Lombard Street Vision Zero Safety Project SEPTEMBER 29, 2015 SAN FRANCISCO, CALIFORNIA Welcome to the Lombard Street Safety Project Community Meeting! Open house style meeting format • Please keep comments concise so others may speak • Speak on your own experience and not the perceived experiences of others • No personal attacks

Transcript of Welcome to the Lombard Street Safety Project …...Sept. 29, 2015 Oct. 13 – 14, 2015 *Outreach...

Page 1: Welcome to the Lombard Street Safety Project …...Sept. 29, 2015 Oct. 13 – 14, 2015 *Outreach throughout Construction Lombard Street Vision ero Safety Project SEPTEMBER 015 SA RACISCO,

Lombard Street Vision Zero Safety Project SEPTEMBER 29, 2015SAN FRANCISCO, CALIFORNIA

Welcome to the Lombard Street Safety Project Community Meeting!

Open house style meeting format• Please keep comments

concise so others may speak

• Speak on your own experience and not the perceived experiences of others

• No personal attacks

Page 2: Welcome to the Lombard Street Safety Project …...Sept. 29, 2015 Oct. 13 – 14, 2015 *Outreach throughout Construction Lombard Street Vision ero Safety Project SEPTEMBER 015 SA RACISCO,

Lombard Street Vision Zero Safety Project SEPTEMBER 29, 2015SAN FRANCISCO, CALIFORNIA

Safety in Action: Lombard Corridor Collision AnalysisLombard Corridor Pedestrian Collision Rate: 27 pedestrian collisions per mile (citywide pedestrian collision rate is 4 collisions per mile)*

Lombard Corridor Vehicle Collision Rate: 91 pedestrian collisions per mile (citywide vehicle collision rate is 12 collisions per mile)*

*Source: SWITRS, 2008-2012

Transit Stop Collisions• Approximately 70 % of all

Muni collisions occur at transit stop intersections

• Over 50% of collisions at transit stop intersections involve boarding opera-tions (e.g. pulling to/from curb, parked/standing/stopped)

30% of collisions caused by unsafe speeds(San Francisco Crossroads data)

Page 3: Welcome to the Lombard Street Safety Project …...Sept. 29, 2015 Oct. 13 – 14, 2015 *Outreach throughout Construction Lombard Street Vision ero Safety Project SEPTEMBER 015 SA RACISCO,

Lombard Street Vision Zero Safety Project SEPTEMBER 29, 2015SAN FRANCISCO, CALIFORNIA

Safety Treatments for LombardExisting Conditions

Proposed Conditions

Existing Conditions

Proposed Conditions

High Visibility Crosswalk and Leading Pedestrian Interval

Daylighting and Advanced Limit Lines

• Improves visibility• Provides people walking across Lombard Street a head start

• Improves visibility for all users

Page 4: Welcome to the Lombard Street Safety Project …...Sept. 29, 2015 Oct. 13 – 14, 2015 *Outreach throughout Construction Lombard Street Vision ero Safety Project SEPTEMBER 015 SA RACISCO,

Lombard Street Vision Zero Safety Project SEPTEMBER 29, 2015SAN FRANCISCO, CALIFORNIA

Safety Treatments for LombardExisting Conditions

Proposed Conditions

Existing Conditions

Proposed Conditions

Curb Extension - Pedestrian Bulb

Curb Extension -Transit Bulb and Stop Relocation

• Improves visibility of pedestrians

• Reduces crossing distances for pedestrians

• Slows turning vehicles

• Eliminates conflicts between drivers and buses

• Improves visibility of pedestrians

• Reduces crossing distances for pedestrians

• Slows turning vehicles

Page 5: Welcome to the Lombard Street Safety Project …...Sept. 29, 2015 Oct. 13 – 14, 2015 *Outreach throughout Construction Lombard Street Vision ero Safety Project SEPTEMBER 015 SA RACISCO,

Lombard Street Vision Zero Safety Project SEPTEMBER 29, 2015SAN FRANCISCO, CALIFORNIA

East to Fort MasonWest to the Presidio

Lombard St

Chestnut St

Richardson Ave

Div

isad

ero

St

Brod

eric

k St

Improving Safety on Lombard

Stop Relocation

New Transit Bulbs Daylighting

N

East to Fort MasonWest to the Presidio

Page 6: Welcome to the Lombard Street Safety Project …...Sept. 29, 2015 Oct. 13 – 14, 2015 *Outreach throughout Construction Lombard Street Vision ero Safety Project SEPTEMBER 015 SA RACISCO,

Lombard Street Vision Zero Safety Project SEPTEMBER 29, 2015SAN FRANCISCO, CALIFORNIA

Improving Safety on Lombard

East to Fort MasonWest to the Presidio

Stop Relocation New Transit Bulb

New Pedestrian BulbDaylighting

Lombard St

Pie

rce

St

Sco

tt S

t

Stei

ner S

t

Fillm

ore

St

N

Page 7: Welcome to the Lombard Street Safety Project …...Sept. 29, 2015 Oct. 13 – 14, 2015 *Outreach throughout Construction Lombard Street Vision ero Safety Project SEPTEMBER 015 SA RACISCO,

Lombard Street Vision Zero Safety Project SEPTEMBER 29, 2015SAN FRANCISCO, CALIFORNIA

Improving Safety on Lombard

East to Fort MasonWest to the Presidio

New Transit Bulb New Transit Stop

New Pedestrian BulbsDaylighting

Buch

anan

St

N

Lombard St

Web

ster

St

Lagu

na S

t

Page 8: Welcome to the Lombard Street Safety Project …...Sept. 29, 2015 Oct. 13 – 14, 2015 *Outreach throughout Construction Lombard Street Vision ero Safety Project SEPTEMBER 015 SA RACISCO,

Lombard Street Vision Zero Safety Project SEPTEMBER 29, 2015SAN FRANCISCO, CALIFORNIA

Improving Safety on Lombard

East to Fort MasonWest to the Presidio

New Transit Stop

Daylighting

Lombard St

Oct

avia

St

Gou

gh S

t

Fran

klin

St

N

Page 9: Welcome to the Lombard Street Safety Project …...Sept. 29, 2015 Oct. 13 – 14, 2015 *Outreach throughout Construction Lombard Street Vision ero Safety Project SEPTEMBER 015 SA RACISCO,

Lombard Street Vision Zero Safety Project SEPTEMBER 29, 2015SAN FRANCISCO, CALIFORNIA

Project Timeline

PublicHearing

Nov. 201

5

SFMTA Board

Meeting

Jan. 201

6

Near-Term Safety

Installations (Non-Construction)

Winter 2

017 –

Spring 20

18

Sidewalk & Utility

Upgrades(Construction)

Caltrans Paving

2018

-Winter 2

018/

Spring 20

19

Winter/s

pring 20

16

Outreach Meeting

WalkingTours

Sept. 29,

2015

Oct. 13 –

14, 2

015

*Outreach throughout Construction

Page 10: Welcome to the Lombard Street Safety Project …...Sept. 29, 2015 Oct. 13 – 14, 2015 *Outreach throughout Construction Lombard Street Vision ero Safety Project SEPTEMBER 015 SA RACISCO,

Lombard Street Vision Zero Safety Project SEPTEMBER 29, 2015SAN FRANCISCO, CALIFORNIA

Benefits of Lombard Safety Project

• Increases safety for residents and visitors walking, driving, biking or taking transit

• Improves landscaping to make Lombard a more pleasant destination

• Increases transit reliability and efficiency and improves traffic flow

• Project coordination with Public Works, PUC, SFMTA, and Caltrans reduces construction duration and cost