Welcome to the Public Officials Kick-off Meeting · 2015-08-21 · Welcome to the Public Officials...

17
Welcome to the Public Officials Kick-off Meeting RECONSTRUCTION AND WIDENING PROJECT November 4, 2013 Chester County, PA Milepost 302 to Milepost 308

Transcript of Welcome to the Public Officials Kick-off Meeting · 2015-08-21 · Welcome to the Public Officials...

Welcome to the Public OfficialsKick-off Meeting

RECONSTRUCTION AND WIDENING PROJECT

November 4, 2013Chester County, PA

Milepost 302 to Milepost 308

RECONSTRUCTION AND WIDENING PROJECT

Agenda

I. Welcome and IntroductionsII. Project OverviewIII. Side Road CoordinationIV. Stormwater ManagementV. Project ScheduleVI. Public Involvement VII. Open Discussion

MP 302-308

RECONSTRUCTION AND WIDENING PROJECT

Project Location

Warwick

Union

Honey Brook

Robeson

Wallace

Uwchlan

West Vincent

Caernarvon

LANCASTER COUNTY

LANCASTER COUNTY

CHESTER COUNTY

CHESTER COUNTY

BERKS COUNTY

BERKS COUNTY

East Nantmeal

West Nantmeal

Upper Uwchlan

Caernarvon

Salisbury

North Coventry

East Coventry

West Pikeland

West BrandywineEast Brandywine

Brecknock

South CoventryNew Morgan

East Vincent

Elverson

Honey Brook

76

76

76

176

100

401

23

23

10

10

100

MP 298Morgantown Interchange

MP 312Downingtown

Interchange

MP 308

MP 302

Main St

Ma

no

r Rd

Bu

llto

wn

Rd H

ed

ge

Rd

Ad

am

s Dr

Ma

rsh

Rd

Fairview Rd

Styer R

d

Little Conestoga Rd

Conestoga Rd

Ridge Rd

Milf

ord

Rd

Park Rd

Pottstown Pike

Va

lle

yR

d

Twin

MP 302-308

RECONSTRUCTION AND WIDENING PROJECT

Typical Section

Shoulder MedianWestbound Lanes

10’

Shoulder

10’10’12’12’

Eastbound Lanes

12’ 12’

Shoulder ShoulderShoulder ShoulderWestbound Lanes Eastbound Lanes

12’ 12’ 12’ 12’ 12’ 12’ 12’ 12’ 12’ 12’2’

Existing Typical Section

Proposed Typical Section

MP 302-308

MP 302-308

Access Gate

EB 704MP 302.81

MP 302-308

Deck Plate GirderSpan – 80 feet

MP 302-308

EB 705MP 303.39

MP 302-308

Deck Plate GirderSpan – 84 feet

MP 302-308

EB 707MP 304.44

MP 302-308

Deck I BeamSpan – 78 feet

MP 302-308

EB 708MP 306.59

MP 302-308

Deck I BeamSpan – 39 feet

MP 302-308

RECONSTRUCTION AND WIDENING PROJECT

Stormwater Management

• Approved Act 167 Plans French Creek (EV) Marsh Creek (HQ)

• Township Ordinances West Nantmeal Township East Nantmeal Township Wallace Township Upper Uwchlan Township

MP 302-308

RECONSTRUCTION AND WIDENING PROJECT

• Preliminary Design (Approximately 2 years) Field Surveys Environmental Studies Geotechnical Studies Utilities Locating

• Public Meeting (Anticipated Fall 2015)

• Advanced Overhead Bridge Replacements• Mainline Turnpike Reconstruction• Right of Way Acquisition Process

Project Schedule MP 302-308

RECONSTRUCTION AND WIDENING PROJECT

• Notice of Intent to Enter Letters Mailed to residents on August 20, 2013

• Public Meeting

• Project Website http://www.paturnpike.com/ConstructionProjects/mp298to312

• Contact InformationBrad Updegrave, PEEngineering Project ManagerPennsylvania Turnpike Commission

[email protected]

Public Involvement MP 302-308

RECONSTRUCTION AND WIDENING PROJECT

Open Discussion MP 302-308