wind power senario

25
Wind Power Wind Power Senario Senario By B N Chaitanya

Transcript of wind power senario

Page 1: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 1/25

Wind PowerWind Power

SenarioSenarioBy

B N Chaitanya

Page 2: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 2/25

Introduction

Power is an essential part in day to day life• In India power sector have improved

drastically from fifth five year plan.

• After liberalization policy in India many

private players have entered into Indianpower sector

• With the liberalization policy governmentgave 100% foreign equity for powersector.

• Government have started power projectsfrom fifth five year plan in order to meet

the supply and demand of the power in

Page 3: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 3/25

Before 1991

• 5th five year plan (1974-79)

• NTPC:

 – Current installed capacity of NTPC group has

become 33,194 MW.

 – NTPC generates power from Coal and Gas.

 – In AP it has only Coal based plants at

Ramagundam (2600MW) and Simhadri

(1000MW).

Page 4: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 4/25

• NHPC:

 – No project in AP.

 – Total installed capacity of 4502 MW

• NPTC:

 –Formed in 1989

 –

Renamed as power grid in1992

Page 5: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 5/25

After 1991

• Creation for private generating

companies

• 100% foreign equity

• Private participation in renovation

and modernization

Page 6: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 6/25

Installed power plants in AP• Nuclear plants – No power plants

•Themal: – Ramagundam Thermal Power Station-

62.5MW

 – Kothagudem thermal plant-1220 MW

 – Dr Narla Tatarao TPS - 1760 MW

 – Rayalaseema Thermal Power Station –840MW

 – Kakatiya Thermal Power Station – 500MW

•Gas: – GVK Gas power plant – 220MW

 – Spectrum Gas power plant – 209 MW

 –

Mytas – 464 MW – KGPL – 445 MW

Page 7: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 7/25

 – GMR – 370 MW

 – Reliance – 220 MW

• Hydro:

• Srisailam hydro plant

Installed capacity1,670 MW

• Nagarjunasagar plant has installed

capacity of 965 MW

• Wind Power:

•  The Indian wind energy sector has an

installed capacity of 12GW

• India is ranked 5th in the World

S o u r c e : National Hydroelectric Power Corporation 

:o u r c e:// . .http mnre gov in

Page 8: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 8/25

Wind Power in AP

:o u r c e

Page 9: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 9/25

Advantages of wind power

• Construction time is less.

• Fuel cost is zero.

• O & M cost is very low.

• Capacity addition can be in modular form.

•   There is no adverse effect on global

environment.

• Capital cost ranges between 4.5 crores to

6.85 crores per MW

Page 10: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 10/25

Opportunities for windpower in AP

• Available Potential: 8968 MW

• Installed Capacity: 170 MW

• Ministry has been issuing guidelines for

wind power development in order to

bring about balanced growth of thesector.

• State govt. has issued power policy to

encoura e IPPs

Page 11: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 11/25

AP State Policy

• Rs 3.50/kWh without any escalation for 10

years.

•Banking is not allowed

•  Third party sale is not allowed

• Captive sale is not allowed

• Penalty on kVArh consumption 10

paise/kVArh upto 10% and 25 paise/

kVArh above 10% :o u r c e/N RE S N A s

Page 12: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 12/25

INCENTIVES

•By Govt. of India

• 80% Accelerated Depreciation

•  Ten year tax holiday

• Generation Based Incentive (GBI)

Page 13: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 13/25

By AP State Govt.

• Allocated available Govt. land.

 Technical Consultancy Services

through NEDCAP.

Page 14: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 14/25

Generation BasedIncentives

Page 15: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 15/25

Eligibility

 – Only for projects commissioned

 – Only for projects validated by C-WET

 – Capacities are commissioned for sale

of power to grid

Page 16: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 16/25

Implimented for

 – Improving quality of turbine

 – Linked to actual generation and not

commissioning of plant

 – Increase in wind sector as a whole

and to promote higher efficiency in

generation

Page 17: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 17/25

Not applicable to• Captive consumption

•  Third party sale

• Who avail the benefits of depreciation

P aym e n t•  B y IR E D A th ro u g h th e ir d e sig n a te d b a n k

a c c o u n t

• -H a lf y e a rly b a sis

• -

Page 18: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 18/25

TYPICAL FLOW CHART FORIMPLEMENTATION OF WIND POWER

PROJECT IN ANDHRA PRAESH

Page 19: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 19/25

 dentification of Potential Site by WRD

 apacity allotment from NEDCAP

 ssignment of PPA by APTRANSCO and signing o

 nspection and safety clearance approval from CEIG

 oint Meter Reading will be taken at substation

( )nterconnection Synchronization Approval from DISCOM

 ayment will be collected from DISCOM

Page 20: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 20/25

Generation of Power

Page 21: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 21/25

AC DC DC

 ariableFrequency

 ero Frequency

 00V Constant 50 Hz ACVoltage

AC

-ooling Sub Statio3K

V

/00V 33KVTransformer

 eteringYard

 IND ENERGYGENERATOR

Click

Rectifier

Inverter

Page 22: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 22/25

 etering-ard A

 etering-ard B

 etering-ard C

 etering-ard D

 ain and CheckMeters

,solaters PT andCT

33KV 132KV

33KV

33KV

33KV

33KV

33KV

-ooling SubStation

-i Directional ransformer

/3 13 2K V

 lickHere

 ain nd heck

Meters

Page 23: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 23/25

Thank you

Page 24: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 24/25

Page 25: wind power senario

8/7/2019 wind power senario

http://slidepdf.com/reader/full/wind-power-senario 25/25

 ain and checkmeter

 urrent ransformer and otential

Transformer

 upply to-oo li ng su b

station

 up pl y f ro mWEG