Westminster Celebrates and Gives Thanks
The Finance and Maintenance Team
• We celebrate and thank God for the Team’s modern & professional strategy and implementation in upgrading and managing the church building
• Team members: Ian Firth, Bill Henderson, Bill Miller, Murray Nicolson, Wayne Schaler, David Wice, John Wice and Ian Young; Dave Joiner on leave of absence; and retired members Vince Gobuyan, Dave Mansell and Heather McCurdie.
The Finance and Maintenance Team
Team members: Ian Firth, Bill Henderson, Bill Miller, Murray
Nicolson, Wayne Schaler, David Wice, John Wice and Ian Young; Dave Joiner on leave of absence; and retired members Vince Gobuyan, Dave Mansell and Heather McCurdie.
Members of the Team at Work
We Thank God for His Blessings
• As a result of our amalgamation with Erskine Presbyterian congregation in 2007, the building fund received $376,595
• Westminster’s dedicated volunteers are focused on the integrity of the building envelope and safety of the congregation
• With a strong decision/ financial management system, the Team is prudently implementing the strategic plan
The Challenge: A complex, aging building
The Strategy
• 75 YEAR PLAN - COSTING FROM 2010 UNTIL 2085 for upgrading and replacement of all building elements
• Building inspections to access priorities• Fire Department inspection to diminish
risks and improve safety• Develop an action plan and start
implementation
Front Door stairs and rails October 2010 - $11,809
BEFORE AFTER
Christian Education Building Windows
December 2010 – January 2011
$19,613
Electrical Upgrades2013 - $23,998
and heating cable for roof
No-key entry system2013-2015 $35,730
• As Session was concerned that general access to the building was a security risk for the children in the building and our employees, a key fob system was installed.
• It also restricts access to the second floor classrooms
Re-pointing Bricks - $62,534August – November 2014
BEFORE DURING AFTER
Concrete Facade $33,125October – November 2014BEFORE AFTER
Christian Education DoorsOctober 2014 $5,633
BEFORE
Air gap and sticking lock
AFTER
CE Stairs and Railing $8,814November – December 2014
BEFORE AFTER
Spire and CanopyDecember 2014 - ? $14,620OUTSIDE INSIDE
Next Project ?
Audio Visual upgrade for the
sanctuary
Westminster THANKS the present and past members
of the Finance and Maintenance Team for their
excellent and dedicated service