Wired Liquid Level Acquistion

2
Click on Pick a Sensor buon The background noise screen will show. Click “Take Shot”. Report can be printed or emailed Click on Report buon Sensors are automacally se- lected based on prior setup. Click pick a sensor if  you want to change sensors. Well Analyzer Gas Gun & PT Use methods and tools to rene results View Pressure Buildup 1 Click on Pick Well buon Connect Well Analyzer 2 Select Liquid Level Click on Liquid Level  buon 3 Pick Sensors 4 Zero the Pressure Sensor 5 Install Sensors on Well 6 Start Acquisition Click on Start New Test buon 8 Get Report 7 Results, Finish Pressure Buildup If  using a PT, observe casing pres- sure buildup for one to two mins, then click End Pressure  Buildup to stop test. Click the Zero Off set tab, then click Get New Off set When nished, close popup window to proceed with tesng. Changes save automacally. Click the Use Shown Value to accept new off set Wired Liquid Level Acquisitio n Wired Liquid Level Ac quisition Wired Liquid Level Acqu isition Charge the gas gun 150-300 psi above surface pressure on the well. Close the gun bleed valve.  Open casing valve between gun and wellhead. Close casing valve to the owline. QAD 5000-6 

Transcript of Wired Liquid Level Acquistion

Page 1: Wired Liquid Level Acquistion

8/20/2019 Wired Liquid Level Acquistion

http://slidepdf.com/reader/full/wired-liquid-level-acquistion 1/1

Click on “Pick a Sensor” buon 

The background no

screen will show. C

“Take Shot”. 

Report can be 

printed or 

emailed 

Click on “Report” buon 

Sensors are automacally se-

lected based on prior setup. 

Click “pick a sensor” if  you want 

to change sensors. 

Well Analyzer Gas Gun & PT 

Use methods and tools 

to refine results 

View Pressure 

Buildup 

1

Click on “Pick Well” buon 

Connect Well Analyzer 2 Select Liquid Level

Click on “Liquid Level” 

buon 

3 Pick Sensors 4 Zero the Pressure Sensor

5 Install Sensors on Well 6 Start AcquisitionClick on 

“Start New

Test” buo

8 Get Report

7 Results, Finish Pressure Buildup

If  using a PT,  observe casing pres-

sure buildup

 for

 one

 to two

 mins,

 

then click “End Pressure Buildup” 

to stop test. 

Click the “Zero Off set” tab, 

then click “Get New Off set” 

When finished, close popup window to proceed with 

tesng. Changes save automacally. 

Click the “Use Shown Value

to accept new off set 

Wired Liquid Level AcquisitionWired Liquid Level AcquisitionWired Liquid Level Acquisition 

Charge the gas gun 150-300 psi 

above surface pressure on the well. 

Close the gun bleed valve. 

Open casing valve between gun 

and wellhead. 

Close casing valve to the flowline. 

QAD 5000-6