WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION...

15
November 9, 2018 WESCO Office Building

Transcript of WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION...

Page 1: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

November 9, 2018

WESCO Office Building

Page 2: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

Wesco Offi ce Building OVERALL• Two-story core and shell offi ce building • Steel structure with a concrete footing and grade beam foundation• Exterior materials: chopped and smooth stone, glass, stucco• Exterior building elements: canopy at main entry, solar shading devices at openings, balconies with canopy cover on southeast and southwest corners• Proposed Building Design: o Total building GSF: 22,349 SF (11,175 SF / level) o 75’ x 140’ structural grid = +/- 78’ x 143’ general building footprint o Building height: 33’-0” (max. allowable: 44’-0”) o Floor-to-fl oor height: 14’-0”

SITE• 4’ high perimeter fencing at grade change on south, east, and west sides o Wrought iron and steel • Patios on southeast and southwest corners of the building• City of Austin parking ratios o Commercial professional offi ce required parking: 1 parking space / 275 SF o 82 spots required / 90 spots provided• Transformer pad on south east corner in existing site cut-out • Multiple telecom services and connections providing internet redundancy• Water meter and connection south of building• Monument sign at entrance on Highway 71• Building-mounted and parking illumination• Dumpster enclosure located on north side near main entry

ACCESS• Northwest main entry with lobby o Monumental stairs and elevator in double height space• Exterior stairs for fi re code on east side of building• Service entry on east side adjacent to exterior stairs for fi rst fl oor use• Entry on the northeast corner for future tenant space on fi rst fl oor o Allow for fl exibility of fi rst fl oor tenants to have direct access from the exterior• Roof access via ladder on exterior stair landing

ROOF• Flat roof with parapet, internal main and overfl ow roof drains• Variable refrigerant fl ow (VRF) mechanical systems planned with space and structural capacity allocated• Vents & intakes• Provisions for future solar panels and rack supports

BUILDING INFRASTRUCTURE• Elevator: 3,000 lbs elevator – machine roomless (MRL), o basis-of-design: ThyssenKrupp• Interior program: o Electrical room o Fire riser room o Telecom room o Janitor’s closet o Vertical chases o Entry lobby with mailslot, monumental stair, and elevator o Circulation o First fl oor men’s and women’s restrooms • Three water closets for female • Two water closets and one urinal for male • Two lavatories for each gender • Drinking fountain • One shower for each gender o Second fl oor restrooms are planned and stacked vertically with fi rst fl oor restrooms o Shell space for future offi ce tenants

NEXT STEPS• Commercial building permit approval pending• General contractor selection and contract negotiation• Construction commencement anticipated on December 1, 2018

Programming 2

Page 3: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | IMPERVIOUS COVER 3

RAMP1:12

RAMP

1:12 RAMP

1:12

RAMP

VANIMPERVIOUS COVER

Site Plan

9,590 sf

34,169 s f

6 ,608 sf

50,367 s f

BUILDING COVERAGE

PAVING

SIDEWALK

TOTAL

Proposed Design

12 ,026 SF

27,893 SF

2,606 SF

42,525 SF

Page 4: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | ARCHITECTURAL SITE PLAN 4

VAN

11047 SFGROSS BUILDING

DUMPSTER LOCATION

LEVEL 1 1 1 ,047 SF

LEVEL 2 1 1 ,302 SF

TOTAL 22,349 SF

GROSS BUILDING CALCULATIONS PARKING CALCULATIONS

Required Proposed82 spots 90 spots

Page 5: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | FLOOR PLAN

LEVEL 1

5

CIRCULATION 666 SF

LEASABLE 8 ,962 SF

LOBBY 599 SF

RESTROOMS 524 SF

SUPPORT 134 SF

TOTAL 10,885 SF

AREA PLAN CALCULATIONS

2

4

6

A B C D E G

599 SFLOBBY

3745 SFSUITE 100

524 SFRESTROOMS

666 SFCORRIDOR

15' - 0" 15' - 0" 20' - 0" 30' - 0" 30' - 0" 15' - 0" 6' - 0" 9' - 0"

1

F

5

3

6' -

0"

30' -

0"

7' -

6"

17' -

6"

20' -

0"

1412 SFSUITE 110

2.7

1627 SFSUITE 120

2178 SFSUITE 130

A.5 E.7

48 SFSUPPORT

40 SFSUPPORT

140' - 0"

81' -

0"

46 SFFIRE RISER

2

4

6

A B C D E G

LOBBY

SUITE 100

RESTROOMS

CORRIDOR

1

F

5

3

SUITE 110

2.7

SUITE 120

SUITE 130

A.5 E.7

SUPPORT

SUPPORT

FIRE RISER

Page 6: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | SPEC. TENANT IMPROVEMENT PLAN

CONFERENCE

OFFICE OFFICE

CONFERENCE

BREAKAREA

OPENOFFICE

CONFERENCE

OFFICE OFFICE

OFFICE

OFFICE

CONFERENCE

BREAKAREA

OPENOFFICE

BREAKAREA

OFFICEOFFICE

19' - 3" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 16' - 6" 14' - 1 1/2"

81' - 4 1/2" 11' - 6" 10' - 0" 38' - 4 1/2"

37' -

8 1

/2"

12' -

0"

12' -

0"

14' -

6 1

/2"

17' - 1 11/16" 14' - 0"

30' -

0 1

/2"

19' -

9"

ENTRY/RECEPTION

OPENOFFICE

BREAKAREA

OPENOFFICE

ENTRY/RECEPTION

4' -

0 5

/8"

STORAV24x30

AV

24x3

0

LEVEL 1

CONFERENCE

OFFICE OFFICE

CONFERENCE

BREAKAREA

OPENOFFICE

CONFERENCE

OFFICE OFFICE

OFFICE

OFFICE

CONFERENCE

BREAKAREA

OPENOFFICE

BREAKAREA

OFFICEOFFICE

ENTRY/RECEPTION

OPENOFFICE

BREAKAREA

OPENOFFICE

ENTRY/RECEPTION

STOR

6

MEETING 807 SF

OFFICE 1 ,627 SF

OFFICE SUPPORT 1 ,01 1 SF

OPEN AREA 5,478 SF

TOTAL 8,923 SF

AREA PLAN CALCULATIONS

2

4

6

A B C D E G

LOBBY

SUITE 100

RESTROOMS

CORRIDOR

1

F

5

3

SUITE 110

2.7

SUITE 120

SUITE 130

A.5 E.7

SUPPORT

SUPPORT

FIRE RISER

Page 7: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | ROOF PLAN

S2

4

6

A B C D E G

1

F

5

3

2.7

A.5 E.7

15' - 0" 15' - 0" 20' - 0" 30' - 0" 30' - 0" 15' - 0" 6' - 0" 9' - 0"

6' -

0"

21' -

0"

9' -

0"

7' -

6"

17' -

6"

20' -

0"

26' -

0"

31' - 6"

AREA RESERVED FOR FUTURE SOLAR PANEL

ARRAY

ROOF PLAN

7

SOLAR ARRAY 7,423 SF

AREA PLAN CALCULATIONS

Page 8: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | SOLAR STUDY

SUMMER

9:00 AM

WINTER

12:00 PM

SOUTHEAST CORNER

8

Page 9: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | SOLAR STUDY

SUMMER WINTER

3:00 PM

SOUTHEAST CORNER

6:00 PM

9

Page 10: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | SOLAR STUDY

SUMMER SOLSTICE 9:00AMSOUTHWEST VIEW

NORTHWEST VIEW

SOUTHEAST VIEW

NORTHEAST VIEW

10

N

Page 11: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | EXTERIOR ELEVATIONS

NORTH ELEVATION

SOUTH ELEVATION

11

Page 12: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | EXTERIOR ELEVATIONS

EAST ELEVATION

WEST ELEVATION

12

Page 13: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | INTERIOR LOBBY RENDERING 13

Page 14: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | PERSPECTIVE

NORTH

NORTHWEST

WEST

VIEWS FROM LEVEL 2

NORTHWEST CORNER

14

Page 15: WESCO Office Building · Architects LEVY WESCO OFFICE BUILDING PRELIMINARY NOT FOR CONSTRUCTION This drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.

Architects LEVY WESCO OFFICE BUILDINGPRELIMINARYNOT FOR CONSTRUCTIONThis drawing was prepared under the supervision of Stephen V. Levy, AIA, TBAE #18122.It is not to be used for regulatory approval, permitting, bidding, or construction purposes.

Aust in , TexasNovember 9, 2018

WESCO OFFICE BUILDING | PERSPECTIVE

VIEWS FROM LEVEL 2

SOUTH

SOUTHEAST

EAST

SOUTHEAST CORNER

15