Page 1: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

WIGOS Implementation Status in RA II and National Activities

Chong PEI, Division Chief, Department of Integrated Observations of CMA

Page 2: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

Outline

1. Background

2. Brief introduction of R-WIP-II

3. Progresses

4. National WIGOS activities in CHINA

5. Challenges and way forward2

Page 3: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

3

1. Background

•Cg-XVI Decided to implement WIGOS and Request(1) To develop R-WIP

(2) To coordinate WIGOS implementation activities with the WIS in their operating

plans and working programs

(3) To promote capacity-building and outreach activities to assist Members in the

implementation of WIGOS

•The 15th RA II session (December, 2012, Doha, Qatar)

•R-WIP-II was approved and adopted as Resolution 4.4/1

3

Page 4: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

2. Brief introduction of R-WIP-II

• R-WIP-II identified 7 individual areas with respect to the 10 areas of the WIGOS IP,

• Most of the activities will be implemented via 7 Actionable “RAII WIGOS projects”

4

Page 5: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

Monitor and review the Implementation of EGOS- IP in RA II

Key Regional Players: China

Hong Kong, China

Completed

' Established an expert group

' Drafted Work plan ' Developed Fund Plan

On-going

' A Portal will be developed

' Gaps and Priority actions will be Identified

3. Progress of implementation of WIGOSproject I

5

Page 6: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

Standard and Practical Portal, including Technical Documents with Necessary Details in English

from all RA II Members

Key Regional Player: Republic of Korea

Completed _ KMA’s domestic project for the

standardization of met observations has finished the 1st phase(2013). Domestic >3,500 sites data from 27 agencies were collected as one system

' By the end of 2014, 80% of the data are collected and QC as operational utilization in real time

On-going

' In 2015, a portal will be developed to share the experience and benefits from the standardization

' Preparing for collecting regional standard and best practices regarding data exchange, sensor inter-comparison or calibration from members

3. Progress of implementation of WIGOSproject II

6

Page 7: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

Integration of Surface-based Remote Sensing Data in the East Asia

Key Regional Players: JMA, CMA, KMA

Completed

— Review progress of on-going activities: •a 2-D grid product of analyzed precipitation was generated experimentally from KMA’s CAPPI and AWS by JMA. •Dissemination plan for ground-based GNSS on WIS/GTS were discussed at joint meetings

— Identified technical issues for data exchange in operations

On-going

' Encourage to exchange data among members•KMA is preparing to expand GNSS data dissemination from ~20 stations via WIS, which are collected domestically by 2016

' To discuss how to develop a feasible and optimal draft design on integrated surface-based remote sensing observations

project III-1 3. Progress of implementation of WIGOS

Page 8: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

Capacity Building in Radar Techniques in the Southeast Asia

Key Regional Players: ASEAN-SCMG: Thailand, Malaysia

Completed

' Regional Training Workshop on Weather Radar Maintenance, QE and Forecast held in Bangkok, on 24 Feb to 7 Mar 2014, •20 participants from Indonesia, Lao PDR, Malaysia, Philippines, Singapore, Thailand and Viet Nam joined it•JMA, Japan Radio Co, and WMO Cooperation for Radar between TMD and JMA is ongoing under Japan-ASEAN Integrated Fund

' The joint project of ASEAN Radar Composite between Thailand and Malaysia has not achieved any specific progress through ASEAN SCMG’s meeting in Vientiane, LAO PDR in Sep 2014

On-going • Establishment of

any trans-boundary activities for radar network

project III-2

8

3. Progress of implementation of WIGOS

Page 9: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

Enhance the Availability and Quality Management Support in Surface, Climate and Upper-air Observations

Key Regional Players: JMA (Coordinator) and Members of Coordination Group

Completed

' WMO/JMA Survey on met. instruments, calibration and training in RA II was implemented, and the consolidated report was available on the WMO RIC Tsukuba website.

' Experts from RIC Tsukuba provided Bangladesh Met. Department (BMD) practical on-the-job training on instrument.

On-going

' To develop a draft report for the investigation survey on quality management of meteorological observation by NMHS in RA II.

' To hold a workshop focusing on sharing and transferring skills of observations QM.

project IV

9

3. Progress of implementation of WIGOS

Page 10: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

Develop a Sand and Dust Storm Warning Advisory and Assessment System (SDS-WAS) in Asia Node

•Key Regional Players: : China, Japan, Republic of Korea

Completed

' The dust forecast model has been continuously operated throughout the year daily, which consists of a NWP model with on-line parameterizations of the atmospheric dust cycle.

' A portal for dust forecast products was developed.

http://eng.weather.gov.cn/dust/

On-going

' Dust forecast model products verification will be carried out in the near future.

' CMA will apply for WMO Regional Specialized Meteorological Centers with Activity Specialization on atmospheric Sand Dust Forecasts.

project V

10

3. Progress of implementation of WIGOS

Page 11: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

Develop Support for NMHSs in Satellite Data, Products and Training

•Key Regional Players: : Japan, Republic of Korea and other satellite operators in RA II

Completed ' Issuance of newsletters to RA II

Members• 4 in 2013 • 3 in 2014 (Oct)

' Asia/Oceania Met. Satellite Users’ Conference

• 4th conference was held in Melbourne, Australia from 9-11 Oct. 2013 by Bureau of Meteorology with two day’s training event

• 5th conference was held in Shanghai, China,from 19-21 Nov. 2014 by CMA with two day VLab training event

• Roshydromet committed to be the 5h sponsor

On-going

' Supportive activities to be prepared for satellite data users concerning the new generation of geostationary meteorological satellites

' To establish a permanent secretariat , preferably within the WMO Space Programme Office

' 6th Asia/Oceania Meteorological Satellite Users’ Conference will be prepared by JMA with 3rd Meeting of the Coordinating Group of the RA II WIGOS Project in 2015

' 7th Conference will be the Joint AOMSUC7-AMS meeting in 2016

project VI

11

3. Progress of implementation of WIGOS

Page 12: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

.Strategic Development Under WIGOS Framwork .Strategic Development Under WIGOS Framwork

_ Five years Plan_ Five years Plan

_ Standards_ Standards

_ Project Surpports_ Project Surpports

_ Process Monitoring_ Process Monitoring

4. National WIGOS activities in CHINA

Page 13: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

. Network Design Under WIGOS Framwork. Network Design Under WIGOS Framwork

_ Project on OSE & OSSEs & FSO in East of China, NWP-Based

_ Will give a report to WIGOS 2016, Shanghai

_ will extend to Qinghai-Tibet Plateau

4. National WIGOS activities in CHINA

. . Sharing data with other Agencies Sharing data with other Agencies

_ Ocean data + Atmospheric data to help forecasting Typhoon _ Hydrological data + Atmospheric data to help nowcasting warning

_ PMs + Atmospheric data to help predicting hazy and fog

Page 14: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

4. National WIGOS activities in CHINA

. . New Generation Radar Tech and Dual-PolNew Generation Radar Tech and Dual-Pol

_ Phase coding and dual-PRFs _ Dual-pol upgrading

_Wind Profilers experimental network for NWP

_ “BIG DATA processing” tech to enhance radar data quality

.Integrate all existing Operational System.Integrate all existing Operational System

_ Bring National and Provincial into An Integrated ONE _ Metadata standardization, collection through the WIS

Page 15: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

. . CMA Integrated Observing SystemCMA Integrated Observing System Operational Platform Operational Platform

ONE platform Monitoring > 10 types of instrument > 50,000 sensors

StandardStableExtendableEasy to maintainIntegratedEasy to operateSave Resource

4. National WIGOS activities in CHINA

Page 16: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

identify data problems automatically

Are you sure your radar working well?

Wrong Data

Data Quality Management

Page 17: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

17

•Data quality Monitoring•Data quality control

Data Quality Management

COMPARISON• Automatically Data quality

control and Instruments Performances monitoring by standards and criteria in near real-time.

• Establish links with WMO other programs including WIS to provide them with the monitoring results by series monitoring reports

Page 18: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

Key issues in Implementing WIGOS in RA II

General Challenges in RA II•Lack of understanding of potential benefits•Lack of effective collaboration mechanisms among key partners and stakeholders•Low level of commitment from Members

Pressing challenges & way forward•How to motivate RA II Members to implement new WIGOS technical regulation and Manual

– Urgent need of explanatory guiding material to navigate Members to implement WIGOS regulatory practices (esp. Metadata of regional networks, etc)

– Training of RA II EG-WIGOS members, to enable them to assist RA II Members to carry on the implementation activities

– Strengthen the supervising mechanism on WIGOS implementation, hopefully by joint efforts of RA II MG and ICG-WIGOS

– Promotion of regional data exchange following WIS standards (metadata)– WIGOS RA II Centers (CMA Monitoring platform can be a good showcas

e)

18

Page 19: WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.

Thank you for your attention!