West Side Market - clecityhall.files.wordpress.com
Transcript of West Side Market - clecityhall.files.wordpress.com
Previous Projects
WJE
DLR Group performs Facility Assessment
2012
City performs improvements to Interior and Exterior Systems$1,466,762
2013
City performs Refrigeration System improvements$528,967
2014
City performs Parking Lot improvements$3,010,023
2015
DLR Group performs updated Facility Assessment
2019
Since 2012, the Jackson Administration has invested $5,515,609 in the West Side Market
Boiler replacement$88,350
2018
City performs fire damage repairs$381,507
Elevator repairs$60,000
Capital Plan Project Goals
Maintain and Restore the Historic Character and Aesthetic
Improve Vendor Space Functionality
Improve Thermal Comfort
Vendor Satisfaction
Customer Experience
Early PackagesBid Packages
WJE
Early Packages
1. Arcade Entrance Improvements
2. CPP Service/Transformer Upgrades
3. Basement Meat Prep/Wash Area
4. Vendor Station Prototype
5. Clock Tower Masonry Repairs
EP1: Arcade Entrance Improvements
Scope: Remove existing and install (8) new
entrances for the public’s use
Upgrades: Continuous hinges and rim locks will
improve durability, maintainability, and security.
Motion sensors and automatic openers will enhance accessibility.
Full lite glass panel doors provide modernized aesthetic.
Cap
ital
Pla
n: E
arly
Pac
kage
s
$243,520
EP2: Transformer and Electrical Service Upgrade
Issues: Market runs on single phase power Power outages resulting in loss of product
and sewage back-up Limited space for internal transformer upgrade
Upgrades: Install new transformer within existing vault Provide three phase power (Sewage Pump) Increase electrical service to provide more
reliable service now and more power the Capital Plan upgrades
Cap
ital
Pla
n: E
arly
Pac
kage
s
$231,500
EP3: Meat Preparation Room Upgrades
Upgrades: Enlarge Meat Prep Area Add new equipment Add drains, waste disposals, and solid
interceptors Add new LED lighting and new exhaust
system Add new wall, floor, and ceiling finishes
Operation and Maintenance Pros: Decreases cooler traffic Decreases risk of cross-contamination Increases cleanliness and safety Increases vendor functionality
Cap
ital
Pla
n: E
arly
Pac
kage
s
$477,415
EP4: Vendor Station Prototype
Upgrades: New electrical panelboards and equipment New flooring and drainage New sink and stainless steel enclosures New LED lighting and ceiling
Issues: Direct water infiltration into the basement
via main market floor penetrations Condensation due to broken steam piping
Operation and Interim Solutions: Seal floor penetrations Repair steam piping Better and safer electrical service Increases cleanliness and safety Increases vendor functionality
Cap
ital
Pla
n: E
arly
Pac
kage
s
$93,593
EP5: Clock Tower and Stone Masonry Repairs
Issues: Deteriorated terra cotta units Missing and spalled mortar Embedded steel corrosion
Repair Solutions: Replace deteriorated terra cotta Repoint all mortar Clean and/or replace embedded steel
Cap
ital
Pla
n: E
arly
Pac
kage
s
$1,881,000
Bid Packages
Bid Package No 1: Vendor Station Upgrades
Bid Package No 2: Cooler Reorganization and Food Prep Upgrades
Bid Package No 3: Mechanical and Building Enclosure Upgrades
Bid Package No. 1 : Vendor Stations
Upgrades: New electrical panelboards and equipment New flooring and drainage New sink and stainless steel enclosures New LED lighting and ceiling
Operation and Maintenance Pros: Better and safer electrical service Increases cleanliness and safety Increases vendor functionality
Cap
ital
Pla
n: B
id P
acka
ges
$2,690,218 (Estimate)
Bid Package No. 2: Coolers and Prep
Upgrades: New coolers and dry storage areas New corridor layout New food preparation area (non-meat) New LED lighting and electrical rooms
Operation and Maintenance Pros: Safer electrical service Increases cleanliness and safety Increases vendor functionality and traffic Allows for vegan options
Cap
ital
Pla
n: B
id P
acka
ges
$5,455,663 (Estimate)
Bid Package No. 3: Mechanical and Enclosure
Upgrades: New Direct Outdoor Air Supply systems within the
building corners using existing windows/louvers. Remove existing rooftop units to restore clerestory
windows. Reduce air leakage into the building via new and/or
repaired fenestration. New air conditioning supply at each vendor station.
Operation and Maintenance Pros: Vendor and Patron thermal comfort Increases cleanliness and daylighting Increases vendor functionality
Cap
ital
Pla
n: B
id P
acka
ges
$3,693,111 (Estimate)
Summary: Recent WorkC
apit
al P
lan
: Bid
Pac
kage
s
2013 Fire Damage - $381,507
2013 Systems Repairs - $1,466,762
2014 Refrigeration Systems - $528,967
2015 Parking Lot - $3,010,023
2018 Boiler Replacement - $88,350
Total Investment: $5,515,609.00
Summary: Early PackagesC
apit
al P
lan
: Bid
Pac
kage
s
1. Arcade Entrance Improvements – Under Contract
2. CPP Service/Transformer Upgrades – Under Contract
3. Basement Meat Prep/Wash Area – Bids Under Review
4. Vendor Station Prototype - Complete
5. Clock Tower Masonry Repairs – Contracting in Process
Total Investment in Early Packages: $2,908,508.00
Summary: Bid PackagesC
apit
al P
lan
: Bid
Pac
kage
s
1. Bid Package 1: Vendor Stations – Preparing to Bid
2. Bid Package 2: Coolers and Prep - 2022
3. Bid Package 3: Mechanical and Enclosure - 2023
Total Estimated Investment in Major Bid Packages: $11,838,992.00
Next regular facility assessment anticipated in 2025