Williamstown Fire DepartmentFire Station Feasibility Study
2008 - 2013
![Page 2: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/2.jpg)
Existing Station
Location 34 Water StreetBuilt 1950Extended the building front forward 15’ in 19904325 Sq ft 1 story building1/3 Acre site River bank on one sideMasonry wallsWood framed roof
![Page 3: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/3.jpg)
Apparatus Bay
• Existing– 2,422 sq. ft.– 3 bays wide– 2 Overhead doors: 1 -10’ x 11’& 1- 20’ x 11’– 4 trucks total =1,320 sq. ft.– Other miscellaneous equipment
![Page 4: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/4.jpg)
Existing Conditions
• Can’t open doors Tight quarters
Isle Obstructions Firefighter to close to Trucks
![Page 5: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/5.jpg)
Existing Spaces
Training Meeting Space
Kitchen
Office
![Page 6: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/6.jpg)
Existing Parking
![Page 7: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/7.jpg)
Space Needs ProgramOutlined By McGuire Group
2008
• Staffing and Parking• Space Allocations• Apparatus and Support• Public Lobby/Dispatch• Administration• Firefighters Headquarters• Indoor Training• Building Support and Mechanical
![Page 8: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/8.jpg)
Operational Issues
• Overhead doors too narrow and too low• Apparatus bays too narrow and too low• Administrative spaces inadequate• No Day Room for firefighters• Air-Pak filling station in apparatus bay is a hazard• No Decontamination area for Gear and Equipment• Male/ Female Shower rooms non-existent• Kitchen is too small for current staff
![Page 9: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/9.jpg)
Space Deficiencies
• Only one office• No room for new construction print review• No office for Asst. Chief’s / Training , Pre-
Planning fires, Truck & Equipment maintenance records
• No area for code enforcement information• Not adequate space for firefighters
– Locker room – Shower room
![Page 10: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/10.jpg)
Apparatus Bay ComparisonWilliamstown FD Existing
2242 Sq./FtModern Fire Station
6100 Sq./Ft
![Page 11: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/11.jpg)
Apparatus Bay Space Needs
Williamstown FD Existing Modern Fire Station
![Page 12: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/12.jpg)
Administrative Space
Present Conference Rm Present Office
Modern Modern
![Page 13: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/13.jpg)
Training
ModernExisting
![Page 14: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/14.jpg)
New Apparatus Area
![Page 15: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/15.jpg)
Apparatus
Williamstown 1975 Williamstown 2012
![Page 16: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/16.jpg)
Proposed New Site562-580 Main St
![Page 17: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/17.jpg)
Aerial View of Proposed Site
![Page 18: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/18.jpg)
![Page 19: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/19.jpg)
![Page 20: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/20.jpg)
![Page 21: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/21.jpg)
Size Comparison
ExistingStation
![Page 22: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/22.jpg)
2009, 2010 & 2011 Calls By Zones
Zone 10, 2%
Zone 9, 4%
Zone 8, 2%
Zone 7, 7%
Zone 6, 9%
Zone 1, 20%
Zone 2, 17%
Zone 3, 9%
Zone 4, 14%
Zone 5, 16%
![Page 23: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/23.jpg)
2009, 2010 & 2011
Zone 102%
Zone 94%
Zone 82%
Zone 77%
Zone 69%
Zone 516%
Zone 414%
Zone 39%
Zone 217%
Zone 120%
Rt. 2 S. Side, South St. to Stratton Rd., Gale Rd
Rt. 2 N. Side, North St. to Willow Ln., South ofN. Hoosac Rd.
South St. to NW Hill, Thornliebank, Bee Hill toBulkey St.
N. Hoosac & Simonds Rd. Everything N to NE
E. of 460 Main to NA, Stratton Rd. E. to NA
Cold Spring, Bee Hill South to 5 Corners
Beyond 5 Corners, all of Oblong
NW Hill, Petersburg, Bulkley
Blair Rd. to 5 Corners, the Hopper & Mt. Hope
Mutual Aid
![Page 24: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013.](https://reader035.fdocuments.net/reader035/viewer/2022070306/5516bada550346f0208b5640/html5/thumbnails/24.jpg)
Thank You
AnytimeAnywhereAnything