Level Station site by the public sector could be considered if this is
required to secure a development in the absence of appropriate private sector
proposals being delivered.
Infrastructure and Environment Projects
5.30 Key early phase projects are:
• Replacement of Wednesfield Road bridge over former railway land with a
retaining wall to allow widening of the road and provision of a bus lane
• Implementation of Culwell Street Junction improvement and realignment of
Culwell Street with associated frontage improvements
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 25
• Construction of new ramped footpath / cycle access from Culwell Street to Lock
Street
• Environmental upgrading of Wednesfield Road bridge under the railway
• Facelift to railway arch structure and Lock Street bridge under railway
• Improvement of access to canal at Cannock Road
5.31 Later phases of environmental and infrastructure improvement would come via the
various development projects, for example
• New access to industrial units off Culwell Street
• Minor realignment of Cambridge Street / Cannock Road junction on the filling
station side
The widening of Wednesfield Road railway bridge should be further explored in
conjunction with longer term public transport schemes.
Development Opportunities
5.32 The principal development opportunities are:
• Low Level Station site – leisure / commercial options
• Springfield Brewery and adjoining lands – residential led mixed-use
refurbishment and redevelopment ( with some leisure / business elements)
• Springfield Cash and Carry site – residential / business redevelopment
• Railway cutting north of Wednesfield Road – reclamation for leisure / commercial
/ business development
• Council Depot site – clearance and redevelopment for leisure / commercial
business development
5.33 In phasing terms successful redevelopment of the railway cutting and council depot
sites would complement the infrastructure works in promoting the major
redevelopment and refurbishment of the Springfield Brewery.
5.34 Redevelopment of land to the east of Cambridge Street currently occupied by a
building contractor and petrol filling station would provide an opportunity for
comprehensive new housing development to link the Brewery site with the adjoining
residential area. This would need business relocations and would be a later phase of
the regeneration programme, linked with enhancement of public space on Cambridge
Street.
5.35 Independent of the above an opportunity exists to develop unused land owned by
Royal Mail off sun street for industry / workshop uses.
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 26
Northern Area
Implementation Approach
5.36 This Character Area does not require the early direct intervention needed elsewhere
in the Quarter, but useful benefits can ensue from selective action in the medium term
and a commitment to fundamental change in the longer term. The approach to
regeneration seeks to deliver higher quality frontage commercial redevelopment on
the Stafford Street and Ring Road frontages, an opportunity for improved public
transport links to the town centre from the north and enhanced pedestrian / cycle
linkages to the Springfield area.
5.37 The Carvers’ site could offer the possibility of a major residential led redevelopment
site in the longer term, requiring access alterations at the junction of Cannock Road
and Stafford Street. In the shorter term an interim measure would be achievable for a
public transport / cycleway link from Cannock Road to Great Western Street if wider
transportation priorities promoted this.
Implementation Priorities
5.38 Attention should focus on establishing a limited range of infrastructure and
environmental works, frameworks for key future developments and, initially one
principal development opportunity. Also in the shorter term action should be pursued
to remove the hazard zone generated by aspects of Carvers’ current activities.
Infrastructure and Environment Projects
5.39 Key early projects are:
• Improvement of pedestrian / cycle links from Broad Street junction to Lock Street
bridge (supporting proposals for Eastern Area)
• Redesign of landscape around Broad Street Basin
• Provision of bus and cycle link from Cannock Road via Great Western Street to
the Ring Road (subject to wider transportation priorities).
• Enhancement of pedestrian link across Ring Road / Stafford Street junction
5.40 Further environmental and infrastructure improvements would come via development
projects.
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 27
Development Opportunities
5.41 It will be necessary to set out a strong design framework for this area. This will both
establish and promote the principle of a high quality northern corridor and gateway for
the town centre, and guide future redevelopment of Carvers’ site, with particular
reference to its relationship with the canal in the event of this site coming forward for
development.
5.42 In the short-term one principal commercial development opportunity should be
pursued, at the junction of Stafford Street / Ring Road. This would entail a
partnership agreement between the Council and private sector as owners of parts of
the site, and the relocation of the Coach Station and car parking. Other publicly
owned premises at The Maltings Day Centre in Herbert Street provide an important
facility and would only be considered for commercial redevelopment should the
present use cease or seek relocation.
Station Area
Implementation Approach
5.43 The Station Character Area differs from the other three in that it is a single use area
of considerable movement and activity whose potential remains unfulfilled. It has an
established function and a key strategic role for the town but is underperforming in
terms of its range of activities, quality of environment, linkages with the rest of the
Quarter and its functional connections with the core of the town centre. It currently
operates solely as a movement corridor into and out of the town centre, bringing little
in added value.
5.44 Environmental improvements alone are not sufficient. The masterplan proposes a
significant broadening of the role of the Station Area, together with restructuring and
enhancement of its access and linkages in all directions. New commercial
development opportunities are identified, together with benefits that would arise
through the partial redesign of the multi-storey car park. Delivery of these initiatives
will require a strong commitment from the Rail Companies and other interested
parties.
5.45 Actions in the Station Area should not perpetuate its self-contained nature, but must
show significant beneficial implications for the Southern and Eastern Character Areas
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 28
and for the town centre to the west. At this stage indicative ideas are set out in the
masterplan – these need substantial early refinement, combining vision, commercial
practicalities and wider transportation objectives, but must be driven by the objective
of broadening the whole function of this area, not just by access or development
issues alone.
5.46 A partnership is required between the rail companies, WMBC, AWM, Centro, Bus
operators, British Waterways, and private landowners, to explore the area’s full
potential and put together a realistic package of schemes. There is scope to promote
the infrastructure elements of this restructuring through the Local Transport Plan
process.
5.47 Examples of component projects include:
• New vehicle and pedestrian access from Corn Hill
• Redesign of Railway Drive, including possible widening of bridge over the Ring
Road, to enhance the links between Bus Station, High Level Station and Town
Centre for pedestrians, local buses and possibly the Metro
• Creation of an enhanced ‘Station Square’
• Major upgrade and extension of station buildings
• Creation of an internal station concourse with retail and other facilities
• Rearrangement of station related services
• New commercial development opportunities between the station, Ring Road and
Corn Hill
• Partial repositioning / expansion of multi-storey car park with new access to rear
• Review of operational car parking
• Upgrade of underpass and relationship with Low Level Station site
• Comprehensive review of development potential west of Ring Road
• Opening up access to the canal
Specific Delivery Actions
5.48 Section 5.5 above identified the following as key priorities.
• Enhancement of key linkages and the canal
• High Level Station and Corn Hill area
• Low Level Station to Springfield Brewery
This section considers the key early actions that should be undertaken by the
principal partners in pursuing each of these priorities before dealing in less detail with
longer-term actions.
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 29
Enhancement of Key Linkages and the Canal
5.49 In the short term the actions are:
• Draw up a comprehensive programme for water quality and towpath
improvements with British Waterways.
• Negotiate and agree proposals for access improvements to the canal at Corn Hill.
This may be tied in with the redevelopment of Site S3
• Negotiate with the Post Office and others regarding revised access to Albion
Street. Design traffic calming and improvement scheme for Albion Street and
improvement of Union Mill Street, to be implemented in conjunction with
development proposals for site S6 and S7.
• Draw up proposals for traffic calming and to upgrade the highway surface,
footpaths, boundaries and lighting along Corn Hill.
• Draw up specifications for upgrading of existing pedestrian / cycle linkages
• Revise design of Culwell St Junction improvements to accommodate new link
road into area. This scheme may need to be held in abeyance until land can be
assembled to implement the revised project.
• Promote bus lane access to Great Western Street through the Local Transport
Plan process.
• Design revised access scheme for the Station taking into account station
upgrading potential, need for improved linkage to canal and opportunities for
development.
5.50 These actions will need the support of Wolverhampton MBC, Centro and British
Waterways as highway authority, Passenger Transport Authority, and the body
responsible for the canal respectively. It may not be possible to accommodate design
costs and work programmes within existing budgets and staffing constraints.
Additional funding to employ outside consultants to progress these schemes may be
required.
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 30
High Level Station and Corn Hill
5.51 In the short term the actions are:
• Draw up CPO after first attempting negotiation for the assembly of sites S3, S6 &
S7. WMBC and AWM will need to put in place appropriate funding to support this
process.
• Support River West scheme for Steam Mill.
• Reclaim Hills Foundry and adjacent lands following acquisition.(S6)
• Encourage Railtrack and Virgin to further redevelop railway station buildings /
land, and redesign car park to create new strategic development and access
opportunities. Funding may be required to support this.
• Prepare Planning Brief for sites S3, S6 & S7.
• Market sites.
• Implement canal access and towpath proposals, if not already done.
• Implement improved access to Union Mill Street and traffic calming to Albion
Street as part of development programme.
5.52 It may be possible to involve developers prior to marketing. However the residential
opportunities in this area may not be for private sale or significant enough to justify a
house builder supporting the CPO process. Housing Associations are often reluctant
to become involved in such schemes. Student Housing, either directly provided by
the university or via a Housing Association/developer, may be an opportunity to be
explored further. The aim for these projects should be to complete them within 5
years.
5.53 In the longer term, compulsory purchase orders may be needed to assemble much of
site S10. Alternative accommodation for GTRM will be needed to release Mill St
Depot for development. The former Royal Mail Depot may come forward for
development and its reuse or redevelopment should be guided by a development
brief.
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 31
Low Level Station to Springfield Brewery 5.54 This area represents the major large scale regeneration opportunity in the Canal
Quarter at over 30 acres in size. However, there are a number of difficulties in
securing comprehensive regeneration. Two landowners, Simon Developments and
THI, own over 22 acres of the area between them, with the Council also being a
significant landowner with 3.5 acres in its control. To create the conditions for a
comprehensive approach to regeneration, a strategy needs to emerge that has the
support of these landowners or their successors.
5.55 The key actions that AWM and WMBC should take in the short term are:
• Design the highway improvement scheme to replace the Wednesfield Road
bridge over the old railway line with a widened carriageway on a retaining wall,
realign Culwell Street, promote a road closure order for Lock Street, and design
an enhanced pedestrian link from Culwell Street through to the town centre via
Lock Street Bridge.
• WMBC should agree in principle to relocate the Council Depot from its current
location, investigate costs and agree a timescale for relocation.
• WMBC should negotiate with the owner of site E3, but if this proves unsuccessful
should prepare a Compulsory Purchase Order for the site, and in conjunction with
AWM set aside funding to support the acquisition and compensation process.
• WMBC and AWM, in partnership with the private sector, should be prepared, if
necessary, to part fund further concept / feasibility work on Low Level Station and
Springfield Brewery to identify a viable development scheme for Low Level
Station and the costs and values of a residential led solution for Springfield
Brewery.
• WMBC should resist planning proposals that would detract from a comprehensive
approach to the area.
5.56 As part of this process, the major landowners, currently THI, Simon Developments
and WMBC, and AWM as potential equity partner, should consider forming a joint
venture vehicle to bring forward a comprehensive scheme based upon the solutions
suggested in the masterplan. A vital part of this will be WMBC delivering
Wolverhampton Canalside Quarter Section 5.0 Implementation
December 2000 32
infrastructure improvements to open up the land to the north of Wednesfield Road
and bringing forward its landholdings for development.
5.57 In the longer term AWM and WMBC may need to consider the acquisition of the
Petrol Filling Station and adjacent industrial premises along Cambridge Street. It may
be necessary to promote a highway improvement scheme for the junction of
Cambridge Street and the Cannock Road. It would be hoped that in the longer term
the industrial premises along Cambridge Street Project E1 would come forward for
development without the need for the public sector to intervene or support the
development with grant aid.
Wolverhampton Canalside Quarter Section 6.0 Delivery Mechanisms and Funding
December 2000 33
6.0 Delivery Mechanisms and Funding
6.1 This section is divided into two parts. The first part considers the need for the
creation of a separate agency to move forward the regeneration of the Canalside
Quarter. The second part provides an assessment of the potential funding sources
available and how they might be applied to support regeneration.
The Need for a Separate Regeneration Agency
6.2 The regeneration of Wolverhampton Canalside Quarter requires both vision and drive
from the Partners who are supporting it. However, AWM, British Waterways and
Wolverhampton MBC may feel that a more focused agency would be appropriate in
bringing forward regeneration.
6.3 The Government has recently published its Urban White Paper "Our Towns and
Cities: The Future". This document sets out a range of initiatives with direct
relevance to the regeneration of Wolverhampton’s Canalside Quarter:
• Increased funding to Regional Development Agencies combined with greater
flexibility in the use of this funding.
• Fiscal incentives such as exemption to Stamp Duty accelerated tax credits for
cleaning up contaminated land, and reform of VAT to encourage conversion of
buildings for residential use.
• Reform of the planning obligation system.
• Fiscal incentives to encourage enterprise and the establishment of small
businesses.
• Encouragement for local authorities and RDA's to utilise compulsory purchase
powers to support regeneration.
• Encouragement for higher density housing and mixed use
• Establishment of 12 new Urban Regeneration Companies across England
6.4 The Urban White Paper suggests a number of structures for regeneration vehicles,
the most relevant of these is the Urban Regeneration Company (URC). URC’s could
be designated for a specific area or across a Local Authority District. More
importantly, URC’s should be able to act swiftly, as a single purpose delivery body to
lead and co-ordinate the regeneration. URC stakeholders are likely to be the local
authority, perhaps a housing association, one or more development companies,
major landowners, local community representatives and the RDA. Such a company
would be legally constituted with the parties contributing staff expertise, resources
Wolverhampton Canalside Quarter Section 6.0 Delivery Mechanisms and Funding
December 2000 34
and other assets. It may also be necessary for the local authority to pass on some
decision-making powers in accordance with an agreed strategy, however, this would
stop short of statutory planning powers. It is intended that 12 such new Urban
Regeneration Companies will be established by summer 2001.
6.5 A number of Urban Regeneration Companies have already been established. The
most advanced example is Liverpool Vision. This company has a Board structure,
which includes members from the Local Authority and officers from the RDA and EP
together with private sector interests in the form of landowners, developers and
companies located in the area. The chairman is drawn from the private sector. Its
boundaries have not been drawn rigidly and its remit is considered to be the whole of
the City Centre. Liverpool Vision has appointed its own Chief Executive and will
shortly have its own core team of officers/consultants. Initial funding of £200,000 was
agreed from the City Council, the RDA and EP to cover the first year’s set-up costs.
The Company has developed a strategy to identify specific projects and development
funding requirements. A similar body has been established in Manchester.
6.6 The local authority will remain the planning authority and promote CPOs, however it
is likely that the Regeneration Company would be consulted on planning applications.
6.7 At the same time, Advantage West Midlands have established the concept
Regeneration Zones as part of the Regional Economic Strategy. AWM have
announced that there will be five urban based regeneration zones in the West
Midlands, one of these will be focused upon the North Black Country and South
Staffordshire and is expected to include the Canalside Quarter within its boundaries.
The purpose of Regeneration Zones will be to link development opportunities to areas
of need through the concentration of resources upon physical, economic,
environmental and community issues. It is likely that much of AWM's budget for
physical regeneration will be focused upon these zones. Development work on the
Black Country North and South Staffordshire Regeneration Zone has commenced
with the production of a Strategic Prospectus to be finalised in December 2000. The
zone is likely to become operational in April 2001 when an Action Plan will be in
place. The action plans and business plans which will form the basis for the
implementation of regeneration activity in the zones provide the opportunity to
promote the Canalside Quarter and specific projects within it.
6.8 It is open to Wolverhampton MBC and AWM to progress one or other of these
models/opportunities. There are clear merits in having a focused organisation with
powers, influence and the funding to make things happen. However, we would
suggest that the partners give careful consideration to the area over which such an
Wolverhampton Canalside Quarter Section 6.0 Delivery Mechanisms and Funding
December 2000 35
organisation would have a remit. Too wide an area would dissipate its impact and set
too many agendas; too narrow and it may lead into conflict with other initiatives the
Council and AWM wish to promote nearby.
6.9 A further consideration is the relationship of such a body to other initiatives
particularly Wolverhampton’s Partnership Committee or any replacement bodies.
Note should also be taken of recent concern from the Audit Commission of the
conflicts between local authorities’ promotion of regeneration opportunities and their
regulatory activities.
6.10 One factor that may cause difficulties for a Regeneration Company at present is the
current stance of some of the key landowners in the area. Several of these
landowners are likely to promote development proposals in the coming months which
may conflict with both the Canalside Quarter Strategy and the Council’s Town Centre
Review of Strategy. In such circumstances, it may be difficult to bring significant
landowners on board in a Regeneration Company at least in the short term. However
this potential difficulty would have implications whatever delivery vehicle is adopted.
Funding 6.11 This section of the report considers the potential to attract funding to support the
regeneration of the Canal Quarter. Here we provide an overview of the sources and
how they could be utilised to support projects. Each potential source of grant aid will
be dealt with in turn.
Wolverhampton MBC 6.12 Whilst there continue to be constraints upon Local Authority capital programmes, it is
clear that substantial up front funding will be required in the following areas:
• Design costs of environmental projects, and highway schemes, outside the Local
Transport Plan process.
• Supporting Compulsory Purchase Orders both in terms of staff resources and
funding to support the acquisition and compensation process (in conjunction with
AWM).
• The relocation of the Council Depot from Culwell Street.
Wolverhampton Canalside Quarter Section 6.0 Delivery Mechanisms and Funding
December 2000 36
• Utilising its landholdings to support the regeneration process, for example at
Culwell St (projects E4 & E5), and Corn Hill (project S6).
Advantage West Midlands 6.13 The resources that AWM would be able to make available to the regeneration of
Canalside Quarter will depend upon the outcome of wider considerations such as the
developing programme for the Black Country North and South Staffordshire
Regeneration Zone and the impact of the Urban White Paper. AWM’s funding
support would be required in the following areas:
• Funding a land acquisition and compensation programme with priority projects at
Corn Hill and adjacent to Springfield Brewery (Projects S6 and E3).
• Site investigations and reclamation works on key sites such as Corn Hill (S6).
• Acting where it can to provide gap funding to support development projects,
subject to the approval by the European Commission of proposals to replace the
Partnership Investment Programme (PIP II).
• Acting as an equity partner in respect of the regeneration of the Springfield
Brewery to Low Level Station area.
European Regional Development Fund (ERDF) 6.14 A new Objective 2 programme will become operational in 2000 running through to
2006. The shape of this programme is currently being discussed and it is assumed
that the Canalside Quarter will remain with the eligible area. ERDF funding could be
utilised to support a number of development projects, however it is not suited to
funding up front acquisition and reclamation costs. Potential uses of ERDF resources
include:
• Support towards environmental improvement projects.
• Support for development projects including on-site and off-site infrastructure and
reclamation. ERDF will not generally fund retail and housing projects.
• Support for the re-use of buildings or new development providing start up space
for new businesses or for tourism projects, e.g. at Springfield Brewery.
Wolverhampton Canalside Quarter Section 6.0 Delivery Mechanisms and Funding
December 2000 37
ERDF is available to the public, private and voluntary sectors and as part of the
regeneration process the private sector should be encouraged to make applications
where relevant.
Heritage Lottery (HLF) 6.15 In specific circumstances, HLF could be obtained to support development projects.
The listed buildings within the study area would be obvious potential projects. HLF
can only support projects managed by ‘not for profit’ bodies and thus opportunities
may be limited.
English Heritage (EH) 6.16 The replacement of Conservation Area Partnerships (CAPS) by Heritage Economic
Regeneration Schemes (HERS) has led to EH funding becoming linked to other
regeneration funds. Wolverhampton MBC has already been successful in attracting
HERS funding to projects in the Canalside Quarter focused upon the Union Mill
Conservation Area. However, compared to other sources, HERS will only bring
limited resources (the maximum allocation is £100,000 per annum over 3 years).
Single Regeneration Budget (SRB) 6.17 There are existing SRB programmes operating in Wolverhampton (SRB3) which
could support some aspects of the regeneration process, particularly initial feasibility
work etc. The Wolverhampton Partnership has not been successful in securing
SRB5 or SRB6 funding for projects in the Canalside Quarter, and the prospects in
future rounds (if there are any) will depend upon the shape and scope of such
programmes.
Private Sector Funding 6.18 The majority of funding to implement the Canalside Quarter Strategy will come from
the private sector through the investment decisions of landowners, developers,
companies and ultimately private individuals. The vision put forward for the Quarter
will help to stimulate interest and confidence in the area. However, WMBC and AWM
have a crucial role to play by maintaining the planning framework which supports this
vision and by implementing key early phase projects which facilitate and underpin
development.
Wolverhampton Canalside Quarter Section 6.0 Delivery Mechanisms and Funding
December 2000 38
British Waterways
6.19 The recent DETR document ' Waterways for Tomorrow' sets out a new framework for
the activities of British Waterways to regenerate British Waterways. This includes
measures to attract additional funding to public/private Partnerships to unlock the
development potential of waterway sites, offers further encouragement to BW to
participate in regeneration activity.
West Midlands Local Transport Plan
6.20 The West Midlands Local Transport Plan is a joint submission made by the seven
district councils of the former West Midlands County and the West Midlands
Passenger Transport Authority. Its key objectives include economic revitalisation and
a more sustainable pattern of development and growth. The West Midlands LTP
2000 bid for resources amounts to £90m in 2001/2002 rising to £100m in later years.
6.21 The current bid includes two specific proposals directly relevant to the Canalside
Quarter:
(a) Under the planned maintenance budget provision to replace Wednesfield Road
Bridge
(b) As part of a £15m package entitled “Wolverhampton Town Centre Access”,
proposals to improve the interchange between the High Level Railway Station
and the Bus Station. This includes a new link to Corn Hill.
6.22 Funding for (a) above has been confirmed and an announcement of funding support
towards (b) is awaited. There will be further opportunities to attract additional LTP
funds towards proposals within the Canalside Quarter. The 20-year strategy set out
in the WMLTP 2000 includes an indicative bid for £194 million to support urban
regeneration.
Wolverhampton Canalside Quarter Section 7.0 Sustainability
December 2000 39
7.0 Sustainability
7.1 The condition of the Canalside Quarter at present is reviewed in the Baseline Report
through a sustainability audit (Appendix D). This sets out Wolverhampton’s
sustainability aims (as set out in the Council’s Local Agenda 21 Policies) and uses
these to gauge the level of the sustainability of the Quarter at present, its potential to
be sustainable in the future, and the extent to which such aims can be fulfilled within
the emerging strategy.
7.2 Both the levels of dereliction and the comprehensive nature of the Canalside Quarter
regeneration initiative do, in themselves represent an opportunity to promote
development and operations that are more sustainable in the longer term. Moreover,
a sustainable approach to the Quarter is shaped both by overall policy and by local
conditions and opportunities. Within the Quarter the fact that there are high levels of
dereliction and no significant residential community represents an opportunity to
embrace more radical change within the emerging strategy and subsequently within
newly developing communities.
7.3 The poor quality of local linkages and the opportunities for enhancing these is a
recurring theme that will contribute to achievement of Transportation objectives in
LA21, as will the further enhancement of public transport infrastructure which the
proposals identify.
7.4 The strategy recognises that whilst much of new development is physical in its
nature, for example, the redevelopment of derelict land, and environmental
enhancements, it is the manner in which new development is undertaken that will
affect how sustainable the area can become. Thus the mix of uses that is promoted,
building standards, the provision for public transport, walking and cycling will all affect
the sustainability of future lifestyles.
7.5 The strategy recognises that sustainability has both these physical and social
dimensions. Measures are proposed which address both of these elements. For
example, environmental enhancements along the canal, measures to improve lighting
and to provide CCTV within the minor streets and underpasses. These measures will
serve to promote both the actual levels of safety and the perception/image of the area
in the eyes of the general public.
7.6 Sustainability issues must also be considered within their broader context. As such,
there are a number of elements that can best be addressed at a higher level through
Wolverhampton Canalside Quarter Section 7.0 Sustainability
December 2000 40
Borough wide initiatives. For example, encouraging the use of less polluting vehicles,
or widening community and public participation in health and other public services are
both aims that are not specific to the Quarter but will apply in general terms.