West Briar Middle School Restroom Renovations ADDENDUM NO. 01
HISD Project 14-11-12
Houston Independent School District Page 1
ADDENDUM NUMBER ONE
3 December 2014
Houston Independent School District
West Briar Middle School Restroom Renovations
CH+P Project No. 14-004B
HISD Project No. 14-11-12
COURTNEY HARPER + PARTNERS, L.C.
Architects
3801 Kirby, Suite 244
Houston, TX 77098
DBR, INC.
MEP Engineers
_________________________________________________________________________________
NOTICE TO ALL BIDDERS:
This Addendum forms a part of the Contract Documents and modifies the original Project Manual and
Drawings, issued for Competitive Sealed Proposals 24 November 2014, to the extent noted hereinafter.
Receipt of the Addendum must be acknowledged on the Bid/Proposal Form.
Careful note of this Addendum shall be taken by all parties of interest so that proper allowance is made in
all computations, estimates and contracts and so that all trades affected are fully advised in the
performance of work that will be required by them.
This Addendum supersedes all previous Drawings, Specifications and instructions pertaining to these
items.
___________________________________________________________________________________
GENERAL INFORMATION
Item No. 1.01 Refer to the attached sign in sheet for the names of the attendees at the Pre-
Proposal Conference held on Tuesday, December 2, 2014.
PROJECT MANUAL
Item No. 1.02 General Documents. 02 Table of Contents. Remove and replace the Table of
Contents with the attached revised Table of Contents.
Item No. 1.03 General Documents. 03 Proposal Advertisement. Replace the paragraph which
describes the Competitive Sealed Proposal process as follows:
The Competitive Sealed Proposal process will be utilized as authorized in Senate
Bill 1093, Legislative Session 83-2013, Ch. 2269, Subchapter d, of Texas
Government Code. The Competitive Sealed Proposal process enables HISD to
select contractors on the basis of price and qualifications/methodology.
Item No. 1.04 General Documents. 04: Project Information.
HISD CS Procurement Manager: Revise the name of the HISD Procurement Manager from Earl Finley to Raymond Hooks.
5.0 Program Construction Budget & Estimate Duration. Revise the Owners Estimated Duration (Calendar Days) from 210 Calendar days to 280 Calendar
West Briar Middle School Restroom Renovations ADDENDUM NO. 01
HISD Project 14-11-12
Houston Independent School District Page 2
days. This duration is the total for all (3) of the MS in this construction
package. It is anticipated that the renovation of each pair of Boys / Girls
Restrooms will be completed within 56 calendar days.
Item No. 1.05 Proposed Submittal Requirements. Section AB for CSP. Specific Conditions
for M/WBE Participation. Remove and replace in its entirety Section AB with
Attachment B: Specific Conditions for M/WBE Participation dated 06/25/2014.
Attachment B is included with this Addendum No. 1 and has a total of 18 pages.
Item No. 1.06 Proposal Forms. Remove and replace CB: Proposal Form (Part A) with the
attached revised CB: Proposal Form (Part A).
END OF ADDENDUM NO. 01
02: TABLE OF CONTENTS
HISD 02-1 02_Table of Contents_ 01-13-2011 WB Add 1.docx Addendum No. 1
GENERAL DOCUMENTS NUMBER OF PAGES
01 Title Page 1
02 Table of Contents 4 03 Proposal Advertisement 1 04 Project Information 3
05 HISD School Operations Parameter Statement 3
06 Project Close-Out Documents 1
PROPOSED SUBMITTAL REQUIREMENTS
AA Instructions for Competitive Sealed Proposal Submittals 4
B Specific Conditions for M/WBE Participation (Procedure and Required Forms) 18
CONTRACT FORMS
BA Standard Form Agreement Between Owner and Contractor AIA Document
A101, as modified by Owner 7
BB General Conditions of the Contract for Construction, AIA Document A201 - 2007,
as modified by Owner 54
BC
BD
Not Used
Wage Rate Schedule 2
BE Notice to Proceed Form 1
BF Performance Bond Form 2
BG Payment Bond Form 2
PROPOSAL FORMS
CA Overall Proposal Packaging Checklist 2
CB Proposal Form (Base Price, Alternates, Allowances, Unit Prices, Duration) 7
CC Proposal Guarantee Bond 2
CD Proposers Technical Proposal 14
CE Equal Opportunity Employer Statement 1
CF Equal Opportunity Employer Affidavit 1
CG Certificate of Non-Segregated Facilities 2
CH Felony Conviction Notification 1
02: TABLE OF CONTENTS
HISD 02-2 02_Table of Contents_ 01-13-2011 WB Add 1.docx Addendum No. 1
NUMBER OF PAGES
CI Notification of Hazardous Materials Affidavit 1
CJ Safety Plan Requirement Certification 2
CHANGE PROPOSAL AND PROJECT CLOSE-OUT FORMS
DA Change Proposal Request 1
DB Change Proposal Contractors Estimate 1
DC Change Proposal Cost Detail 1
DD
Certificate of Asbestos Free Construction (required for final payment) 1
OWNER FURNISHED INFORMATION AVAILABLE TO PROPOSERS
1) Hazardous Materials Report Issued Under Separate Cover
DRAWINGS
COVER SHEET
Architectural A0.01 GENERAL INFORMATION, SHEET INDEX, SYMBOLS & ABBREVIATIONS A0.10 KEY PLAN- LEVELS 1 & 2 A0.20 DEMOLITION PLANS- LEVELS 1 & 2 A2.01 RENOVATION PLANS- LEVELS 1 & 2 A2.10 REFLECTED CEILING PLAN- LEVELS 1 & 2 A5.01 SCHEDULES A5.30 PARTITION TYPES A7.01 INTERIOR ELEVATIONS A7.10 INTERIOR DETAILS Mechanical MEP1.1 LEVEL 1 MEP COMPOSITE PLAN MEP1.2 LEVEL 2 MEP COMPOSITE PLAN M2.1 LEVEL 1 MECHANICAL PLAN M2.2 LEVEL 2 MECHANICAL PLAN Electrical E0.1 ELECTRICAL SYMBOL LEGEND EL2.1 LEVEL 1 LIGHTING PLAN EL2.2 LEVEL 2 LIGHTING PLAN EP2.1 LEVEL 1 POWER PLAN EP2.2 LEVEL 2 POWER PLAN E4.1 ELECTRICAL ONE LINE AND SCHEDULES E4.2 ELECTRICAL DETAILS Plumbing P2.1 LEVEL 1 PLUMBING PLAN AND DEMO PLAN P2.2 LEVEL 2 PLUMBING PLAN AND DEMO PLAN P4.1 PLUMBING SCHEDULES AND DETAILS
02: TABLE OF CONTENTS
HISD 02-3 02_Table of Contents_ 01-13-2011 WB Add 1.docx Addendum No. 1
SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS
01 10 00 Summary 4
01 22 00 Unit Prices 5
01 25 00 Substitution Procedures 4
01 26 00 Contract Modification Procedures 3
01 29 00 Payment Procedures 4
01 31 00 Project Management & Coordination 9
01 32 00 Construction Progress Documentation 7
01 32 33 Photographic Documentation 2
01 33 00 Submittal Procedures 9
01 35 16 Alteration Project Procedures 6
01 40 00 Quality Requirements 8
01 42 00 References 4
01 50 00 Temporary Facilities & Controls 8
01 60 00 Product Requirements 5
01 73 00 Execution 7
01 77 00 Closeout Procedures 6
01 78 23 Operation & Maintenance data 7
01 78 39 Project Record Documents 3
01 79 00 Demonstration & Training 6
DIVISION 2 EXISTING CONDITIONS
02 41 19 Selective Demolition 5
DIVISION 3 CONCRETE
04 22 00 Concrete Unit Masonry 8
DIVISION 4 MASONRY (NOT USED)
DIVISION 5 - METALS
05 50 00 Metal Fabrications 4
DIVISION 06 WOOD, PLASTICS, & COMPOSITES
06 10 00 Rough Carpentry 4
DIVISION 7 THERMAL & MOISTURE PROTECTION
07 92 00 Joint Sealants 6
DIVISION 8 - OPENINGS
08 31 13 Access Doors & Frames 4
DIVISION 9 - FINISHES
09 01 30 Maintenance of Tiling 5
09 22 16 Non-Structural Metal Framing 5
09 29 00 Gypsum Board 6
09 30 13 Ceramic Tiling 6
09 91 23 Interior Painting 7
DIVISION 10 - SPECIALTIES
10 21 13 Toilet Compartments 4
10 28.13 Toilet Accessories 4
02: TABLE OF CONTENTS
HISD 02-4 02_Table of Contents_ 01-13-2011 WB Add 1.docx Addendum No. 1
DIVISION 11 EQUIPMENT (NOT USED)
DIVISION 12 FURNISHINGS (NOT USED)
DIVISION 13 SPECIAL CONSTRUCTION (NOT USED)
DIVISION 14 CONVEYING EQUIPMENT (NOT USED)
DIVISION 21 FIRE SUPPRESSION (NOT USED)
DIVISION 22 - PLUMBING
22 02 00 Basic Materials and Methods 19
22 05 29 Hangers & Supports for Plumbing Piping & Equipment 6
22 05 53 Identification for Plumbing Piping Equipment 2
22 07 19 Plumbing Piping Insulation 5
22 10 00 Plumbing Piping 14
22 11 19 Plumbing Specialties 4
22 30 00 Plumbing Equipment 4
22 40 00 Plumbing Fixtures 5
DIVISION 23 - HEATING, VENTILATING & AIR CONDITIONING (HVAC)
23 02 00 Basic Materials and Methods 21
23 03 00 Mechanical Demolition for Remodeling 5
23 05 13 Common Motor Requirements for HVAC Equipment 5
23 07 13 Duct Insulation 5
23 31 13 Metal Ductwork 9
23 33 00 Ductwork Accessories 6
23 34 00 HVAC Fans 5
23 37 13 Air Distribution Devices 3
23 41 00 Air Filters 2
DIVISION 26 - ELECTRICAL
26 02 00 Basic Materials and Methods 18
26 03 00 Demolition Work 3
26 03 13 Electrical Demolition for Remodeling 5
26 05 19 Wire, Cable, and Related Materials 4
26 05 26 Grounding 2
26 05 33 Raceways 7
26 24 16 Panelboards 4
26 27 26 Wiring Devices 4
26 28 10 Class J Fuses 2
26 28 16 Safety and Disconnect Switches 3