West Bengal Minorities' Development & Finance Corporation (A Statutory Corporation of Govt. of West Bengal) No:-865-MDC/OB-OG Date: 05.03.2020 NOTICE INVITING QUOTATION NIQ NO:- AMBER-AC/lst flr(S/E) of2020(2nd Call) Sealed quotations arc invited by the WJ3MDFC as per particulars given below:- i). Name of Work Supply, installation, testing and commissioning of one no (01) Air-Condition machine capacity of II.OTR, preferably Blue star; Hitachi &carrier make for 151 floor of AMBER Building, office of WBMDFC Salt Lake Kolkata-64. iv). Earnest money 7 days from the date of issue of work order. Authorised sales and service dealer I stockist and Competent bonafide resourceful firms having credential of such type of work. Rs.9000.00 in favour of WBMDFC through NEFT/RTGS (Beneficiaries Bank Name- sm, Saltl.ake, Kolkata IFS Code No. SBINOOOI612, Bank A/cNo. 35632345165. ii). Time of Completion iii). Eligibility of Contractor v). Last date of submission of Quotati on vi). Opening date of quotation 17.03.2020 17.03.2020 up to 15.30 hours at 16.00 hours The willing agencies will have to quote their rate in their letter pad in accordance with the attached specified blank quotation paper/work schedule Rates arc to be quoted both in words and in figures inclusive all taxes & all other incidental charges viz carriage charge, fixing charges ,loading, unloading etc. 8% security money will be deducted from the bill submitted by the successful agency. Unsuccessful quotationer earnest money will be released after issuing work order to successful quotationer. Successful quotationer will have to execute an agreement on non judicial stamp paper worth Rs.IOO.OOwithin 3 (three) days from the date of work order. Conditional Rates will not be accepted. All correction are to be initialled. Willing agencies will have to produce the copies of valid up to date professional tax clearance certificate, Trade license, of PAN Card, upto date IT &GST return copy ,credential along with their quotation papers. The work is to be carried out as per direction of Corporation. Design and Drawing of AC duct to be submitted by the agency before AC- Installation work. All agencies are requested to be present at the time of opening of sealed quotation. Managing Director, WBMDFC reserves the right to reject any quotation or all quotations without assigning any reason. j':nel:- Blank work schedule &Annexure -I No:-865-MDC/OB-06 Date: 05.03.2020 C....QID' forwarded for information & wid«s:irculation to the: I) Director, Directorate of Madrasha Education, Govt. of West Bengal 2) Dy. Secretary, MA & ME Department, Govt. of West Bengal 3) Director, Directorate of Madrasha Education, Govt. of West Bengal II) Secretary, Urdu Academy 5) Office Notice Board 6) Department Website ~y forwarded fOLinformation tQJhe_: No:-865-MDC/OB-06 I) PA to Hori'ble Chairman, WBMDFC 2) General Manager (Admn),WBMDFC 3) Executive Engineer, MA & ME Department, Govt. of West Bengal II) Chief Accounts Officer, WBMDFC Date: 05.03.2020 Head Office: Amber, 00-27E, Sector-1, Salt Lake City, Kolkata - 700 064 Phone: 033-2334-2893/4004-7469, Toll Free No.: 1800-120-2130, Web: www.wbmdfc.org e-mail: [email protected]

Transcript of WestBengal Minorities' Development Finance Corporation AC 2nd call... · 2020. 3. 11. ·...

Page 1: WestBengal Minorities' Development Finance Corporation AC 2nd call... · 2020. 3. 11. · •WestBengal Minorities' Development &Finance Corporation (AStatutory Corporation of Govt.

• West Bengal Minorities' Development & Finance Corporation(A Statutory Corporation of Govt. of West Bengal)

No:-865-MDC/OB-OG Date: 05.03.2020

NOTICE INVITING QUOTATIONNIQ NO:- AMBER-AC/lst flr(S/E) of2020(2nd Call)

Sealed quotations arc invited by the WJ3MDFC as per particulars given below:-

i). Name of Work Supply, installation, testing and commissioning of one no (01)Air-Condition machine capacity of II.OTR, preferably Blue star;Hitachi &carrier make for 151 floor of AMBER Building, office ofWBMDFC Salt Lake Kolkata-64.

iv). Earnest money

7 days from the date of issue of work order.

Authorised sales and service dealer I stockistand Competent bonafide resourceful firms having credential of suchtype of work.

Rs.9000.00 in favour of WBMDFC through NEFT/RTGS(Beneficiaries Bank Name- sm, Saltl.ake,Kolkata IFS Code No. SBINOOOI612, Bank A/cNo. 35632345165.

ii). Time of Completion

iii). Eligibility of Contractor

v). Last date of submissionof Quotati on

vi). Opening date of quotation17.03.202017.03.2020

up to 15.30 hoursat 16.00 hours

The willing agencies will have to quote their rate in their letter pad in accordance with the attached specifiedblank quotation paper/work schedule Rates arc to be quoted both in words and in figures inclusive all taxes &all other incidental charges viz carriage charge, fixing charges ,loading, unloading etc.8% security money will be deducted from the bill submitted by the successful agency.Unsuccessful quotationer earnest money will be released after issuing work order to successful quotationer.Successful quotationer will have to execute an agreement on non judicial stamp paper worth Rs.IOO.OOwithin 3(three) days from the date of work order.Conditional Rates will not be accepted.All correction are to be initialled.Willing agencies will have to produce the copies of valid up to date professional tax clearance certificate,Trade license, of PAN Card, upto date IT &GST return copy ,credential along with their quotation papers.The work is to be carried out as per direction of Corporation. Design and Drawing of AC duct to be submittedby the agency before AC- Installation work.All agencies are requested to be present at the time of opening of sealed quotation.Managing Director, WBMDFC reserves the right to reject any quotation or all quotationswithout assigning any reason.

j':nel:- Blank work schedule &Annexure -I

No:-865-MDC/OB-06Date: 05.03.2020

C....QID'forwarded for information & wid«s:irculation to the:I) Director, Directorate of Madrasha Education, Govt. of West Bengal2) Dy. Secretary, MA & ME Department, Govt. of West Bengal3) Director, Directorate of Madrasha Education, Govt. of West BengalII) Secretary, Urdu Academy5) Office Notice Board6) Department Website

~y forwarded fOLinformation tQJhe_:No:-865-MDC/OB-06I) PA to Hori'ble Chairman, WBMDFC2) General Manager (Admn),WBMDFC3) Executive Engineer, MA & ME Department, Govt. of West BengalII) Chief Accounts Officer, WBMDFC

Date: 05.03.2020

Head Office: Amber, 00-27E, Sector-1, Salt Lake City, Kolkata - 700 064Phone: 033-2334-2893/4004-7469, Toll Free No.: 1800-120-2130, Web: www.wbmdfc.org

e-mail: [email protected]

Page 2: WestBengal Minorities' Development Finance Corporation AC 2nd call... · 2020. 3. 11. · •WestBengal Minorities' Development &Finance Corporation (AStatutory Corporation of Govt.

• West Bengal Minorities' Development & Finance Corporation(A Statutory Corporation of Govt. of West Bengal)

Annexure -1

GENERAL TERMS & CONDITION

I. No idle labour charges will be entertained in any circumstances.

2. The contractor shall procure the best available materials as specified in tender scheduleconfirming to the relevant I3IS standard and all materials to be used in work shall duly beapproved by the Engineer in-Charge.

3. No secured advance on materials is admissible.

4. No mobilisation advance is admissible under this contract.

5. Necessary safety and security measure (viz. uses of safety belt, nets, helmets etc) to the workersare to be given by the tenderer at his own cost.

6. Full Security deposit@1 0% shall be refunded after one year from virtual completion of worksatisfactori Iy.

7. All statutory deduction of taxes as applicable as per rule, will be deducted from the agency's bill.

8. The time allowed for completion of work as mentioned in the tender shall be strictly observed bythe contractor and shall be reckoned from the date on which the order to commence work is givento the contractor. The work shall throughout the stipulated period of the contract be proceededwith all the due diligence (time being deem cd to be of the essence of the contact on the pari of thecontractor) In the event of the contractor failing to commence or finish the work within the duedate as per work programme submitted before execution of work, he shall be to liable to pay ascompensation an amount equal to the one percent as per estimated value of tender or such smalleramount as fixed by the Corporation for every week delay all the work remains un-cornmenced orun-finished after the stipulated due date.

9. In case the work is deliberately suspended for more than half month due to fault of the agency, hissecurity deposit as constituted or earnest money will be forfeited by the Corporation, and theagency will be black listed from participating in tender/quotation for at least 3 years.

10. The Agency will be liable to maintain the work at the appropriate service level to the satisfaction of theEngineer-in Charge/authority at his own cost for the entire security period from the date of completion. Ifany defect/damage is found during the period as mentioned above, the contractor shall make the same goodas per contract otherwise, penal action against the Agency will be imposed by the Corporation as deemedfit. The quantities of various items are approximate and may vary as per site condition and decision ofWI3MDFC. The agency will have to quote its rate considering the above aspect.

Contd.

Head Office: Amber, DD-27E, Sector-1, Salt Lake City, Kolkata - 700 064Phone: 033-2334-2893/4004-7469, Toll Free No.: 1800-120-2130, Web: www.wbmdfc.org

e-mail: [email protected]

Page 3: WestBengal Minorities' Development Finance Corporation AC 2nd call... · 2020. 3. 11. · •WestBengal Minorities' Development &Finance Corporation (AStatutory Corporation of Govt.

• West Bengal Minorities' Development & Finance Corporation(A Statutory Corporation of Govt. of West Bengal)

(2)

II. If the contractor fails to do any rectification/replacement as suggested by the EinC, the Corporation shall beentitled to carry out such work by his own work men or by other contractor. In such cases necessaryexpenditure would be deducted from the security deposit of the prime agency.

12. No price escalation will be allowed during period of construction.

13. Contractor shall take every precautions to protect against damage breakage or pilferage of any material ofCorporation and if such happened that will be borne by the contractor.

14. All quantity of the items are approximate/variable. No such claim of the contractor will be entertained ifanyone item or more than one item is not executed as per site condition or as per decision of theCorporation.

15. Excess quantity of work may be carried out subject to approval of the Corporation.

16. Any additional item of work if required by the EinC/ Authority shall be evaluated at the rate set out in thecontract and if the contract does not contain any rate applicable for extra or additional work, the suitableprice shall be taken from the PWD schedule (WB) as far as practicable. If there is no similar item in PWDschedule of rates, the item rates to be derived as per current market price as per satisfaction of1':inC/Authority, and the agency has to do such extra/additional work on the determined rate.

17. The agency will have to carryout his work in coordination with the work of other agency selected byWBMDFC to complete the work in scheduled time.

18. The agency will have to perform all maintenance work during guarantee / warrantee period as per contract.

~~~

Managing Dire tor

Head Office: Amber, 00-27E, Sector-1, Salt Lake City, Kolkata - 700 064Phone: 033-2334-2893/4004-7469, Toll Free No.: 1800-120-2130, Web: www.wbmdfc.org

e-mail: [email protected]

Page 4: WestBengal Minorities' Development Finance Corporation AC 2nd call... · 2020. 3. 11. · •WestBengal Minorities' Development &Finance Corporation (AStatutory Corporation of Govt.

WORK SCHEDULEl\'ime of Work: Supply, Installation, Testing and commissioning of Air-conditioning system at 1stfloor (S/E)side of of Administrative building cum Empowernment Centre ofWBMDFC, Salt Lake,Kolkata-700064

I)ART-A (Supply of Equipment)

SI. No. Description Qty Unit Rate (Rs) Amount(Rs.)

Supply, Installation, Testing &Commissioning of Aircoolcd Ductable Split

1 Air-Conditioning system with ScrollCompressor with R-407C/410A Refregerant.Make -Blue Star,Hitachi,Carrier.

1.1 11.0TR Ductable Split type AC Unit. 1 Nos.PART-B (Supply Ancillary and its installation)

2 Installation of Ductable Split type AC Unit. I Nos.

Supply erection Testing & Commissioning

"of Refegerant Piping to be manufactured

.) from hard, drawn copper complete withnitrile rubber based insulation 6 mm.

3.1 1-1/S"OD-6mm thick insulation 16 Rmt3.2 7/S" OD-6mm thick insulation 16 Rmt

Supply erection Testing & Commissioning 16 Rmt4 of Drain piping of25mm dia of ,HDPE

Construction.Supply erection Testing & Commissioning

5 of Drain piping of 32mm dia of ,HDPE 10 RmtConstruction.

6Supply instllation Testing & Commissioning 10 Kgof Referegerant charging (R-41OA/407C).

7Supply instllation Testing & Commissioning 15 Rmtof 2C x 1.5 sq.mm copper control cable.

SSupply instllation Testing & Commissioning 10 Rmtof 4C x 2.5 sq.mm copper power cable.

8.1Supply instllation Testing & Commissioning 10 Rmtof 4C x 6.00 sq.mm copper power cable.Supply erection Testing & Commissioningof G1duct work material conforming to IS

9 277 & ducting shall conform to SMACNA-including necessary supports, fasteners andall other accessories

9.1 22G 20 Sq.mtr

9.2 240 40 Sq.mtr

V

Page 5: WestBengal Minorities' Development Finance Corporation AC 2nd call... · 2020. 3. 11. · •WestBengal Minorities' Development &Finance Corporation (AStatutory Corporation of Govt.

, Supply erection Testing & Commissioning

• of polyethylene based/nitrile rubber based10 duct thermal insulation material of thickness

13mm having thermal conditivity not lessthan 0.027 Kcal/hr. m2deg.c at mean

10.1 25m thick 60 Sq.mtrSupply erection Testing & Commissioningof duct acoustic insulation to be made out

11 Duct acoustic insulation with 12mm thick 16 Sq.mtrFGP (4Skg/cum) RP tissues + 360Alumunium perforated sheet.Supply erection Testing & Commissioning

12of extruded alununium powder coatedsupply & return air diffuser/grills withvolume control damper to be measurred as

12.1 Supply air grills with volume control 4 Sq.mtr12.2 Return air grills with volume control 4 Sq.mtr

13Supply installation Testing & I Nos.Commissioning of Canvass connection as

14Supply installation of MS stand for ductable

SO Kgout door unit @1OOkg/unit.

15 Supply installation of VI Pad as requried. 4 Nos.

Total 0.00