NSW Department of Education – School Infrastructure schoolinfrastructure.nsw.gov.au For more information phone: 1300 482 651 Email: [email protected] Lidcombe Public School upgrade Welcome to Lidcombe Public School information session We’re excited your new school facilities are ready for you to use. We have delivered: This is an example of a flexible learning space we are delivering to students across NSW A new building with 14 permanent, flexible learning spaces and a library Refurbishment of the existing library into two new flexible learning spaces New outdoor play space A new Covered Outdoor Learning Area (COLA)

Transcript of Welcome to Lidcombe Public School information session...future demountable cola cola cola...

Page 1: Welcome to Lidcombe Public School information session...future demountable cola cola cola demountable location of future demountables subject to separate da n future demountable future

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Lidcombe Public School upgrade

Welcome to Lidcombe Public School information sessionWe’re excited your new school facilities are ready for you to use. We have delivered:

This is an example of a flexible learning space we are delivering to students across NSW

A new building with 14 permanent,flexible learning spaces and a library

Refurbishment of the existing library into two new flexible learning spaces

New outdoor play space

A new Covered Outdoor Learning Area (COLA)

Page 2: Welcome to Lidcombe Public School information session...future demountable cola cola cola demountable location of future demountables subject to separate da n future demountable future

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Lidcombe Public School upgrade

Investing in our schoolsThe NSW Government is investing $6.7 billion over four years to deliver more than 190 new and upgraded schools to support communities across NSW. In addition, a record $1.3 billion is being spent on school maintenance over five years, along with a record $500 million for the sustainable Cooler Classrooms program to provide air conditioning to schools. This is the largest investment in public education infrastructure in the history of NSW.

The NSW Department of Education is committed to delivering new and upgraded schools for communities across NSW. The delivery of these important projects is essential to the future learning needs of our students and supports growth in the local economy.

Staged deliveryThis project will be delivered in three stages.

Stage One which included the new administration building with staff facilities was delivered in May 2019.

Stage Two which includes the new building, Building M, with 14 flexible learning spaces, a new library, new playground space and a new COLA is ready for occupation when school resumes Term 2, 2020.

Stage Three includes the refurbishment of the existing library into two flexible learning spaces, removal of demountable classrooms and landscaping works. The refurbishment of the library is due to commence during the Term 1 school holidays and is expected to be completed in mid 2020.

The project is expected to be completed in mid 2020.

Artist impression of the administration building delivered to Lidcombe Public School

Page 3: Welcome to Lidcombe Public School information session...future demountable cola cola cola demountable location of future demountables subject to separate da n future demountable future

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Lidcombe Public School upgrade

Site map of the Lidcombe Public School upgrade

4.8m

4.4m

EXWT

EXWT

D O O D S O N A V E N U E

M I L L S S T R E E T

MI

LL

S

ST

RE

ET

. .

.

66.

°

SITE BOUNDARY

ST JOACHIM CHURCH

GI

LL

IV

ER

S

PL

R E S I D E N T I A L

R E S I D E N T I A L

RE

SI

DE

NT

IA

L

EXWT

CONCRETE PATH

.

EXWT

BLOCK D

EXISTING CAR PARKINGAPPROX. 20 CAR SPACES SPORTS FIELD

SOFTFALL

BLOCK H BLOCK I

BLOCK A

.

BLOCK B

BLOCK C

PLAYGROUND/SPORTFIELD

PLAYGROUND/SPORTFIELD

CONCRETE

BITUMEN

GARDEN

CONCRETE

DEMOUNTABLE

° ' "

'

COLA

DEMOUNTABLECOLA

DEMOUNTABLE

EXDEMOUNTABLE

RELOCATED

FUTUREDEMOUNTABLE

COLA

COLA COLA

DEMOUNTABLE

LOCATION OF FUTUREDEMOUNTABLES SUBJECTTO SEPARATE DAAPPLICATION

FUTUREDEMOUNTABLE

FUTUREDEMOUNTABLEDEMOUNTABLEDEMOUNTABLE

ZONE A

ZONE B

ADMINDEMOUNTABLE

ADMINISTRATION BUILDING BLOCK G

K E A T I N G S T R E E T

STUDENT ENTRY

STUDENT ENTRY VEHICLE ENTRY

M I L L S S T R E E T

BLOCK K (HALL)

NEW BLOCK M TWO STOREY

DELIVERY

STUDENT ENTRY STUDENT ENTRY VEHICLE ENTRY MAIN ENTRY

STUDENT ENTRY VEHICLE STAFF ENTRY VEHICLE STAFF ENTRY

JO

HN

S

TR

EE

T

EXISTING BUS

STOP

B

EXISTING BUS STOPB

EXISTING DROP OFF AREA

Page 4: Welcome to Lidcombe Public School information session...future demountable cola cola cola demountable location of future demountables subject to separate da n future demountable future

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Lidcombe Public School upgrade

Term 2 classroom allocation

Rev Date By Issue Name CK

01

02

03

04

05

06

07

08

09

10

26/07/2018

21/08/2018

14/09/2018

28/09/2018

5/10/2018

22/11/2018

20/12/2018

20/12/2018

29/05/2019

12/12/2019

GL

GL

GL

GL

GL

SH

FT

FT

FT

FT

Issued for Information

50% Detailed Design Issue - Zone B

Revised 50% Detailed Design - Zone B

80% Detailed Design - Zone B

95% Detailed Design - Zone B

Issued for Information

100% Detailed Design Issue

Issue for Construction - Zone B

Issued for Construction

Issued for Construction

CW

CW

CW

CW

CW

FT

CW

CW

CW

CW

Drawing Title

Scale :Drawn :

Status:

Drawing No.Project No.

Project Name

Architect

Client

Date :Checked :

12/12/2019

QUALITYCERTIFIED ISO

9001

INITIALLING THE 'DRAWN' AND THE 'CHECK' BOXESCONFIRMS THAT THIS DRAWING HAS BEENPREPARED IN CONFORMITY WITH JDHARCHITECTS Q.M.S. PROCEDURES.

Rev.

1:100 @A1FT CW

CONSTRUCTION

Mechanical, Electrical,Hydraulic, Structural & CivilEngineering Consultant

Building Certifier

Project Manager

Landscape

Planning

Contractor

ZONE B - GROUND FLOORFURNITURE AND FINISHES PLAN

A-431996

MILLS STREETLIDCOMBE

LIDCOMBE PUBLIC SCHOOL

JDH ARCHITECTS PTY. [email protected] 27 110 978 802ACN 110 978 802NOMINATED ARCHITECT:JAYNE HARRISON (7403)

© COPYRIGHT JDH ARCHITECTS PTY. LTD.THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONSAND VERIFY ALL ERRORS AND OMISSIONS TO THE ARCHITECT.USE FIGURATIVE DIMENSIONS, DO NOT SCALE THE DRAWINGS.DRAWINGS SHALL NOT BE USED FOR CONSTRUCTIONPURPOSES UNTIL ISSUED BY THE ARCHITECT FORCONSTRUCTION.

44 Little Oxford StreetDarlinghurst, NSW 2010Telephone: 02 9281 8697www.jdharchitects.com.au

10

FLOOR FINISHES LEGEND

FCT - CERAMIC FLOOR TILE

FVS - VINYL SHEET

FVS-A - ANTI STATIC VINYLSHEET

FCU - CARPET TILE TIEREDSEATING

FCU - CARPET TILE

FCF - FINISH CONCRETEFLOOR

FLOOR FINISHESFCF FINISH CONCRETE FLOORFCT CERAMIC FLOOR TILESFCU CARPET TILES WITH UNDERLAYFVS VINYL SHEETINGTR THRESHOLD RAMP

ABBREVIATIONS

ENTRYMATMT2

CH27

CH27 CH27

TB35

CH3CH3

TB35

TB35

AV3

FCP2 FCP2

FCP2

FCP2

FCP2

FCP2

FCP1

AV3 AV3

AV3

AV3

AV3

AV3

AV2

. -

SUNSHADE OVERSUNSHADE OVER

FALL

1:50

FALL1:50

FALL

1:50

FALL1:50

FALL

1:50

FALL1:50

FALL1:50

FALL1:50

FALL

1:50

FALL

1:50

FALL1:50LIBRARY OFFICE

.

TT1

F. H. R.

ENTRY MATMT2

ENTRY MATMT1

ENTRYMATMT2

TB14

TB14TB14

TB14

TB14

TB14

TB14

TB14TB14

TB14

TB14

TB14

TB14 TB14

TB14 TB14

TB14

TB14

TB14TB14

TB14TB14

TB14

TB14

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1 CH1

CH1 CH1

CH1

CH1CH1

CH1

CH1CH1

CH1

CH1

CH1

CH1

CH1 CH1

CH1

CH1

CH1

CH1

CH1 CH1

CH1

CH1

CH1

CH1

CH1CH1

CH1

CH1

CH1

CH1

CH1 CH1

CH1

CH1

CH1

CH1

CH1

CH1 CH1CH1

CH1

CH1

CH1

CH1

CH1CH1

CH1

CH1

CH1

CH1

CH1

CH1 CH1

CH1 CH1CH1

CH1

CH1 CH1

CH1 CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1 CH1

CH1 CH1

CH1

CH1

CH1

CH3 CH3

CH3

CH3

CH3

CH3

CH3

CH3 CH3

CH3 CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3 CH3

CH3

CH3CH3

CH3 CH3

CH3 CH3

CH3

CH3 CH3 CH3

CH3

CH3

CH3

CH3CH3

CH3CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH20CH20

CH20

CH20CH20

CH20

CH20

CH20CH20 CH20

CH20

CH20

CH20

CH20

CH20

CH20

CH20CH20

TB5TB5 TB5

TB5TB5TB5

TB5 TB5 TB5

TB5TB5TB5

TB5 TB5 TB5

TB5TB5TB5TB5 TB5

TB5

TB5TB5TB5

TB5 TB5 TB5

TB5TB5TB5

TB5

TB5 TB5

TB5

TB5TB5

CH6

CH6

CH6

CH6

CH6

CH6

CH6

CH6

CH6

CH4

CH5

CH4

CH4

CH5

CH4

CH5

CH4

CH5

CH4

CH4

CH4

CH4

CH5

CH19

CH19

CH19

CH19

TB10

TB10

TB10

CH9

TB2

TB2 TB2

TB2

TB2 TB2

TB2

TB2

TB2TB2

TB2

TB2

TB2 TB2

TB2TB2

TB2

TB2

TB2 TB2

TB2TB2

TB2TB2

TB2 TB2

TB2TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2

TB2TB2

TB2

TB2

TB2

TB2

TB2TB2

TB2

TB2

TB2

TB2

TB2TB2

TB2

TB11

TB11

TB11

TB11

TB11

TB11

TB11

TB11

TB11

TB11

TB11TB11

TB11

TB11

TB11

CH9

CH4CH9

CH10

CH10

CH10

CH9

CH9

CH9

CH5

CH8

TCS

TCS

TCS

TCS

SH3

SH3

SH3

SH3

SH3

SH3SH3

SH3

SH3

SH3

SH3

SH3

AV2

SH3

SH3

TB35TB35

TT1

TT1

TT1

TT1

TT1

TT1

TB14TB14

TB14

TB14

TB14

TB14

TB14TB14TB14

TB14

TB14

CH1

CH1

CH1CH1

CH1

CH1

CH1CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1 CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1 CH1

CH1

CH1CH1

CH1

CH1

CH1CH1

CH1

CH1

CH1

CH1 CH1

CH3

CH3

CH3

CH3

CH3CH3

CH3CH3

CH3CH3

CH3CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3 CH3

CH3

CH3

CH3

CH20

CH20

CH20CH20

CH20

CH20

CH20

CH20

CH20CH20

CH20

CH20

TB5 TB5TB5

TB5TB5TB5

TB5TB5 TB5

TB5 TB5 TB5 TB5

TB5TB5TB5

TB5

TB5 TB5 TB5

TB5TB5TB5

TB5

TB5 TB5

TB5

TB5

TB5 TB5 TB5

TB5TB5TB5

TB5

TB5

CH6

CH6

CH6 CH6

CH4

CH5

CH4

CH4

CH4CH5

CH4

CH5

CH19

CH19

TB10

CH24CH10

CH10

CH10

TB34 TB34

CH9

TB11

TB11

TB11CH9

CH8

TB34

CH3 CH3

TB14TB34

LRB1

LRB2

TB14TB14

TB14

TB14CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH3

CH3CH3

CH3

CH3 CH3

CH3 CH3CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

SH1

SH1

SH1 SH1

SH1

SH1

CH31

TB23

TB12

CH5

CH5

CH10

CH10

CH10

CH10

CH5

TB31

CH34

CH34

CH5

CH10

CH10

CH8

CH33

CH33

TB32

SH2SH2

SH2

SH3SH3SH3

SH3SH3SH3

SH3SH3SH3

SH3SH3SH3

SH3SH3SH3

AV2

SH3SH3 SH3SH3SH3

CH35

CH35

TB12

CH10

CH31

CH8

CH35

.-

.

.

CH19

CH15

CH15

CH15

CH15

CH15

CH15

CH15

CH15

CH15CH15CH15

CH15

CH15

CH15

CH15CH15

CH15CH15

CH15

CH15

CH15

CH15 CH15

CH15CH5

CH5

CH5

CH6

CH6 CH9

EXISTING BITUMEN FINISHTO BE MADE GOOD

NEW LANDSCAPEBATTER

SOFT LANDSCAPE

1:40 FALL

NEW SOFT LANDSCAPE(approx 500mm overthe existing levels)

EXISTING ASTROTURFTO BE MADE GOOD

1:20 SOFTFALLPATHWAY

NEW SOFT LANDSCAPE

ENTRY

SJP

SW

ROOF OVER DASHED

DP

DP

DPDP

RWT

DP

SLID

E

FCC

FCC

FCCBUBBLERS

JU.01a

SW

SW

BUBBLERS

SOFTFALLCLIMBING WALL

STAIR

TIERED SEATINGFCC

BAL0

2

JU.0

2a

JU.0

2a

JU.0

3

SH

SH

SH

SH

SH

SH

JU.06

JU.0

5

BAL

JU.12a

BAL02

HR01

HR01

JU.04b

JU.06

OUTDOORLEARNING

FCC

STAIRS

SJP

NEW CONCRETEWALKWAY

FCE

SENSORY GARDENCHECK LANDSCAPE PLAN FOR DETAILS

UJ.

20e JU

.02b

JU.0

1b

WW

B

WW

B

WWB

JU.0

1b

HAN

DR

AIL

HAN

DR

AIL

+BA

L

JU.04aTR

TR

1:40 SOFTFALLLANDING

SOFTFALLCLIMBING WALL

1:20 SOFTFALLPATHWAY

TIERED SEATINGFCC

JU.0

2c

WW

B

WWB

WW

B

WW

B

WWB

DP

BALUSTRADE

JU.04c JU.04c

JU.0

2d

JU.0

2a

JU.02b

JU.0

2c

JU.0

2a

JU.0

4c

WW

B

WW

B

WW

B

WWB

WW

B

WW

B WWB

SLID

E

JU.04a

FALL

1:50

SW

HR

01

HR

01

BAL02 BAL02

BAL0

2a

BUBBLERS

BUBBLER

S

JU.14

OUTLINE OFPROPOSED OSD TANKBELOW GROUND.FOR DETAIL ANDLEVELS REFER TOCIVIL ENGINEERDRAWINGS

TIERED SEATINGFCP1

DP

A/C

A/C A/C

A/C A/C

A/C A/C

SW

WWB

JU.12b

W/D 3 21.0 m2

FCP2/SK1

HB 4 66.9 m2

FCP1/SK1

MOVEMENT 1

LIBRARY

BALCONY 1.

HB 2 66.0 m2

FCP1/SK1

PAA 3 42.8 m2

FVS4/SK1

W/D 4 13.5 m2

FCP2/SK1

PAA 2 20.5 m2

FVS4/SK1

HB 1 66.7 m2

FCP1/SK1

HB 7 64.1 m2

FCP1/SK1

HB 5 66.0 m2

FCP1/SK1

HB 6 66.0 m2

FCP1/SK1

HB 3 66.0 m2

FCP1/SK1

PAA 1 45.7 m2

FVS4/SK1

MOVEMENT 2 120.8 m2FCP1/SK1

W/D 2 12.4 m2

FCP2/SK1

KLA RESOURCE 2.

LIFT 5.3 m2

ACC WC 1 6.5 m2

FCT2/SK2

M AMB WC 1 3.1 m2

FCT2/SK2

STORE 1 9.1 m2

FVS4/SK1

KLA RESOURCE 1

F AMB WC 1 3.1 m2

FCT2/SK2

MALE WC 1

FEMALE WC 1.

PUMP. 2

COLA 343.2 m2

ASTRO TURF

EDB 1.

STORE 2.

W/D 1 13.0 m2

FCP2/SK1

CLEANERS 1 3.4 m2

FCT2/SK2

COMMS 1.

STAIR 4 15.6 m2

FCC

3-6RMiss Libro

3MMiss Lee

3AMiss Mo

3BMrs

Ranasinghe

3TMiss Granata

K-6SMrs James

K-6EMrs Evyaz

Ground floor classroom allocation

Moving into Building M. Some classes will transition into the new learning spaces in Building M from Term 2, 2020. Conditions permitting, this move will be completed during the Term 1 school holidays to ensure students are ready to start learning in their new classrooms when they return to school.

Building M – Ground floor classroom allocation Please refer to the floor plans for the full list of classes being moved into Building M.

Page 5: Welcome to Lidcombe Public School information session...future demountable cola cola cola demountable location of future demountables subject to separate da n future demountable future

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Lidcombe Public School upgrade

Rev Date By Issue Name CK

01

02

03

04

05

06

07

08

09

10

11

26/07/2018

21/08/2018

14/09/2018

28/09/2018

5/10/2018

22/11/2018

20/12/2018

20/12/2018

29/05/2019

12/12/2019

29/01/2020

GL

GL

GL

GL

GL

SH

FT

FT

FT

FT

FT

Issued for Information

50% Detailed Design Issue - Zone B

Revised 50% Detailed Design - Zone B

80% Detailed Design - Zone B

95% Detailed Design - Zone B

Issued for Information

100% Detailed Design Issue

Issue for Construction - Zone B

Issued for Construction

Issued for Construction

Issued for Construction

CW

CW

CW

CW

CW

FT

CW

CW

CW

CW

JJ

Drawing Title

Scale :Drawn :

Status:

Drawing No.Project No.

Project Name

Architect

Client

Date :Checked :

29/01/2020

QUALITYCERTIFIED ISO

9001

INITIALLING THE 'DRAWN' AND THE 'CHECK' BOXESCONFIRMS THAT THIS DRAWING HAS BEENPREPARED IN CONFORMITY WITH JDHARCHITECTS Q.M.S. PROCEDURES.

Rev.

1:100 @A1FT CW

CONSTRUCTION

Mechanical, Electrical,Hydraulic, Structural & CivilEngineering Consultant

Building Certifier

Project Manager

Landscape

Planning

Contractor

ZONE B - FIRST FLOORFURNITURE AND FINISHES PLAN

A-432996

MILLS STREETLIDCOMBE

LIDCOMBE PUBLIC SCHOOL

JDH ARCHITECTS PTY. [email protected] 27 110 978 802ACN 110 978 802NOMINATED ARCHITECT:JAYNE HARRISON (7403)

© COPYRIGHT JDH ARCHITECTS PTY. LTD.THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONSAND VERIFY ALL ERRORS AND OMISSIONS TO THE ARCHITECT.USE FIGURATIVE DIMENSIONS, DO NOT SCALE THE DRAWINGS.DRAWINGS SHALL NOT BE USED FOR CONSTRUCTIONPURPOSES UNTIL ISSUED BY THE ARCHITECT FORCONSTRUCTION.

44 Little Oxford StreetDarlinghurst, NSW 2010Telephone: 02 9281 8697www.jdharchitects.com.au

11

FLOOR FINISHES LEGEND

FCT - CERAMIC FLOOR TILE

FVS - VINYL SHEET

FVS-A - ANTI STATIC VINYLSHEET

FCU - CARPET TILE TIEREDSEATING

FCU - CARPET TILE

FCF - FINISH CONCRETEFLOOR

FLOOR FINISHESFCF FINISH CONCRETE FLOORFCT CERAMIC FLOOR TILESFCU CARPET TILES WITH UNDERLAYFVS VINYL SHEETINGTR THRESHOLD RAMP

ABBREVIATIONS

M1.22W.07

M1.04W.14

M1.30W.06

M1.01D.08b

M1.35D.06a

M1.30D.09

M1.26W.08

M1.37D.10

M1.34D.06a

M1.38D.24

CARPET 2

TB35

TB35

TB35

TB35

TB35

FCP2 FCP2

FCP2

FCP2

FCP2

FCP2

FCP2

AV3

AV3

AV3

AV3 AV3 AV3

AV3

VOID

LOUVRED SUNSHADELOUVRED SUNSHADEBALCONY 3FCF

25.8 m2M1.33

BALCONY 2FCF

37.9 m2M1.32

W/D 5FCP2/SK1 13.8 m2M1.10

M1.09D.19

M1.24D.02

M1.09W.11

M1.08W.10

M1.20D.01

M1.23D.02

M1.17D.20 M1.19

D.03

M1.14D.02

M1.25D.14

M1.19W.19

M1.20W.12

M1.29D.14M1.28

D.03M1.07D.17

M1.08D.06a

M1.06D.17

M1.16D.02

M1.33

W.15

M1.32

W.16

M1.31

W.17

M1.04D.14

M1.29W.12

M1.34W.12

M1.11W.03

M1.12W.03

M1.27W.12

M1.35W.12

M1.21W.10

M1.12D.08a

M1.32D.06a

M1.33D.06a

M1.23W.12M1.18W.12

M1.25W.03

M1.24W.03

M1.21D.08a

M1.13D.14

M1.15W.03

M1.

10W

.02

M1.11D.08a

M1.22D.08a

M1.03D.11

M1.14W.11

M1.13W.10

M1.02D.20a

M1.15D.06a

M1.28W.07

M1.18D.07

M1.27D.05

M1.26D.03

M1.16W.19

M1.17W.12

M1.31D.09M1.10

D.02

TB14

TB14TB14

TB14

TB14

TB14

TB14

TB14TB14

TB14TB14

TB14

TB14

TB14

TB14

TB14

TB14 TB14

TB14 TB14

TB14

TB14

TB14

TB14

TB14TB14

TB14TB14

TB14TB14

TB14 TB14

TB14

TB14

TB14

CH2CH2

CH2

CH2CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2 CH2

CH2 CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2

CH2CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2

CH2

CH2

CH2

CH2

CH2 CH2CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2 CH2CH2

CH2

CH2 CH2

CH2 CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2 CH2CH2

CH2

CH3 CH3

CH3

CH3

CH3

CH3

CH3

CH3 CH3

CH3 CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3 CH3

CH3

CH3CH3

CH3CH3

CH3CH3

CH3 CH3

CH3 CH3

CH3

CH3 CH3 CH3

CH3

CH3

CH3

CH3CH3

CH3CH3

CH3CH3

CH3CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3 CH3

CH3

CH3

CH3

CH3

TB6 TB6TB6

TB6TB6TB6

TB6TB6 TB6

TB6 TB6 TB6 TB6

TB6TB6TB6

TB6TB6 TB6

TB6TB6TB6

TB6 TB6 TB6

TB6TB6TB6

TB6 TB6 TB6

TB6TB6TB6TB6 TB6

TB6

TB6TB6TB6

TB6 TB6 TB6

TB6TB6TB6TB6

TB6 TB6 TB6

TB6TB6TB6

TB6

TB6 TB6

TB6

TB6

TB6

TB6 TB6

TB6

TB6TB6

TB6 TB6 TB6

TB6TB6TB6

TB6

TB6

CH6

CH6

CH6

CH6

CH6

CH6

CH6

CH6

CH6

CH6

CH6 CH6CH6

CH4 CH4 CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH4

CH19CH19

CH19

CH19

CH19

CH19

CH19

TB10

TB10

TB10

CH8CH8

CH4

CH9

TB12

TB12

TB12

TB12

TB12

TB12

TB12

TB12

TB12

TB12

TB12

TB12

TB12TB12

TB12

TB12

TB12CH10 CH10CH10

CH9

CH4

CH9

TB3

TB3 TB3

TB3

TB3 TB3

TB3

TB3

TB3TB3

TB3TB3

TB3

TB3 TB3

TB3TB3

TB3

TB3

TB3 TB3

TB3TB3

TB3TB3

TB3 TB3

TB3TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3TB3

TB3

TB3

TB3

TB3

TB3TB3

TB3

TB3

TB3

TB3

TB3TB3

TB3

CH24

TB34 TB34

CH4

CH2CH2CH2

CH9

CH9

CH9

CH9CH10

CH10 CH10

TB31

TB33

TB32

TB32

TB33CH2

CH2CH2

CH2

CH2 CH2

CH2

CH2

CH2

CH2

TB14

TB14

TB14

TB14CH6TB12

CH6

CH6

TB12

CH4 CH4

CH4

CH4

CH3CH3

CH3 CH3

CH3 CH3

CH3CH3

TB14

TB14

TB14

TB14

TB14

TB14

TB14TB14

TB14

TB14

TB14

TB14

TB14TB14

TB14TB14

TB14

TB14

TB14

TB14

TB14

TB14

TB14 TB14

TB14 TB14

TB14

TB14

TB14

TB14

TB14TB14

TB14TB14

TB14TB14

TB14

TB14

TB14

CH2CH2

CH2

CH2CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2 CH2

CH2 CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2

CH2CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2 CH2CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2 CH2CH2

CH2

CH2 CH2

CH2 CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2 CH2

CH2

CH2

CH2

CH2

TB3

TB3 TB3

TB3

TB3 TB3

TB3

TB3

TB3TB3

TB3TB3

TB3

TB3 TB3

TB3TB3

TB3

TB3

TB3 TB3

TB3TB3

TB3TB3

TB3 TB3

TB3TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3TB3

TB3

TB3

TB3

TB3

TB3TB3

TB3

TB3

TB3

TB3

TB3TB3

TB10

TB10

TB10

CH8

CH20

CH20

CH20CH20

CH20

CH20

CH20

CH20

CH20

CH20CH20

CH20

CH20

CH20

CH20CH20

CH20

CH20

CH20

CH20

CH20CH20

CH20

CH20

TCS

TCS

SH3

SH3

SH3 SH3

SH3 TCS

TCS

SH3

SH3

SH3

SH3

SH3

SH3

SH3 SH3

SH3

SH3

AV2

CH9

CH3TB34

CH3 CH3

TB14CH3TB34

SH3

TT1

TT1

TT1

TT1

TT1

TT1

TT1

LOW WALL

.-

CH15

CH15

CH15

CH15

CH15

CH15

CH15

CH15

CH15CH15

CH15

CH15

CH15

CH15

CH15 CH15

CH15CH15

CH15

CH15

CH15CH15CH15CH4

CH4

CH4

CH6CH9

CH9

ROOF OVER DASHED

ROOF OVER DASHED

AWN

ING

DP

DP

DP

LOUVRES ABOVE

JU.09BALUSTRADE

BAL BALUSTRADE

BAL

BAL

BAL

BAL

BAL

DP

DP

JU.06

JU.04a

JU.04a

JU.04a

WW

B

JU.0

3

WW

B

JU.0

1b

JU.0

1b

JU.0

2c

WW

B

WWB

JU.01a

JU.0

2b

WWBWWB

JU.04c JU.04c

JU.0

2a

JU.0

2d

JU.02b

JU.0

2c

JU.0

2a

JU.0

2a

JU.0

4c

UJ.

20a

WWB

WW

B

WW

B

WWB

JU.12a

RWO

WWB

WWB

WW

B

WW

B

WWBWWB

WW

B

WW

B

WWB

WW

B

WW

B

HB 11FCP1/SK1 67.2 m2

M1.17

HB 8FCP1/SK1 66.8 m2

M1.06

MOVEMENT 3FCP1/SK1 77.9 m2

M1.03

PAA 6FVS4/SK1 43.0 m2M1.18

W/D 8FCP2/SK1 13.8 m2

M1.23

PAA 5FVS4/SK1 20.9 m2

M1.07

W/D 7FCP2/SK1 20.5 m2

M1.20

HB 9FCP1/SK1 67.5 m2M1.08

HB 10FCP1/SK1 67.7 m2

M1.09

SPECIAL PROGRAMSFVS4/SK1 29.8 m2

M1.02

HB 14FCP1/SK1 66.0 m2

M1.24

HB 13FCP1/SK1 66.0 m2

M1.22

PAA 4FVS4/SK1 40.4 m2

M1.04

MOVEMENT 4FCP1/SK1 124.1 m2

M1.21

HB 12FCP1/SK1 66.7 m2M1.19

STORE 4FVS4/SK1 15.1 m2

M1.11

FEMALE WC 2FCT2/SK2 13.0 m2

M1.12

MALE WC 2FCT2/SK2 12.7 m2M1.13

CLEANERS 2FVS1/SK1

3.0 m2M1.14

COMMS 2FVS-A/SK3

13.1 m2M1.25

M AMB WC 2FCT2/SK2

3.1 m2M1.27

F AMB WC 2FCT2/SK2

3.1 m2M1.28

LIFT

5.3 m2M1.31

STAIR 2FCP1/SK1 21.3 m2M1.15

BALCONY 4FCF

28.8 m2M1.34

W/D 6FCP2/SK1 14.1 m2M1.16

STORE 3FVS4/SK1

8.7 m2M1.05

SERVICESFVS4/SK1

1.6 m2M1.35

FCP2

LIBRARY OFFICEFLOOR TYPE

9.3 m2

TT1

TT1

TB14TB14

TB14 TB14

TB14 TB14

TB14 TB14

CH2

CH2

CH2

CH2

CH2 CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2 CH2

CH2

CH2

CH2 CH2

CH2 CH2

CH2

CH2

CH2 CH2

CH2

TB3

TB3TB3

TB3

TB3

TB3

TB3TB3

TB3

TB3TB3

TB3

TB3

TB3

TB3

TB3TB3

TB3TB3

TB3

TB3

TB3

TB3TB3

TB3TB3

TB3TB3

TB3

TB3

TB3

TB3TB3

TB3

TB3

TB3

TB10

TB10

TB12

CH4CH6CH6

CH5CH6 CH6

CH4

CH5

CH19

CH4

CH9

CH4

TB12CH9

CH19

CH3

CH3

CH3

CH3 CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3

CH3CH3

CH3

AV2

AV2

TB12

JU.01aJU.12a

HB15FCP 1/ SK1

67.3 m2HB16

FCP 1/ SK167.0 m2

WITHDRAWAL 9FCP 1/ SK1

12.7 m2

WITHDRAWAL 10FCP 1/ SK1

12.6 m2

PAA 7FVS 4/ SK1

44.9 m2

1 EXISTING LIBRARY BLOCK D1:100

NOTES:

- CONTRACTOR SCOPE OF WORKS INCLUDES SUPPLY OFFURNITURE AND AV EQUIPMENT- NO MODIFICATION TO BUILDING FABRIC TO BEUNDERTAKEN AS PART OF CONSTRUCTION CONTRACT

JJ

6FMr Minett

4CMrs Chau

4BMiss Fisher

4KMiss Yin

4LMrs OrtadoMrs Pisano

6HMrs

Matthews

6QMiss Chan

Level One classroom allocation

Term 2 classroom allocation

Building M – Level One classroom allocation

Page 6: Welcome to Lidcombe Public School information session...future demountable cola cola cola demountable location of future demountables subject to separate da n future demountable future

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Lidcombe Public School upgrade

What are innovative learning spaces?Our children’s education is vital – they are the next leaders, the future workforce and the foundation of communities for generations to come.

Innovative or flexible learning prepares students across all curriculum areas and learning stages with skills and capabilities to thrive in a rapidly changing and interconnected world. It connects students, engages their sense of curiosity, and allows flexible, technology-rich spaces for one-to-one, small group and whole class activities. Innovative learning fosters collaborative learning between students and teachers.

Space■ There are zones for different

activities, with variedfurniture and resources –such as booths, standingtables, studios and beanbags.

■ Spaces can be connected byglass or sliding doors withfurniture in corridors andon balconies to extend thelearning space.

■ No front of classroom.■ Spaces are designed to be

shared by multiple classes.

Students■ Students have the ability to

move around the learningspace to encouragecollaborative learning.

■ Students working acrossa range of projectssimultaneously.

■ Students engaged in handson learning, building andtesting.

Teachers■ Movement around the

learning space rather thanthe teacher being at thefront of the room.

■ Teachers plan learningtogether, for example instage or faculty teams.

■ Teachers teaching togetherto better meet the needs ofstudents.

Learning■ Personalised learning, so

each student is learning attheir own level and pace.

■ Students learning in largegroups, small groups orindividually.

■ Students are workingtowards the same projectin different subjectareas, encouraging crossdisciplinary learning.

Technology■ Technology integrated into

the space to extend learning.■ Accessibility of technology

to suit different activities atpoint of need, for examplefilming and recordingequipment.

■ WiFi accessible across alllearning areas.