Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins...
Transcript of Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins...
Wiggins Island Coal Export Terminal (WICET)
2
Introduction
Wiggins Island Coal Export Terminal (WICET)
• Overview
• Inloading
• Stockyard
• Outloading
Contents
3
Stage 1 of a new coal export facility recently completed in the Port of Gladstone
Capital cost approximately A$3.1 billion
One inloading conveyor
One bridge stacker (125m spans)
One outloading conveyor
One berth
One shiploader
27Mtpa throughput capacity
Wiggins Island Coal Export Terminal (WICET)
4
Aurecon’s role via the AH JV (since 2004):
• Pre-feasibility study
• Feasibility study
• Detailed design
• Civil
• Structural
• Mechanical
• Electrical
• Piping
• Instrumentation and Control
• Environmental
• Onsite construction assistance
• Commissioning
• Ongoing operational assistance
Wiggins Island Coal Export Terminal (WICET)
5
3D model deliverables:
• Bentley Navigator
• Multi-disciplined
• Structural
• Mechanical
• Electrical
• Piping
• Intelligent model files
3D models were complimented by 2D drawings:
• Standard drawings
• Specific details
Wiggins Island Coal Export Terminal (WICET)
6
Wiggins Island Coal Export Terminal (WICET)
7
• Main source of delivery to site
• Latent ground conditions
• Additional load out capabilities added
Barge Wharf
8
• Concrete filled cofferdam
• Reinforced sheetpile front wall
Barge Wharf
9
• Multi-level concrete building
• Train unloading facility
• Interaction with Queensland Rail (QR)
Dump Station
10
Inloading Tunnels
11
• Various tunnel solutions used• Box tunnel (cut and cover)
• Jacked box tunnel
• Arched tunnel
Inloading Tunnels
12
• Supporting 45m spanning gantries
• 3.6m diameter external, 2.4m diameter internal
• Concrete filled annulus
Stockyard Trestles
13
Gantries
• 21 gantries
• Typical 45m span
• 4.6m deep girders
• 300t each
Stockyard Gantries
14
Bridge stacker
• 125m spans
• Shuttling conveyor
• Telescopic chutes
• 780t each bridge
Bridge Stacker
15
Bridge Stacker
Delivery to site on 92m barge as a single 125m span
16
Lifting and installation of western span via a dual crane lift
Bridge Stacker
17
Stockyard reclaim tunnel with reclaim chamber (12 off) and service/escape tunnel
Reclaim Tunnels
18
Construction of reclaim tunnel (RC1) and reclaim chambers
Reclaim Tunnels
19
Jetty galleries (76 off)
• 24m span
• Aluminium full width floors
• 1.8km jetty
Jetty
20
Head end of jetty for transfer onto the wharf conveyor
Jetty
21
Wharf modules
• 9 modules
• 500t to 1200t
• Concrete deck installed
Wharf
22
Wharf module installation via dual crane lift from Jumbo Jubilee vessel
Wharf
23
Shiploader
• 1300t
• 8250tph capacity
• 16m rail gauge
• 53m long boom
Shiploader
24
Shiploader
25
Future construction is planned at WICET to increase the facilities throughput capacity:
• WEXP1 (when completed)
• Two inloading conveyors
• Increased stockyard capacity
• Two outloading conveyors
• Three berths
• Two shiploader
• WEXP2 (when completed)
• Three inloading conveyors
• Further increase to stockyard capacity
• Three outloading conveyors
• Four berths
• Three shiploader
Wiggins Island Coal Export Terminal (WICET)