STEP ONEPOSITION CONTAINERSPrepare ground, slab and/or footings to the ballast requirements outlined in your manual. Position containers to the required distance apart then check that containers are at equal height, level and exact distance as outlined in Manual.
Hint: Wait until first arch is installed before locking down containers.
[email protected] TWOCANOPY BASE RAILConstruct and Attach Canopy Base RailAssemble base rail sections, preferably on top of container, starting with the correct corner twist lock base plates, ensuring that rail is flush with edge of the container.
[email protected] THREEASSEMBLE ARCHES
[email protected] arches on ground then raise into position using crane, lifts and/or telehandler.Install purlins and end bracing as you go.
STEP FOURINSTALL ANY END WALL FRAMESInstall End Wall Fabric and Doors Before Raising Canopy
STEP FIVEPULL THE CANOPYUse Lifts and/or crane where possible
ENJOYPLEASE ENJOY YOUR SHELTERWeve put a lot of thought and design into providing you withan easy to assemble, strong, elegant and cost effective portable shelter.
Refer to your manual always for exact assembly details.