    UMTS RNP and RNO introduction

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    2/33

     

    Objectives

    Have the general idea about the

    RNP and RNO;

    To know the typical RNP and

    RNO procedure;

    Upon completion o thi! cour!e"you will be able to# 

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    3/33

     

    Course Contents

    Brief Introduction

    Dimensioning

    Nominal planning

    Cell planning

    Optimization

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    4/33

     

    Brief Introduction

    Importance of RNP and RNO

    Radio Access networ is more e!pensive t"an ot"ers

    Different area "as different radio environment and

    customized solution is needed

    Relations"ip between RNP and RNO

    RNP tae responsible for pre#sale period

    RNO tae responsible for post#sale period

    RNP is more important t"an RNO

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    5/33

     

    $arget of RNP

    Coverage

     Achieve the required radio coverage with specified probability

    Capacity

    Meet the capacity requirements with acceptable block/delayQuality

    Reach good QoS by linking the capacity and coverage

    Cost

    Minimied the overall cost of the network

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    6/33

     

    $%pical Procedure of RNP and RNO &'(

    Main Ta!k Sub$ta!k

    Preparation

    maps !aero" digital" paper#

    morphology character survey

    definition of coverage ob$ectives

    %eo databa!e check

    %eo database acquisition

    %eo database validation

    %eo database modification

    integration in the planning tool

    &' mea!urement!campaign

    measurement sites definition !position" height" etc&

    measurement sites acquisition

    definition of drive route

    Measurements !preparation" field test#

    C' measurement post processing !filtering and averaging"report#

    Propagation modelcalibration

    propagation model calibration

    performance assessment

    &' indoor mea!urement! C' indoor measurements

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    7/33 

    $%pical Procedure of RNP and RNO &)(

    Main Ta!k Sub$ta!k

    pre$engineering

    definition of link budget

    set up of new pro$ect in planning tool

    definition of coverage thresholds for each R(

    detailed analysis of the planning one

    dimensioning

    setup of the site naming convention

    availability of friendly sitesintegration of friendly sites in the pro$ect

    )ominal planning

    definition and issue of search rings

    R( )ngineering

    site survey

    complete search document

    start of site acquisition

    first set of candidates returned from acquisition

    ranking of candidates

    site visits

    check of drawings

    *g simulation for clusters

    final R)+ report e,port

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    8/33 

    $%pical Procedure of RNP and RNO &*(

    Main Ta!k Sub$ta!k

    Parameter PlanningSC planning

    system and cell parameter planning" R)+ related

    Optimi*ation

    Scheme for -ptimiation

    .rive est

    .rive est Analysis

    0,ternal 1nterference Measurement

    raffic Statistics Analysis

    'orst Cell Analysis

     Alarm Analysis

    C.. Analysis

    C.. Ad$ustment

    Subscriber Complaint Analysis

    2/' Configuration Changes

    -ptimiation Result Confirm

    Reports and .ocumentation

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    9/33 

    Course Contents

    Brief Introduction

    Dimensioning

    Nominal planning

    Cell planning

    Optimization

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    10/33 

    Dimensioning

    $"e purpose of dimensioning is basicall% to give an

    evaluation of t"e number of sites re+uired in t"e planning

    zone in order to reac" t"e performances and capacit%

    objectives for eac" service to be deplo%ed,

    In t"is p"ase- t"e R. tool is usuall% not available- neit"er

    t"e terrain and nor t"e clutter databases,

    Dimensioning tools can "elp us to decide t"e location of

    sites- but not accurate enoug" comparing wit" R.

    planning tools,

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    11/33 

    Assumptions for Dimensioning

    $"e assumptions for dimensioning are usuall%/

    $"e planning area is covered wit" a "e!agonal grid for eac" morp"olog%,

    .or roads- t"ere is no "e!agonal grid- but t"e approac" taes into account

    cells face to face, 0suall% t"e lengt" of t"e roads is divided b% twice t"e cell range

    to find t"e re+uired number of cells,

    $"e cell range is defined for eac" morp"olog% or for t"e roads b% t"e lin

    budget of t"e limiting service in t"is morp"olog% &service wit" t"e smallest cell

    range(

    $"e different morp"ologies generall% considered are dense urban- urban-

    suburban and rural,

    Normall%- no tuned propagation model being available in t"is p"ase- t"e

    standard propagation model lie CO1$)*' 2ata is generall% used

    $"e sites are not positioned- onl% a global number of sites is given

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    12/33 

    Dimensioning C"art .low

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    13/33 

    Course Contents

    Brief Introduction

    Dimensioning

    Nominal planning

    Cell planning

    Optimization

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    14/33 

    Nominal Planning

    Nominal planning is more detailed planning based on

    dimensioning results,

    In t"e nominal planning- all sites are positioned accuratel%

    in t"e R. planning tool, $"e output is t"e nominal plan and

    t"e t"eoretical specification for eac" site, Nominal planning

    is also called pre#engineering p"ase and pre#design p"ase,

    .rom t"e specification of t"eoretical sites- a searc" zone

    will be defined and used as t"e input for site searc",

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    15/33 

    Nominal Planning C"art .low

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    16/33 

    Initial site c"oice

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    17/33 

    Constraints on site c"oice

    Performances objectives

    $"e performance objectives are issued b% t"e mareting, $oget"er

    wit" t"e terrain and clutter c"aracteristics- t"e% will determine t"e

    inter site distance and antenna "eig"t,

    Antenna 2eig"t

    .or eac" clutter- t"e R. planners must "ave an idea of t"e average

    clutter "eig"t so t"at t"e nominal sites antenna "eig"ts can be fi!ed,,

    .riendl% sites

    $"e use of friendl% sites is t"e main constraint , $"ese sites ma% are

    mainl% from t"e re#use of )nd generation sites- or b% t"e need to

    s"orten t"e deplo%ment time line &e,g, b% signing frame agreements

    wit" large real estate "olders(,

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    18/33 

    34453445 34453445645645

    745745

    4545 895895 :45:45745745

    1imulation 3ec"anism

    Coverage +robability Calculation

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    19/33 

    1earc" 4one Definition

    Search *one in den!e urban" urban" !ub$urban

    Site! are placed at the node! o a he+agonal grid, The grid

    mu!t be adapted to the terrain and clutter o the area,

    Theoretical !earch ring radiu!#

    'here R i! the cell range and d i! the inter !ite di!tance a!

    deined below#

    128

    d  Rr    ==

    d

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    20/33 

    $"eoretical site specification

    The theoretical !ite !peciication i! output during or at the end o the pre$

    engineering pha!e, Thi!" together with a !earch ring deined or each

    theoretical !ite" i! the input to !ite ac-ui!ition,

    )+ample! or the Theoretical !ite !peciication#

    .ate o creation o the theoretical !ite" name o R( planner 

    Name o !ite /naming convention to be deined or the pro0ect1

    &ode o !ite /coding convention to be deined or the pro0ect1

    Type o !ite# New !ite or )+i!ting !ite /riendly !ite1

    2ddre!! o the !ite i any and Theoretical !ite coordinate!

    2ntenna# Height!" theoretical a*imuth!" type o antenna" length" width"number o antenna per a*imuth,

    &overage ob0ective o the !ite in word!# thi!" together with the map o

    coverage" will help !ite ac-ui!ition to under!tand the ob0ective! o the !ite,

    The re-uired room or the e-uipment /height" area on the ground" etc31

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    21/33

     

    Course Contents

    Brief Introduction

    Dimensioning

    Nominal planning

    Cell planning

    Optimization

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    22/33

     

    Cell Planning

    $"e final RNP related cell engineering parameters and

    reports are t"e e!port of cell planning, $o ac"ieve t"is/

    .irstl%- we "ave to do site surve% according to t"e nominal planning results

    &searc" ring and $"eoretical site specification( and verif% and ran for eac"sites,

    1econdl%- t"e confirmed sites s"ould also be verified b% simulation- to

    c"ec t"e% satisf% t"e networ targets or not,

    .inall%- e!port t"e final report and results, $"is report will guide t"e

    engineering construction,

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    23/33

     

    Cell Planning C"art .low

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    24/33

     

    1ite searc"

    Once a candidate !ite ha! been !pot" the !ite ac-ui!ition !hould

    gather all the inormation that will be re-uired or thorough

    evaluation o the candidate !ite and inally the ranking o the

    candidate,

    The criteria or evaluation are mainly#

    R( related /coverage 4 intererence1

    .eployment /technical work re-uired by the !ite" acce!! to the !ite"

    lightning protection" etc,,1

    &o!t o the !ite

    Probability o obtaining all the re-uired authori*ation! or the !ite

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    25/33

     

    Candidate raning

    The ollowing criteria will be taken into account#

    R( ranking# coverage and intererence ranking i! the mo!t important,

    The !ite !hould cover the ob0ective it i! de!igned or and at the !ame time

    interere a! little a! po!!ible with the other !ite!, (or e+ample" contrarily

    to %SM" high$ri!e candidate !ite! or UTR2N will be !y!tematically

    re0ected in order not to impair the traic capacity,

    .eployment ranking# !everal criteria linked to the practical !ite!

    deployment will have to be taken into account#

    Site !haring

    Room or e-uipment# 5TS" antenna

    2vailability o energy !upply and lea!ed line

    Negotiation a!pect# what i! the probability to obtain the lea!e or the !ite

    )nvironmental a!pect!# what i! the probability to obtain the agreement rom

    the environmental authoritie!

    Total co!t o the !ite

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    26/33

     

    1ite 5alidation

    &hoice o candidate

    R(# ideally the be!t candidate !hould be cho!en,

    Negotiation# the !ite cho!en mu!t be negotiable or an acceptable price

    lea!e or buyable or a rea!onable price and thi!" in a delay compatible

    with the pro0ect,

    (inal choice# the validation o the cho!en candidate !ite will be inal

    ater the technical vi!it,

    Technical vi!it

    The purpo!e o the technical vi!it i! to grant the inal validation or the

    candidate !ite, .uring thi! vi!it" the conormity o the !ite will be checked

    and the work to be done on the !ite evaluated,

    Thi! vi!it i! the inal !tep beore the !ite i! build" !o it mu!t be accurate,

    The output o thi! technical vi!it will be a technical document giving

    detailed inormation on the work to be carried out on the !ite, Thi!

    document will be the ba!e to prepare the work planning on the !ite,

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    27/33

     

    Course Contents

    Brief Introduction

    Dimensioning

    Nominal planning

    Cell planning

    Optimization

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    28/33

     

    Optimization

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    29/33

     

    Optimization

    1ingle site verification

    $"e first p"ase of optimization involves functionalit% verification of

    ever% new site,

    $"e objectives of t"e single site verification are to ensure t"ere are

    no faults related to site installation or parameter settings,

    single s iteverifcation test

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    30/33

     

    Optimization

    R. optimization

    Once all t"e sites in a given area are integrated and verified- R.

    &or Cluster( optimization could begin,

    $"is refers to t"e main p"ase of optimization w"ic" aims at

    optimizing coverage w"ile in t"e same time eeping interference

    and pilot pollution under control over t"e target area,

    $"is p"ase also includes t"e verification and optimization of t"e

    *6 neig"bor lists,

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    31/33

     

    Optimization

    1ervices $esting 7 Parameter Optimization

    $"e different services s"ould be field tested in order to assess t"e

    performance and identif% an% need for specific parameter

    optimization,

    $"is testing s"ould normall% be conducted in areas of good R.

    conditions in order to e!clude an% coverage issues, 1uc" testing

    does not need to be performed for eac" cell but t"e drive route

    must include different clutter t%pes and environments,

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    32/33

     

    Optimization

    Regular Reference Route $esting 7 1tats Anal%sis/

    Constant monitoring and evaluation of t"e networ performance

    will be re+uired in order to identif% an% new issues t"at could

    arise- for e!ample- as a result of increase in traffic or c"anges in

    t"e environment,

    1uc" monitoring can be based on field testing as well as networ

    stats anal%sis, 1tats anal%sis could include- among ot"ers- various

    triggers t"at indicate t"e need for networ upgrade and e!pansion,

    Results of t"e regular anal%sis ma% necessitate re#visits to t"e R.

    optimisation and8or parameters9 tuning,

  • 8/17/2019 W(Level2)-WCDMA RNP and RNO-20050526-A-1[1].0

    33/33