Welcome to Boulder City Nevada

18
Welcome to Boulder City Nevada EDSGN 100 Hydrogen Fuel City Group 5 Stephen Ulisny, Neil Arias, Curtis Covelli, Sebastian Reigber

description

Welcome to Boulder City Nevada. EDSGN 100 Hydrogen Fuel City Group 5 Stephen Ulisny, Neil Arias, Curtis Covelli , Sebastian Reigber. What we’ll be talking about…. Design Task Background Specs Production Transportation Source of Power Storage Best Solution Flow Chart Prototype - PowerPoint PPT Presentation

Transcript of Welcome to Boulder City Nevada

Page 1: Welcome to Boulder City Nevada

Welcome toBoulder City Nevada

EDSGN 100Hydrogen Fuel City

Group 5Stephen Ulisny, Neil Arias, Curtis Covelli, Sebastian Reigber

Page 2: Welcome to Boulder City Nevada

Design Task Background Specs Production Transportation Source of Power Storage Best Solution Flow Chart

Prototype Cost Analysis Conclusion Questions

What we’ll be talking about…

Page 3: Welcome to Boulder City Nevada

Standardized fueling station for a H2 city

Supply the transportation network with H2 fuel using renewable resources

Our Mission

Page 4: Welcome to Boulder City Nevada

Boulder City, Nevada–25 miles SE of Las Vegas

Located about 6 miles from the Hoover Dam and 5 miles from the Boulder City Landfill

Population: 16,840

Requires about9,000kg of H2 a dayto meet transportneeds

Where we’ll be stationed…

Page 5: Welcome to Boulder City Nevada

Safe Sustainable 350 BAR and 700 BAR for passenger and

commercial vehicles. HCNG containing up to 30% hydrogen at

250 BAR 2 stations to meet the city needs with 6

pumps at each station

In a perfect world…

Page 6: Welcome to Boulder City Nevada

Electrolysis◦ Water

Large energy cost◦ Urine

Urine breaks down◦ Microbial

Not developed

Molten Carbonate Fuel Cell Breaks Down

Steam Biomethane Costly

How will we produce it?

Page 7: Welcome to Boulder City Nevada

Trucks Constant Refill

Pipes Costly

Produced on Site Need of space

Produced at House Not realistic

How to get it to the station

Page 8: Welcome to Boulder City Nevada

Liquid Expensive

Gas Storage

Produced Right Before Use Cant keep up with demand

Storage/Distribution

Page 9: Welcome to Boulder City Nevada

Solar Lack of Space

Wind Lack of Space

Coal Not Renewable

Nuclear Expensive

Hydroelectric Not Enough Power

Methane Waste Abundance of CH4

Source of Power

Page 10: Welcome to Boulder City Nevada

Production◦ Steam Methane Reforming

Transportation◦ Trucks-H2◦ Piping-CH4

Storage◦ Liquid

Source of Power◦ Methane

Our best options…

Page 11: Welcome to Boulder City Nevada

Flow Chart to station

STEAM METHANEREFORME

R

CO2CH4

STEAMH2

Lake Mead

WATER

BoulderCity

Landfill

CH4 PUMPINGSTATION

H2 Liquefier

LIQUID H2 TRUCKINGBOILE

R

FUEL

Page 12: Welcome to Boulder City Nevada

350 BARCOMPRESS

OR 350 BAR H2 STORAGE

700BAR COMPRESSO

R

PUMP

CNG COMPRESSO

RBC

Landfill CNG STORAGE

CH4

LIQUID H2

STORAGE

TRUCKED H2 VAPORISER

HCNG BLENDE

R

H2 GAS COOLING BLOCK

CHILLER

Page 13: Welcome to Boulder City Nevada

What we envision

Page 14: Welcome to Boulder City Nevada

Steam Methane Reformer -> $20,000,000

+ Pipelines ->

$10,000,000 + Cost of Stations ->

$17,324,000

Total Cost of System -> $57,324,000

The initial Cost…

Page 15: Welcome to Boulder City Nevada

Sell 350 and 700 bar at 4$ a kg ->$30,400 per day Sell HCNG at 5$ a kg -> $37,500 per day Cost to pump -> $40,000 per day 50 employees to run system -> $7,000 per day Nitrogen -> $5,000 per day Methane -> $2,000 per day

Total Profit -> $13,900 per day Yearly Profit -> $5,073,500 a year

Profit Per Day

Page 16: Welcome to Boulder City Nevada

The system will be paid off in a little over 11 years

This system is replica table around most cities that have landfills in the vicinity

We could sell hydrogen for other city needs

Paving the way for the future

Page 17: Welcome to Boulder City Nevada

Questions?