PROJECT PURPOSE
• Analyze structure of the bridge and prepare short term remediations
• Analyze the long-term multi-modal capacity improvements that include the future operating requirements of high-speed and intercity passenger rail, commuter rail, transit, bike and pedestrian, and freight services over the Potomac River
• Analyze multi-modal connectivity and operational improvements
■
■
■
Data Collection
Public Involvement
Agency and Bridge User Involvement
Transportation Analysis & Evaluation
Alternatives Development
Environmental Screening
Recommendations
PROJECT SCOPE
■
■
■
■
■
■
■
PROJECT NEEDS
Needs Your Preference
Multi-modal Access
Inter-Modal Connectivity
Long-term Capacity
Transportation Demand
Support Existing & Future Land Use
Operational Improvements
System Linkages
Improve Structural Conditions
Other
SCHEDULE
Milestone Date
Data Collection, Analysis and Evaluation Fall 2012 / Winter 2013
Bridge Alternatives and Conceptual Engineering
Environmental Review Spring 2013 / Summer 2013
Final Report Summer 2013
Winter 2013 / Spring 2013
PUBLIC INVOLVEMENT
Anticipated Meeting Dates
Public Meeting #1 November 13, 2012
Public Meeting #2 Winter 2013 / Spring 2013
Public Meeting #3 Summer 2013
Please give us your comments:
■ At a public meeting
■Website: www.longbridgeproject.com
■Email: [email protected]