Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... ·...

21
COMPLETE Wickham Transport Interchange Project Pollution Incident Management Plan Project Name Wickham Transport Interchange Location: Project Number Client LOR Document Number Issued By: Daniel Keegan Authorised By: James Kennedy Laing O'Rourke office address 100 Arthur Street North Sydney NSW 2060 Signed: James Kennedy 01 02 31 Oct 2016 Laing O'Rourke Australia Construction Pty Limited ABN: 39 112 099 000 Newcastle, NSW G85 Transport for NSW (TfNSW) WTI-LOR-PMP-0016 Project Environmental Representative Laing O'Rourke Project Leader Laing O'Rourke Issue incorporating TINSW comments Periodic Review ( 12 months) Level 4, Innovation Place, 100 Arthur Street, North Sydney NSW 2060 tel: +61 2 9903 0300 fax: +61 2 9903 0333 web: www.laingorourke.com.au

Transcript of Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... ·...

Page 1: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

COMPLETE

Wickham Transport Interchange Project Pollution Incident Management Plan

Project Name Wickham Transport Interchange

Location:

Project Number

Client

LOR Document Number

Issued By: Daniel Keegan

Authorised By: James Kennedy

Laing O'Rourke office address 100 Arthur Street North Sydney NSW 2060

Signed: James Kennedy

01

02 31 Oct 2016

Laing O'Rourke Australia Construction Pty Limited ABN: 39 112 099 000

Newcastle, NSW

G85

Transport for NSW (TfNSW)

WTI-LOR-PMP-0016

Project Environmental Representative Laing O'Rourke

Project Leader Laing O'Rourke

Issue incorporating TINSW comments

Periodic Review ( 12 months)

Level 4, Innovation Place, 100 Arthur Street, North Sydney NSW 2060 tel: +61 2 9903 0300 fax: +61 2 9903 0333 web: www.laingorourke.com.au

Page 2: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

Register of Changes – Rev 02

Page / Reference Details

Throughout Minor editorial corrections

Section 3 Updated details of satellite site compounds

Appendix A Updating details of PIRMP tests

Appendix D Updating Environmental Control Maps to latest version

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 2 of 17

Page 3: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

Terms and Definitions The following terms, abbreviations and definitions are used in this document:

Terms Explanation

CLM Act Contaminated Land Management Act 1997

EPA Environment Protection Authority

EPL Environmental Protection License

ERC Emergency Response Coordinator

ErSed Erosion and Sediment (controls)

LORAC Laing O’Rourke Australia Construction

LORAC Laing O’Rourke Australia Construction

OEH Office of Environment and Heritage

PIRMP Pollution Incident Response Management Plan

POELA Protection of the Environment Legislation Amendment Act

POEO Act Protection of the Environment Operations Act 1997

POEO Regs Protection of the Environment Operations (General) Regulation 2009

TfNSW Transport for New South Wales

WTI Wickham Transport Interchange Project

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 3 of 17

Page 4: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

Table of Contents 1 Purpose ................................................................................................................................................................. 5 2 Scope .................................................................................................................................................................... 5 3 Distribution Policy ................................................................................................................................................. 5 4 Definitions ............................................................................................................................................................. 5 4.1 Material Harm ........................................................................................................................................................................... 5 4.2 Pollution incident ...................................................................................................................................................................... 6 5 Notification ............................................................................................................................................................ 6 5.1 Duty to report a pollution incident ............................................................................................................................................ 6 5.2 Responsibility ........................................................................................................................................................................... 6 5.3 Who to notify of material harm ................................................................................................................................................ 6 6 Regulatory Authorities and project personnel to be notified ............................................................................. 6 7 Notification and Services ..................................................................................................................................... 7 7.1 Regulatory Authority ................................................................................................................................................................ 7 7.2 Emergency Services ................................................................................................................................................................ 7 7.3 Contaminated Land ................................................................................................................................................................. 7 8 Notification Procedure .......................................................................................................................................... 7 9 Community and Stakeholder Notification ........................................................................................................... 8 10 Hazards ................................................................................................................................................................. 8 11 Potential Scenarios .............................................................................................................................................. 9 11.1 Spills / leaks from plant i.e. fuels and oils ............................................................................................................................... 9 11.2 Hazardous chemicals .............................................................................................................................................................. 9 11.3 Land contamination/Poor Waste Management ..................................................................................................................... 9 11.4 Dust generation ........................................................................................................................................................................ 9 11.5 Effluent leaks ............................................................................................................................................................................ 9 11.6 Water contamination by dewatering or stormwater runoff ..................................................................................................... 9 12 Pre-emptive actions to be taken .......................................................................................................................... 9 13 Environmental Mapping Systems ....................................................................................................................... 9 14 Safety Equipment ................................................................................................................................................. 9 15 Prepare, Test and Maintain ............................................................................................................................... 10 16 Staff Training ...................................................................................................................................................... 10 Appendix A – PIRMP Test Tracking Spreadsheet .............................................................................................................................11 Appendix B – Emergency Reporting Flow Chart ...............................................................................................................................12 Appendix C – Emergency Response Plan (Chemical Release or Explosion, spill or leak) .............................................................13 Appendix D - Environmental Control Maps ........................................................................................................................................14 Appendix E – PIRMP Risk Assessment .............................................................................................................................................15

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 4 of 17

Page 5: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

1 Purpose This document aims to provide procedures for responding to pollution incidents that may occur on the Laing O’Rourke (LORAC) Wickham Transport Interchange (WTI) Project site. It seeks to raise awareness of pollution incidents and provide clear instruction on how to best respond to them.

2 Scope This Pollution Incident Response Management Plan was developed for the Wickham Transport Interchange Project in accordance with the

• Protection of the Environment Legislation Amendment Act (POELA) 2011 • Protection of the Environment Operations Act (POEO) 1997.

It is constructed to meet all requirements listed under the POELA Act and the POEO Act. It pertains to all those activities, products and services on the WTI site over which it has control or influence. The WTI site is located within the Newcastle urban centre and, is a key project within the Newcastle Urban Renewal Strategy. The project includes the construction of a new station and interchange at Wickham and a new stabling yard between Wickham and Hamilton Stations. Having begun in late 2014, the project is expected to run for 24 months. Activities associated with this project are:

• Construction of the new Wickham Station and Interchange • Construction of a stabling yard between Wickham and Hamilton Station • Minor road upgrades and realignment • Drainage and sewer upgrades • Ancillary infrastructure such service routes, overhead wiring, CCTV, footpaths, decanting facilities, fencing.

On site, there are multiple hazards with the potential to cause a pollution incident. Briefly these are:

• Spills / leaks from plant i.e. fuels and oils; • Hazardous chemicals • Land contamination; • Land contamination/Poor Waste Management; • Dust generation; • Effluent leaks; • Water contamination by dewatering or stormwater runoff.

This document details the action steps that should be taken in the event of an environmental incident.

3 Distribution Policy The controlled copy will be retained in Asite, the LORAC project document management system, where it can be accessed by personnel as necessary. All paper copies of this PIRMP will be considered as ‘uncontrolled’ unless they have been allocated a ‘copy number’ in a colour other than black. The Project Leader and Project Environmental Representative will keep an ‘uncontrolled’ copy of the PIRMP. A Paper copy will also be kept in satellite offices. Compound Address Description Main Contact

Main Compound End of Railway Lane, Wickham, NSW, 2293 Main project office Dan Keegan 0435 859 160

The Store Satellite Office 854 Pacific Highway, Newcastle West Satellite office in The Store building

Luke Ainsworth 0404 225 499

Hamilton Station Satellite Office Cnr Fern and Beaumont Streets, Islington

Demountable office building located adjacent to Hamilton Exchange

Dan Keegan 0435 859 160

Other temporary worksite compounds are utilised as required during possessions The copy of the PIRMP and monitoring records will be made available on the Laing O’Rourke project website.

4 Definitions 4.1 Material Harm Harm to the environment is material if:

• it involves actual or potential harm to the health or safety of human beings or to ecosystems that is not trivial, or • it results in actual or potential loss or property damage of an amount, or amounts in aggregate, exceeding $10,000 (or

such other amount as is prescribed by the regulations).

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 5 of 17

Page 6: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

4.2 Pollution incident Pollution incident means an incident or set of circumstances during or as a consequence of which there is or is likely to be a leak, spill or other escape or deposit of a substance, as a result of which pollution has occurred, is occurring or is likely to occur. It includes an incident or set of circumstances in which a substance has been placed or disposed of on premises, but it does not include an incident or set of circumstances involving only the emission of any noise.

5 Notification 5.1 Duty to report a pollution incident Under the POEO Act a duty to immediately report an incident applies where a pollution incident occurs in the course of the project so that material harm to the environment is caused or threatened. It does not matter that harm to the environment is caused only in the premises where the pollution incident occurs. Leaks, spills, water discharges and other pollution incidents can harm the environment. The relevant regulatory authorities need to be informed of pollution incidents immediately, so that action can be coordinated to prevent or limit harm to the environment. Regulatory authorities and notification responsibilities are given below.

5.2 Responsibility Under the POEO Act, the following people have a duty to notify a pollution incident occurring in the course of an activity that causes or threatens material harm to the environment:

• the person carrying out the activity; • an employee or agent carrying out the activity; • an employer carrying out the activity; and • The occupier of the premises where the incident occurs.

5.3 Who to notify of material harm Any pollution incident that occurs on the Wickham Transport Interchange that causes or has the potential to cause material harm must be immediately reported to the Project Leader, the Project Environmental Representative, the Emergency Response Coordinator, and the Regional Environmental Manager once the person becomes aware of the incident. The Emergency Response Coordinator, Regional Environment Manager and the Environmental Representative will then be the point of contact for notifying all relevant regulatory authorities. If a pollution incident occurs and, the Emergency Response Coordinator, Project Leader, Regional Environment Manager and the Project Environmental Representative are all non-contactable then, it is the responsibility of the person carrying out the activity to notify all relevant regulatory authorities. An incident does not require notification if the regulatory authority has already been notified by another party. Notification to the client Project Environment and Planning Manager and Environmental Management Representative must also be made immediately by the Project Environmental Representative. All incidents must also be reported to the Communication and Community Liaison Manager in accordance with the WTI Community Liaison Management Plan.

6 Regulatory Authorities and project personnel to be notified Below is a list of the relevant regulatory authorities and project personnel to be notified of any pollution incident for the Wickham Transport Interchange Project.

Contact Phone Number

EPA Pollution Hotline 131 555

NSW Ministry of Health 02 9391 9000

WorkCover 13 10 50

Fire and Rescue NSW Emergency - 000 Non-Emergency (Hamilton station) - 02 4961 6388

Newcastle City Council 02 4974 2000

Project Environmental Representative – Daniel Keegan 0435 859 160

Emergency Response Coordinator – Clive Hunter 0428 412 130

Communication and Community Liaison Manager – Kelly Lofberg 0425 715 536

Project Leader – James Kennedy 0400 310 626

Regional Environmental Manager – Chris Greenaway 0418 197 242

TfNSW Environmental Representative – Tim Renshaw 0404 618 886

EMR – David Bone 0407 461 092

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 6 of 17

Page 7: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

Contact Phone Number

WTI Information and Complaints Line 1800 775 465

7 Notification and Services 7.1 Regulatory Authority Pollution incidents posing material harm to the environment must be notified to the Environmental Protection Authority. If in doubt as to who to notify, ring EPA's Pollution Line on 131 555. The relevant information about a pollution incident required to be reported consists of the following:

i. the time, date, nature, duration and location of the incident; ii. the location of the place where pollution is occurring or is likely to occur; iii. the nature, quantity or volume and the concentration of any pollutants involved; iv. the circumstances in which the incident occurred (including the cause of the incident, if known); v. the action taken or proposed to be taken to deal with the incident and any resulting pollution or threatened pollution.

If the information required by items (iii) to (v) becomes known after the initial notification is made, that information must be provided to the authorities immediately after it becomes known. A person/project must notify even though the notification might incriminate the person/project. However the notification is not admissible in evidence against the person/project for an offence.

7.2 Emergency Services If a pollution incident occurs, all necessary action should be taken to minimise the size and any adverse effects of the release. If adequate resources are not available to contain the release and if it threatens public health, property or the environment, the NSW Fire Brigades should be contacted for emergency assistance - phone 000. In addition, if advice is needed on cleaning-up the incident or on the disposal of any resulting waste materials, EPA staff can be contacted 24-hours/day via Pollution Line on 131 555. If the NSW Fire Brigade are called, they may notify the EPA if they consider the environment or public health to be threatened. Notification by the NSW Fire Brigade does not negate the need for person carrying on the activity or the occupier of the premises to notify the EPA.

7.3 Contaminated Land Any project activities that have contaminated land or owners of land who become aware that the land has been contaminated must notify the EPA as soon as practicable after becoming aware of the contamination, if the contamination meets certain criteria. The duty to notify is a requirement under section 60 of the Contaminated Land Management Act 1997 (CLM Act). For on-site contamination this relates to;

• The concentration of a contaminant in an individual soil sample is equal to or more than 250% of the Health Investigation Level and/or Health Screening Level for that contaminant for the current or approved use of the respective on-site land, as specified in Section 6, Schedule B1 of the National Environment Protection (Assessment of Site Contamination) Measure 1999 (NEPC 2013)

AND • A person has been or foreseeably will be exposed to the contaminant or a by-product of the contaminant.

For off-site contamination this relates to;

• The concentration of a contaminant in an individual soil sample is equal to or more than 250% of the Health Investigation Level and/or Health Screening Level for that contaminant for the current or approved use of the respective on-site land, as specified in Section 6, Schedule B1 of the National Environment Protection (Assessment of Site Contamination) Measure 1999 (NEPC 2013)

AND • The concentration of the contaminant in or on the soil on the neighbouring land will foreseeably continue to remain

above the specified concentration.

8 Notification Procedure Below is a step by step procedure for notifying pollution incidents on Wickham Transport Interchange Project:

i. Assess the situation and if safe to do so, immediately rectify the pollution source and control the migration of any pollution. Ensure access routes for spills to any surrounding drains or waterways are blocked. See project ERAPs for site specific controls.

ii. Immediately notify the LORAC Project Leader, Environmental Representative and the Emergency Response Coordinator of the pollution incident, giving details such as location, volumes of pollutants and circumstances of the incident. If the incident is not able to be contained by means of the Project, notify the emergency services to aid in control of the incident.

iii. If deemed to be required, the Emergency Response Coordinator or elected representative will immediately notify the EPA giving the details as listed in this Section 6.

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 7 of 17

Page 8: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

iv. Notify the Transport Environmental Representative and the Environmental Management Representative and provide

the details of the incident. v. If information regarding the incident becomes known after the initial notification is made, that information will be

provided to the authorities immediately after it becomes known by the Emergency Response Coordinator or elected representative.

vi. Any follow up reports required as per the Project licences and conditions will be submitted to Transport, Laing O’Rourke and the EPA by the Project Environmental Representative within the given timeframes. This reporting is likely to detail, after investigation into the incident;

• the cause of the incident, • any environmental harm or potential harm caused, • actions that have been undertaken to rectify, reduce or remediate the pollution incident, • responsibilities for the incident, and • actions to be implemented to avoid repeat occurrences of a similar incident.

Note: other environmental incidents i.e. chemical release and spills response are also contained within the Construction Health and Safety Plan and Emergency Response Management Plan.

9 Community and Stakeholder Notification If in the event of a pollution incident community and stakeholder notification is required, this will be carried out by the Project Communication and Community Liaison Manager, Kelly Lofberg. Community liaison and notification procedures are detailed in the Community Liaison Management Plan (WTI-LOR-PMP-0005) for the Project, which outlines measures including:

• Publication of incident-related information on TfNSW Project website. • Distribution of letter-box drops. • Individual briefings of affected residents.

Mechanisms for early warnings and ongoing regular updates to the community may include:

• Doorknock of residents, businesses and others (e.g. schools) potentially impacted by the incident • Phone contact/messages using the TfNSW Consultation Manager database • Distribution of advice to residents, businesses and vehicle owners, pedestrians, commuters and schools as required • Publication of information on the TfNSW Project website • Dissemination of information to local and metropolitan media • Liaison with local council and other government stakeholders • Liaison with utilities providers • Installation of temporary directional signage • Utilising the Transport Management Centre with messages to commuters or residents.

In the event of a pollution incident which has the potential to impact the local community, the Project Communication and Community Liaison Manager will contact the A/Principal Manager, Community Engagement Transport Projects who will liaise with the appropriate people within TfNSW to determine if community notification is required and the mechanisms by which the notification shall be made. Notification to any residents, businesses or other premises that may be affected by the pollution incident shall include the following information:

• Details of incident and extent of impact (as known at the time) • Safety warnings and recommendations to prevent / minimise impacts, if required • Potential impacts on the operation of local businesses, if required.

The area of the local community which may be affected by a pollution incident is dependent on a number of issues including weather and quantity of pollution. The Project Communication and Community Liaison Manager, in consultation with the TfNSW A/Principal Manager, Community Engagement and other personnel as required, shall determine the geographical extent of the public notification and details to be provided in the notification.

10 Hazards LORAC have completed risk assessment of the site and identified hazards Hazards with the potential to cause a pollution incident include:

• Spills / leaks from plant i.e. fuels and oils; • Hazardous chemicals • Land contamination/Poor Waste Management; • Dust generation; • Effluent leaks; • Water contamination by dewatering or stormwater runoff.

For a details of the likelihood of above hazards occurring, please refer to the risk assessment contained in Appendix E.

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 8 of 17

Page 9: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

11 Potential Scenarios There are a number of potential scenarios under which the hazards identified in Section 11 may cause material harm. The potential scenarios listed below do not form a fully comprehensive list but are typical scenarios that must be planned for. Each incident should be considered in its own right as to whether it constitutes material harm.

11.1 Spills / leaks from plant i.e. fuels and oils • Plant failure leading to an uncontrolled release of fuel or oil into stormwater systems. • Areas more susceptible to this hazard include the Wickham Transport Interchange building area on Station Street,

Wickham and stabling yard works adjacent to Fern Street, Islington.

11.2 Hazardous chemicals • Spill of hazardous chemicals during use or transport. Those chemicals flowing off-site, into stormwater systems or

remaining on-site and causing material harm • Hazardous chemical containers being affected by flood waters leading to an uncontrolled release of pollutants • The area most susceptible to this hazard is the Wickham Transport Interchange building area on Station Street.

11.3 Land contamination/Poor Waste Management • Incorrect disposal of contaminated material leading to the spread of contaminated material • Incorrect re-use of contaminated material

11.4 Dust generation • Strong winds during construction activity leading to a dust event that may impact nearby residents and businesses.

11.5 Effluent leaks • Spill of effluent during effluent tank pump out • Overflows from effluent tanks entering local waterways • Effluent tanks affected by flood waters leading to an uncontrolled release of effluent

11.6 Water contamination by dewatering or stormwater runoff • Dewatering of contaminated water in excavations, pits or other into stormwater systems • Major failure of erosion and sediment controls leading to the release of inappropriately treated stormwater entering

stormwater systems.

12 Pre-emptive actions to be taken Pre-emptive actions taken to minimise the likely hood of hazards occurring include:

• Project induction, Mission Zero Next Gear Induction and Asbestos Awareness; • Asbestos Management Plan; • Spill containment kits on site and trained personal; • Water carts on site; • Water testing, pumping procedure and permit; • Erosion and sediment controls and plans; • Environmental Control Maps • Training and competency tracking; • Plant maintenance checks; • Storage of chemicals in accordance with requirements.

13 Environmental Mapping Systems Environmental Control Maps (ECMs) and Erosion and Sediment Control Plans (ESCPs) detail controls implemented on site to prevent environmental pollution incidences, including incidents that may migrate from the site. Environmental control maps will identify hazardous zones, illustrate environmental controls, and detail proposed construction activities. All locations of drainage inlets are recorded in the ESCPs. Erosion and Sediment Control Plans are updated regularly for the construction stage.

14 Safety Equipment The location of spill kits and environmental controls is detailed on the project Environmental Control Maps (Appendix C) and Erosion and Sediment Control Plans. Safety equipment, controls and personnel protective equipment required for the works are detailed in Safe Work Method Statements (SWMS). A Safety Data Sheet (SDS) folder is kept within the chemical storage container. A Dangerous Goods and Hazardous Substances Register is kept on Asite and outlines maximum quantities of potential pollutants kept on site. Specific controls required to work within areas contaminated with asbestos are detailed in the Asbestos Management Plan and work area specific asbestos removal plans.

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 9 of 17

Page 10: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

Segregated chemical storage containers and segregated waste storage are mapped in the ECMs. Testing equipment for water testing are located in the Main Site Compound. Chemicals for water treatment are located in the chemical storage container. Copies of all plans are readily available on site and supplied to all work crews.

15 Prepare, Test and Maintain After preparation of this PIRMP, it is to be tested via a mock pollution incident to ensure personnel are aware of the processes and responsibilities on site. All testing of this plan and any supplementary amendments that are made are to be documented and stored with the Project files and may be requested by the EPA at any time. A PIRMP Test Tracking spreadsheet can be seen in Appendix A. The PIRMP will be reviewed and maintained to ensure information in the plan is accurate and up to date. The review process will occur every 12 months and within one month of any pollution incident occurring. This will ensure any issues within the plan are identified and revised.

16 Staff Training All managers, supervisors and staff will be trained progressively throughout the project development. Tool box talks will be presented to educate workers of preventative actions, controls, PIRMP updates, site issues and environmental pollution incidents involved in the site. The tool box talk will present a chance for workers to raise any concerns or issues in the project and PIRMP. Training records are kept as per project training register. The induction will include the PIRMP procedures.

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 10 of 17

Page 11: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

Appendix A – PIRMP Test Tracking Spreadsheet

PIRMP Test Date Personnel Involved Position on Project Responsibility Amendments Required

22 Apr 15 – Desktop simulation

LORAC Project Management team

Project Leader, Environmental representative, Emergency Response Coordinator, Regional Environmental Manager

Management and project delivery

Emergency Response packs to be developed for Emergency Response Team

10 Jul 15 – Chemical spill simulation LORAC site team Site personnel - assorted

Attend to spill to minimise impacts and notify management

None

22 Feb 16 LORAC site team and Emergency Response Team (ERT & Site team)

Project Leader, Environmental representative, Emergency Response Coordinator, Regional Environmental Manager, Site team (assorted)

Attend to spill to minimise impacts, notify management, notify regulators

None

The testing of the plan will be undertaken: (a) routinely at least once every 12 months, and (b) within 1 month of any pollution incident occurring in the course of an activity to which the environment protection licence relates so as to assess, in the light of that

incident, whether the information included in the plan is accurate and up to date and the plan is still capable of being implemented in a workable and effective manner.

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 11 of 17

Page 12: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

Appendix B – Emergency Reporting Flow Chart

Role Name Number

HSEQ Director John Green

M: 0467 742 955 D: 07 3223 2664

Head of Legal

Annabel Crookes

M: 0414 702 817 D: 02 9903 0502

HSEQ Manager (North)

David Drummond M: 0427 532 861

HSEQ Manager (South)

Kurt Warren M: 0411 258 842

HSEQ Manager (West)

Ian Counsell M: 0407 333 609

HSE & CR Manager (Rail)

Lindsay Holt M: 0418 614 691

Actual or Potential Environmental Incident Occurs

Ensure that the incident cause has been rectified where safe to do so and that any spill or result of

the incident minimises environmental harm. Ensure the safety of personnel or public

Report the incident immediately to the HSEQ Director and Head of Legal. Register on IMPACT

within 1 hour. Report to Client

Brief Management / Investigation Team

LORAC Lead Incident Investigator to coordinate the collection of evidence

Consider the need for resources and operations

Inform workforce and other stakeholders

Debrief witnesses

Assess risks/actual and potential harm. Has material harm of more than $10,000 occurred or is

likely to occur?

Ensure site has been secured

Notification to the external environmental regulators to be recorded on F 0161 Record of Conversation.

Note – NSW - Immediate regulatory reporting requirement for incidents involving material harm There are additional authorities to be notified including the following: • The Ministry of Health - Public

Health Unit - 02 9391 9000) • WorkCover (13 10 50) • Local council - 02 4974 2000 • Fire and Rescue NSW on 000

Report to EPA 131555 and other nominated authorities

Cooperate with the local authorities.

Reporting requirements as per the contract are as follows:

• Verbal Notification immediately to EPM and PM

• Incident to be recorded on INX within 4 hours

Document factual reporting to Client in strict accordance with the contract. Provide Client feedback to Brief Management/ Investigation Team

Yes – Class 1 Reportable to

external authorities

No – Class 2 or 3

Ensure site has been secured

Reporting requirements as per the contract are as follows:

• Verbal Notification immediately to EPM and PM

• Incident to be recorded on INX within 4 hours

Document factual reporting to Client in strict accordance with the contract. Provide Client feedback to Project Leader

Debrief Project Team and Workers. Identify actions to prevent future occurrences.

Action clean up or rectification following investigation

REPORT ALL INCIDENTS IMMEDIATELY TO THE PROJECT LEADER JAMES KENNEDY 0400 310 626 ENVIRONMENTAL REPRESENTATIVE DAN KEEGAN 0435 859 160

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 12 of 17

Page 13: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan 04 Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

Appendix C – Emergency Response Plan (Chemical Release or Explosion, spill or leak)

HAZARDOUS SUBSTANCE SPILL / TOXIC EMISSIONS IDENTIFIED

Alert people in immediate area of spill/ release and evacuate all persons from area.

Identify substance – use container labelling, MSDS, Hazardous Substance register and application as a guide during identification.

Substance identified?

Refer to MSDS for advice on hazardous/dangerous goods classification, first aid measures, fire fighting measures, personal protective equipment & emergency procedures.

Is it safe to approach the

injured worker / work area?

Isolate the affected area at a safe distance by erecting a temporary barricade and placing suitable warning signs to restrict unnecessary movement through the area.

Is substance flammable?

Remove / isolate ignition sources, if safe to do so.

Isolate the affected area at a safe distance by erecting a temporary barricade and placing suitable warning signs and evacuate site as per Emergency Coordination procedures.

Notify Emergency Services, Environmental and Safety Regulator as necessary.

No one shall leave the Assembly Area until all persons have been fully accounted for and the ALL CLEAR has been given to return to work by the emergency response coordinator , under the guidance of the Emergency Services.

Contain hazardous substance and toxic emissions using spill kit, absorbent material or other methods as per applicable MSDS.

Notify Emergency Services, Environmental & Safety Regulator as necessary.

NO

Yes

NO

NO

Yes

Yes

Report the Incident to; Project Leader Environmental Representative Emergency Response Coordinator

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 13 of 17

Page 14: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

Appendix D - Environmental Control Maps

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 14 of 17

Page 15: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

!A!A

!A

!A

!A

!A

13

15

Wickham Transport Interchange Project Source: Aurecon, Sydney Trains, LPIDPE, Nearmap

P:\GI

S\Pr

ojects

\2458

49_N

ovora

il\Gen

eral_I

tems.m

xd\JO

B No

.\19-0

7-16\r

egine

.berna

rdo\R

ev 0

Projection: GDA 1994 MGA Zone 56

Date Revision Map No. Author1 of 4 regine.bernardo19/07/2016 4

Legend

Extent Map

°0 20 40m

1:2,000 Environment Control Map: General ItemsPage 1 of 4

!. Site Access Gate (No.)Flow DirectionExisting Sewer 1065EPL Boundary0-0.5Haul RoadArchaelogical AreaLaydown Area

Hours of work7am - 6pm Monday to Friday (11 hours)8am - 1pm Saturday (5 hours)All other works are subject to approval.High impact noise including rock breaking, jackhammering, concrete and rail works can only occur for3 hours before a 1 hour continuous break is given.ContactsProject Leader - James Kennedy 0400 310 626Construction Manager - Nick Stephens 0400 318 640Environmental Coordinator - Dan Keegan 0435 859 160Communications Manager - Kelly Lofberg 0425 715 536Construction Response Line - 1800 775 465Info Line - 1800 684 490

Page 16: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

!("S

"S

!A!A

!A

!A

!A

!A

Do not remove vegetationwithout approvalDo not remove vegetationwithout approval

Do not remove vegetationwithout approval

Do not remove vegetationwithout approval

Sydney Trains WasteStockpile to be keptseperate and delineated

No parking or queuing

No pa

rking

or qu

euing

Tree to be removedoutside boundarywith Council approval

Timber RelicItem 12 in REF Fig 8.1

Do no remove vegetationwithout approval

Do no remove vegetationwithout approvalDo no remove vegetationwithout approval

Office

Toilet Crib

Do not remove vegetationwithout approval

Potential BatHabitat

NCA9

NCA2

1

14

NCA1

16

Wickham Transport Interchange Project Source: Aurecon, Sydney Trains, LPIDPE, Nearmap

P:\GI

S\Pr

ojects

\2458

49_N

ovora

il\Gen

eral_I

tems.m

xd\JO

B No

.\19-0

7-16\r

egine

.berna

rdo\R

ev 0

Projection: GDA 1994 MGA Zone 56

Date Revision Map No. Author2 of 4 regine.bernardo19/07/2016 4

Legend

Extent Map

°0 20 40m

1:2,000 Environment Control Map: General ItemsPage 2 of 4

"S Stabilisation

!( Recycling

Bin

0/Spill Kit

!H Noise Monitoring Locations

!. Site Access Gate (No.)Flow DirectionExisting DrainageExisting SewerSediment FencesExisting Sewer 1065Site AmenitiesSpill Kit

XY XY DelineationTemporary Access Track - dust supression whererequiredTimber RelicConcrete WashoutEnvironmental AreasState Heritage AreaEarthworks April 2016 - November 2016EPL Boundary0-0.5Archaelogical Area

Hours of work7am - 6pm Monday to Friday (11 hours)8am - 1pm Saturday (5 hours)All other works are subject to approval.High impact noise including rock breaking, jackhammering, concrete and rail works can only occur for3 hours before a 1 hour continuous break is given.ContactsProject Leader - James Kennedy 0400 310 626Construction Manager - Nick Stephens 0400 318 640Environmental Coordinator - Dan Keegan 0435 859 160Communications Manager - Kelly Lofberg 0425 715 536Construction Response Line - 1800 775 465Info Line - 1800 684 490

Page 17: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

!(

"S

"S

"S

")

")

")

")

")

!A!A

!A

!A

!A

!A

")

No Parking

Do not remove vegetationwithout approvalDo not remove vegetationwithout approval

Railway Lane Gate -Light vehicle access andegress only (waste disposaland deliveries excepted)

Holland Street Gate -Construction vehicleaccess and egress only

Do not remove vegetationwithout approval

Do not remove vegetationwithout approval

Parking

Sydney Trains WasteStockpile to be keptseperate and delineated

No pa

rking

or qu

euing

Queuing area

Limited Parking AvailableLimited Parking Available

Tree to be removedoutside boundarywith Council approval

Timber RelicItem 12 in REF Fig 8.1

Do no remove vegetationwithout approval

Do no remove vegetationwithout approvalDo no remove vegetationwithout approval

Railway Lane Gate -Light vehicle access andegress only (waste disposaland deliveries excepted)

Office

Do not remove vegetationwithout approval

Potential BatHabitat

NCA5

NCA8

3

2

11

12

54

Wickham Transport Interchange Project Source: Aurecon, Sydney Trains, LPIDPE, Nearmap

P:\GI

S\Pr

ojects

\2458

49_N

ovora

il\Gen

eral_I

tems.m

xd\JO

B No

.\19-0

7-16\r

egine

.berna

rdo\R

ev 0

Projection: GDA 1994 MGA Zone 56

Date Revision Map No. Author3 of 4 regine.bernardo19/07/2016 4

Legend

Extent Map

°0 20 40m

1:2,000 Environment Control Map: General ItemsPage 3 of 4

") Protect drainage pit during construction!( Recycling

Bin

0/Spill Kit

!H Noise Monitoring Locations

!( Site Compound (See seperate map)

!. Site Access Gate (No.)Flow DirectionExisting DrainageExisting SewerSediment FencesExisting Sewer 1065Infiltration BasinPiling and EarthworksAsbestos Capped AreasSpill KitChemical StorageChemical StorageTemporary Access Track - dust supression whererequiredConstruction Waste ECMSoil StockpileVegetation StockpilePotential Heritage StructureParkingEnvironmental AreasEarthworks April 2016 - November 2016EPL Boundary0-0.50.5-11-1.51.5-22-2.5

Hours of work7am - 6pm Monday to Friday (11 hours)8am - 1pm Saturday (5 hours)All other works are subject to approval.High impact noise including rock breaking, jackhammering, concrete and rail works can only occur for3 hours before a 1 hour continuous break is given.ContactsProject Leader - James Kennedy 0400 310 626Construction Manager - Nick Stephens 0400 318 640Environmental Coordinator - Dan Keegan 0435 859 160Communications Manager - Kelly Lofberg 0425 715 536Construction Response Line - 1800 775 465Info Line - 1800 684 490

Page 18: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

"S

"S

")

")

")

")")

")

")

")

")

!A!A

!A

!A

!A

!A

")

")

No Parking 6b

Limited Parking AvailableLimited Parking AvailableFirst Aid

ToiletsCrib

Office

Office

Crib

NCA6

NCA5

9

7 86

10

Wickham Transport Interchange Project Source: Aurecon, Sydney Trains, LPIDPE, Nearmap

P:\GI

S\Pr

ojects

\2458

49_N

ovora

il\Gen

eral_I

tems.m

xd\JO

B No

.\19-0

7-16\r

egine

.berna

rdo\R

ev 0

Projection: GDA 1994 MGA Zone 56

Date Revision Map No. Author4 of 4 regine.bernardo19/07/2016 4

Legend

Extent Map

°0 20 40m

1:2,000 Environment Control Map: General ItemsPage 4 of 4

") Protect drainage pit during construction

"S Stabilisation

!H Noise Monitoring Locations

!. Site Access Gate (No.)

!A Groundwater Well

") Groundwater PumpGroundwater Layflat HoseGroundwater Extraction PointExisting DrainageExisting SewerSediment FencesExisting Sewer 1065Stormwater PitInfiltration BasinPiling and EarthworksSite AmenitiesSpill KitChemical StorageTemporary Access Track - dust supression whererequiredEarthworks April 2016 - November 2016EPL Boundary0-0.50.5-11-1.51.5-22-2.52.5-3>3.0

Hours of work7am - 6pm Monday to Friday (11 hours)8am - 1pm Saturday (5 hours)All other works are subject to approval.High impact noise including rock breaking, jackhammering, concrete and rail works can only occur for3 hours before a 1 hour continuous break is given.ContactsProject Leader - James Kennedy 0400 310 626Construction Manager - Nick Stephens 0400 318 640Environmental Coordinator - Dan Keegan 0435 859 160Communications Manager - Kelly Lofberg 0425 715 536Construction Response Line - 1800 775 465Info Line - 1800 684 490

Page 19: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan 04 Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

Appendix E – PIRMP Risk Assessment Typical pollution incident that may occur on WTI have been assessed in accordance with the table below: Risk Assessment Rankings: E = Extreme H = High M = Medium L = Low The risks must be reassessed following the consideration of control measures. Mitigation measures are not compulsory if a subsequent risk assessment is carried out for particular circumstances and controls are agreed to by the appropriate personnel including the Construction Manager (or delegate) and Environmental Representative. Issues or activities that represent an Extreme risk after the application of control measures are not to be undertaken.

Aspect Potential Environmental Impact Initial Risk Rating

Control Measures Residual Risk Rating

P X C = Risk P X C = Risk

Spills / leaks from plant i.e. fuels and oils;

Significant plant failure – spill entering stormwater/waterways and impacting downstream

P 2 E

• Refuel in laydown area only with drip tray and spill kit • Appropriate number of spill kits on site • Spill kit training • All plant/vehicle maintenance to be carried out off-site • Vehicles and plant to undergo maintenance as per

manufacturer’s requirements. Prestart check to be undertaken.

• Protection of stormwater pits where possible

U 3 M

Hazardous chemicals Hazardous chemical spill leaving site and/or entering stormwater/waterways and impacting downstream

P 2 E

• Proper transport and storage of hazardous chemicals • Storage container located outside of 100 year ARI flood

zone • Appropriate number of spill kits on site • Spill kit training • SDS register to be maintained within the site office and

chemical storage container • Minimise volumes of hazardous chemicals kept on site • Choose less hazardous substitutes where possible. • Protection of stormwater pits where possible

U 3 M

Land contamination/Poor Waste Management;

Spreading of contaminated material to new areas L 2 E

• Distribute mapping of contaminated areas • Demarcated contaminated areas/stockpiles where possible • Maintain a waste register • Ensure waste transportation subcontractors have

appropriate permits for transporting hazardous waste • An Occupational Hygienist and asbestos removalist must

be present when working with or disposing of asbestos • Manage soil in accordance with the Remediation Action

Plan and CEMP • Induction and Toolboxes to cover signs of contamination,

asbestos contamination in soil and signs of Acid Sulphate Soils

U 2 M

Dust generation;.

Significant dust event during high winds resulting in dust deposition to nearby residents and/or businesses. Impacts to local traffic.

P 4 M

• Minimise stripping of surface/vegetation until works need to occur in an area

• Use of water carts/dust suppressants • Restrict plant and vehicle movement during dry and windy

weather

R 4 L

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 15 of 17

Page 20: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

Aspect Potential Environmental Impact Initial Risk Rating

Control Measures Residual Risk Rating

P X C = Risk P X C = Risk • Utilise shade cloth on barrier fencing

Effluent leaks; Spilled effluent leaving site and/or entering stormwater/waterways and impacting downstream

L 3 H

• Fit ablution blocks with cut-off valves and high level alarms • Ensure an effluent spill kit is maintained at all ablution

blocks • Locate ablution blocks outside of flood zones • Form an earth bund around the downslope side of the

ablution block • Protection of stormwater pits where possible

U 3 M

Water contamination by dewatering or stormwater runoff.

Contaminated water leaving site and/or entering stormwater/waterways and impacting downstream. This may occur through dewatering or ErSed control failure.

L 2 E

• Induction and toolbox talks to educate workforce on dewatering practices

• Dewatering must be conducted under an approved dewatering plan.

• Maintain Erosion and sediment controls and conduct regular inspections

• Toolbox workers on actions to be taken during a service strike where sewerage is released or where pressurised water may wash spoil offsite

• Protection of stormwater pits where possible

U 2 M

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 16 of 17

Page 21: Wickham Transport Interchange Project Pollution Incident .../media/lor/files/australia... · Wickham Transport Interchange Project Pollution Incident Management Plan Project Name

Pollution Incident Management Plan Project: Project No: Date: Rev: Wickham Transport Interchange G85 31 October 2016 02

Environmental Risk Assessment Rankings This table may be used as a guide in determining the level of risk for each environmental issue. For each identified issue, consider the ‘maximum credible’ (not absolute worst case) risk that could result with minimal or no controls other than existing and using normal construction practices. Note: Any one of the listed consequences must result in the use of the applicable consequence grading. Select a letter and a number from each column. Plot letter and number selections on the Risk Ranking Matrix to determine applicable ranking:

Likelihood (Probability and Frequency of Occurrence)

Consequence (Outcome or Severity of Occurrence)

C Certain Common or repeating occurrence Consequence can reasonably be expected to occur in

life of Project. 1 Severe

Major pollution incident causing significant and widespread damage or potential to health or the environment Persistent reduction in ecosystem function and value. Ongoing disruption and loss of protected species. Major prosecution likely, outcome in excess of $500,000

L Likely

Known to have occurred / “has happened” Conditions may allow the consequence to occur on

the Project during its lifetime The event has occurred within the Business Unit

within the previous 5 years.

2 Major

Significant widespread and persistent changes to habitat, species or environmental media Significant pollution incident causing damage or potential damage to health or the environment external to the

site. Potential for prosecution. Potential outcome between $50,000 - $500,000 Numerous substantial complaints Actual material environmental harm

P Possible

Could occur / “heard of it happening” Exceptional conditions may allow consequences to

occur on the Project, or has occurred nationally within the Australian Business.

3 Moderate

Localised irreversible habitat loss or effects on habitat, species or environmental media Reportable incident to the relevant environmental regulator or other authority. Demonstrated breach of legislative, licence or guideline requirements. Likely infringement notice or fine, potential for prosecution up to $50,000. Will cause complaints.

U Unlikely

Not likely to occur Reasonable to expect that the consequence will not

occur on the Project. Has occurred in industry but not in Business Unit.

4 Minor

Localised degradation of habitat or short term impacts to habitat, species or environmental media. Pollution incident that marginally exceeds licence conditions or guidelines for acceptable pollution. Fine unlikely. Potential for complaints.

R Rare Practically impossible Not known to have occurred in industry or unheard of. 5 Incidental

Localised or short term effects on habitat, species or environmental media. Fully contained on site and can be fully remediated. Little potential for fine or complaints. Insignificant or trivial incident

Probability ► ▼Consequence

CERTAIN LIKELY POSSIBLE UNLIKELY RARE

1 – Severe E E E H M

2 – Major E E H M M

3 - Moderate H H M M L

4 – Minor M M M L L

5 - Incidental M L L L L

Pollution Incident Management Plan WTI-LOR-PMP-0016

Copyright © Laing O’Rourke 2015 All rights reserved

Page Number 17 of 17