Well Road Project – Accelerated Bridge Construction Using Self-Propelled
Modular Transporters (SPMT’s)
By: Mark Bucci, P.E.
![Page 2: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/2.jpg)
Presentation Outline
Project History Project Scope Construction Alternatives Plan Development Contractor’s Methodology Current Project Status
![Page 3: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/3.jpg)
Project History
Site Information◦ West Monroe, LA◦ LA 3249 (Well Road) over I-20
Well Road Overpass
Truck Stop
![Page 4: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/4.jpg)
Project History
Site Information◦ High Average Daily Traffic (ADT) I-20 41,300 ADT LA 3249 (Well Road) 18,700 ADT
◦ High truck traffic
![Page 5: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/5.jpg)
Project History
Existing Bridge◦ Built in 1963◦ 4 – Simple Span Composite Steel Plate Girder
Bridge (55 ft – 70 ft – 85 ft – 50 ft)◦ Lightweight concrete deck
![Page 6: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/6.jpg)
Project History
Bridge Condition◦ Deck Deterioration
![Page 7: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/7.jpg)
Project History◦ Deck Deterioration
![Page 8: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/8.jpg)
Project History◦ Deck Deterioration
![Page 9: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/9.jpg)
Project History Bridge Condition◦ Bearing Corrosion
![Page 10: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/10.jpg)
Project History◦ Bearing Corrosion (Cont.)
![Page 11: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/11.jpg)
Project History
Bridge Condition◦ Column Bent Spalling
![Page 12: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/12.jpg)
Project History Bridge Load Testing (March 2008)◦ Bridge Diagnostics, Inc. (BDI) performed the
testing◦ Determine the structural capacity considering
deck deterioration◦ Review the load rating◦ Provide information to assist in determining
the best course of action for rehabilitation
![Page 13: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/13.jpg)
Project History
Bridge Load Testing
![Page 14: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/14.jpg)
Project History
Bridge Load Testing◦ Finite Element Model Calibrated to match the test results The structure was load rated
◦ Results The bridge did not need to be load posted An overlay could be applied
![Page 15: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/15.jpg)
Project History
Temporary Repairs◦ Quick Set Concrete Patches
![Page 16: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/16.jpg)
Project History
Temporary Repairs◦ Asphalt Overlay Recommended by the District to reduce
maintenance
![Page 17: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/17.jpg)
Presentation Outline
Project History Project Scope Construction Alternatives Plan Development Contractor’s Methodology Current Project Status
![Page 18: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/18.jpg)
Project Scope
Project created in mid 2008 to perform permanent repairs
Funded by State Surplus
Aggressive delivery schedule
Proposed July 2009 letting
![Page 19: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/19.jpg)
Project Scope
Requirements◦ Replace the deck◦ Minimize impacts to
businesses and the traveling public◦ Maintain vertical
clearance◦ Strengthen
substructure if necessary
Considerations◦ High ADT◦ Heavy Truck Traffic◦ Future widening
![Page 20: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/20.jpg)
Accelerated Construction
![Page 21: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/21.jpg)
Presentation Outline
Project History Project Scope Construction Alternatives Plan Development Contractor’s Methodology Current Project Status
![Page 22: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/22.jpg)
Construction Alternatives
Accelerated Construction◦ Precast Panel Units
![Page 23: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/23.jpg)
Construction Alternatives
Accelerated Construction◦ Precast Panel Units
![Page 24: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/24.jpg)
Construction Alternatives
Accelerated Construction◦ Span Replacement
![Page 25: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/25.jpg)
Construction Alternatives
Accelerated Construction◦ Span Replacement Self-Propelled Modular Transporters (SPMT’s)
![Page 26: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/26.jpg)
Construction Alternatives
Accelerated Construction◦ Span Replacement Self-Propelled Modular Transporters (SPMT’s)
![Page 27: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/27.jpg)
Construction Alternatives
Accelerated Construction◦ Span Replacement Crane
![Page 28: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/28.jpg)
Construction Alternatives
Accelerated Construction◦ Recommend span replacement Reduce traffic impacts
Limit overall closure period
![Page 29: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/29.jpg)
Presentation Outline
Project History Project Scope Construction Alternatives Plan Development Contractor’s Methodology Current Project Status
![Page 30: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/30.jpg)
Plan Development
Project Initiation◦ Task order was created with Modjeski and
Masters (NTP issued July 2008) Design and develop plans for the new steel girder
spans with a concrete deck Load rate the repaired bridge Develop plans to strengthen the substructure if
necessary Establish constructability Traffic control plan
![Page 31: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/31.jpg)
Plan Development
Steel Girder Replacement Spans◦ 28’ clear roadway
◦ Weathering steel rolled W-shape girders
◦ Girders to be composite with deck
◦ 7 ½” thick concrete deck
◦ Epoxy coated deck steel
![Page 32: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/32.jpg)
Plan Development
Steel Girder Spans
![Page 33: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/33.jpg)
Plan Development
Bridge Load Rating◦ Existing bridge was designed using the HS-20
truck
◦ The rating showed that the substructure required strengthening using LRFR (HL-93 truck)
![Page 34: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/34.jpg)
Plan Development
Substructure Strengthening◦ A spread footing was added between the
existing pile footings of column bents
◦ Drilled shafts were added to the existing end bents
![Page 35: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/35.jpg)
Plan Development
Substructure Strengthening◦ Column Bent Spread Footing
![Page 36: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/36.jpg)
Plan Development
Substructure Strengthening◦ End Bent Strengthening (Drilled Shafts)
![Page 37: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/37.jpg)
Plan Development
Suggested Method of Construction◦ Construct spans in a staging area◦ Move the spans using SPMT’s Replace the spans over four consecutive nightly
closures from 7:00 PM to 7:00 AM Replace all four spans over a weekend closure
beginning at 7:00 PM Friday and re-opening the bridge at 7:00 AM the following Monday
![Page 38: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/38.jpg)
Plan Development
Suggested Method of Construction
![Page 39: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/39.jpg)
Plan Development
Suggested Method of Construction
![Page 40: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/40.jpg)
Plan Development
Suggested Method of Construction
![Page 41: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/41.jpg)
Plan Development
Prefabrication Plan◦ Geotechnical assessment◦ Design of temporary supports◦ Settlement analysis and monitoring
![Page 42: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/42.jpg)
Plan Development
Movement Plan◦ As-built survey◦ Moving equipment◦ Path of movement◦ Lift point locations ◦ Analysis of temporary loads on spans◦ Geotechnical assessment◦ Span monitoring◦ Contingency planning
![Page 43: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/43.jpg)
Plan Development
Span Monitoring◦ 10 – Elevation reference points per span◦ Monitoring Intervals Before Lift Immediately After Lift As needed through transport to maintain relative
elevations Final Position
![Page 44: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/44.jpg)
Plan Development
Traffic Control Plan
Road Closed
Road Closed
Temporary Detour
![Page 45: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/45.jpg)
Plan Development
Traffic Control Plan◦ Temporary Detour Road
![Page 46: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/46.jpg)
Plan Development
Traffic Control Plan
Project Site
![Page 47: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/47.jpg)
Plan Development
Project was let in December 2009◦ Engineer’s Estimate $3.95 Million
◦ Contractor’s Bid Price $ 3.17 Million
◦ Awarded to Gibson and Associates
◦ Work Order issued March 2010
![Page 48: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/48.jpg)
Presentation Outline
Project History Project Scope Construction Alternatives Plan Development Contractor’s Methodology Current Project Status
![Page 49: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/49.jpg)
Contractor’s Methodology
Staging area within the interchange
Temporary steel pipe trestle
SPMT’s to move the spans
Perform the moves over a weekend closure
![Page 50: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/50.jpg)
Contractor’s Methodology
Staging Area and Movement Path
Staging Area
![Page 51: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/51.jpg)
Contractor’s Methodology
Temporary Support
![Page 52: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/52.jpg)
Contractor’s Methodology
Temporary Support
![Page 53: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/53.jpg)
Contractor’s Methodology
Movement Method
![Page 54: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/54.jpg)
Contractor’s Methodology
Movement Method
![Page 55: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/55.jpg)
Presentation Outline
Project History Project Scope Construction Alternatives Plan Development Contractor’s Methodology Current Project Status
![Page 56: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/56.jpg)
Current Project Status
Substructure Strengthening
![Page 57: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/57.jpg)
Current Project Status
Substructure Strengthening
![Page 58: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/58.jpg)
Current Project Status
Substructure Strengthening
![Page 59: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/59.jpg)
Current Project Status
Span Construction
![Page 60: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/60.jpg)
Current Project Status
Span Movement◦ Span movement plan is currently under
review
◦ Span movement is tentatively scheduled for early February 2011
![Page 61: Well Road Project - Florida International Universityutcdb.fiu.edu/LA 3249-Well Road Presentation.pdf · Presentation Outline Project History Project Scope Construction Alternatives](https://reader034.fdocuments.net/reader034/viewer/2022050104/5f4301881648c86a7e693079/html5/thumbnails/61.jpg)