![Page 1: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/1.jpg)
Introduction to well completionGeneral Procedure of well completionOpen hole well completionCased hole well completion
![Page 2: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/2.jpg)
Informal definition:The high time of the well when engineer and
personnel comes to decide whether to install the production casing in order to initiate the production at
the surface or it should be abandoned .
Technical Definition:Well completion means to prepare the well for
production by installing the necessary equipments into the well in order to allow the safe
and controlled flow of HCS at the surface.
![Page 3: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/3.jpg)
![Page 4: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/4.jpg)
![Page 5: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/5.jpg)
![Page 6: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/6.jpg)
![Page 7: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/7.jpg)
![Page 8: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/8.jpg)
![Page 9: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/9.jpg)
In an open hole well completion the production casing is
just set above the pay zone, while the entire deepen bottom
of pay zone is left uncased.
![Page 10: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/10.jpg)
![Page 11: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/11.jpg)
•Maximum exposure of pay zone
•Less pressure drawdown during flow
•No formation damage occurs due to cementing
and perforation.
•Less formation damage
![Page 12: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/12.jpg)
•Inability to plug off water or gas zones
•Inability to stimulate the separate zones within the
productive zones
![Page 13: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/13.jpg)
•For the most common type of well completion today
involves the cased hole completion, in which the
production casing and liner are cemented and
perforated subsequently.
![Page 14: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/14.jpg)
•Select the sections of the pay zone we wish to produce
•Stimulate the separate pay zone from the well
•Multiple completion zones
![Page 15: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/15.jpg)
•A Liner is installed across the pay zone•It can be divided into two: Screen Liner and perforated liner
•Screen Liner : Casing is set above the producing zone and
an uncemented screen and liner assembly is installed
across the pay zone
![Page 16: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/16.jpg)
![Page 17: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/17.jpg)
•Casing is set above the producing zone and a liner assembly is installed across the pay zone and cemented in place. The liner is then perforated selectively for production.
![Page 18: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/18.jpg)
![Page 19: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/19.jpg)
•Production casing is cemented through the
producing zone and pay section is selectively
perforated
![Page 20: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/20.jpg)
![Page 21: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/21.jpg)
•Production tubing is perforated and cemented
![Page 22: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/22.jpg)
![Page 23: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/23.jpg)
•Casing flow: large flow rate no tubing is required, used in middle
east.
•Tubing and Annulus flow: large flow rate flow segregation.
•Tubing flow: Used widely in Malaysia due to safety, may use one
more tubing strings.
![Page 24: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/24.jpg)
•Simplest way of completing the well
•In this method well is completed by single zone with single
tubing
![Page 25: Well completion](https://reader034.fdocuments.net/reader034/viewer/2022052209/55a513fc1a28ab8b6b8b4575/html5/thumbnails/25.jpg)
•In this multiple branches are drilled from a single zone
•It is used to improve productivity from closely spaced target zones.