WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

download WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

of 39

Transcript of WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    1/39

    Tolani Institute of Management 1

    Welspun gujarat

    stahl Rohren Ltd

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    2/39

    Tolani Institute of Management 2

    INDIAN PIPELINE INDUSTRY

    Among the top three manufacturing hubs after

    Japan and Europe.

    Penetration level of pipelines in oil & gastransportation is low at 32% in India as

    compared to 59% in USA and 79% globally

    Highly Raw Material intensive with the RM

    cost more than 70% of the total cost

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    3/39

    Tolani Institute of Management 3

    Low-cost quality products and various

    certifications, Indian companies have augmented

    their export sales over the last three to four years.

    The global export market of the steel pipes is

    stated to be close to $27 billion a year with theUS, Western Europe, Australia, and Japan being

    the biggest importers. India is one of the major

    exporting nations including Indonesia, Malaysia

    and Thailand.

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    4/39

    Tolani Institute of Management 4

    Freight cost high due to higher imports and

    exports.

    The building & construction industries along

    with the oil & gas sector are the major

    marketplaces for pipe.

    High oil and gas discoveries worldwide,

    increased efforts by the Government of India

    on infrastructure development.

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    5/39

    Tolani Institute of Management 5

    Demand of Pipelines

    Demand is expected to be in excess of 3000 Km per Annum which would be more

    or less in line with the total domestic capacity (Post expansion).

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    6/39

    Tolani Institute of Management 6

    Birth of a global pipe making

    The Indian pipe majors Welspun Gujarat, Jindal

    Saw, PSL, Man Industries and Ratnamani Metals

    and Tubes set up their plants in the region to reach

    a combined capacity of around 1 million tones per

    year and likely to double it in near future.

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    7/39

    Tolani Institute of Management 7

    INTRODUTION TO WELSPUN

    Strong culture of Engineering Excellence

    Set to be positioned as the World's Largest

    Pipe Company with an increase in capacity

    from 1 million ton per annum to 1.75

    million ton per annum by March 2009.

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    8/39

    Tolani Institute of Management 8

    Timely communication to

    Target stakeholders in a

    Transparent fashion

    MISSION

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    9/39

    Tolani Institute of Management 9

    VISION

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    10/39

    Tolani Institute of Management 10

    Awards/Recognition

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    11/39

    Tolani Institute of Management 11

    CUSTOMERS OF WGSRL

    Global Customers

    British petroleum

    Chevron

    TransCanada

    Lone star

    (Bangladesh) Etc.

    Domestic Customers

    GSPL

    GGCL

    Reliance

    GAIAL

    IOC

    Jay Somnath Etc.

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    12/39

    Tolani Institute of Management 12

    MAJOR SUPPLIERS OF WGSRL

    Most Important Raw Material = Coil

    So major supplier for WGSRL are:-

    ESSAR Steel

    ISPAT Steel

    POSCO

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    13/39

    Tolani Institute of Management 13

    COMPITITORS OF WGSRL

    Jindal Steels

    MAN Industries

    PSL

    Ratnamani Metals and Tubes ROD Etc.

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    14/39

    Tolani Institute of Management 14

    WGSRL

    Manufacturing Bending Coating

    LSAW ERW Spiral/HSAW

    S1 S2 S3

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    15/39

    Tolani Institute of Management 15

    Production Flow Chart of

    Spiral-3

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    16/39

    Tolani Institute of Management 16

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    17/39

    Tolani Institute of Management 17

    Flow Chart

    ofCOATING

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    18/39

    Tolani Institute of Management 18

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    19/39

    Tolani Institute of Management 19

    Concepts

    ofPOM

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    20/39

    Tolani Institute of Management 20

    Competitive priorities:

    Top quality

    Consistent quality

    On time delivery

    Customization

    Volume flexibility

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    21/39

    Tolani Institute of Management 21

    Core competencies:

    Speed of production (150 pipes per day)

    Quality

    Employees (around 3000)

    Backward integration

    (captive in-house power and raw material)

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    22/39

    Tolani Institute of Management 22

    Batch Process:

    Reasons for this:

    More Variety

    Moderate Volume

    Average Quantity

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    23/39

    Tolani Institute of Management 23

    Make to order strategy:

    Customized Product

    Moderate Complexity & less Divergence

    High Capital Intensity

    Reasons for this:

    Fixed Automation

    Little Human Intervention

    Latest technology

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    24/39

    Tolani Institute of Management 24

    LOCATION ADVANTAGES

    Easy Availability labor at less cost

    Tax benefits like excise duty exemption,

    income & sales tax holiday for Kutch after the

    earthquake in 2001.

    Excellent logistics for import of steel, iron ore

    and coal as well as export of pipes with all

    season Kandla and Mundra port in the vicinity.

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    25/39

    Tolani Institute of Management 25

    Availability of hassle free land at reasonable

    prices.

    Indigenous availability of raw material.

    Nearer to supplier

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    26/39

    Tolani Institute of Management 26

    Process Layout

    Line-flow Layout & Fixed Position Layout:

    Linear PathFixed Manufacturing Site

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    27/39

    Tolani Institute of Management 27

    Inventory Control System

    Periodic Review System

    Reasons for this:

    No uncertainty in Demand

    No Constraint on lot size

    Review Period = 30 Days

    Order is received in 3 parts

    2% additional for Safety against loss

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    28/39

    Tolani Institute of Management 28

    Cont.

    Supply Chain Strategy: Efficient

    Reasons for this:

    Predictable demand & low forecastingerrors

    Competitive priorities are low cost,consistent quality, on-time delivery

    Infrequent new product introduction

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    29/39

    Tolani Institute of Management 29

    Cont.

    Mass Customization:

    Highly Customized Product

    Low Cost

    Benefits of Mass Customization:

    Managing customer relationships

    Eliminate finished goods inventory

    Higher perceived value of product

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    30/39

    Tolani Institute of Management 30

    Cont.

    Backward Integration:

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    31/39

    Tolani Institute of Management 31

    Capacity Related Discussion

    Current Capacity : 150 Pipes/day

    No Capacity Cushions:

    Reason For this: 2 years Orderin hand

    Expansion:

    Domestic Expansion

    Global Expansion: Plant in Little

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    32/39

    Tolani Institute of Management 32

    LEAN SYSTEM @ WGSRL

    Pull method of Workflow

    Quality at source

    Small lot size(Maximum 50/lot)

    Uniform Workstation load(150 pipes/day)

    Standardized Components & Work Method

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    33/39

    Tolani Institute of Management 33

    Cont.

    Backward Integration for Less Inventory Slack

    Flexible Workforce

    Automation

    Continuous Improvement With

    Lean System

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    34/39

    Tolani Institute of Management 34

    Other concepts.

    Very Less Bullwhip Effect

    Centralized Inventory Placement

    system

    Bottleneck Management

    Past Bottleneck Production

    Capacity

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    35/39

    Tolani Institute of Management 35

    Quality Control

    ISO 9001 - By

    PIQR

    API 5L (Line Pipes)

    API 5CT (Casing)

    API 2B (Tubular)

    ISO/TS 29001

    Certifications:

    ISI by Bureau of

    Indian Standards

    ISO 14001 by LRQA

    OHSAS 18001 by

    LRQA

    Six Sigma certificate.

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    36/39

    Tolani Institute of Management 36

    TQM @ WGSRL

    Customer Satisfaction:Conformance to Specifications

    Value

    Fitness for usePsychological Impression

    Employee Involvement

    Quality at the SourceEmployee Empowerment

    Continuous Improvement(Kaizen)

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    37/39

    Tolani Institute of Management 37

    Quality Procedure

    Handling of Coils by C hookFrom storage to mill the coils are lifted by 30 Ton

    crane

    Handling of pipe inside the plant:

    Rolling of the pipes on the level beds and

    racksRubberized surface to prevent scratch

  • 8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT

    38/39

    Tolani Institute of Management 38

    Cont.

    As per the specifications of the

    customer testing are done at the

    different places.

    Finished goods are stocked in stand

    for storage.