7/- 07O8 Westinghouse U. S. Nuclear Regulatory Commission Attn: Capt. Robert A. Nelson, USN (Ret) Chief Spent Fuels Licensing Section Officer Office of Nuclear Material Safety and Safeguards Washington, DC 20555 Westinghouse Electric Company Nuclear Fuel Columbia Fuel Site P.O. Drawer R Columbia,South Carolina 29250 USA Direct tel: Direct fax: e-mail: Your ref: Our ref: 803-647-3552 07100708/2005202 UAM-NRC-06-002 January 6, 2006 SUBJECT: RESPONSE TO SAFETY INSPECTION REPORT: 07100708/2005202 Westinghouse Electric Company herein provides this response to Safety Inspection Report and Compliance Inspection Report # 07100708/2005202 dated December 7, 2005. Appendix A provides a response to the non-cited violation identified in the Inspection Report. References identified In Appendix A as Proprietary Class 2 were made available during the inspection but are not included in the response. Should you have any questions or require additional information, please call the undersigned at (803) 647-3552 or Mr. Peter Vescovi at (803) 647-3671. Sincerely, WESTINGHOUSE ELECTRIC COMPANY Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A cc: Mr. James Pearson, NRC Inspector 1/ X00

Transcript of Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and...

Page 1: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

7/- 07O8

Westinghouse

U. S. Nuclear Regulatory CommissionAttn: Capt. Robert A. Nelson, USN (Ret)ChiefSpent Fuels Licensing Section OfficerOffice of Nuclear Material Safety and SafeguardsWashington, DC 20555

Westinghouse Electric CompanyNuclear FuelColumbia Fuel SiteP.O. Drawer RColumbia,South Carolina 29250USA

Direct tel:Direct fax:

e-mail:Your ref:Our ref:

803-647-3552

07100708/2005202UAM-NRC-06-002

January 6, 2006

SUBJECT: RESPONSE TO SAFETY INSPECTION REPORT: 07100708/2005202

Westinghouse Electric Company herein provides this response to Safety Inspection Report andCompliance Inspection Report # 07100708/2005202 dated December 7, 2005. Appendix A provides aresponse to the non-cited violation identified in the Inspection Report. References identified In Appendix Aas Proprietary Class 2 were made available during the inspection but are not included in the response.

Should you have any questions or require additional information, please call the undersigned at (803) 647-3552 orMr. Peter Vescovi at (803) 647-3671.

Sincerely,

WESTINGHOUSE ELECTRIC COMPANY

Norman A. KentManagerTransport Licensing and Compliance

Attachments: Appendix A

cc: Mr. James Pearson, NRC Inspector

1/ X00

Page 2: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Page I of 3Our ref: UAM-NRC-06-002January 6, 2006

APPENDIX A

WESTINGHOUSE RESPONSE TO NOTICE OF VIOLA TIONS

A.1 The following information is provided in response to Non-Cited Violation as reported in07100708/2005202 failure to comply with requirements for procurement of maintenanceservices for the Patriot shipping package (USA.9292/AF-85).

A.L.a ACKNOWLEDGEMENT OF THE VIOLATION

The violation is correct as stated in the Safety Inspection Report and ComplianceInspection report 07100708/2005202. Westinghouse identified the noncompliance earlyin October 2005 and immediately stopped work at the vendor site. A meeting wasconvened that included representatives from Westinghouse quality assurance, supplierquality, transportation, shipping container licensing and compliance, and productengineering to ascertain the nature and extent the noncompliance and establish a plan ofcorrective actions.

A.L.b REASON FOR THE VIOLATION

The non-cited violation identifies maintenance being performed on the PATRIOT modelpackage, Package Identification USA/9292/AF-85, licensed under NRC Docket 71-9292.The bill of material on the license drawing, Dwg. No. 10014E28, identifies the safetyrelated components for the package. Maintenance work being performed forWestinghouse by the supplier included cutting and welding the inner container lid endcap. Both the inner container lid and end cap are designated as safety related componentsin the bill of material. The Westinghouse procedure for the control of purchased itemsand services (WEC 6.1) defines the responsibilities and identifies requirements forprocurement of shipping packages subject to approval by the U.S. Department ofTransportation (DOT) or U.S. Nuclear Regulatory Commission (NRC) for thetransportation of radioactive material. WEC 6.1 defines specific responsibilitiesassociated with procurement of items or services that includes identifying the item orservice as safety-related.

Westinghouse initiated a purchase requisition that requested a vendor to provide servicesto chemically clean and paint PATRIOT inner containers, which included the cutting andwelding the lid end caps. The requisition incorrectly identified the services to be "non-QA". This "non-QA" designation established a release strategy that did not includeappropriate quality approvals for services that are safety-related. As a resultWestinghouse issued a purchase order to the vendor that did not include appropriatequality requirements.

A BNFL Group company

Page 3: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Page 2 of 3Our ref: UAM-NRC-06-002January 6, 2006

A.I.c CORRECTIVE ACTION TAKEN AND RESULTS ACHIEVED

When Westinghouse realized that the vendor providing the services was not a QualifiedSupplier work was stopped and initiated a corrective action plan. The initial correctiveaction plan included qualifying the supplier, the process, the welders, and the workalready completed.

After reviewing the vendor processes and Westinghouse quality requirements it wasdecided that rather than qualify the supplier Westinghouse would follow approvedprocedures for the dedication of commercial grade items that are intended for use innuclear safety-related applications. Westinghouse issued a commercial dedicationinstruction (CDI) for maintenance performed on the Patriot inner container by thesupplier. In accordance with the commercial dedication procedure Westinghouse isresponsible for executing the CDI to dedicate packaging as a safety-related item. Thededication is based on special inspections and tests to verify critical characteristicsidentified by the responsible engineer. The critical characteristics include productidentification verification, inner package skin integrity, inner package structural weldintegrity, channel weld integrity, lid end repair weld integrity, surface finish, lid/basefunctionality, dimensional stability, and process verification.

Westinghouse worked generated a Manufacturing and Quality Plan (MAQP) for therefurbishment of the Patriot inner containers. The MAQP provides specific guidance forcleaning, acid stripping, welding, weld inspection, and powder coat painting servicesprovided by the vendor. Westinghouse developed procedures with input from the vendorfor the weld process, for welder qualification and specifically welding the lid end cap. Aprocess routing was developed to documents the performance of required maintenanceand inspections. The process routing identified inspection hold points during themaintenance.

Westinghouse procured the services of a qualified supplier to qualify the welders and thewelding process. This vendor certified that test specimens were prepared, joined andexamined in accordance with the requirements of American National Standard, AWSD9.IM/D9.1:2000, Sheet Metal Welding Code (ASW D9.1). Furthermore they providedprocedure qualification test record (ASW D9.1, Annex E) and welding procedurespecifications (ASW D9. 1, Annex D) to certify the welding process used to repair the lidend cap. Welder and welding operator qualification test records (ASW D9. 1, Annex F)were also provided by QIS for each of the welders who performed the welding.

Magnetic particle testing (MT) was used for nondestructive examination of all weldingthat was performed on the inner containers prior to issuing the CDI. The MT wascompleted on December 01, 2005. MT was performed using dry powder per ASW D9. 1to detect surface discontinuities in the sheet metal welds of the lid end cap. All weldsinspected were found to be acceptable. No defects were found at the time of theinspection.

Page 4: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Page 3 of 3Our ref: UAM-NRC-06-002January 6, 2006

A.1.d ACTIONS TO PREVENT RECURRENCE

Westinghouse initiated a corrective actions process (CAPS) issue report (05286-C003)on October 13, 2005. The CAPS program formally ascertains the cause of the problemthrough an apparent cause analysis, and also requires short and long term correctiveactions as well as actions to prevent recurrence. A project team has already beenestablished to assess the current practices for procuring services and components forshipping containers. The CAPS process and project team's review may result inrevisions to procedures or training to ensure that the quality requirements associated withprocuring services or items for shipping packages are correctly identified.

A.1.e DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED

First note that no shipments have been made with packages that did comply with theCertificate of Compliance (CoC). Compliance was achieved with regard to t hemaintenance activities November 15, 2005 when the Commercial Dedication Instructionwas issued. Full compliance for the Patriot shipping packages will be achieved when therevised CoC is issued, and the anticipated date is prior to January 23, 2006.

References

1. U.S. NRC Safety Inspection Report and Compliance Inspection, Report07100708/2005202

2. Commercial Dedication Instruction CDI-3219 (Proprietary Class 2)3. Weld Wire Analysis4. Procedure TR-219 Refurbish Patriot BWR Shipping Package, Rev. 2

(Proprietary Class 2)5. AWS D9.IM/D9.1:2000, Annex E - Procedure Qualification Test Record (PQR),

Annex D - Welder Procedure Specification (WPS), Annex F - Welder and WeldingOperator Qualification Test Records

6. Magnetic Particle Inspection Report7. BWR/Patriot Inner Shipping Box, Refurbishment Manufacturing & Quality Plan

(MAQP)8. Patriot BWR Inner Box Routing9. Weld Process and Welder Qualification, BWRWELD00110. Weld Procedure for BWR Inner Box, ENDWELD001

Page 5: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

NRC FORM 591S PART 1 U.S. NUCLEAR REGULATORY COMMISSION(8-2002)10 CFR 2.201

SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION1. LICENSEEICERTIFICATE HOLDER 2. NRC/REGIONALOFFICEWestinghouse Electric Company, LLC Spent Fuel Project OfficeP. O. Drawer R M/S 0-13-D-13Columbia, SC 29250 Washington, DC 20555-0001

REPORT 07100708/20052023. LICENSEEICERTIFICATE NUMBER(S) 4. INSPECTION LOCATION 5. DATE(S) OF INSPECTION

71-0708 Columbia, SC October 31 - December 7, 2005The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the NuclearRegulatory Commission (NRC) rules and regulations and the conditions of your license or Certificate of Compliance (CoC). The Inspection consisted ofselective examinations of procedures and representative records, interviews with personnel, and observations by the Inspector. The inspection findings areas follows:

1. Based on the inspection findings, no violations or nonconformances were identified.

2. Previous violation(s) or nonconformance(s) closed.

- 3.The violation(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-identified,non-repetitive, and corrective action was or Is being taken, and the remaining criteria In the NRC Enforcement Policy, NUREG-1600, toexercise discretion, were satisfied.

1 Non-Cited Violation(s) was/were discussed involving the following requirement(s) and Corrective Action(s):

On June 10, 2005, Westinghouse Issued Purchase Order 4500168745 to Chem-Strip of Alamance,Inc., of Burlington, NC, to provide services to chemically clean and paint BWR/Patriot innershipping containers. This process involved cutting and welding of the end of each container lid.The lid is designated on Drawing 10014E28 as a safety-related component of the Patriotcontainer. The Westinghouse requisition for this work did not identify the work as safety-relatedand there was no QA review and approval of the requisition.

] 4. During this inspection certain of your activities, as described below and/or attached, were in violation or nonconformance of NRC requirementsand are being cited. This form is a NOTICE OF VIOLATION OR NONCONFORMANCE, which may be subject to posting in accordance with 10CFR 19.11.

(Violations, Nonconformances, and Corrective Actions)

STATEMENT OF CORRECTIVE ACTIONS] I hereby state that, within 30 days, the actions described by me to the inspector will be taken to correct the violations identified. This statement of correctiveJ actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full

compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requested; ORi Written Response requested in 30 days [i1 YES [ NO

TITLE PRINTED NAME SIGNATURE DATE

LICENSEE Norman Kent I /t)gt4t- "IJ2z ./7/1l0

NRC INSPECTOR James Pearson Uc-r<(J / ./j7/04-ram U 1- U tan M ~ S F ^ XAR T A A A A A1 /

NHU t-UHM 5VIS PART 1 (8-2002) (/

Page 6: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

591 S PART 2 U.S. NUCLEAR REGULATORY COMMISSION

SAFETY INSPECTION REPORTAND COMPLIANCE INSPECTION

1. LICENSEE/CERTIFICATE HOLDER 2. NRC/REGIONAL OFFICE

Westinghouse Electric Company Spent Fuel Project Office, M/S 0-13-D-13REPORT NUMBER(S) 07100708/2005202 Washington, DC 20555-00013. UCENSE/CERTIFICATE NUMBER 4. INSPECTION LOCATION 5. DATE(S) OF INSPECTION

71-0708 Columbia, SC October 31- December 7,2005

(Continued)Westinghouse created Issue Report # 05-286-C003, submitted 10/13/05, identifying that (1) the PO was issuedwithout the required QC approval, (2) the vendor was not on the approved supplier list, (3) the vendor's weldinghad not been done under a Westinghouse program, and (4) an inspection program had not been established forthe vendor welding.

Q. C. Deviation or Notification (QCDN) No. 65309, dated 10/17/05, identified the defective condition as: The endsof the BWR Inner Box were welded back in place and painted without the weld being inspected. The requirementwas cited as: Welds on safety-related parts are to be inspected to PS-WELD1 0, Rev. 01. The QCDN identified19 units in the condition, and instructed that the completed boxes be inspected for weld defects. The QCDNappeared to indicate the welds had subsequently been inspected by Westinghouse, but the NRC inspector wasinformed that some of the welds had been painted over at the time of the inspection.

The above Issue Report and QCDN document that Westinghouse had identified deviations and initiated correctiveactions prior to the start of the NRC inspection. However, the team noted that the refurbishment activities wereongoing at the time of the inspection and the team considered that the actions that had been taken did not appearto be adequate to resolve the issue for either the completed units or the ongoing work. Westinghouseacknowledged during discussions with the team that additional actions would be necessary.

The purchase order to Chem-Strip specified that welding was to meet Westinghouse Electric Co. SpecificationPS-WELD1 0 - Shielded Metal Arc Welding of Carbon Steel. No other welding procedure was provided to Chem-Strip. The inspector was informed that Chem-Strip was performing MIG welding. PS-WELD10 states that theweld joint design shall be shown on drawing and designated by AWS weld symbols. Most of the weldingperformed to replace the end of the container lid was on newly created joints not shown on licensing or fabricationdrawings.

Westinghouse had copies of certificates of welding qualification for three Chem-Strip employees. Neither Chem-Strip nor the three issuers of the certificates were approved suppliers for Westinghouse. No test reports, weldingrecords, or other objective evidence accompanied any of the certificates which were dated 1990, 1992, and 1996.While such documentation may be obtainable, it did not appear that Westinghouse had reviewed or validated anysuch information.

Westinghouse issued a letter stating that two Chem-Strip employees had been trained on the verification ofcontainer rework welds per PS-WELD10 and container drawings on October 27, 2005. The letter certified theindividuals to perform weld inspections per the specification and drawing. There was no further documentation onthe details of the training or the weld attributes to be inspected. PS-WELD1 0 is a general welding specificationand the drawings do not show the weld joint design. The sign-off on the inspection sheet used by Chem-Striponly states "Inspected Welds." Also, there was no further documentation attesting to the qualification of theinspector, such as a written or practical examination, or the results of an eye examination normally required for avisual inspector.

NRC FORM 591 S PART 2 (8-2002)

Page 7: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

591S PART 3 U.S. NUCLEAR REGULATORY COMMISSION591S PART 3 U.S. NUCLEAR REGULATORY COMMISSION

_1 Docket File InformationSAFETY INSPECTION REPORT

AND COMPLIANCE INSPECTIONLICENSEEICERTIFICATE HOLDER 2 NRC/REGIONALOFFICE

Westinghouse Electric Company Spent Fuel Project Office, M/S 0-13-D-13REPORT NUMBER(S) 07100708/2005202 Washington, DC 20555-00013. UCENSEEtCERTIFICATENUMBER(S) 4. INSPECTION LOCATION 5. DATE(S) OF INSPECTION

71-0708 Columbia, SC October 31- December 7, 20056. INSPECTION PROCEDURES USED 7. INSPECTION FOCUS AREAS

86001 Quality Assurance Program Implementation and NRC Inspection FollowupSUPPLEMENTAL INSPECTION INFORMATION

3. UCENSEE CONTACT 4. TELEPHONE NUMBER

Norman Kent 803-647-3552PROGRAM SCOPE

10 CFR 71.1 05(b) states, in part, the certificate holder shall provide control over activities affectingquality of the identified materials and components to an extent consistent with their importance tosafety, and as necessary to assure conformance to the approved design of each individual packageused for the shipment of radioactive material.

Contrary to the above, cutting and welding was performed on important-to-safety components ofPatriot shipping containers at Carolina Chem-Strip:

(1) without adequate procedures for welding,(2) without adequate documentation of welder qualifications, and(3) without adequate provisions for inspection and documentation of completed welds.

NRC FORM 591S PART 3 (82002)

Page 8: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

1I asmP'G|TiPRN0 O 1 MM1m:

Princeton Gamma-Tech, Inc.Spectruin Report

Monday, November 14, 2005

C:fProgran Files PGTU)atamSaple_1907_SOO1.pgtNovember 14, 200514:31:23

Set ID:File:Colledted:

Live Tnme:Beam Voltage:

43.3920.00

Count Rate:Beam Current

15572.00

Dead Time:Takeoff Angle:

29.49 %33.01

r- A 4 FS: 1100

MnK" .IA ?11.._- _ - - r:iif_ -, ' , -'_ *, ' ' , , ' .. . I

I 5 10. I

20

Element Line keV KRatio Wt% At%0/ ChiSquareMn KA1 5.898 0.0134 1.28 1.29 2.64Si KAI 1.740 0.0010 0.16 0.32 1.44P KAI 2.013 0.0007 0.09 0.17 1.44S KAI 2.307 0.0008 0.09 0.16 1.44Fe KAI 6.403 0.9833 98.37 98.05 2.64C KAI 0.277 0.0000 0.00 0.00 0.00

Total 100.00 100.00 2.23

I Element I Line I Gross I BKG | Overlap I Net

MnSipSFe

KAIKAIKAIKAIKA1

(cps)23.7387.4447.9519.150

714.681

(cps)15.9945.7857.0067.88215.672

(cps)0.0000.0010.0060.0050.954

(cps)10.6071.8301.1141.298

696.301

PRINCETON GAMMA-TECH. INC. C/N 863 PRINCETON. NJ 08542-0863

-

Page 9: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Of

Element Line Det Eff Z Corr A Corr F Corr Tot Corr ModesMn KAI 0.995 1.019 1.005 0.928 0.950 Elmnt.Si KAI 0.906 0.864 1.942 0.998 1.675 ElmntP KAI 0.882 0.898 1.614 0.996 1.444 ElmntLS KAI 0.916 0.880 1.400 0.992 1.222 Elmnt.

Fe KAI 0.996 1.000 1.000 1.000 1.000 Elmnt.C KAI 0.193 0.746 6.273 0.999 4.678 Elmnt.

. . . _ .

.. ...

Page 10: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

--

1'. '' 'ESAB Welding &CuttingjWelding Egitipment Plasm Cuttems Weldinacr mahtunble-... page I of 1

Hon- I Contbci Us Dil*rlutor L-cator I $$Con licates S -~ e Map

IAbout ESAB

.

Necws And Evento

Pireez

I Warranty Rlegistration

I SA83 CertificatesI Prom'otions

I I9y $urchargae1Support

i Resour"CONDistributors' Area

Pro motional Calendae

Supported Sites

Training

Cutting Systems

Canada

U.S.

-Mexico

Wo .id-idc

FI ~

Go BackTo Pro*dt Page

Typical Wire Analysis

Tpioai; Typicaassi&2fi WdIs_

65 |ER70S 2 10.06 [09 i)53 110091000

.9 70S-3 .08 1.0)3 10. 0101:

2 70S-3 08 11.20 .60 .009 .O0,.70S-4 .10 11.20 i70 . 09 0H1

- .08 1,0 ._ _ .01 1

. 87F . 70S-7 .09 1.65 .60 .01:2 0.01t

-D2 183 .6 .0110.011

"-R10OS-1 fl0.06 11.62 1 10.00510.00:1Sr . i20. 2I S 1 .07 1.60132 o.005 0.00

40 0.35 .014

Search ESASNAcom

[ T- Find I

Leg:ii I rerm I SVce#ap IC 2005 ESAB VVMdnQ en CutlnO ProwJcts Al K rigts r

.Mlg Welders 1hG Wckters I' Arc Wekkmr I G=isWeddng &Cuttin E-quIprnentWeldhig Electodcs I Wcfdkkg Wire

ILSAB Is the worlds lioeavd~ mn tiiacturer of TIG wvelder:, MIG or wis-u welders stick welder; flux cored weiderx, mult~iproce.33 weldermutlioperator systems, autarnated welding systems, submerged arc we~ders, weLding equipment. weklma gunls tand acc r-orlec, *xYfwelding tipr and nozeesi, stilv tcei weldini wire, flux vored waiding wire, mig welding wire, welding consmablo3, and welder cr.a, Repair, Farm and Ruanch, Construction. MotOrs;portb. Hobbyit and VfabicattIon markets.

httd/www.esabna.comSF-AB/sbowded.cfmn?&D1P=8&Product ID=1 31 8&CA7TU>=2. 1120I 1/1/2005

Page 11: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

'ESAflWelding&Cuttinglweding-qiipirentPlastnaCwfl 6 I 4'I *^°Palf jeA!a" e 1 of 2

Homo * | LIU | OiEIbAo Locator | tUSOS CvldeAiU I DCc Ma p

About VSAD -

News And Evcets

Products

Warranty Registratlon

HSDSESA8 Cnrtificatc*Promotlions

Alloy Surchtarges

Support

Resources

Distributtors' Atea

PromotiownuCaiendur

Supported Sites

Trainliag

Cutting Systems

Cainada

U.S.

Mcxico

Worldwide

J .

|Pick A Aegrin

St - -

CauW~og - Solid Mwer - Carbon Stecd Wlrcs

F-

i--

Spoolarc 86-

AWS Cls ER70S-6Code and Specification Dtat AWS AS.18. ASME SFA 5.18MAI - MEL 70S-6, MIL9--2376S/1ABS - ER70S-6Lloyds -3SA. 3YSACWB-CSA W4&4-) ER4OS-6

Description:Spoolare 86 contains higher levels of manganese and siliconthan the other standard grades of MIG wire. This -wirefeatubes e~cceIcnt toleranoe of rust and scale, produces thehighest deposit strengh of all the carbot steel MIG wires.

Spoolarc 86 is used for butt and fillet welding of sheet andplate of a variety of thickness. Applications include generalcarbon sted fiiboation.

Search ESABNA.com

TzpkdMekmwd ca

As Weded.7% Al25z% CO 2 :

0.dd Stre4, psi, 460009

TcnsileStrenglh, psi Wa) 6,000 (593 1,600 (563)

.Elo ionin 2 (51 mm) 1271111

Typl Cazpp V-Nkh Inqmc Jropaties

As Wdded. .5%Ad2S% CO2 ' CO2

Testing Temperature Ift-lbs(J)

-~20°F -18°C) 57 91) -31(42)

Typial Unilued WeldMetalAnali r)

iGas C Mn SiCu75% Adr25-% CO2 11(0.7 1 '*'9 11 -012 ooli lz-

httpJ/www.csabna.com/webcatlogshowdetl.cfin?product ID113 l9&GD-9l &CID=22 11//2005 I

Page 12: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

ESAB Welding & Cuting I Welding Equipment, Plasmi Cutriz Wedmlno' oCas .h1a Pa-ge2 of.2U"d00 fl: I II~~'I POAI838H

2 1 .0.51 I 0.011 I 0.012 0.26

Typiecip(d.itd MWdd MCiat*nalysks

Recommended Wdding Paramwecrs

* Tp~ico, iMnc.nar-

Deoxqitinn and ffficiincy DataforWdling Wi.res

tmdard D amtde, and Packages

- .023"(0.6 mm)x.12 & 33# (5.4& 15kg) Spl* .030'(0.8 mm) x 12, 33 & 44# (S.4, 15 & 20 kg)sp* .035"(0O9 mm) x 12, 3344 & 601 (5.4, 15, 20 & 27 kg Spl, 65# (29 k1

700 & 100W318 & 454 kg) red, & 500 & 900#(227 & 408 kg)Marat* .045u(1.2 mm)x 12,33, 44 & 60# (5.4, 15,20 & 27 kg) sp, 65# (29k1

300.700 & 1000#(136, 3 S & 454 Jtd, & 500#(227 kg)Mafithon..052"(1.4 mm) x 500227 kS)Marathofi Pac.

* 1116T(1.6 inm) x 33, 44 & 60(1S, 20 & 27k&)spl, 65#(29 kg)coil & 7'(318 kg)rel

P ,kaging Spedcaiovns 1 Pl"kin~g

Letl I Temis I SiteMap IC 2DDS ESAB Wakknand Cutting Product. AS e19hts tlwfea

Mig Weldecs I TIG Welders I Arc Wders. I Gas Weding & rtig Equiptnot I Pbsma CutWkRd g Electrodes I Welding Wke

ESS Is the workfls feadina mantfcwer ofTIG welders, MIG or wiro welders, stick weldo;, flux cored welders, mriftIpro welderamtrs, wifoodera, munloperator vystem., uutomnwted weding ystems, sub erged arc welders, wrJding ftqulpnwpnt welding ovwisuoyfuel torcheis, bas tordws, gas regsors. oats welding tUV and nozzle-, vtanincl ctcol weldkig wir, flux cored welding wire, mg iconumablcs. and welder tralnng mnatorbb for thoe Industrul, Muntenwnce & Repair, Farm and Ranch, Conh tio M*otoporrv, Horubriction Markets.

httpi/www.cbutcomwebcatWogtshowdcte.cfmproduct 1D=13 19&GHD'91&CI1/1 1/112005

Page 13: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

11/16/2005 16:52 FAX 9043590771.11/07/200S 16:28 FAX 9043590771

QUALITY INSPECTION SERVS

QUALITY INSPECIION SERVS

I002

Iaj oh

AVIS D9.IWP-:2000

C-.0

Annex E

Procedure Qualification Test Record (PQR)

(Iis Annax is not * parl of AWS I)9.1N/D9.1±20D0, She& Meal Wddft Code. t-st is bidudcd for inrtomatonputposm only.)

POQNvmber 4 2 /WPSNtxnbor hj24O de/

VAMAIABESBaeemot .67.e-6av •AIe/

Meta tdickness /Z 'Cclaling AJ010'LFJMn preant /J -On 17 --- -cnakii ae* /4

fI-7 t:S

P os dn of we d n 6 j . Z Z C~r1 L ..W oidru p n~ ce ss //1/6Manuak s u miworna&i-or aukomuc 1 A-L*FA~ef mewa Spee. A

mets da~ss L R 7 05f- 6Filff m etalENF .N _ _ _ _ _ _ _ _ _ _

ocbtrcal chF. fi D doenMode oft .%#J0 6/t &

GA fow Uni tciiq 0 C/ fWeklders norm / 68 % ff0 DWlderls ID no.see Deans

Wold in butt joirt v:sW exawte rosuhs

(see 3.42.1r o 1.)1

F ujsion - -,A __ _ __ _ _ __ __ _ __ __ _

EF I' c t 4 ,ro a t - _ _ _ _ _ _ _ _ _

Conwaio

Powos__Und_____

4o A_ ___Fusion . . _,

Eff* Owm.

Cck. . .-

JONING PROCEPIJRE

_ - - IWOdg Pow

Currenl Ryane Witage Range Spoed dlItEvl Jont Detal.~~~~ ~ ._ .. .I_ _ I _

IY6d f.t

_____________________ I - � I L -.------ -

'We. the nd ed, Owatiyl ta fe Statamers in flis recrd we cone a d MA Iho test &esrr n pvrv d. jo;nand exanined in vdnniewlh te krnerds of AWS D9.1M/DM.1, Shed Mea WeM7 l~de.

Marufacturer ow Contrach. /, . I/V 4 t 6/-l , -</-Y'

Autemd by yJ °- -6Dah-i X- --z

25

Page 14: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

* /16/2005 16:52 FAX 9043590771IU "z"US 16:23 FAX 9043590771 QUALITY INSPECTION SERVS

QUALITY INSPL~cTION SERVSIa1 003

0010AWS C?9.1M/D9.1Z2WO

r'.

Annex DWelding Procedure SpeQification (WVPS)

(This Annox is rit a part of AWS D9.IM/D9.1:2000 Shed Mdal Wecin Code, but is included for infrniMasonpwposes oldy.)

WPS HwnbwWPS Rev. Nak

NIJRe LJJI- D ,Aol SuppdYPQR Na((s) .EAVnL jLYMWPS Rev. VWe - c r

VARIABLES- - A

D"meta

coatkv tpe-Joait prep_

*M"

*'F~RW met3 cFller metal F.E keebW cModo of bwS~e ng gDiiCias flow tUmf-S~e DaOo

_ZakOil $Yr/:r _ A6 4A _lxS t,,-.

. .

rion P gA'Z a e "_ _ _

"~n g f / C4! _ _ _ _ _ _ _

N u m b e r _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

br, S>y4 cot Vrr'. {e s __ __ d / Zerih(OFH //O

JOINWG PROCEMURE

Wdding PFiier

Fider MeW S&O Currofg Mange W" Rwqe SpeeddfbWl J*o Dew

o. 6ar //r- /Y59AV, 7 g- Z2 v %5- rPA, 7

We. the &signA cm* tl toe statemer ki ffis recad ae cre and O VW test spedmans % PvpaZ johnedand efaknd In a acordance tv wqukefnts r t AWS 09.1AMMA.1 Shede Maid Wvk6V *)R*W

Manutadicter or C cW/, 4 :1-51r rp

i/D 7 lwhf ed hobdyz _ 4; m I -e,,_

Dm X,9~ 4wA r --

24

Page 15: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

2005 16:52 FAX 9043590771 QUALITY INSPECTION SERVS%du.-lt A v LLr1U SERYS

l 005Q) 012

C'

AWS 09.MlU.l12MO

Annex F

Welder and Welding Operator Qualificatioii Test Record(This Annc= is no a put of AWS D9.1 MJ19.1:200, Shet Metal WddiC Codf, bu is inehdod for Fnforma1io

purpooft only.)

Name Aichaed W rds

Dalbo W~ ~VTed //- ?Ot0D Ma ec( Kr wnko gaTo 3t JI I 1!AIve

9rIo QWdow RPassd Orhd

Q4ALM~CAT4 T.iST PF0RUEDWPS BW*-W -ca c

PqLm r1o0o C a 7 k4E ! I.,/ ,A ,

8kwe ~wkt

T~pe d a~nmr ~ t'5 A-5ESSE MAL VARIABLES QU &1JFEI 3BY 1 E, rpesodbasaeml. e5 .4-34 wa*v

n Coa& garo 0e 11 WodurrtorNBadcik rm*y1 PAo[]EIC jdop LdconRI~e metal F rub err SW81*9 ga~s used z % A ' 2 - a1

Mdo#f p of pfizon PbonlwondaO

VIUL 4SPEC11o RESULTS

Sq.M -_f

(BEk JA Vd Yea No Y N

Raekd t WtA NJA

mom gm "por"oWVA WA

Urodert wrodg Milst- __tA

MarkM= ruanfe tuN . e.

Types of jomnts &&1

-___

lhetWld '4bs NO S No

Urff to'i 2A tf a g A /

CL. 1,# orO0.26t

Crdo

k-pecion petk"Pnncdby~RfiaOf kxpe ?D2C e. 1Data - r -

Date 444M44L3K _ ,fi/- J-. I

260r

'c ,#

Page 16: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

/2005 16:52 FAX 9043590771 QUALITY INSPECITION SERVSI.'mmLL1 l N t~eL~jjj l h EVS

0 006Q012

AWS 09.1M109.1:2000

0

Annex F

Welder and Welding Operator Qualification Test Record(Mix Annr is nO a pat of AWS D9.1 M/D9.1:200,0 Sheet Mel Wdding C4e, bIitis includcd for infornation

puriog, only.)

DatoodWemvgQTodDate of Knowledge Test_ _ _ _

0OrA []Wrken }Passed 1i1EWed

QUAUFICA10 11ZST PERFORMED

Wm rturtze g o -pt 7 aSqv=ve gor o V VI-,

Be Wd test, ._ -

CZ5 - ESrMAL VAMABLES QUALIFIED BY TESr. ypes ofbase mew _ CD -v~ 31 nPozs$ - WeciCoaig material onBaadd mael A//

Oyes 0 no

Filer mea F r'znbr P6MWod of lppkation

J1manal D s Qi-ati Daro

Oao jdp QdmnStihkf;gaosed 754: /2; /iZ . O! epOtan weldedoft Elhoz [8vew 0 wmad

VISUAL INSPECTION RESULTS

SqureWevald MeWeldS. AC

(Budtti _ Weld YW' No Yes No

Jo" trsim- kn.

po bac bo;penat--6m A KA

renbrcenmerR 4Mmr one mporeorkmdsion oer O2St A

Lkdrcumt exce"ng O.l5t- _ A WU NA

Tidcness gne qfWted _Poeslof qoinsd qJ. zI3 ,F /, ZTypes of Jodnts qua fled 6

Accepc Qrena

Wei * Brazw Weld

FilletWeld yea No Yet NO

(mobic band)

Rsqqed -**e fi throat

Roqtired rnmutn

Pore orkc indwo" ove0.251

Undott O "tm WA W/A. *% _ _0.25t

Nane Of k w

Date'*1,

26-,Ql CJ

:k.. -

- -

Page 17: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

/2005 16:52 FAX 9043590771 QUALITY INSPECTION SERVSwv.eUtlL1 £trwr.2mvtjn ZS-tYSI1004

1012

AWS 9.1W ?U1:201,

Annex F

Welder and Welding Operator Qualificatioi0 Test RecordcI11& Anex is no a p2n of AW5 9.1 WM.12.1;00Q, Sec Mctat Wd C&, bo_ is ir~d for wrsai

rp6s I ooty.)

L[Xrn a to _

1)Ata of mgd Tast II -' -10,5

R Owin OPawc CJFwbd

QCAUAT4O4N TEST PRFORMD",WS fu6m Y1? 2L7 1 4/

SquamWOOV0 ( VOK7/c-70 r

ea___/- _ __

S VARABLES OUAUFIED BY TESteoef h a".. me3t Wek*gpSS /

__M. 0r hansbw C £/4'7Cc- nivateOa wd o )e Qlye O~r= WecswnerBadku na Notel A1k/[i Eip ~F~emeWFowuber___________________Motiiod o( qG~afm P~cOn wwwaodI mriinal [IsiSGT-a3i []a10 ofua hoto jjErwt fJirvedt)am

poMr"E o

_ =

Urkender 0=00&Qrt OAR-

_, eptm Cae

Weki u Wldd

fwet vad us go yes No

fonit~on-OV* bona)

Pare or kwkusion we0.25l

__i _ _ -I �nd�

$ Pn qd I, ,3, fm ' d ,00am '-

'Types of joint nts~-dCr4 ~1 Lma zi4"

iZs'C

peoon per byne ya yNama ofk~e

Da~e JZ L/ ~ f~ 2.yav +_

. . Pt, a

-- --- X -- --

I

.V1

Page 18: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

/2005 16:52 FAX 9043590771.4 - ----- QUALITY INSPECTION SERVS4UI A L.iAA 1"Z1MILftUr SU1YS

0 007Ii012

AwS 09.1"O9.120

Annex F

Welder and Welding Operator Qualification Test Record(is Annm= is Pot a pan of AWS D9.1 9.1;MK se*ca Meawl lrctVg.Cod4, bid is inekjdd for 14infonton

jcrpow ably.)

Name LbflCI tAi ,..

Date We&*V Tod I I -i0ODatoftdKhMWv Td r I 1!j

QwrkiEewM Pla~se U Fmed

QUALFICATIO 1 TEST PFORMEDvips nmer r -. ot _~e1 vr-DC

68tph4Ok_,eG; j6Cz~y1,(-

Mdld -- 6.i?7 jlv - < -

Y*dttest (-/A _

ESSENIAL VAIALES CAUIJREID BY IESTTicb-b34 WukWngPe-mm 9__ _ __ _ __ __ __ _ __ __ __ _ Ma d ee ofZrtSr W o' e r C/'?C 09CD* Yesg CS no vWekkVvmAdIsacmT~tefI5 A/A fowc[ Dip OldeenFmlerMdaUFnmuxb /ergmoued- 751;. As /Z-£ 660Ud di PonwoV1od

Oosr6- 0"KAD El aOii* 3 ip4wm W4 IMAd

VISUALASPECTM RESULTS

. Wid Wuzd

)d Yes Na Yes No

'.1no" uson)

JdntWA hA

Mm Ou r;o pom orwdLsin aer 0251 ( --

Unkd=A weaeig 0.15V _ A WA

Pdog m d____Tyseon quadr-__TyPes- o~f joW qta~d_

AWepbwwao Werfa

Mat Weld Wa go fs No

Undercut veteedhi WA N/A

__U or .-2

nrcc

J

26

-

Page 19: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Quality Inspection Services, Inc Corporate Headquarters2004 Edison Avenue 37 Franklin Street Suite 400

Jacksonville, FL 32204 Buffalo, NY 14202(904) 359-0747 (716) 853-2611

Suffalo, NY, Ent Syracuse, NY, Mechanicilf, NY, RcMoxxnd, WA, Rcky Hill, CT. Gamewvio, NY Amhest. NY Waren, PA, Jacsonville, FLMAGNETIC PARTICLE INSPECTION x I Nuclear I I Non-NuclearTo: Robert Pollard Date: 12-19-05

Inspection Project: BWR PATRIOT INNER BOX

QISI Job Number 05-70-0778 P.O. I Release Number 4500181547

Q1SI Procedure: NOE MT-01 Acceptance Standards: AWS D 9.1 SHEET METAL CODE

S tem: FUEL ASSEMBLY TRANSPORT Area: TRANSPORTATIONLOCATION; y

IX Weld [i| Castings | Machined | I| Machinery |il Pipe Il Structural.A I I I I Parts I I I

COMPONENT ' Other:

Non- Bar I Casting I Machined I Pipe X PlateWeld Parts

Type of Base Tye of Filler SIZ NO. of WeldMATERIAL ' -'- -Metal fi -mat Piees

16ga.cls 40"ofUnear 34Ud's As x Sth&P derweld per lid. Welded coated

MODE' . Initial I a Re air I X I Final

Wet X Dry X Yoke Prod X Continuous

*; Coil Head - l AC X DC

INSPECTION Spacing: T 1.5 INCHES Amperages: 4METHOD _ _ _ _ _ _ _ _ _ _ _ _ _

MT Equipment I Model I Serial Number: Inspction Medium I Color. . DA 400 PARKER PROBE RED RP6 plh BATCH 1252A

. .SN 11052

Reference Summary: Digital pic's Included x I See Attachment Inspection Results: All welds Inspected werefound to be acceptable. No relevant Indicationswere found at time of Inspection.

Copy To:Stephen D. Palmer, Jr. Requested BY: Robert Pollard

Quality Inspection Services, Inc. |

LI Reported By (Technician): Roger A. Miller

12-19-05

Customer QSI Supervisor Terry HedgesSpecifications

Ths repou is nd to be construzed as a 9Ur or waranty dcBe corwdan di the natenals tested. CUALrrY INSPECTION SERVICES. INC isnd nle fAr anyrrdfAorprcn of rsAts orwcoditm. or for any daks orbsses aftbutabe bt performanc d a est.These serices am rendered wutt anyrranty. Any iy isidled to fe arnount paid for the servies at issue. Al orders am subject to Ouality Irspection Servies, Wc's Standard Terms and Coniions d Sale. %4kh are avalable uponrequest.

Page 20: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Quality Inspection Services, Inc Corporate Headquarters2004 Edison Avenue 37 Franklin Street Suite 400

Jacksonville, FL 32204 Buffalo, NY 14202(904) 35940747 (716) 853-2611

1 1 .

ATTACHMENT I

Serial #s Location of Inspection169 TOP END01 TOPEND14~8 TOP END122 TOPEND

_ 013 TOP END

Page 21: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

V QUALITY INSPECTION SERVICES, INC.b 37 Franklin Street * Cathedral Park Tower * Suite 400 e Buffalo, New York 14202 * 716-853-2611 * Fax 716-853-2619

Visit us at: wwwqisi.com * E-mail: buffalo qisi.com

Buffalo, NY Long Island, NY East Syracuse, NY Albany, NY Hartford, CT Jacksonville, FL Warren, PA Pittsburgh, PA Hanford, V716-683710 631-585-3150 315-431-4291 518-899-3230 860-257-77 904-359-0747 814-726-1988 412-461-1502 509-373-86

THIS IS NOT AN INVOICE.Affr_3 tt~n~twiuntr. unutzi

Customer: I .is wo it (.* . 7'S) -i77 OiSJob# 1 l _/,

Contact: CustomerPO# ,) Ifl t .

Location: " . CustomerJob#

WorkDescription:- 'i.- ''i* ' ' .l i ' - ' -m*r.

Work Instructions: I ; , > d. -.

NDE Methods/Techniques: Acceptance Criteria: ,,)S Y)9-Inspector(s) Engineer(s): \>'f: ; C Start Date: End Date: 1,J.4 /7 Ž..

Time Expended: For Office Use Only For Office Use Only

Shift Hours Rate Extension Rate Extension

Regular: WorkHours

Premium Travel Hours:

Total: _ Total Mies

MATERIAL CONSUMABLES/EQUIPMENT

Radiographic Film For Office Use Only __| Equipment For Office Use Oi

Oty Size Rate Extension Oty Description Period Rate Eixtens;

Breathing Air

._ _ Confined Space Entry

:_ ._ _Magnetic Flux Extrusion _

TroxIer Nuclear Density _

Ultrasonic ThicknessMaterial/Consumables For Office Use Only Ultrasonic Shear Wave

Description Qty Unit Rate Extension Positive Material ID

Magnetic Particle ;A _____7. Coating Thickness _

Liquid Penetrant ____Skidmore Bolt Torque

Leak Detector (Snoop) Video Borescope

Gas / Air / Helium Portable Hardness Tester

* Acidrryvac Suits Varian Helium Leak Detector

Concrete Cylinders =_=_==_

Total Amount Due _

Comments:

Prepared By: A : ; > / A. ': ; Date: . (7 " -.-

CustomerAuthorkzation: - *m * -- ;-- Date: ___-___;; _i __

WHITE -0IS COPY YELLOW-CUSTOMER COPY

Page 22: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

I 0.

Chem-Strip MAQP - 001

Rev. IChem-Strip of Alamance, Inc

BWRIPatriot Inner Shipping Box

Refurbishment Manufacturing & Quality Plan (MAQP)

Scope:

This MAQP applies to the cleaning, acid striping, welding, weld inspection, andpowder coat painting services provided to Westinghouse Electric Co. in Columbia,South Carolina.

1. Process Flow

I. Receive > Clean (via oven bake) > Remove lid top end > Acid Strip/Neutralize > Replace top lid > Inspect Weld > Powder Coat Paint >Inspect > Ship

II. Process Operations:

1.0 Receive BWR Inner Boxes from Westinghouse

1.1 Unload the boxes from the truck using a forklift.

1.2 Record the serial numbers of the boxes received.

1.3 Initiate for each box:

A. Container Refurbishment Process sheetB. Process RoutingC. Record serial numbers

1.4 Prepare three (3) metal tags with the serial number for each box.

1.5 Attach the tags to each box as indicated on the Tag Location Sketch.

NOTE:

Any non-conforming box or box section should be tagged. This tag shouldhave the box serial number, the nature of the non-conformity, date, andoperator initials. This box is to be set aside until a disposition is made by anWestinghouse engineer. The non-conformity is to be noted in the commentsection of the process routing - Patriot BWR Inner Box Routing.

2.0 - Bake off Paint, Rust, etc.

SD Pahlmer Pace I I I1 'ION20D

SD Palmer Page 1 1111612005

Page 23: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Chem-Strip MAQP - 00IRev. I

2.1 Remove the lid from the main body.

2.2 Measure the lid with a commercial grade measuring tape.

* Measure the overall width at the mid-span

* Measure the overall length at the mid-span 42.3 Place the box lids and main bodies on carrier for transport to oven (4 total

boxes per carrier).

2.4 Place the carrier with the boxes in the oven.

2.5 Close the oven doors.

2.6 Heat the oven to approximately 820° F.

2.7 Bake the boxes for approximately 3-4 hours.

2.8 Turn the heat off and allow the boxes to cool to approximately 4000 F.

2.9 Remove the carrier from the oven.

2.10 Rinse the ash residue form the boxes with tap water.

3.0 Remove End of Lid

3.1 Cut the end off the "top" end of the lid. (The "top" end the end withremovable end section.)

3.2 Stamp the box serial number on the inside of the piece removed from theend. Hold this end piece for reattachment later in this process.

4.0 Chemically Strip Box

4.1 Place the box sections on the chemical bath carrier with the open endsdown.

4.2 Place the carrier with the boxes in the chemical bath to remove theremainder of the paint, rust, etc. (Approximate time - 1 hour or until theboxes are clean to bare metal.)

4.3 Rinse the boxes.

4.4 Place the boxes in a neutralizing solution.

4.5 Rinse and dry the boxes.

SD Palnmer - Page 2 | 11/6n200s

. ., _ . _

Page 24: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

' Id

Chem-Strip MAQP - 001Rev. I

5.0 Paint Inside the Cavities in the Lid and the Main Body

5.1 Paint the interior cavities of the lid and main body with an epoxy paint.Use a wand to get paint along the entire length of the box and around allsections of the support angles.

6.0 Weld on the Lid End and Weld Repair

rI I

LWARNING:

Always wear the proper Personal Safety Equipment for a welding operation.Failure to comply may result in personnel injury.

NOTE:

The lid end had been stamped with the inner box serial number when the endwas removed. The number was stamped on the inside of the end.

-.

6.1 Match the inner box lid end to the lid by the serial number.

6.2 Remove any rust or residue on the edges to be welded.

6.3 Position the lid end on the lid (the side stamped with the serial number isto the inside). The lid has been placed on the longitudinal edge with thewidth of the end in the vertical direction.

s ..

NOTE:

Only welders qualified and certified may weld on the box.

Only qualified and designated weld inspectors may do the weld inspection.

6.4 Tack-weld the lid end to the lid per Weld Procedure ENDWELD00 I.

6.5 Inspect the tack-welds for cracks. Any defective welds are to be removedand rewelded per Weld Procedure ENDWELDOO 1.

6.6 Weld from the top to the bottom down each vertical side per WeldProcedure ENDWELDOOI.

6.7 Turn the lid 900 (a quarter turn about the longitudinal axis).

6.8 Weld from the top to the bottom down each vertical side to complete thoweld per Weld Procedure ENDWELDOO1.

.SD Palmer Page 3 Ht1612005

SD Palmer Page 3 11116/ZOOS

Page 25: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Chem-Strip MAQP - 001Rev. I

6.9 Inspect the final weld per Weld Procedure ENDWELDOOI for thefollowing:

6.10

6.11

6.12

* Complete fusion

* A maximum of 3.2 mm (1/8 inch) reinforcement 4

* No more than one visible pore or inclusion in-any 25 mm (I inch) ofthe weld. The size of any pore or inclusion shall not exceed 0.25t,where t is the base metal thickness.

* No undercutting exceeding 0.1 St.

* No cracksRepair any defects in the welds per Weld Procedure ENDWELDOO 1.Grind the weld until the weld is level with the lid surface.

Inspect the ground weld per Weld Procedure ENDWELDOOI for thefollowing:

* Complete fusion

* No more than one visible pore or inclusion in any 25 mm (I inch) ofthe weld. The size of any pore or inclusion shall not exceed 0.25t,where t is the base metal thickness.

* No undercutting exceeding 0.151.

* No cracks

6.13 Complete the welding Documentation of Repairs.

6.14 Welding Repairs

A. Identify the areas for weld repair. Mark these areas on the weldingrouting.

B. Prepare the area to be welded.C. Weld the defective area per Weld Procedure ENDWELDOO .D. Inspect the weld per Weld Procedure ENDWELDOO I for the

following:

* Complete fusion

* A maximum of 3.2 mm (1/8 inch) reinforcement

* No-more than one visible pore or inclusion in any 25 mm (I inch)of the weld. The size of any pore or inclusion shall not exceed0.25t, where t is the base metal thickness.

* No undercutting exceeding 0.1St.

* No cracks

E. Grind and reweld as necessary per Weld Procedure ENDWELDOOI.

SD Pslner - Page 4 X 1116t200

Page 26: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Chem-Strip MAQP - 001Rev. I

F. Complete the welding Documentation of Repairs.

6.15 Perform the straighteninglalignment of bolt holes to assure box closure.

7.0 Powder Coat the BWR Inner Box

7.1 Wash the box with iron phosphate.

7.2 Rinse the box with tap water.

7.3 Place the box in a drying oven until dry.

7.4 Remove from oven and powder coat the boxes with RAL5002 Blue.

7.5 Place the powder coated box in an oven.

7.6 Heat the oven to approximately 3750 F.

7.7 Bake the powder coat on for about 20 minutes.

7.8 Remove from oven and allow the box to cool.

8.0 Prepare for Return Shipment

8.1 Measure the lid with a commercial grade measuring tape.

* Measure the overall width at the mid-span

* Measure the overall length at the mid-span

* Compare the measurements with the measurements taken before thebaking oven

* If the measurements are within 1/1 6" of the initial measurements,then the box is acceptable.

* If the measurements are greater than 1/16" of the initialmeasurements, then an engineering disposition would be neededfor acceptance of the box.

8.2 Reassemble the BWR inner box.8.3 Place packing foam between the box sections (lid, removable end, and

main body) in place of gasket material during the reassemble.8.4 Secure the sections together with nuts and bolts at least hand tight.8.5 Inspect the box visually to assure that the box is ready for return shipment.8.6 Prepare paperwork for Westinghouse review.

SD Palmer - Page 5 1 1116'2005

Page 27: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

WESTINGHOUSE NUCLEAR FUELSUPPLIER SUBMITTAL FORM FORM NO.: SCMF-:5(0-0 -I

SUPPLIER Section:From: Chem-Strip of Alamance,

Purchase Order No. (For Ref Only):Inc. . Date: 11/16/05

Phone:Fax:

1. The following items re forwarded for Westinghouse review and approval.Document No Rev Title - Applicable P/N

A. MAQP BWR/Patriot Inner Shipping Container RefurbishmentB. _

C.

D. .

2. Comments/Reason For Submittal: (e.g., New, Revision, explanation)A.B.

C.D.

WESTINGHOUSE Section: Docket No. 2051 Date: 11/161051. Please review and return to Supplier Performance Technician within 5 working days.Reviewer Comments:

Reviewer: Nanc Signature Approval: Conditional Disapproval:Approval:

I'D Eng: B. Hempy .PA/QC Eng T. Brown . .

FBMIlPE: R. Lincoln

2. Supplier Performance Engineer - Evaluate Reviewer forms/comments. R. Maurer

A. Nofify supplier of any corrections needed and request Initial: Date:applicable documents be resubmitted.B. Obtain corrected submittal/verify corrections. if Initial: Date:applicable.

C. SPE Final Appro%-al - Sionaittirl Dale:

To Supplier: SPEi Final Approva above indicates submitued items are approved for use.

Page 28: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

W'FSTINGHOUSE NIJCIls AR FtJEILSlIPPLIER SUBMrIITAL FORiM1

S;l !I'PL'l Sectioll: Putirchise Orderl: .Afama c'leemu*Sirip of alulhlnce. Inc.

IFORM No.: S IIF-500-l

rNo. ror Ref Only):D)ale: 11/14105IPlhone:Fax:

. .

I. Thc following items are fonvardc( for Wcstinghouse review and approva0.Document No Rev Title - Applicable P/N

A. MAQP - BWRIPairiot Inner Shipping Container RefurbishmentB.=...C.D. .______._2. Comments/Reason For Submittal: (e.g., New, Revision, explanation)A.B.

C-D.

WESTINGHOUSE Section: Docket No. 2051 Date: 11114/051. Please review and return to Supplier Performance Technician within 5 working days.Reviewer Commnents:

Reviewer: Name Signature Approval: Conditional Disapproval:Q En TBrow _ _-Approval:

PD Eng: s iyf _ _____

PtVQ>C rEng T. BrownYI:BNlJlIli: R. LincolnOther: B. Stone . _ _ . . -

2. Supplier Performance Engincer - Evaluate Reviewer formns/comments. R. Maurer

A. Notil supplier ol upy corrections needed and reques: Initial: Date;:ppli. :4ble documents Iv resubmitted. II; ( him mI m I %rr-ctcd t.uhmill;ml!a itv tl-%ir . s. If I I ,i I i:m I|

|L(' Sl'l: 1,m., Ap\pim.al * Signa.mluic: | ).ute|

To Stiplimr: SPE Final Approval above itlicatc sul'Miud itelms are :appoxed for ulse.

Page 29: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

WESTINGHOUSE NUCLEAR FUELSUPPLIER SUBMIrTAL FORM FORM NO.: SCMF-500-l

SUPPLIER Section:From: Chem-Strip of Alanmance, .

Purchase Order No. (For Ref Only):Inc. Date: 11/14/05

Phone:

_ _

Fax:

I J1. i ne rollowing items are tonvaraea tor westinghouse review ana.approval;Vocument No Rev Title - Applicable P/N

A. MAQP BWRtPalriot Inner Shipping Container Refurbishment

D.=.2. Comments/Reason For Submittal: (e.g., New, Revision, explanation)A.

B.C.D.

WESTINGHOUSE Section: Docket No. 2051 Date: 11/14/051. Please review and return to Supplier Performance Technician within 5 working days.Revicwer Comments:

Reviewer: Name Signature Approval: Conditional Disapproval:

,_ - Approval:PD Eng: B. Hempy 1PA/QC Eng %Plyib . t

FBM/PE: R. LincolnOther: B. Stone .

2. Supplier Performance Engineer -Evaluate Reviewer fornis/comments. R. Maurer

A. Notify supplicr of any corrections needed and request Initial: Date:apiplicable docunments be resubmitted.B. Obtain corrected submittal/verify corrections. if Inidial: Date:apoplicabEle.

('. SplE Son Pl s Aprproval - Signarure: Dafr:

To Sutpplier: SPE F~inal Approval above indlicates submlittedl items are approved for use.

Page 30: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

I I .

WVESTINGHOUSE NUCLEAR FUELSUPPLIER SUBMIrITTAL FORM FORM NO.: SCMIF-50()- I

SUPPILIER Section: Purchase Order No. (For Ref Only):From: C:hem-Strip of Alaniance, Inc. Date: 11/14105

Phone:

Fax:

_-

'Tihe follnwino itfms are fcrwirded fnr Wemtinchouse review and anproval.I

Document No Rey Title Applicable P/N

A. MAQP BWRlPatriot Inner Shipping Container Refurbishment

B.C. = .:

2. Comments/Reason For Submittal: (e.g., New, Revision, explanalion)A.B.C.

D.

WESTINGHOUSE Section: Docket No. 2051 Date: 111141051. Please review and return to Supplier Performance Technician within 5 working days.Reviewer Comments:

Reviewer: Name Signature Approval: Conditional Disapproval:Approval:

PD Eng: B. HempyPA/QC Eng T. BrownFBM/PE: RI;Lincodn lrofflwo OsOther: B. Slone _ .

2. SupplierPerformanceEntgineer EvaluateReviewverforms/comments. R.Maurer

A. Notify supplier of any corrections needed and rcquest Initial: Date:applicabic documents tv resutbmitied.

B. Ocmtn corrcted submittalfVlril; corrections. if Initial: Date;

aippliclable.C. SfP' IFina) Approv~al - Signature: DatC:

_ . _ __ C,

To Supplier-: SIl' IFinal Approval above inlicaics subilitcdl ilens are approved for usc.

. .-

-

Page 31: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

.4� )? *�

Carolina Chem-Strip of Alamance, Inc.Process Routing

Patriot BWR Inner Box Routing Rev. 1Box Serial Number

NOTE:Any non-conforming box or box section should be tagged. This tag should have the box serial number, the nature of the non-conformity,date, and operator initials. This box is to be set aside until a disposition is made by an Westinghouse engineer. The non-conformity is tobe noted in the comment section of this routing.

Step Area Description Date Initials Inspector Independent Rep CommentsCompleted Date / Initials Date I Initials _

I Receive Unload boxes from truck.Place in designated area.

2 Record serial number above(CDI Step H.1)

3 Initiate Process Routing for each box.

4 Prepare three (3) metal tags with the serialnumber for each box. __

5 Attach the tags to each corresponding box asspecified on the Tag Location Sketch.

6 Oven Remove the box lid.Bake

7 Measure lid overall length at mid-span

Measure lid overall width at mid-span

Tape Serial Number

Page 32: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Step Area Description Date Initials Inspector Independent Rep CommentsCompleted Date / Initials Date / Initials

8 Place box lid and bottom on carrier for__ transport to oven (4 sets per carrier)

9 Place in oven. Heat oven to a minimum of8000F and bake for a minimum of 3 hours.Time in: Time out:

10 After baking, allow oven to cool until theboxes are safe to handle before removing.Remove from oven.

11 Rinse ash residue from box with tap water.

12 Move box to Fab Shop

13 Fab Cut end off of lid ("top" end)Shop.

14 Stamp the box serial number on the inside ofthe removed lid end. Hold for futurereplacement.

15 Move box to chemical bath.

16 Chem Dip box in chemical bath to remove paint,Bath rust, etc for a minimum of 90 minutes.

17 Rinse completely with tap water and allow todry.

18 Visually inspect inner package and verify thatgross rust, paint and other debris is removed. _

19 Epoxy paint the inside of the lid and the mainbox with ERP-420/ERP-520 Epoxy, orengineering approved equal (CDI Step H.6).The painting is to be done with a wand. Usethe paint manufacturer's technical sheet timesfor proper drying.

Page 33: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

1'

Step Area Description Date Initials Inspector Independent Rep CommentsCompleted Date / Initials Date / Initials _

20 Move box to Fab-Shop

21 Fab- Visually inspect entire inner package forShop pitted steel and indicate any pitting locations

on Documentation of Repairs (CDI Step H.2)

Identify and document any weld repairsrequired on the Documentation of Repairs'Welds Sketch (CDI Step H.2).

22 Perform any straightening / alignment of boltholes (cold working) to assure box closure.

23 Visually inspect entire inner package forcracked welds (including lifting lugs, boltlugs and channel) noting location of crackedwelds on Documentation of Repairs (CDIStep H.3).

24 Repair welds (ENDWELDOO1) and noterepair on Documentation of Repairs (CDISteps H.3 and H4).

25 Replace the lid end and weld in place(ENDWELDOO 1) (CDI Step H.5).

26 HOLD Visually inspect the weld on the lid endPT. (ENDWELD00 1).

Document the results (CDI Step H.5).

Visually inspect any additional new weldsand/or weld repairs (ENDWELDOO 1).Document the results.

Review Documentation of Repairs document.27 Reassemble the box.

Page 34: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

a> e

Step Area Description Date Initials Inspector Independent Rep Comments28 Move the box to Powder Coating Completed Date / Initials Date / Initials

29 Powder Disassemble box.Coating

30 HOLD Visually verify that the box is free of rust and- PT. other debris.

31 Wash the box with iron phosphate.

Completely rinse the box with tap water.

Place box in drying oven for a minimum of 60minutes at 3750F.

32 After drying, remove from oven.Powder coat box with RAL5002 Blue (CDIStep H.6).

33 Place powder coated box in oven.Bake at 3751F for a minimum of 20 minutes(CDI Step H.6).

34 Remove box from oven.________ Allow box to cool naturally. _ _

35 Visually verify that the finished paint surfaceis free of gross debris, runs and drips (CDIStep H.6).__

36 Reassemble box with foam packing (in lieu ofgaskets) between lid, removable end, andmain body.

37 Insert bolts and secure (at least hand tight)__ with nuts.

38 Verify the lid mates with the package base.Full insertion of lug bolts is acceptable (CDIStep H.7).

- - III- II

Page 35: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Sc4

.9

Step Area Description Date Initials Inspector Independent Rep CommentsCompleted Date / Initials Date / Initials

39 Measure lid overall length at mid-span

Measure lid overall width at mid-span

Tape Serial Number

Compare with measurements in step 7. If themeasurements are within 1/16", the box isacceptable. (CDI Step H.8)

40 Visually inspect for shipment.

41 Ship Prepare all documents for final review.Assemble packet per box. _ _

42 Contact Westinghouse for pick-up.Transmit documentation for shipment. ----- _

Approved By:

Stephen D. Palmer, Jr.

Jeffrey K. Eaves

Harry D. Hinson

Page 36: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Weld Qualification

Issue Date: 11-15-2005

Procedure No: BWRWELDOO IRevision: 0Page 1

I

Weld Process and Welder Qualification

I. Start-up:

1.1 N/A

.

II. Normal Operation:

1.0 Welding Procedure Specification

1.1 Qualification of welders is to be to AWS D9. I M/D9.1:2000 Sheet MetalWelding Code

1.2 The weld parameters are as follows:

A. Variables

Base Metal Carbon Steel A36

Metal Thickness 16 GA

Coating Type None

Joint Preparation Clean edges free of rust

Backing Material N/A

Position of Welding G3 - Vertical

Welding Process MIG

Manual, Semiautomatic, or Automatic Manual

Filler Metal Specification A5.18

Filler Metal Class/Weld Metal Grade ER70S-6

Filler Metal F Number F6

Electrical Characteristics DCEP

Mode of Transfer Short Circuit

Shielding Gas/Combination 75% AR /25% C02

Page 37: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Weld Qualification Procedure No: BWRWELD001Revision: 0Page 2 of 3Issue Date: 11-15-2005

Gas Flow Umin (CFH) 40 CFH

B. Joining Settings

Filler Metal Size 0.035 inch

Welding Power - Current Range 115 - 145 AMP

Welding Power - Voltage Range 21 - 25 Volts

Wire - Speed of Travel 4.5 Feet / minute

Joint Detail GAI

2.0 Qualification Welds

I. U '- - - - --

WARNING:

Always wear the proper Personal Safety Equipment for a welding operation.Failure to comply may result in personnel injury.

1' '.1

2.1

2.2

Weld a Butt Joint for all tests in the vertical or G3 position.

Prepare two pieces of the metal type and thickness as would be inproduction as follows:

* Obtain the metal type - Carbon steel (A36)

* Obtain the metal thickness 16GA - The qualification would cover thethickness from 0.5t to 2t where t is the thickness of the test piece. A 12GA piece would be acceptable.

* Cut two pieces for each test 75 mm (3") by 150 mm (6")

* Secure the pieces in the vertical position (G3) with two longitudinaledges butted up.

2.3 Set-up the weld equipment

* Use a manual DCEP MIG welder

* Use as a shielding gas 75% Argon/25% CO2

* Use short circuit mode of metal transfer

* Use the proper wire for the material and type of weld

* Set weld current and voltage

Page 38: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

i.

Weld Qualification Procedure No: BWRWELD0O1Revision: 0

IssueDate: 11-15-2005 Page 3of`3

2.4 Weld the test coupon

3.0 Weld Qualification

3.1 Inspect the weld visually without aid of magnification. (Prescriptioneyeglasses for vision correction are acceptable.)

3.2 Accept the welds (except for the first and last 13 mm (0.5 inch) as follows:

* Complete fusion

* Complete joint penetration

* A maximum of 3.2 mm (1/8 inch) face reinforcement and 3.2 mm(1/8) root reinforcement

* No more than one visible pore or inclusion in any 25 mm (1 inch) ofthe weld. The size of any pore or inclusion shall not exceed 0.25t,where t is the base metal thickness.

* No undercutting exceeding 0.15t.

* No cracks

Approved By:

Process Engineer r

Product Assurance 4 r I .A )1cI-,.. 1 .r> .--Weld Engineer

Page 39: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

A

Weld Procedure

Issue Date: 12/07/2005

Procedure No: ENDWELDOOIRevision: 2 -Page 1 of 4

Weld Procedure for BWR Inner Box

I. Start-up:

1.1 Assemble equipment for the weld process

* MIG welder

* Shielding gas - 75% Argon / 25% CO2

* Filler wire for the material (carbon steel)

* Set the weld current for the material and type of weld (see tablebelow).

1.2 The weld parameters are as follows:

A. Variables

Base Metal Carbon Steel A36

Metal Thickness 16 GA

Coating Type None

Joint Preparation Clean edges free of rust

Backing Material N/A

Position of Welding Any positions but overhead

Welding Process MIG

Manual, Semiautomatic, or Automatic Manual

Filler Metal Specification A5.18

Filler Metal Class/Weld Metal Grade ER70S-6

Filler Metal F Number F6

Electrical Characteristics DCEP

Mode of Transfer Short Circuit

Shielding Gas/Combination 75% AR / 25% CO2

Page 40: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

-

Weld Procedure

Issue Date: 12/07/2005

Procedure No: ENDWELDOO IRevision: 2Page 2 of 4

Gas Flow Iinin (CFH) 40 CFH

B. Joining Settings

Filler Metal Size 0.035 inch

Welding Power - Current Range 115 - 145 AMP

Welding Power - Voltage Range 16 -.21 Volts

Wire - Speed of Travel 4.5 Feet / minute

Joint Detail GAI, Square Butt Weld

Pre-Heating Not Required when the ambienttemperature is 2 500 F

II. Normal Operation:

1.0 Welding Procedure for Lid Ends

.II

WARNING:

Always wear the proper Personal Safety Equipment for a welding operation.Failure to comply may result in personnel injury.

iIl

NOTE:

The lid end had been stamped with the inner box serial number when the endwas removed. The number was stamped on the inside of the end.

1.1 Match the inner box lid end to the lid by the serial number.

1.2 Remove any rust or residue on the edges to be welded.

1.3 Position the lid end on the lid (the side stamped with the serial number isto the inside). The lid has been placed on the longitudinal edge with thewidth of the end in the vertical direction. The gap to be welded betweenthe lid and the lid end is to be 0.06 inches or less.

Page 41: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

Weld Procedure Procedure No: ENDWELD001Revision: 2

Issue Date: 12/07/2005 Page 3 of 4

NOTE:

Only welders qualified and certified may weld on the box.

Only qualified and designated weld inspectors may do the weld inspection.

All welding is to be done at 50'F or higher ambient air temperature.

1.4 Tack-weld the lid end to the lid.

1.5 Inspect the tack-welds for cracks. Any defective welds are to be removedand rewelded using the same procedure and requirements.

1.6 Weld from the top to the bottom down each vertical side.

1.7 Turn the lid 90° (a quarter turn about the longitudinal axis).

1.8 Weld from the top to the bottom down each vertical side to complete theweld.

1.9 Inspect the final weld for the following:

* Complete fusion

* A maximum of 3.2 mm (1/8 inch) reinforcement

* No more than one visible pore or inclusion in any 25 mm (1 inch) ofthe weld. The size of any pore or inclusion shall not exceed 0.25t,where t is the base metal thickness.

* No undercutting exceeding 0.15t.

* No cracks

1.10 Repair any defects in the welds using the same procedure andrequirements.

NOTE:

The structural welds in the BWR Patriot inner box are at the corners of themain box.

1.11 Grind the weld until the weld is level with the lid surface (for non-structural welds only). Remove all weld spatter.

1.12 Inspect the ground weld for the following:

* Complete fusion

Page 42: Westinghouse Electric Company Westinghouse · Norman A. Kent Manager Transport Licensing and Compliance Attachments: Appendix A ... action plan included qualifying the supplier, the

. . .

Weld Procedure Procedure No: ENDWELDOOIRevision: 2

Issue Date: 12/07/2005 Page 4 of 4

* No more than one visible pore or inclusion in any 25 mm (1 inch) ofthe weld. The size of any pore or inclusion shall not exceed 0.25t,where t is the base metal thickness.

* No undercutting exceeding 0.ISt.

* No cracks

1.13 Complete the welding routing.

2.0 Welding Procedure for Repairs

2.1 Identify the areas for weld repair. Mark these areas on the welding routing.

2.2 Prepare the area to be welded by remove any rust or residue on the edgesto be welded.

2.3 Weld the defective area.

2.4 Inspect the weld for the following:

* Complete fusion

* A maximum of 3.2 mm (1/8 inch) reinforcement

* No more than one visible pore or inclusion in any 25 mm (1 inch) ofthe weld. The size of any pore or inclusion shall not exceed 0.25t,where t is the base metal thickness.

* No undercutting exceeding 0.15t.

* No cracks

2.5 Grind and reweld as necessary (using the same requirements andprocedure).

2.6 Complete the welding routing.

Approved By:

Process Engineer , /-

Product Assurance

Weld Engineer